Toisa Polaris
Toisa Polaris
Toisa Polaris
Sealion Shipping Limited Sealion House The Courtyard 17 West Street Farnham, Surrey GU9 7DR Telephone: (01252) 737773 Tlx: 859135 LEOSEA G Telefax: (01252) 737770 Website: www.sealionshipping.co.uk
MAIN MACHINERY
Diesel Electric Installation comprising of: Main Engines 4 x Wartsila 9L26 Diesel Engines each driving an alternator and each producing 2,680kW at 660v 3Ph.60Hz. (Total Power 10,720 kW) 1 x 750kW 1 x 150kW unit located well above the freeboard deck and clear of regulation side damage areas.
THRUSTERS
Stern Thrusters 2 x 2,200kW Fully azimuthing Kaplan nozzle xed pitch propeller units driven by innitely variable speed frequency controlled motors. 3 x 1,335kW Tunnel Thrusters of variable pitch type set very low for maximum efficiency.
DIVE SYSTEM
Capacity Depth rating No of Dive Bells Mixed Gas Storage Hyperbaric lifeboat Air Diving 18 man system 200 m rated (300m capable) 2 x bells 20,400 m3 onboard with Gas reclaim 1 x 18 man self propelled 2 x Air dive stations and 1 x DDC
DIMENSIONS
Length OA Length BP Breadth mld. Depth mld. Draught (summer) 113.57 m 107.35 m 22.00 m 9.50 m 6.75 m
REDUNDANCY FEATURES
Main Machinery divided into two separate spaces each capable of independent operation in event of re / ooding etc. and located clear of assumed side damage. Switchboards in two compartments also clear of regulation side damage area. Each Main Propulsion Thruster and each Tunnel Thruster is located in its own separate watertight compartment. All Power / control cabling and pipework lead independently to relevant Thruster / motor / control equipt. etc and widely separated for maximum redundancy. Main Machinery Control Room in Engine Room space with secondary control from Wheelhouse. A third Emergency Control Centre is located well above the Freeboard Deck, and inboard of regulation damage areas and surrounded by re-proof boundaries. 35 m x 21 m (abt.) 700 m (abt.)
2
PERFORMANCE / CONSUMPTION
Service speed abt. 13.25 knots
CARGO AREAS
Working deck dims. Working deck area Deck strength Deck load
DYNAMIC POSITIONING
DP system comprises two main Control Systems within the Wheelhouse with further independent Control computer / position within the Emergency Control Centre. Independent references / sensors lead to this station by separate cabling for maximum redundancy. DP System References Simrad SDP 21 (3 x Op.stations) 3 x DGPS Fanbeam Taut Wire HIPAP (High accuracy xed and tracking head under water system) Three Gyro Compasses Three Wind sensors Three Motion Reference Units Compliance Standards DNV Dynpos AUTRO IMO DP-Equipment Class 3
5 tonnes / m
TANK CAPACITIES
Fuel oil Potable water 1,300 m3 (abt.) 460 m3 (abt.)
STABILISATION
Intering Active Roll Reduction System (1 x tank)
ACCOMMODATION
Wheelhouse and accommodation fully air conditioned. Total Berths Hospital Gymnasium 98 in single and double berth cabins. 1 Berth Yes
MOONPOOLS
Two Moonpools each abt. 4.68m x 4.68m for Diving operations. One Optional Moonpool (Stern) abt. 6.24m x 6.24m.
Charterers spaces including Suites, Operations areas and Survey / Work Type areas.
DECK MACHINERY
Offshore Cranes 1 x 150mt SWL Active Heave compensated (250mt SWL for port use) 1 x 10mt at 25m Hydralift crane 1 x 10mt at 10m / 1mt at 22m Norlift crane Stern and aft Main Deck stiffened for installation of A-Frame
HELIDECK
Load Capability D value Suitable for a Super Puma Type AS332L2 19.5 metres
This specication is subject to change without prior notication. The particulars are believed to be correct, but are not guaranteed.
Conference Room
60
270
30
20
40
60
80
90
0 24
12 0
STERN
The constant current follows the wind and waves around the vessel. Circles are Wind Speed in Knots
This specication is subject to change without prior notication. The particulars are believed to be correct, but are not guaranteed.
15
21