Method Statement Draft
Method Statement Draft
PROJECT:
CLIENT : M/S.
CONTRACTOR : M/s.
METHOD STATEMENT
SIGN-OFF
Project Manager
Name: Date:
Signature:
Client: M/s.
Project Manager
Name: Date:
Signature
CONTENTS
1. PRELIMINARY NOTE
2. PURPOSE OF WORK
3. RESPONSIBILITIES
4. SAFETY REQUIREMENTS
5. PERSONAL PROTECTIVE APPAREL AND SAFETY EQUIPMENT
(PPE)METHODOLOGY
6. EQUIPMENT & MANPOWER
6.1 EQUIPMENT
6.2 MANPOWER
6.3 MATERIAL
7. SCOPE OF WORK
8. Methodology
8.1 PREPARATION WORK
9. Clear work area
10. Dismantle Aluminium scaffold
11. Rubbish arising
12. Health and Safety Management Provisions
1. PRELIMINARY NOTE:
LLC reserves the right to adapt the methods used according to site needs and
configuration. In the case of major changes to the methods intended to be used,
this method statement will be resubmitted for approval. The Work shall be
commenced upon approval of the MS and RS by Client.
2. PURPOSE OF WORK:
This document defines the procedures to be used during the initial stage starting
from excavation, water tank installation and fixing it to the main line of the
warehouse and office. The scope of work covers the excavation to installation
of water tank and fix the water line to the existing main line of the warehouse
and office.
3. Responsibilities:
Project Mr.
Manager Leads and execute timely completion of work and oversee
the safety of the site.
Project Mr.
engineer Directs the site team to ensure that all work procedures and
safety aspect is covered as per the procedures and overseas
the proposed work.
Safety officer Mr
Provide relevant and required training on site to enforce all
safety rules and regulations and oversee the process.
Supervisor Mr.
Overseas and directs the execution of work on site and
ensures that safety measures are in place and maintained.
General To Follow the Instruction provided by Supervisor and
workers follow site Safety rules and regulations at all time.
4. Scope of work:
Gypsum Wall cladding all the joints filling and sanding.
Fix on the wall MDF 30X30 cm access door for electrical point – fixing
the screws
Double skin Plywood fixing on the wooden structure for steps- Fixing the
screws.
PVC floor tiles on the wooden steps & side safety wall both sides- fixing
by glue.
Fixing of existing window paint wooden architrave – Fixing by silicon
and screws.
Wooden capping fixing on the safety wall top – Fixing by silicon.
5. Safety Requirements:
Worker involved must be inducted by Safety officer.
Worker involved must wear complete and proper PPE requirements at all
times.
Worker involved must be MS/RA briefed and recorded.
All workers must be briefed with emergency procedure, Evacuation drill
procedure and general site rules that are followed at Mapei Site.
Material Handling.
Induction and training shall be based on this safety program and shall
include but shall not be limited to:
6.1EQUIPMENT:
Hand shovel
Lead power cable
6.2 MANPOWER:
Engineer 1 Nos
Workers 3 Nos
6.3 MATERIALS:
Ply wood
Timber wood
Steel nails
Tool box materials
7. SCOPE OF WORK:
The scope work involved in water tank installation and its pipe line fixing it to
the existing main lines.
As an initial step, provide safe access for the site operatives to reach to the work
area.
Obtaining the work permit from the Mapei Client representative and
ensure the work area is safe.
Tool box talk training must be given to the workers about the scope of
work and the risk that are associated with the work must be
communicated.
Job specific instruction must be given by the onsite supervisor.
Providing proper access to the excavation team.
Excavation shall be done manually to prevent any damage to the
unidentified underground services.
All site rubbish that arises during the excavation and tank installation
shall be stored in the black cover and at the end of each shift, the waste
debris shall be disposed in the designated area.
8 Methodology:
8.1 Preparation Work:
PPE must be worn at all times.
Aluminium Scaffold shall be provided for all the height work activities.
Ensure that the existing underground services drawing shall be
identified before the commencement of the excavation work.
All equipment shall be inspected, and all personnel shall be inducted
and trained before the commencement of work on site.
9. Clear Working Area:
The Team will undertake safety induction /Pre job safety briefings.