itr",r^* f''o"roov Uomp,q.w
All Glass Works (Tempering . Bending . Structure)
ffi.,Hffi lso 900 'l
\V/
:2008
JIJ =-Il €-9": :<,tiz
(g+otetl- silJ[**.l 6bjttrlLrcliita
- )

AllAluminum Works (Doors -Windows - Special Profiles)

All Stainless Steel Works and LaserCutting


>z iir:gotullgso[l
-SoudiAromio
(
0.U g[ai
1i1.t .F! -
-
'i9il,
aig
6#l+ - rtrl ) qa'Jb l9#Ilt ,rto"t
J'I* .Ftlli*ll Jt-....r4lXlEr
lnstallation of Automatic Doors
dOfmOkObO VendOf lD: 10063122 : 1< irtT ijlulj,l,*<.-f-i
orrn,r-rrrriir"rir*r*rlr
c.R. 2050012639 - lndustrial Lic. N0.',]21030034465 www.company-albitar.com \Il'l,.tttlo p31 ,.cLalt da+iJl - 1,0,,\llrl i.u-

uotatio,n QTN# 20221139 -05


ro: ABSAL PAUL CONTRACTING Date;2610312O23
22LO26 T ALBITAR- ALUMINIUM WORKS FOR TAQA Email- hameed.alaam@yahoo.com
Project :
,ATION CENTRE DTV PROJECT
lnfo: ABDULHAMEED ALAAM & GK SUJIN Mob: +956 546852037

Kind Attention Mn Shine T Thonkan Customer Tel: +956 13 802 8154

Thank you very much for your inquiry ond we are pleased to provide you with r
our best offer
Sl No DESCRIPTION QTY UNIT UNIT PRICE TOTAL
8.0 DtvtstoN 8 - DOORS & WINDOWS
Metal-Framed Skylight :

Supply and install Aluminum-framed skylight with powder coating


finish 24mm double glazed (6mm Sunguard DS 40 + 10mm air
spacer + 6mm Climaguard Neutral 70 )tempered glass on powder
8630
coated finish aluminum frame SG50 size of aluminum frame is
9.5cm X Scm X 2.5mm X 3.2mm Thk with Steel tube 10 x 10
supports painted finish and EPDM Gasket and Sika/Wacker Silicon
lRote: SAR 200O oer som)
8520.1 skylight Type "01", size 6000 x 9100 mm. 1 unit I san trog,2oo sAR 109,200

8s20.2 Skylieht Type "02", size 3000 x 4010 mm, 1 *l r4!!19e sAR 24,060
SUB TOTAL sAR 733,260
Vat 7 5% ( No: 3008647 7 2900003 ) sAR 79,989
GRAND TOTAL sAR 753,249
One Hundred Fiftv Three Thousand @
TERMS & CONDITIONS:
: 50% payment on advance,2OYo upon start of delivery
of materials to site for installation,259/o as
Pavment
pprogressive payment and 5% before completion of works
Delivery : To be discussed prior signing the contract
Validity : 30 days from quotation issue date.

NOIEi
1. The quantities may differ from that mentioned in quotation and for that after work conrpleton, final measurement
will be taken & the customer will be liable to pay based on our final invoice.
2. All the materials issued by Albitar Factory to the second party in this quotation is owned by Albitar Factory unless the
final payment has been made. Albitar Factory has the right to re-obtain the materials from the second party if the
payment has not been finalized
3. tn the event of cancellation of the project after receiving down payment, 25% will be deducted from the advance
payment and the remaining amount will be refunded

For Albitar Factory Verified By Approved by

OPt4] i'
Sales Department

Prepared by: Rawoof/B


Entered by: