Supplier Audit Plan..
Supplier Audit Plan..
Supplier Audit Plan..
Prepared By:-
UDIT PLAN - 2021
May-21 Jun-21
ITEM NAME
PLAN ACTUAL PLAN ACTUAL
Top/Bottom
14.05.21
12.05.21
PCBA/SMT PCB
16.05.21
10.05.21
DC cable
DC cable
Packing Material
PE Bag
Checked By:-