00 Report
00 Report
00 Report
1 PREPARATION Rp 26,905,352.00
BASE CAMP Rp 22,530,000.00
TOOLS Rp 4,375,352.00
TOTAL Rp 102,350,000.00
CATANIA U26/22
CITRA RAYA - TANGERANG
PREPARATION
A BASE CAMP
1 Sewa Kontrakan 1 Thn Rp 17,000,000.00 Rp 17,000,000.00
2 Pengadaan Wifi 1 ls Rp 400,000.00 Rp 400,000.00
3 Service AC (cuci, ganti freon) 1 ls Rp 450,000.00 Rp 450,000.00
4 Risecooker 1 bh Rp 240,000.00 Rp 240,000.00
5 Perlengkapan kamar mandi (ember besar, gayung, tempat sampah, dll) 1 ls Rp 320,000.00 Rp 320,000.00
6 Keperluan dapur 1 ls Rp 500,000.00 Rp 500,000.00
7 Pengadaan sepeda motor Yamaha Vega 1 unit Rp 3,500,000.00 Rp 3,500,000.00
8 Helm 1 bh Rp 120,000.00 Rp 120,000.00
Biaya-biaya
Biaya Material Rp 7,796,300.00
Biaya Alat Rp 2,235,352.00
Biaya Operasioanal Rp 2,620,000.00
Biaya Tol Rp -
Biaya ATK Rp -
Biaya Upah Tenaga Harian Rp 20,865,000.00
Total Beban Rp 33,516,652.00
Laba (Rugi) Rp 2,373,348.00
Material On Site (MOS)
Project Gondowangi Sentra Menteng MN-61 Bintaro
TOTAL Rp 4,651,500.00
DATA GAJI TEAM
Rp 13,500,000.00
TOTAL