The document provides a list of materials and quantities needed for installing two PAC CITEC ESD 25A air conditioning units at BANK HANNA. It includes 28 items such as copper pipes, elbows, shocks, duct tape, refrigerant, wires, aluminum, bolts, cement, sand, rubber mounts, PVC pipes and fittings to connect the air conditioning units. It also includes trays and joints for cable management, additional PVC and steel items, a water pump and check valve, and a drain pan.
The document provides a list of materials and quantities needed for installing two PAC CITEC ESD 25A air conditioning units at BANK HANNA. It includes 28 items such as copper pipes, elbows, shocks, duct tape, refrigerant, wires, aluminum, bolts, cement, sand, rubber mounts, PVC pipes and fittings to connect the air conditioning units. It also includes trays and joints for cable management, additional PVC and steel items, a water pump and check valve, and a drain pan.
The document provides a list of materials and quantities needed for installing two PAC CITEC ESD 25A air conditioning units at BANK HANNA. It includes 28 items such as copper pipes, elbows, shocks, duct tape, refrigerant, wires, aluminum, bolts, cement, sand, rubber mounts, PVC pipes and fittings to connect the air conditioning units. It also includes trays and joints for cable management, additional PVC and steel items, a water pump and check valve, and a drain pan.
The document provides a list of materials and quantities needed for installing two PAC CITEC ESD 25A air conditioning units at BANK HANNA. It includes 28 items such as copper pipes, elbows, shocks, duct tape, refrigerant, wires, aluminum, bolts, cement, sand, rubber mounts, PVC pipes and fittings to connect the air conditioning units. It also includes trays and joints for cable management, additional PVC and steel items, a water pump and check valve, and a drain pan.