Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Alcaldia Mixed Rendering Plant

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

WATERSOFTENER

Steam Boiler Room


OFFAL

TANK
L
CHEMICA
SCREEN

SYSTEM
FEED WATER
PLC Room
O

XX CFM
100 PSIG
COMPRESSOR
AIR
2

RM
1

MEAL COOLING & STORAGE


21,500

Picker Fingers!
RM RM

/ Debris
4 5

RM
6
RM
3

RM PROCESSING AREA
2

O
1

BUILDING HT. APPROX. 6.5 M


V
V 2
1
25,000

g!
in
w
al Dra
Sc ry
NOTES NO. DATE DESCRIPTION REV. BY APP. BY THIS DRAWING IS THE PROPERTY!

e
CUSTOMER

to ina
OF ANCO-EAGLIN, INC.!
UTILIZING, COPYING, OR HANDING!

ot lim
IT OVER TO A THIRD PERSON IS! LOCATION

e
NOT ALLOWED WITHOUT THE!
REVISIONS

Pr
EXPRESS CONSENT OF ANCO-! SCALE: 1=75 DRAWN BY:BCE
EAGLIN, INC.

N
TOLERANCES UNLESS ! APPROVED BY: XXX
DO NOT SCALE THIS DRAWING OTHERWISE SPECIFIED:!
USE DIMENSIONS ONLY DATE: XXX
ANGULAR: ± 1°!
DECIMAL: ± .005"!
ANCO-EAGLIN INC. DWG. NUMBER REV.
FRACTIONAL: ± 1/32" 1420 LORRAINE AVE.

HIGHPOINT, NC 27263 XXX

You might also like