Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

MCC Baler Plumbing

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

66.

00
3.00 60.00 3.00
9.00 9.00 9.00 3.00 3.00 9.00 9.00 9.00

3.00

3.00
RISER 3/4" Ø PIPE

1/2" Ø PIPE
U WC

1/2" Ø PIPE
F WC

1/2" Ø PIPE
U
HE F SHEWC
F
WC
F

7.00

7.00
CRIMINOLOGY

1" Ø PIPE
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM
LABORATORY

DN
UP

3.00

3.00
H A L L W A Y H A L L W A Y H

3.00
UP
UP

UP

1.50
UP

9.00
CLASSROOM
F F F F F F
SHE HE

3.50
WCWCWCWCWC WCWCWC

Y
RISER U UU
1/2" Ø PIPE

A
UP

3.75
W
1 SACRISTY

W
9.00

O P E N A R E A

L
ALTAR

9.00
UP CLASSROOM

L
W
1

A
61.00

61.00
H
3/4" Ø PIPE
9.00

9.00
CLASSROOM
23.25

1.35 9.65 1.35 4.65 6.00 2.50 5.80 3.00 1.35 1.35 3.00

WC U F
DN
WC WC CR
WC WC
CR U U CR
GUIDANCE
CRU UCR
DEAN'S
F F F F

4.00
HED FACULTY CONFERENCE CLINIC
OFFICE COUNCILOR
ROOM
RECEPTION

3.00
1/2" Ø PIPE

1/2" Ø PIPE

1/2" Ø PIPE

1/2" Ø PIPE
UP

1.50
I H A L L W A Y H A L L W A Y H A L L W A Y
9.00

1/2" Ø PIPE

1/2" Ø PIPE
H A L L W A Y
*
COORDINATORS
F F F F F F

5.00
FACULTY ROOM SHS REGISTRAR OFFICE CASHIER OSAD
HE SHE
F F F
CR U CRUUCR WCWCWC WCWCWCWCWC
WC WC WC UUU RISER
3/4" Ø PIPE 3/4" Ø PIPE 3/4" Ø PIPE
UP

1" Ø PIPE

13.01
13.02

CV GV TO WATER
M
MAIN LINE
WM

5.00 6.00 6.00 1.35 1.35 3.65 3.00 7.00


3.00 10.00 8.00 9.00 6.00 9.00 8.00 10.00 3.00
66.00

GROUND FLOOR WATER LINE LAYOUT


SCALE: 1:200 MTS.

CERTIFIED BY: PROJECT: APPROVED BY: REVISIONS: SHEET CONTENT: SHEET NUMBER :
DESIGNED BY:

TWO STOREY
MinagawaBUILDING P-1
DRAWN BY:
PROPOSED
to TWO STOREY SCHOOL BUILDING
Mami
MASTER PLUMBER/SANITARY ENGINEER GROUND FLOOR
PRC NO.: TIN:
MOUNT CARMEL COLLEGE (BALER), INC CHECKED BY:
WATERLINE LAYOUT
PTR NO.: DATE ISSUED: OWNER
LOCATION : BRGY. PINGIT, BALER, AURORA PROVINCE. DATE FINISHED:
PLACE ISSUED:
66.00
3.00 60.00 3.00
9.00 9.00 9.00 3.00 3.00 9.00 9.00 9.00

3.00

3.00
R O O F L I N E

RISER

1/2" Ø PIPE
1/2" Ø PIPE
U WC
U F WC
HE F SHEWC
F
WC
F

7.00

7.00
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM

DN

3.00
3.00
H A L L W A Y H A L L W A Y

DN
R O O F L I N E

3.00
1.50
1/2" Ø PIPE

9.00
CLASSROOM
F F F F
SHE HE

3.50
U
WCWCWCWCWC WC U

Y
RISER U

E
1/2" Ø PIPE

A
N

N
I

I
W
L

L
9.00

O P E N A R E A

L
F

9.00
CLASSROOM

O
L
O

O
R

R
A
61.00

61.00
H
MULTI PURPOSE
9.00

HALL

9.00
CLASSROOM

R O O F L I N E

H A L L W A Y

DN

3.00
9.00

1/2" Ø PIPE
1/2" Ø PIPE
H A L L W A Y
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM
F F F F F F

5.00
HE SHE

WCWCWC WCWCWCWCWC
UUU RISER
3/4" Ø PIPE
R O O F L I N E

13.01
13.02

3.00 7.00
3.00 10.00 8.00 9.00 6.00 9.00 8.00 10.00 3.00
66.00

SECOND FLOOR WATER LINE LAYOUT


SCALE: 1:200 MTS.

CERTIFIED BY: PROJECT: APPROVED BY: REVISIONS: SHEET CONTENT: SHEET NUMBER :
DESIGNED BY:

TWO STOREY BUILDING


P-2
DRAWN BY:
MASTER PLUMBER/SANITARY ENGINEER PROPOSED TWO STOREY SCHOOL
mail.aaaaaaeaaauuouuaumqaammaaoa.ae BUILDING
www.aaaaaaaaa
SECOND FLOOR
PRC NO.: TIN:
MOUNT CARMEL COLLEGE (BALER), INC CHECKED BY:
WATERLINE LAYOUT
PTR NO.: DATE ISSUED: OWNER
LOCATION : BRGY. PINGIT, BALER, AURORA PROVINCE. DATE FINISHED:
PLACE ISSUED:
66.00
3.00 60.00 3.00
9.00 9.00 9.00 3.00 3.00 9.00 9.00 9.00

SEPTIC

3.00

3.00
4"Ø WASTE PIPE
TANK
4"Ø DRAINAGE PIPE 4"Ø DRAINAGE PIPE 4"Ø DRAINAGE PIPE 4"Ø DRAINAGE PIPE 4"Ø DRAINAGE PIPE
CB CB CB CB SS 3"Ø PVC PIPE
CB CB CB CB

UFD WC FD

3"Ø PVC PIPE

2"Ø PVC PIPE

2"Ø PVC PIPE

2"Ø PVC PIPE


LAV WC
U
LAVHE WC SHE
WC

4"Ø DRAINAGE PIPE

4"Ø DRAINAGE PIPE


LAV
FD
FD WC
LAV

7.00

7.00
CRIMINOLOGY
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM
LABORATORY

CB DN CB
UP

3.00

3.00
H A L L W A Y H A L L W A Y mi

4"Ø DRAINAGE PIPE


CB CB CB CB CB CB
4"Ø DRAINAGE PIPE 4"Ø DRAINAGE PIPE 4"Ø DRAINAGE PIPE 4"Ø DRAINAGE PIPE 4"Ø DRAINAGE PIPE

3.00
UP

4"Ø DRAINAGE PIPE


UP

UP

4"Ø DRAINAGE PIPE

4"Ø DRAINAGE PIPE


1.50
UP

9.00
LAV LAV LAV LAV LAV LAV CLASSROOM
2"Ø PVC PIPE 2"Ø PVC PIPE
3"Ø WASTE PIPE

2"Ø PVC PIPE


2"Ø PVC PIPE
SHE HE

3.50

2"Ø PVC PIPE

2"Ø PVC PIPE


FD FD FD FD

Y
WC WC WC WC WC WC WC WC WCWCWC

4"Ø WASTE PIPE


CB CB
SS

A
UP CB CB

3.75
W
1 SACRISTY

W
4"Ø DRAINAGE PIPE
SEPTIC
TANK

4"Ø DRAINAGE PIPE

4"Ø DRAINAGE PIPE


9.00

O P E N A R E A

L
ALTAR

9.00
UP CLASSROOM

L
W
1

A
61.00

61.00
CB CB

H
CB CB

4"Ø DRAINAGE PIPE

4"Ø DRAINAGE PIPE


4"Ø DRAINAGE PIPE

4"Ø DRAINAGE PIPE


9.00

9.00
CLASSROOM
23.25

1.35 9.65 1.35 4.65 6.00 2.50 5.80 3.00 1.35 1.35 3.00
4"Ø DRAINAGE PIPE 4"Ø DRAINAGE PIPE 4"Ø DRAINAGE PIPE 4"Ø DRAINAGE PIPE 4"Ø DRAINAGE PIPE
CB CB CB CB CB CB

2"Ø PVC PIPE


DN
WC WC U WC WC

2"Ø PVC PIPE

2"Ø PVC PIPE


LAV

2"Ø PVC PIPE


WC CR
CB
FD CR U U CR FD FDCRU UCRFD
DEAN'S FD GUIDANCE

4.00
LAV HED FACULTY LAV CONFERENCE LAV LAV CLINIC
OFFICE COUNCILOR CB
ROOM
3"Ø PVC PIPE 3"Ø PVC PIPE 3"Ø PVC PIPE -

RECEPTION

3.00
4"Ø DRAINAGE PIPE
3"Ø WASTE PIPE
UP

1.50

3"Ø PVC PIPE


4"Ø DRAINAGE PIPE

H A L L W A Y H A L L W A Y H A L L W A Y
9.00

H A L L W A Y Baggy

LAV LAV LAV LAV LAV LAV


COORDINATORS

5.00
4.51
FACULTY ROOM SHS REGISTRAR CASHIER OSAD FD
3"Ø PVC PIPE 3"Ø PVC PIPE HE FD 3"Ø PVC PIPE
FD SHE SS

2"Ø PVC PIPE

2"Ø PVC PIPE

2"Ø PVC PIPE

2"Ø PVC PIPE

2"Ø PVC PIPE


LAV LAV LAV
FD CR U FDCRU UCRFD FD
WC WC WC WC WC WC WC WC

4"Ø WASTE PIPE


WC WC WC U U U
4"Ø WASTE PIPE

CB CB CB CB CB CB CB CB
4"Ø DRAINAGE PIPE 4"Ø DRAINAGE PIPE 4"Ø DRAINAGE PIPE 4"Ø DRAINAGE PIPE 4"Ø DRAINAGE PIPE 4"Ø DRAINAGE PIPE 4"Ø DRAINAGE PIPE

UP

TO MAIN DRAINAGE LINE TO MAIN DRAINAGE LINE TO MAIN DRAINAGE LINE TO MAIN DRAINAGE LINE TO MAIN DRAINAGE LINE TO MAIN DRAINAGE LINE TO MAIN DRAINAGE LINE TO MAIN DRAINAGE LINE

SEPTIC
TANK SEPTIC
TANK

13.01
13.02

5.00 6.00 6.00 1.35 1.35 3.65 3.00 7.00


3.00 10.00 8.00 9.00 6.00 9.00 8.00 10.00 3.00
66.00

GROUND FLOOR SEWER LINE LAYOUT


SCALE: 1:200 MTS.

CERTIFIED BY: PROJECT: APPROVED BY: REVISIONS: SHEET CONTENT: SHEET NUMBER :
DESIGNED BY:

TWO STOREY BUILDING


P-3
DRAWN BY:
MASTER PLUMBER/SANITARY ENGINEER * MMMM
PROPOSED Magmatism
TWO STOREY SCHOOL BUILDING MaMa
MuammarHausmann Maugham
GROUND FLOOR
PRC NO.: TIN:
MOUNT CARMEL COLLEGE (BALER), INC CHECKED BY:
SEWER LINE LAYOUT
PTR NO.: DATE ISSUED: OWNER
LOCATION : BRGY. PINGIT, BALER, AURORA PROVINCE. DATE FINISHED:
PLACE ISSUED:
66.00
3.00 60.00 3.00
9.00 9.00 9.00 3.00 3.00 9.00 9.00 9.00

3.00

3.00
R O O F L I N E

SS 3"Ø PVC PIPE

UFD WC FD

3"Ø PVC PIPE

2"Ø PVC PIPE

2"Ø PVC PIPE

2"Ø PVC PIPE


LAV WC
U
LAVHE WC SHE
LAV WC
FD
FD WC
LAV

7.00

7.00
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM

DN

3.00
3.00
H A L L W A Y H A L L W A Y

DN
R O O F L I N E

3.00
1.50

9.00
LAV LAV LAV LAV CLASSROOM
2"Ø WASTE PIPE

3"Ø WASTE PIPE

3"Ø WASTE PIPE

2"Ø WASTE PIPE


SHE FD HE

3.50
FD U

Y
WC WC WC WC WC U
2"Ø WASTE PIPE
U
SS

E
3"Ø WASTE PIPE

A
N

N
I

I
W
L

L
9.00

O P E N A R E A

L
F

9.00
CLASSROOM

O
L
O

O
R

R
A
61.00

61.00
H
MULTI PURPOSE
9.00

HALL

9.00
CLASSROOM

R O O F L I N E

H A L L W A Y

DN

3.00
9.00

H A L L W A Y

2"Ø PVC PIPE


2"Ø PVC PIPE
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM LAV LAV LAV LAV LAV LAV

5.00
FD
HE FD 3"Ø PVC PIPE
FD SHE SS

2"Ø PVC PIPE

2"Ø PVC PIPE

2"Ø PVC PIPE


FD
WC WC WC WC WC WC WC WC
U U U

R O O F L I N E

13.01
13.02

3.00 7.00
3.00 10.00 8.00 9.00 6.00 9.00 8.00 10.00 3.00
66.00

SECOND FLOOR SEWER LINE LAYOUT


SCALE: 1:200 MTS.

CERTIFIED BY: PROJECT: APPROVED BY: REVISIONS: SHEET CONTENT: SHEET NUMBER :
DESIGNED BY:

TWO STOREY BUILDING


P-4
DRAWN BY:
MASTER PLUMBER/SANITARY ENGINEER www.aamiaawoaauaaaaamamnaaaamm
PROPOSED TWO STOREY SCHOOL BUILDING SECOND FLOOR
PRC NO.: TIN:
MOUNT CARMEL COLLEGE (BALER), INC CHECKED BY:
SEWER LINE LAYOUT
PTR NO.: DATE ISSUED: OWNER
LOCATION : BRGY. PINGIT, BALER, AURORA PROVINCE. DATE FINISHED:
PLACE ISSUED:
CL
AS
SR
OO
M

RIS E F DN
C CL
AS
S F
N E LA RIM
R WC BO IN SR
I WC HE RHA OL
TO OG
OO
M
L WC RY Y
WC F A
F WC HE
F
O WC U L

UU
O
R L
CL
RIS F CL
WAS
AS
SR
ER WC F SR OO
WC SHEF
UP
OO M
E H
AM U
W WC N
U WC
1
WC I A F HE
WC R Y
F
1/2 WC
L O F RIS
MU "Ø W F UP
L
O F SH W
PIP F CW E F F
H
W C
E E R R
LT 1
W
E
O C L F
CL WC C O
HAI PU
SA UP
CR
IST O UU W L
AS
SR O
U O
LL RP AL
R Y I OM E
PIP U
F
E OS TA
R A N DN
Ø U W
PIP "
E L
E 2
1/ F F E
H C CL
Ø E I
PIP F
Y AS
"
UP

3/4
SR N
Ø WC RISE OM
O
" F SH E
1/ 2 EWC R
E
WC PIP
DN
" Ø
1/ 2
O H

P
E UP
A
CL
CL
AS
N UP
AS
L SR
OO
SR
OO
M

1.3 A M

5 R L
3/4

CL
AS E W
PIP
3/4
SR
O OM CR O A E
U WC
H
R A
"Ø O F P CL
PIP 9.6 E A CL AS
SR
E O 5 Y AS
F E N SR
OO
O OM
3"
PIP
HE L
M
UP D FA C A Ø
L
"Ø CULA H
R
L DS
1I/2
LTSS
CR
F N
H Y RO 1.3 A E
OM 5 W
WCU W A
FA
CU E
UC
A
LT L E
Y F CR 4.6 N
Y A
CL
RO
O M
L 5 L I AS
SR 3"
SH L
A Y
O Ø
S L
E CL OM DS 3"
PIP
CD W A
OF LEAASN SS
FIC S'S F W RO Ø
"Ø W E ROO 6.0 R OM DS
1/ 2
A O
M 0 O
O
L
A O
0 Y R E
4.0 PIP
RE DN L
GI F
Y
ST 2.5 Y Ø
1"
RA
R 0 WC 0 L A

1.5 CL
AS U I CL A E
SR
OO CR
F N H AS CL 3" 3"
1 5.8
SR A SS I
N Ø Ø
4.5
M E W O OM R DS DS
RE
CE 0 L OOM
CL
A
SS
PT
IO
N
UP
L 3"Ø CBDS
RO
CO O
3/4 N F VT M
"Ø E RO FER R
PIP 3.0 L O
OM EN
PIP 0 IPE

CECL O EP
E AS AG
1/2 1.3
H A
CA R AIN 4"Ø
SH SR
COOGOUMI 5 CL
3"
DR DR 3"
IER 1.3 AS CL
Ø
4"Ø AIN
Ø
A UN DAN 5 SRH AS
DS LA
AG
EP DS
CRWC
CIL CE OO SR
OR 3.0 M O E VL
AV CBDS
DN
IPE
DCSLA
U OM C
F UCWC LA RIM 3"Ø
L SS
0 N SH BO IN RO
F F R H
CO I WC RHA OL
OR DN E
FD TO OG CB
O M VT
DIN
L
P E F L SS WC IPE RY Y R
AT PI WU F CLIN A WC AG
EP LA
VL A 3"
OR
" Ø U U W HE IC F WCØ DR
A IN
AV Ø
HE DS
1/ 2
S L 4"Ø
CW O 4" WC FD L DR
CR F
A
CW
L
CL 3" O U
AIN
AG
WC U U F CW W AS Ø U EP
SR DS R
DS U L IPE
DSCLAS
WC RC O SA Y
CW S F A OO
PIP
E LA
VL
E F
H M CL
D
CW Y WA
S TE E 2"Ø AV WA S RO
CW F PIP PV LA SS
OM SS
WC FD
C RO
4"Ø CB PV C V UP
CB
F CW 2"Ø
WC
SH PIPE E H O
AM U
F
H
CU S SS E 3"EØ U FD 3"
E TA EPTI
LA H
Ø
W
UU F PI
AP RPIS
1 WC
PV
C PIP
FD
WA
ST
N
A V E WC
DS
U W HE " Ø L
ER NK C W
2"Ø C
EP
IPE
I
CB
R Y
DSTLASVEFPD WC
WC PIP E L
CW 1/2 E 3" 3" VC FD
LA
V
O
AN TIC LA
LA SHV FW
MU D
L P L
LA
CW PIP W Ø Ø 2"Ø W K
UP
O V E
FC W V
HE 2"Ø
DS DS LA E
FD W C
CW Ø LT W C IPE
PV
CP V PIP 4"Ø
L F 4"Ø
C
R
CW 1/2"SHF
GE WA
1 O WCPVC P FD IPE UA DR CL ST W O
HAI PU
A SA AIN P A EP C
3/4 CW E F Y
CR
IST O 2"Ø W
CW 4"Ø
DR
IN
AG
EP L
AS
SR CB I PE O
"Ø F IPE W
O
CW LL RP CW SS
CB Y OM
R I F
PIP C IPE
CW AL
3"
E C E
O SE
TA
R CB CB A
N
E
DN
LA H
3"Ø
P VC
P U
U FD
3
WC "Ø PVC
L Ø
DS
RIS GE
PIP 3" V E DSCLAS I
ER AINA Ø UP Y LA FD
V
WC IPE PIP
N
DR DS CP
PV LA
FIDPE
E SR
OO
IPE 2"Ø LA S V PW
4"Ø
4"Ø E
EP DR V HEPVC C CB M
AG AIN
DR
AIN AG F2D"Ø W
EP C
4"Ø IPE WC
CB DN 4"Ø

O H DR
AIN
DS 3"
P
CB CB AG
E EP
Ø
PIP
IPE
PIP
E
3" E A CL
AS DS
Ø CL
E 4"Ø UP

1" IN
AG
3" IP E Ø N DR AS SR
D RA
Ø NA
G EP DS U AIN
P AG
LS RO
OO
M
4"Ø DS AI
CB

A OM
EP
DR IPE
4"Ø
1.3 R CB
L
5 3" 3"
CV
CB
CL
AS CB
Ø E W 4"Ø
Ø
DS A DS
WATER LINE
SR FD E DR

O DS
TO A
OO CRC PIP IN
WMM GV MA
IN
DR R M PV WC 4"Ø
H
A
AG
EP
U 4"Ø
P IPE
AIN Ø
AG 2" DR CL
MATO W
E
O LA DR
LIN
3" 9 E
AIN
CL A
Ø .65
AIN
E
4"Ø V AG AG A
Y AS
SS
RO

ISOMETRIC LAYOUT
O EP
N
EP
IN AT DR
AIN F PIP
E IPE
DS
IPE SR
OO OM
LIN ER L CB
AG E HE
EP ST M
WA DF
E UP IPE
L 3"Ø 3"Ø ACCL CB H A CB
R
ULAS L
PV
SCALE: 1:200 MTS. FD I CP TYSR 3"
1.3 4"Ø

DS E
H IP
CR OO
LA N E
M 5 A Ø W DR
AIN
TO CB E U V FA E WC
4"Ø
3" A DS 4"Ø AG
MA
IN
TE
PIP WC CU A DR
Ø E DR
3" EP
IPE
LA U
LT AIN L AIN
Ø
DR

D 4.65
A S Y A
WA AG
IN
YR AG
DS
AG
CR PIPE N CL
V IPE S
EL EP EP
IN 4"Ø OO L CF IPE A
S 4"Ø
E
PV D L I SS
TA EPTI
DR M A Y RO
AIN SH 2"Ø L
S CL O
NK C AG L CB CB
EP CD W AS M
IPE 3"Ø OF LEAASN W SR
F
W PV FIC S'S
C E RO
CB
6.0 R DS O PIP
E O OM
PIP OM A E IPE
CB
E 4"Ø
DR 0 O
O
L
DR
AIN
AG
AG
EP
TO A AIN 3" O 4"Ø DR
A IN
0 AG
Ø Y R
3"
4.0
MA
IN
RE DN EP L 4"Ø
DR
AIN
GI Y
IPE
DS F
Ø
2.5 DS
AG
EL 4"Ø ST Y
IN
RA CB
E DR
R 0 3"Ø
0 L A CB

1.5
AIN PV
AG
EP CP CL WC I CB
A
IPE AS CL E
CU
IPE H
SR N AS CL
OFO SR N
1 DM R C PIPEL AS
4.5 PV AV
4"Ø
DR 5.8 E
IPE
W OO SR I
3" 0
R M
CB EC
EP 2"Ø
AIN
AG UP INAG
EP L OOM IPE
EP EP
TO T IO
N IP Ø DR
A L AG
DS
MA E
CO AIN
IN
DR
AIN 4"Ø
N 3" 4"Ø F DR
RO FER Ø
AG
4"Ø
E LIN DR
AIN
OM EN 3.0 DS
L O
0
E
AG
EP
IPE
CE
CL CB O
AS
CA H
SR 1.3 CB
CL
A
R
S HI COOGOUMI 51 AS CL
CB ER A UN DAN
4"Ø
.35 P IPE SRH AS
CIL CE FD WC
DR CB
TO A IN NA
GE OO SR
ORLA CR AG AI M O
3.0
MA
IN EP DR OM
D L V U IPE
0
RA
IN 4"Ø
AG 4"Ø LA U CR WC
EL CO VL F 3"
Ø 3"ØDN
IN
E DR OR IPE
AIN L LAAV D H EP
AG DI
NA V LA CB
DS V AG
EP
CV AIN
IPE TO
R FD
WU LIN A
T R 4"Ø
DR
S U HE
FD
IC L
L U WC
CB FD AV A
L
WC CR U WC W
CL
AS
TO
MA
UC LA WC FD LA SR
CB

SEWER LINE
IN
O VL OO
DR
AIN RF V SA Y WC S AV A
AG
E 4"Ø WC D D WC H E LA M
LIN
E DR F D V Y
PIP
E
AIN LA WC AG
E
AG 3"Ø VL WC AIN
EP
A SS DR

ISOMETRIC LAYOUT
PV
IPE
IPE C PIP VL H
WUC 4"Ø
CP E AV
PV A P
2"Ø U F
CB U D HE
FD L
TO U WC
MA L
SCALE: 1:200 MTS. IN
DR
AIN WC PIPE 3"Ø P CB
AG
EL P
C
VW
C
VC
PIP F LA W
IN
E
2"Ø ED VL E
4"Ø WC SH AV A PIP
DR
AIN W E E LA A GE
C P I P
F V Y AIN
AG
EP PW
V C D DR
IPE
2" Ø C 4"Ø
WC PIPE S
C
PVW
C
S
2"Ø
TO IPE
MA CB EP
IN ST
DR
AIN WA
AG
EL 4"Ø
IN
E

S
TA EPTI
NK C

CERTIFIED BY: PROJECT: APPROVED BY: REVISIONS: SHEET CONTENT: SHEET NUMBER :
DESIGNED BY:

TWO STOREY BUILDING


P-5
DRAWN BY:
MASTER PLUMBER/SANITARY ENGINEER
PROPOSED TWO
airman STOREY SCHOOL BUILDING
. www.aamaaaiuaaaaauaaaamaaams
MOUNT CARMEL COLLEGE (BALER), INC CHECKED BY: ISOMETRIC LAYOUT
PRC NO.: TIN:
PTR NO.: DATE ISSUED: OWNER
LOCATION : BRGY. PINGIT, BALER, AURORA PROVINCE. DATE FINISHED:
PLACE ISSUED:
4.50 RETRACTABLE
LIFTING BAR
3.00 1.50 500

6"Ø DIAMETER PVC PIPE

100
1.00

VERIFY
500
2.00
0.50

4" DIA PVC


DOWNSPOUT

1.00

50
PLAN SECTION
PLAN
DETAIL OF CATCH BASIN
SCALE NOT TO SCALE

MH MH

10mmØ BARS @
200mm O.C. BOTHWAYS
GENERAL NOTES:
100mmØ PVC PIPE
1.0 ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE
PLUMBING LEGEND: EXECUTED ACCORDING TO THE PROVIS``NS.
MWSL MAIN WATER SUPPLY LINE 2.0 ALL PIPES SHALL BE INSTALLED AS INDICATED, ANY
10mmØ VERTICAL BARS
@ 800mm O.C. W/ 10mmØ WSL WATER SUPPLY LINE RELOCATION REQUIRED FOR PROPER EXECUTION OR
HORIZONTAL BARS @ EVERY
1.50

WPL WASTE PIPE LINE OTHER TRADES SHALL BE WITH THE PRIOR APPROVAL
THIRD LAYER
WC WATER CLOSET OF THE ARCHITECT.
5" THK. C.H.B.
LAV LAVATORY 3.0 ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL
CO CLEAN OUT MAINTAIN 1% AS MINIMUM, UNLESS OTHERWISE NOTED.
3 - 12mmØ LONGITUDINAL FD FLOOR DRAIN 4.0 ALL PLUMBING FIXTURES SHALL BE PROPERLY VENTED.
BARS W/ 10mmØ TRAVERSE
BARS
VTR VENT THROUGH ROOF 5.0 SEPTIC VAULT MUST BE WATERTIGHT, COMPLETE WITH
THE REQUIREMENTS OF A TYPICAL APPROVED TANK.
0.20

KS KITCHEN SINK
PVC POLYVINYLCHLORIDE 6.0 ALL WORKS SHALL BE OF CLASS WORKMANSHIP, PIPING
SYSTEM MUST BE CHECKED SPECIALLY ON JOINTS TO
0.60 SECTION 0.60 0.60
SD

CB
SHOWER DRAIN

CATCH BASIN ENSURE WATERTIGHT PLUMBING SYSTEM.


HBF HOSE BIBB FAUCET 7.0 ALL PLUMBING WORKS SHALL BE DONE UNDER THE
LS LAUNDRY SINK DIRECT SUPERVISION OF A DULY LICENSED SANITARY
DETAIL OF SEPTIC TANK SS SOIL STACK ENGINEER OR AUTHORIZED REPRESENTATIVE.
SCALE NOT TO SCALE 8.0 REFER TO THE TECHNICAL SPECIFICATION FOR DETAILED
R RISER
MATERIAL AND EQUIPMENT SPECIFICATIONS.

CERTIFIED BY: PROJECT: APPROVED BY: REVISIONS: SHEET CONTENT: SHEET NUMBER :
DESIGNED BY:

TWO STOREY BUILDING


P-6
DRAWN BY:
DETAIL OF SEPTIC TANK
MASTER PLUMBER/SANITARY ENGINEER imaginations
im TWO STOREY
PROPOSED SCHOOL BUILDING DETAIL OF CATCH BASIN
PRC NO.: TIN:
MOUNT CARMEL COLLEGE (BALER), INC CHECKED BY:
LEGEND
PTR NO.: DATE ISSUED: OWNER GENERAL NOTES
LOCATION : BRGY. PINGIT, BALER, AURORA PROVINCE. DATE FINISHED:
PLACE ISSUED:

You might also like