Jta TDP 2019 2029
Jta TDP 2019 2029
Jta TDP 2019 2029
Major Update
FY 2019 – FY 2029
November 2019
Transit Development Plan Major Update
CONTENTS
Executive Summary ...................................................................................................................................... 1
1 Introduction ............................................................................................................................................. 9
1.1 TDP Components ....................................................................................................................... 10
1.2 Statutory/Legislative Requirements and TDP Checklist ............................................................. 11
2 Baseline Conditions .............................................................................................................................. 15
2.1 Overview of Study Area .............................................................................................................. 15
2.2 Population and Employment ....................................................................................................... 16
2.3 Demographic and Employment Spatial Analysis ........................................................................ 41
2.4 Land Use/Growth Characteristics ............................................................................................... 61
2.5 Travel/Mobility Characteristics .................................................................................................... 71
3 Existing Services & Performance Evaluation ....................................................................................... 75
3.1 Duval County Existing System Profile ........................................................................................ 75
3.2 Clay County Existing System Profile .......................................................................................... 95
3.3 System Performance Evaluation ................................................................................................ 96
3.4 Farebox Report ......................................................................................................................... 139
4 Public and Internal Involvement ......................................................................................................... 142
4.1 Public Involvement Plan ........................................................................................................... 144
4.2 Phase 1 ..................................................................................................................................... 145
4.3 Phase 2 ..................................................................................................................................... 147
4.4 Internal Agency Engagement ................................................................................................... 147
4.5 Phase 3 ..................................................................................................................................... 148
5 Situational Appraisal ........................................................................................................................... 149
5.1 Transportation Plans and Policies ............................................................................................ 149
5.2 Socioeconomic Trends ............................................................................................................. 155
5.3 Land Use ................................................................................................................................... 155
5.4 Organizational Issues ............................................................................................................... 156
5.5 Technology ............................................................................................................................... 156
5.6 Transit-Friendly Land Use & Urban Design Efforts .................................................................. 162
5.7 10-Year Ridership Projections .................................................................................................. 168
6 Goals and Objectives ......................................................................................................................... 169
6.1 Vision Statement ....................................................................................................................... 169
6.2 Mission Statement .................................................................................................................... 169
6.3 Core Values .............................................................................................................................. 170
6.4 Goals and Objectives ................................................................................................................ 170
6.5 Tracking and Monitoring ........................................................................................................... 170
7 System FrameworK: Long-Term System Concept ............................................................................ 171
7.1 Recommendation Development Process ................................................................................. 171
7.2 Principles for Recommendations .............................................................................................. 174
7.3 10-Year TDP Alternatives ......................................................................................................... 175
7.4 Long-Term System Concepts ................................................................................................... 190
8 10-Year Transit Plan ........................................................................................................................... 200
i
Transit Development Plan Major Update | Contents
FIGURES
Figure 1: Duval County Transit Potential ...................................................................................................... 2
Figure 2: Jacksonville Regional Transportation Center rendering ................................................................ 4
Figure 3: Peak-Hour Headways of Services Proposed in 10-Year Transit Plan .......................................... 7
Figure 4: Duval County 2010 Population by Census Tract ......................................................................... 17
Figure 5: Duval County Estimated 2017 Population by Census Tract ........................................................ 18
Figure 6: Clay County 2010 Population by Census Tract ........................................................................... 21
Figure 7: Clay County Estimated 2017 Population by Census Tract .......................................................... 22
Figure 8: Duval County 2010 Population Below 150 Percent of the Poverty Level .................................... 24
Figure 9: Duval County Estimated 2017 Population Below 150 Percent of the Poverty Level ................... 25
Figure 10: Duval County 2010 Zero-Car Households ................................................................................. 27
Figure 11: Duval County Estimated 2017 Zero-Car Households................................................................ 28
Figure 12: Duval County 2017 Median Age ................................................................................................ 29
Figure 13: Duval County Estimated 2017 Unemployment Rate ................................................................. 31
Figure 14: Clay County 2010 Population Below 150 Percent of the Poverty Line...................................... 33
Figure 15: Clay County Estimated 2017 Population Below 150 Percent of the Poverty Level ................... 34
Figure 16: Clay County 2010 Zero-Car Households ................................................................................... 36
Figure 17: Clay County Estimated 2017 Zero-Car households .................................................................. 37
Figure 18: Clay County 2017 Median Age .................................................................................................. 38
Figure 19: Clay County Estimated 2017 Unemployment Rate ................................................................... 40
Figure 20: Duval County Population Density .............................................................................................. 42
ii
Transit Development Plan Major Update | Contents
iii
Transit Development Plan Major Update | Contents
Figure 63: Demand-Response General Measures Peer Comparison, FY 2017 ...................................... 116
Figure 64: Demand-Response Vehicle Measures Peer Comparison, FY 2017 ....................................... 117
Figure 65: Demand-Response Service/Service Effectiveness Measures Peer Comparison, FY 2017 ... 119
Figure 66: Demand-Response Expense and Revenue Peer Comparison, FY 2017 ............................... 122
Figure 67: Demand-Response Efficiency Peer Comparison, FY 2017 .................................................... 124
Figure 68: JTA ferry in the St. Johns River ............................................................................................... 128
Figure 69: Automated Guideway General Measures Peer Comparison, FY 2017 ................................... 131
Figure 70: Automated Guideway Vehicle Measures Peer Comparison, FY 2017 .................................... 132
Figure 71: The Miami-Dade County DTPW–Transit Metromover ............................................................. 133
Figure 72: Automated Guideway Service/Service Effectiveness Measures Peer Comparison, FY 2017 134
Figure 73: Automated Guideway Expense and Revenue Measures Peer Comparison, FY 2017 ........... 136
Figure 74: Automated Guideway Service/Service Effectiveness Measures Peer Comparison, FY 2017 138
Figure 75: How often do you ride JTA? (n = 106) ..................................................................................... 145
Figure 76: What is your primary reason for not riding any local transit? (n = 39) ..................................... 146
Figure 77: Do you agree with the following statements? (n = 65) ............................................................ 146
Figure 78: Outreach on Route Recommendations at Gateway Transit Hub, June 2019 ........................ 174
Figure 79: Frequent Routes ...................................................................................................................... 176
Figure 80: Mainline Routes ....................................................................................................................... 177
Figure 81: Connector Routes .................................................................................................................... 178
Figure 82: Limited Connector Routes ....................................................................................................... 179
Figure 83: Express and Express Select Routes ....................................................................................... 180
Figure 84: Clay Community Transportation Routes .................................................................................. 181
Figure 85: ReadiRide Zones ..................................................................................................................... 182
Figure 86: Peak-Hour Headways by Route and Branch, Proposed Services .......................................... 183
Figure 87: Agile Plan – Autonomous Shuttle Implementation Candidate Sites ........................................ 192
Figure 88: Example of Time-Bound TNC Subsidy Program (Detroit, MI) ................................................. 197
Figure 89: Example of Microtransit Service (Sacramento, CA) ................................................................ 198
Figure 90: Existing and Potential Skyway Stations Under Full System Expansion .................................. 205
TABLES
Table 1: Existing and Proposed Route Types............................................................................................... 6
Table 2: Transit Development Plan Requirements and Recommended Practice Checklist ....................... 12
Table 3: Duval Population Characteristics 2010 vs. 2017 .......................................................................... 16
Table 4: 2030 and 2040 Population Projections for Duval County ............................................................. 16
Table 5: 2030 and 2040 Employment Projections for Duval County .......................................................... 19
Table 6: Clay Population Characteristics 2010 vs. 2017 ............................................................................ 20
Table 7: 2030 and 2040 Population Projections for Clay County ............................................................... 20
Table 8: 2030 and 2040 Employment Projections for Clay County ............................................................ 23
Table 9: Duval County Population Below 150 Percent of the Poverty Level 2010 vs. 2017 ...................... 23
Table 10: Duval County Zero-Car Households 2010 vs. 2017 ................................................................... 26
Table 11: Annual Average Unemployment Rate 2010-2017 ...................................................................... 30
iv
Transit Development Plan Major Update | Contents
Table 12: Clay County Population Below 150 Percent of the Poverty Level 2010 vs. 2017 ...................... 32
Table 13: Zero-Car Households 2010 vs. 2017 .......................................................................................... 35
Table 14: Annual Average Unemployment Rate 2010-2017 Clay vs Duval Count .................................... 39
Table 15: Duval County Employment by Industry, 2010, 2030, 2040 ........................................................ 61
Table 16: Clay County Employment by Industry 2010, 2030, 2040............................................................ 66
Table 17: Fiscal Year 2018 Performance Standards .................................................................................. 85
Table 18: JTA Fixed Route Performance.................................................................................................... 87
Table 19: Other JTA Service Performance ................................................................................................. 89
Table 20: Connexion Performance ............................................................................................................. 90
Table 21: JTA Park-n-Ride Lots .................................................................................................................. 92
Table 22: Myrtle Avenue Operations Campus Facilities ............................................................................. 93
Table 23: FTE Data Peer Comparison, FY 2017 ...................................................................................... 100
Table 24: JTA Agency-wide Expenses and Revenue, FY 2015 – FY 2017 ............................................. 100
Table 25: JTA Agency-wide Operating Revenue, FY 2015 - FY 2017 ..................................................... 101
Table 26: JTA Agency-wide Capital Revenue, FY 2015 – FY 2017 ......................................................... 101
Table 27: Agency-wide Expenses and Revenue Peer Comparison, FY 2017 ......................................... 102
Table 28: JTA Fixed Route General Measures, FY 2015 – FY 2017 ....................................................... 104
Table 29: JTA Fixed Route Vehicle Measures, FY 2015 – FY 2017 ........................................................ 106
Table 30: JTA Fixed Route Service/Service Effectiveness Measures, FY 2015 – FY 2017 .................... 107
Table 31: JTA Fixed Route Expense and Revenue Measures, FY 2015 – FY 2017 ............................... 109
Table 32: Fixed Route Expense and Revenue Peer Comparison, FY 2017 ............................................ 110
Table 33: JTA Fixed Route Efficiency Measures, FY 2015 – FY 2017..................................................... 112
Table 34: JTA Demand-Response General Measures, FY 2015 – FY 2017 ........................................... 115
Table 35: JTA Demand-Response Vehicle Measures, FY 2015 – FY 2017 ............................................ 117
Table 36: JTA Demand-Response Service/Service Effectiveness Measures, FY 2015 – FY 2017......... 118
Table 37: JTA Demand-Response Expense and Revenue Measures, FY 2015 – FY 2017 .................... 120
Table 38: Demand-Response Expense and Revenue Peer Comparison, FY 2017 ................................ 121
Table 39: JTA Demand-Response Efficiency Measures, FY 2015 – FY 2017 ......................................... 123
Table 40: JTA Ferry General Measures, FY 2016 – FY 2017 .................................................................. 126
Table 41: JTA Ferry Vehicle Measures, FY 2016 – FY 2017 ................................................................... 127
Table 42: JTA Ferry Service/Service Effectiveness Measures, FY 2016 – FY 2017 ............................... 127
Table 43: JTA Ferry Expense and Revenue Measures, FY 2016 – FY 2017 .......................................... 128
Table 44: JTA Ferry Efficiency Measures, FY 2016 – FY 2017................................................................ 129
Table 45: JTA Automated Guideway General Measures, FY 2015 – FY 2017 ........................................ 130
Table 46: JTA Automated Guideway Vehicle Measures, FY 2015 – FY 2017 ......................................... 132
Table 47: JTA Automated Guideway Service/Service Effectiveness Measures, FY 2015 – FY 2017 ..... 133
Table 48: JTA Automated Guideway Expense and Revenue Measures, FY 2015 – FY 2017 ................ 135
Table 49: Automated Guideway Expense and Revenue Measures Peer Comparison, FY 2017 ............ 135
Table 50: JTA Automated Guideway Efficiency Measures, FY 2015 – FY 2017 ..................................... 137
Table 51: Fixed-Route Bus Fare Revenue and Operating Expenses for Fixed-Route Bus Services (FY
2014 – FY 2018) ........................................................................................................................ 141
Table 52: Farebox Recovery Ratio for Non-Fixed Bus Services (2018) ................................................... 141
v
Transit Development Plan Major Update | Contents
Table 53: TDP Public Meeting Locations and Dates ................................................................................ 143
Table 54: Pop-Up Events .......................................................................................................................... 143
Table 55: Average Support Score for Each Recommendation (Phase 3 Survey) .................................... 172
Table 56: Route Characteristics ................................................................................................................ 184
Table 57: Headways for JTA Services as Proposed ................................................................................ 186
Table 58: Approximate Spans of Service for JTA Services as Proposed ................................................. 188
Table 59: Origin and Destinations for Vanpool Programs (Suggested) .................................................... 194
Table 60: Fixed-Route Bus Average Daily Ridership ............................................................................... 202
Table 61: Fixed-Route Bus Annual Summary........................................................................................... 203
Table 62: Ferry Annual Summary ............................................................................................................. 204
Table 63: ReadiRide Forecasting Summary ............................................................................................. 204
Table 64: Paratransit Forecasting Summary ............................................................................................ 204
Table 65: Systemwide Annual Summary .................................................................................................. 206
Table 66: Number of Routes or Zones by Service Class .......................................................................... 207
Table 67: Average Headways ................................................................................................................... 207
Table 68: Revenue Hours by Service Class ............................................................................................. 208
Table 69: Service Improvement Phasing .................................................................................................. 211
Table 70: Operating and Capital Cost Assumptions ................................................................................. 213
Table 71: Operating and Capital Revenue Assumptions .......................................................................... 214
Table 72: Operating Cost Forecast (figures in thousands) ....................................................................... 216
Table 73: Planning Expenses (figures in thousands) ............................................................................... 216
Table 74: Operating Revenue Forecast (figures in thousands; excludes planning 5307 revenue) .......... 218
Table 75: Capital Expenditures by Year (figures in thousands)................................................................ 219
Table 76: Capital Revenue (figures in $ thousands) ................................................................................. 221
Table 77: Net Operating Balance (figures in $ thousands) ....................................................................... 223
Table 78: Net Capital Balance (figures in $ thousands) ........................................................................... 223
Table 79: Summary of TDP Action Items.................................................................................................. 224
vi
Transit Development Plan Major Update | Executive Summary
EXECUTIVE SUMMARY
The Jacksonville Transportation Authority (JTA) is the agency legally permitted to offer
transit services in Duval County and, as requested, assumed Clay County services in
2019. As mandated by state statutes, this Transit Development Plan (TDP) major
update serves as a comprehensive self-evaluation of the agency’s existing services
relative to its mission, values, goals, and objectives and the practices and performance
of peer agencies. The TDP outlines JTA’s array of strategies to improve its services
considering changing demographic and economic conditions and to align with other
plans for the Northeast Florida region over the period from 2019 to 2030.
Baseline Conditions
As a foundation for analysis and planning, this plan surveys baseline population, employment, and land
use conditions in the JTA service area. JTA provides transit services to all of Duval County, including
Jacksonville, Atlantic Beach, Baldwin, Jacksonville Beach, and Neptune Beach. As of 2019, JTA also
provides paratransit and bus transit services to neighboring Clay County, as well as, express bus services
which connect Jacksonville to Nassau County in the north and Clay County to the southwest.
The population of Clay County grew by nine percent between 2010 and 2017, at a greater rate than the
statewide population, reaching 201,472. Total population is forecast to surpass 315,000 by 2040, an
increase of 65 percent from 2010. Employment in Clay County is also projected to steadily increase to
over 89,000 jobs by 2040, a 30-year change of 63 percent. Clay County serves as a bedroom community
for Jacksonville, with 48 percent of workers commuting to Duval County for work. As in Duval County, the
proportion of residents below 150 percent of the poverty level has increased.
1
Transit Development Plan Major Update | Executive Summary
2
Transit Development Plan Major Update | Executive Summary
Travel Patterns
JTA analyzed current and projected travel patterns to identify common origins, destinations, and
transportation needs in the Jacksonville metropolitan area. Major travel patterns in and around Duval
County connect to downtown Jacksonville from all directions, in both peak and off-peak periods. The St.
Johns River acts as a natural barrier to travel across the city, limiting trips between east and west
Jacksonville to the seven bridges that cross the river. The greatest county-to-county volumes occur
between Duval County and St. Johns County, followed the second highest volume of trips to and from
Clay County.
JTA evaluates fixed routes for productivity, cost efficiency, on-time performance, and farebox recovery.
As of 2018, most routes are below agency standards for passengers per revenue hour, passengers per
revenue mile, and average passenger load. JTA routes consistently perform at or above the agency’s 75
percent on-time performance standard, with trips arriving on-time 79 percent of the time. Many routes
exhibit sub-standard economic and financial performance. JTA’s farebox recovery ratio for fixed-route
buses decreased between FY 2017 and FY 2018, as a result of diverging fare revenue and operating
expense trends. However, proposed changes to the fare structure may help close the gap between
revenues and expenses within the TPD ten-year horizon. As a result of this comprehensive operational
analysis, JTA is considering various strategies to enhance performance and strengthen its services.
These include:
Compared to peer agencies, JTA offers more revenue hours and miles of fixed-route service. Despite
covering longer distances and offering more service, JTA also operates fewer vehicles, resulting in the
highest revenue miles per vehicle in maximum service among its peers. Ridership per capita is lower for
JTA, although passenger trips per revenue hour and revenue mile are higher than peer agencies. As with
other agencies, productivity has declined over recent years along, similar to the nationwide trend in transit
ridership. Financially, JTA has higher than average expenses which are met by greater than average
revenues.
3
Transit Development Plan Major Update | Executive Summary
service when and where fixed route transit may be unfit, JTA offers numerous non-fixed route services
across many modes of transit. In Downtown Jacksonville, the elevated Skyway people mover connects
the urban core with free and frequent automated service. Introduced in 2018, JTA’s ReadiRide service
offers affordable, on-demand transportation in eight flex zones in Duval County, connecting riders to
activity centers and fixed-route transit. JTA’s other bus services include Gameday Xpress, which offers
direct service to TIAA Bank Field from fan lots during major sporting events, and paratransit service in
both Duval and Clay counties. In addition, the St. Johns River Ferry continues to provide passage for
automobiles, bicyclists, and pedestrians between Mayport and Fort George Island every 30 minutes.
Beginning in 2019, JTA initiated operations of two flexible bus routes in northeastern Clay County.
Operating under the name Clay Community Transportation (CCT), the Red and Blue routes offer
deviated-fixed route service on weekdays between Middleburg, Orange Park Mall, Green Cove Springs,
and Jacksonville Naval Air Station. For an extra fee, riders can call and request a pick-up off of the
designated route.
JTA is above its peers for demand-response transportation services, providing more revenue miles and
revenue hours than average. The agency’s productivity is in line with peers, achieving similar rates for
passenger trips per revenue mile and passenger trips per revenue hour. JTA has higher than average
expenses, however, its revenues are also above the peer average.
4
Transit Development Plan Major Update | Executive Summary
Other Modes
Additional transit modes and services are under evaluation for future implementation. The First Coast
Southeast Corridor Commuter Rail service would provide a direct transit connection between St. Johns
County and Downtown Jacksonville. The Jacksonville Skyway Modernization Program plans to overhaul
and expand the existing Skyway system with the Ultimate Urban Circulator (U2C) autonomous vehicle
service in downtown and adjacent neighborhoods.
In order to expand beyond fixed-route and paratransit bus services to provide innovative multimodal
transportation services, the JTA Technology and Innovation Department continues to realize the agency’s
vision for the integration and adoption of new mobility services. From the deployment of autonomous
vehicles, to the use of artificial intelligence and data analytics, to the growing concerns around risk
management and cybersecurity, JTA aims to leverage technology and smart, data-driven decisions that
will be responsive to the future.
Safety and Security: Ensure safety and security throughout the transportation system and in the
Authority work environment
Employee Success: Strengthen workforce through professional development opportunities that
enhance knowledge, skills, and leadership abilities
Customer Satisfaction: Deliver a superior and reliable customer experience
Financial Stability: Ensure long-term financial sustainability
Organizational Efficiency and Effectiveness: Attain the highest level of agency performance.
Sustainability: Advance transportation solutions that support environmental goals and are mindful of
the context of our community
Transformative Mobility Solutions: Deliver innovative transportation choice providing accessible
mobility throughout the community.
In addition to the goals defined for JTA as an agency, the objectives of service improvements were
identified and evaluated based on public and stakeholder outreach. Public feedback was solicited in three
phases throughout the development of the TDP and included 23 meetings with Jacksonville’s six Citizens
Planning Advisory Committees (CPACs) and other local and regional organizations, as well as an online
survey and a face-to-face survey at three major transit hubs in Duval County and Orange Park Mall in
Clay County.
5
Transit Development Plan Major Update | Executive Summary
transit demand, simplify services, improve connections to jobs, provide stronger crosstown connections,
and increase offerings of all-day service. The recommendations were developed without constraints, but
will take effect in a phased implementation between 2019 and 2030 according to expected ridership and
available budget. Figure 3 shows the frequency of service throughout the JTA system if all
recommendations are implemented.
As a part of the improved service framework, ReadiRide services will be expanded across Duval and Clay
counties. By 2023, seventeen zones will offer demand-response transportation to complement JTA’s fixed
route network. JTA will also continue to operate St. Johns Ferry seven days a week, every 30 minutes.
Alternative modes for the future transit network in the metropolitan region are also under consideration.
JTA continues to analyze opportunities to leverage Jacksonville’s extensive rail network for commuter rail
service, especially along the I-95 corridor between Downtown Jacksonville and St. Augustine in St. Johns
County. In addition, the Skyway Modernization Project will bring innovative autonomous vehicle
technology to Downtown Jacksonville, reutilizing the Skyway’s elevated guideway and expanding the
system farther across the urban core.
In total, the JTA transit system will include 48 fixed routes and 17 ReadiRide flex zones, as well as ferry,
Skyway, paratransit, and commuter rail services (Table 1).
6
Transit Development Plan Major Update | Executive Summary
7
Transit Development Plan Major Update | Executive Summary
Online and in-person surveys measured public opinion on each proposed service change, resulting in an
approval rating for each change. All proposed changes to fixed-route service received a score of 3.5 or
higher out of five, on the approval side of the scale. Public comments were also used to improve
recommendations where possible, resulting in the final proposed service improvements for JTA’s fixed
route system between 2019 and 2030.
The TDP Financial Plan describes the specific funding strategies used to implement the phasing plan
according to estimated annual financial needs. The financial plan covers operating costs, operating
revenues, funding sources, and capital needs, including investments in the existing system, fleet
expansion to support the service recommendations of this TDP, and investment in new fixed-guideway
infrastructure. In particular, the U2C Skyway project represents a large share of anticipated capital
expenses within the ten-year TDP horizon.
Action Plan
In view of the service improvements, technology investments, administrative goals, and other objectives
defined in this plan and the Blueprint for Transportation Excellence, JTA developed an action plan
containing all items to be implemented and monitored moving forward. As the responsible agency for
these action items, JTA will manage and report progress on these objectives in future TDP Annual
Updates.
8
Transit Development Plan Major Update | Introduction
1 INTRODUCTION
The Jacksonville Transportation Authority (JTA) is the agency legally permitted to offer
transit services in Duval County and, as requested, assumed Clay County services in
2019. In 2019, in order to better provide transit services to residents, employees, and
visitors in Northeast Florida, and as mandated by state statutes, JTA conducted a
comprehensive self-evaluation, hereafter referred to as the Transit Development Plan
(TDP). The TDP outlines strategic initiatives and imagines future service plans for JTA
for the ten-year period from 2019 to 2030.
Changes in travel patterns, fluctuations in the economy, increases or decreases in access to financial
resources, and advances in technology all suggest a need to periodically reexamine the transit system
and adapt to evolving conditions. The TDP is integral to JTA’s long-term health, because it affords the
agency the chance to assess its operational performance, as well as, the opportunity to develop a
strategic blueprint for continued success.
Broadly, this document reviews JTA’s vision, mission, goals, objectives, services and strategies for
improvement. The TDP summarizes the existing state of Duval County’s demographics, land use and
travel patterns and of JTA’s operations. It also incorporates findings from JTA’s studies on a variety of
modes of transport—including bus, bus rapid transit, commuter rail, ferry, skyway, autonomous transit
services, and park and ride facilities—as well as, from other related long-range plans developed by the
City of Jacksonville, Duval County, and neighboring Clay County. Indeed, this TDP is but one element of
a larger transportation planning effort across Northeast Florida. In the course of compiling this TDP, JTA
developed a Public Involvement Plan (PIP) to offer opportunities for members of the public and local
agencies to provide feedback on JTA’s provision of public transit. This feedback significantly informed the
TDP and is included herein; the specifics of the PIP are included in Appendix A: Public Involvement
Plan.
There is an additional financial incentive to the TDP, transportation projects become eligible for
specialized state funding streams when they are included in a TDP. Also, in order for a project to receive
state funding, it must be included in the North Florida TPO’s Long Range Transportation Plan (LRTP) or
the State Transportation Improvement Program (STIP). At the regional/local level, projects must be
included in the TPO’s Transportation Improvement Plan (TIP), which serves as the region’s short-range
planning document. In order to ensure this TDP aligns with the mission and direction of local, regional,
and statewide agencies’ plans, JTA reviewed many relevant initiatives, including:
FDOT’s 2060 Florida Transportation Plan (FTP), including its 2016 Strategic Intermodal System (SIS)
Policy Plan;
North Florida TPO’s 2040 Long Range Transportation Plan;
Northeast Florida Regional Council’s 2014 Strategic Regional Policy Plan;
Northeast Florida Regional Transportation Commission’s 2017 Regional Multimodal Transportation
Plan;
North Florida TPO’s 2016 Duval County Transportation Disadvantaged Service Plan;
Reality Check First Coast (a 2009 visioning exercise) and First Coast Vision;
City of Jacksonville’s 2030 Mobility Plan & 2030 Comprehensive Plan; and
Clay County’s 2040 Comprehensive Plan.
9
Transit Development Plan Major Update | Introduction
The last “major update” to JTA’s TDP was conducted in 2014; major updates are conducted every five
years. A “minor update” is also undertaken annually.
Baseline Conditions;
Existing Services & Performance Evaluation;
Public and Internal Involvement;
Situational Appraisal;
Goals and Objectives;
Service Framework: Long-Term System Concept;
10-Year Transit Plan: Alternatives Development and Education; and
Implementation Plan.
This document was developed in accordance with the state rule governing Transit Development Plans
(Florida Administrative Code 14-73.001).
The Regional Coordination appraisal analyzes some of the state and regional plans referenced earlier in
this Introduction, including the FDOT FTP, the FDOT SIS Policy Plan, and the North Florida LRTP. It also
analyzes some of JTA’s own plans and policies, including the previous TDP (2014), Blueprint 2020, on-
board surveys, and the MOVE plan. This section focuses on the synergies between JTA’s initiatives and
the longer-term state and regional visions for mobility.
10
Transit Development Plan Major Update | Introduction
The Socioeconomic Trends appraisal analyzes transit propensity in Duval and Clay counties relative to
the state of Florida with respect to the counties’ trends in median age, employment status, and car
ownership.
The Community Feedback appraisal reviews the input given by members of the public in outreach
sessions and comment periods.
The Organizational Issues appraisal reviews the management structure and recent strategic initiatives of
JTA.
The Land Use Plans and Policies appraisal continues the analysis of the other regional and municipal
plans referenced earlier in this Introduction, including the Reality Check First Coast, First Coast Vision,
the City of Jacksonville’s plans, and Clay County’s 2040 Comprehensive Plan. This section focuses on
the synergies between JTA’s initiatives and local plans for land use and transit-oriented development.
The Technology appraisal analyzes the technologies and software in use for internal and external JTA
operations, including safety and security, customer- and employee-facing apps, and transformative
mobility solutions. There is considerable attention given to Mobility as a Service as a framework for future
technological innovations.
11
Transit Development Plan Major Update | Introduction
The list of elements that must specifically be addressed within the TDP document is dictated by the
Florida Administrative Code (F.A.C.) 14-73.001. These requirements and TDP practices recommended by
FDOT are shown in Table 2 along with their locations in the document.
Existing Services & Performance Chapter 3: Existing Services & Performance Evaluation
Evaluation
12
Transit Development Plan Major Update | Introduction
Transit Friendly Land Use and 5.6 Transit-Friendly Land Use & Urban Design Efforts
Urban Design Efforts
13
Transit Development Plan Major Update | Introduction
14
Transit Development Plan Major Update | Baseline Conditions
2 BASELINE CONDITIONS
The Baseline Conditions chapter reviews the socioeconomic, land use, and travel conditions for Duval
and Clay Counties. The analysis examines recent trends in the demographic characteristics of the two
counties, with special emphasis given to the populations with a higher propensity to use transit, such as
low-income persons, youth and elderly, and those without access to an automobile. A demographic and
spatial analysis identifies the locations where transit is most likely to be successful. This demographic
analysis is complimented by a forward-looking examination of changes to land use and a consideration of
travel flows in the region. The findings of this Baseline Conditions assessment are complimented by the
evaluation of transit services in Chapter 3: Existing Services & Performance Evaluation and further
analysis of conditions affecting JTA’s ability to effectively provide transit services in Chapter 5:
Situational Appraisal.
15
Transit Development Plan Major Update | Baseline Conditions
Percent Change
2010 2017 (2010-2017)
Duval Duval Duval
County Florida County Florida County Florida
Total
864,263 18,801,310 912,043 20,278,447 6% 8%
Population
Total
342,450 7,420,802 347,783 7,510,882 2% 1%
Households
Source: MySidewalk; U.S. Census 2010 Table DP-1; U.S. Census Bureau, 2013-2017 ACS 5-Year Estimates Table
B01003, Table B11005
Population trends in Duval County aid in depicting the socioeconomic status in the region. Table 4 shows
population projections for Duval County in the years 2030 and 2040. Projections were taken from the
Northeast Regional Planning Model (NERPM) using data from the North Florida Transportation Planning
Organization (TPO) 2040 Long Range Transportation Plan (LRTP). The total population of Duval County
is projected to grow to approximately 1,002,508 by 2030, and to approximately 1,071,614 by 2040,
according to NERPM projections. Between 2010 and 2040, the total population is projected to grow by 24
percent.
Table 4: 2030 and 2040 Population Projections for Duval County
Percent Change
2010 2030 2040 (2010-2040)
Total
864,263 1,002,508 1,071,614 24%
Population
Source: U.S. Census 2010, NERPM projections, North Florida TPO 2040 LRTP
16
Transit Development Plan Major Update | Baseline Conditions
17
Transit Development Plan Major Update | Baseline Conditions
18
Transit Development Plan Major Update | Baseline Conditions
Percent Change
2010 2030 2040 (2010-2040)
Total
519,141 597,835 635,765 22%
Employment
Source: U.S. Census 2010, NERPM projections, North Florida TPO 2040 LRTP
Population trends in Clay County help depict the socioeconomic status of the region. Table 7 shows
population projections for Clay County in the years 2030 and 2040. Projections were taken from the
Northeast Regional Planning Model (NERPM) using data from the North Florida Transportation Planning
Organization (TPO) 2040 Long Range Transportation Plan (LRTP). The total population of Clay County is
projected to grow to approximately 274,090 by 2030, and to approximately 315,703 by 2040, according to
NERPM projections. Between 2010 and 2040, the total population is projected to grow by 65 percent.
19
Transit Development Plan Major Update | Baseline Conditions
Percent Change
2010 2017 (2010-2017)
Percent Change
2010 2030 2040 (2010-2040)
Total
184,295 274,090 315,703 65%
Population
Source: U.S. Census 2010, NERPM projections, North Florida TPO 2040 LRTP
20
Transit Development Plan Major Update | Baseline Conditions
21
Transit Development Plan Major Update | Baseline Conditions
22
Transit Development Plan Major Update | Baseline Conditions
Percent Change
2010 2030 2040 (2010-2040)
Total
54,454 77,514 89,027 63%
Employment
Source: U.S. Census 2010, NERPM projections, North Florida TPO 2040 LRTP
The population below 150 percent of the poverty level in Duval County and the state of Florida is shown
in Table 9. In Duval County, the population below 150 percent of the poverty level increased by 19
percent, from 191,621 in 2010 to approximately 227,865 in 2017. The percent of the total population in
Duval County below 150 percent of the poverty level increased from 23 percent in 2010 to approximately
26 percent in 2017. In Florida, the population below 150 percent of the poverty level increased by 20
percent, from 4,295,674 in 2010 to approximately 5,162,521 in 2017. The percent of the total population
in Florida below 150 percent of the poverty level increased from 24 percent in 2010 to approximately 26
percent in 2017. The 2010 and 2017 population below 150 percent of the poverty level by census tract in
Duval County is shown in Figure 8 and Figure 9. Locating the areas of Duval County with a higher
percent population below 150 percent of the poverty level provides a better picture of the socioeconomic
characteristics of the region. It also allows for locating potential areas that may need increased access to
transit service. JTA can use this information to help ensure that it is adequately serving disadvantaged
populations.
Table 9: Duval County Population Below 150 Percent of the Poverty Level 2010 vs. 2017
Percent Change
2010 2017 (2010-2017)
Duval Duval Duval
County Florida County Florida County Florida
Population Below
191,621 4,295,674 227,865 5,162,521 19% 20%
150% Poverty Level
Population Percent
Below 150% of Poverty 23% 24% 26% 26% +3% +2%
Level
Source: U.S. Census Bureau, 2006-2010 ACS 5-Year Estimates Table C17002; U.S. Census Bureau, 2013-2017
ACS 5-Year Estimates Table C17002
23
Transit Development Plan Major Update | Baseline Conditions
Figure 8: Duval County 2010 Population Below 150 Percent of the Poverty Level
24
Transit Development Plan Major Update | Baseline Conditions
Figure 9: Duval County Estimated 2017 Population Below 150 Percent of the Poverty Level
25
Transit Development Plan Major Update | Baseline Conditions
Zero-Car Households
Examining the number of zero-car households in Duval County and the state of Florida allows for further
analysis of transit ridership, as these populations may rely on transit as their primary mode, either by
choice or due to necessity. A 2017 APTA study reported that approximately 54 percent of all transit users
nationwide indicated a vehicle available to them on a regular basis, and 46 percent indicated that they
had no vehicle available. The number of zero-car households in Duval County and the state of Florida is
shown in Table 10.
From 2010 to 2017, the number of zero-car households in Duval County increased by 12 percent, from
25,351 to 28,351 households. Zero-car households make up seven percent of the total number of
households in Duval County. The number of zero-car households in Florida increased by nine percent,
from 462,112 households in 2010 to approximately 502,079 households in 2017. The number of zero-car
households make up six percent of the total number of households in Florida. The number of zero-car
households by census tract in Duval County in 2010 and 2017 are shown in Figure 10 and Figure 11.
Percent Change
2010 2017 (2010-2017)
Duval Duval Duval
County Florida County Florida County Florida
Zero-Car
25,351 462,112 28,351 502,079 12% 9%
Households
Percent of the
total number of 7% 6% 8% 7% +1% +1%
households
Source: U.S. Census Bureau, 2006-2010 ACS 5-Year Estimates Table B25044; U.S. Census Bureau, 2013-2017
ACS 5-Year Estimates Table B25044
Age
The estimated median age of residents by census tract in Duval County in 2017 is shown in Figure 12.
Examining the median age of the region provides additional demographic information that can be used in
assessing transit services. A 2017 APTA study reported that 79 percent of all transit users nationwide fall
in the age range of 25 to 54. In 2017, the median age of residents countywide is 36. The median age of
residents in the state of Florida is 42.
26
Transit Development Plan Major Update | Baseline Conditions
27
Transit Development Plan Major Update | Baseline Conditions
28
Transit Development Plan Major Update | Baseline Conditions
29
Transit Development Plan Major Update | Baseline Conditions
Unemployment Rate
The estimated annual average unemployment rate for Duval County from 2010 to 2017 is shown in Table
11, based on data from the Bureau of Labor Statistics. The unemployment rate greatly increased after the
recession but has gradually decreased since 2010. The average unemployment rate for Duval County is
4.1 percent. The estimated unemployment rate for Duval County in 2017 by census tract is shown in
Figure 13. The rate has dropped even further in 2019 to 3.6 percent.
Source: MySidewalk; U.S. Census Bureau, 2006-2010 ACS 5-Year Estimates; U.S. Census Bureau,
2013-2017 ACS 5-Year Estimates
30
Transit Development Plan Major Update | Baseline Conditions
31
Transit Development Plan Major Update | Baseline Conditions
The population below 150 percent of the poverty level in Clay County and the state of Florida is shown in
Table 12. In Clay County, the population below 150 percent of the poverty level increased by 40 percent,
from 27,655 in 2010 to 38,813 in 2017. The percent of the total population in Clay County below 150
percent of the poverty level increased from 15 percent in 2010 to 19 percent in 2017. In Florida, the
population below 150 percent of the poverty level increased by 20 percent, from 4,295,674 in 2010 to
5,162,521 in 2017.
The percent of the total population in Florida below 150 percent of the poverty level increased from 24
percent in 2010 to 26 percent in 2017. The population below 150 percent of the poverty level by census
tract in Clay County in 2010 and 2017 is shown in Figure 14 and Figure 15. Locating the areas of Clay
County with a higher percentage of population below 150 percent of the poverty level provides a better
picture of the socioeconomic characteristics of the region. It also allows for locating potential areas that
may need increased access to transit service.
Table 12: Clay County Population Below 150 Percent of the Poverty Level 2010 vs. 2017
Percent Change
2010 2017 (2010-2017)
Clay Clay Clay
County Florida County Florida County Florida
Population Below
27,655 4,295,674 38,813 5,162,521 40% 20%
150% Poverty Level
Population Percent
Below 150% of Poverty 15% 24% 19% 26% +4% +2%
Level
Source: U.S. Census Bureau, 2006-2010 ACS 5-Year Estimates Table C17002; U.S. Census Bureau, 2013-2017
ACS 5-Year Estimates Table C17002
32
Transit Development Plan Major Update | Baseline Conditions
Figure 14: Clay County 2010 Population Below 150 Percent of the Poverty Line
33
Transit Development Plan Major Update | Baseline Conditions
Figure 15: Clay County Estimated 2017 Population Below 150 Percent of the Poverty Level
34
Transit Development Plan Major Update | Baseline Conditions
Zero-Car Households
Examining the number of zero-car households in Clay County and the state of Florida allows for further
analysis of transit ridership, as these populations may rely on transit as their primary mode, either by
choice or due to necessity. A 2017 APTA study reported that approximately 54 percent of all transit users
nationwide indicated that they have a vehicle available to them on a regular basis, and 46 percent
reported that they had no vehicle available. The number of zero-car households in Clay County and the
state of Florida is shown in Table 13.
The number of zero-car households in Clay County remained virtually unchanged, from 2,073 households
in 2010 to 2,039 households in 2017. Zero-car households make up three percent of the total number of
households in Clay County. The number of zero-car households in Florida increased by nine percent,
from 462,112 households in 2010 to 502,079 households in 2017. In 2010, the number of zero-car
households made up six percent of the total number of households in Florida. In 2017, this number is
seven percent. The number of zero-car households by census tract in Clay County in 2010 and 2017 is
shown in Figure 16 and Figure 17.
Percent Change
2010 2017 (2010-2017)
Clay Clay Clay
County Florida County Florida County Florida
Zero-Car
2,073 462,112 2,039 502,079 -2% 9%
Households
Percent of the
total number of 3% 6% 3% 7% 0% +1%
households
Source: U.S. Census Bureau, 2006-2010 ACS 5-Year Estimates Table B25044; U.S. Census Bureau, 2013-2017
ACS 5-Year Estimates Table B25044
Age
The estimated median age of residents by census tract in Clay County in 2017 is shown in Figure 18.
Examining the median age of the region provides additional demographic information that can be used in
assessing transit services. A 2017 APTA study that approximately 79 percent of all transit users
nationwide fall in the age range of 25 to 54. In 2017, the median age of residents countywide is 39. The
median age of residents in the state of Florida is 42.
35
Transit Development Plan Major Update | Baseline Conditions
36
Transit Development Plan Major Update | Baseline Conditions
37
Transit Development Plan Major Update | Baseline Conditions
38
Transit Development Plan Major Update | Baseline Conditions
Unemployment Rate
The estimated annual average unemployment rate for Clay County from 2010 to 2017 is shown in Table
14, based on data from the Bureau of Labor Statistics. The unemployment rate greatly increased after the
recession but has gradually decreased since 2010. The average unemployment rate for Clay County in
2017 is 3.9 percent. The estimated unemployment rate for Clay County in 2017 by census tract is shown
in Figure 19. The rate has dropped even further in 2019 to 3.3 percent.
Table 14: Annual Average Unemployment Rate 2010-2017 Clay vs Duval Count
0
2010 2011 2012 2013 2014 2015 2016 2017 2018
39
Transit Development Plan Major Update | Baseline Conditions
40
Transit Development Plan Major Update | Baseline Conditions
Population Density
Most public transportation riders will access bus services by walking to a bus stop. Thus, the geographic
areas served by transit are generally those within a quarter- or half-mile distance from a bus stop, or a 10-
minute walk. Denser residential areas have more people living close enough to access a bus stop,
making these stronger markets for transit. Figure 20 shows the population density of JTA’s service area,
with darker colors corresponding to higher densities.
Employment Density
Employment density is a strong indicator of demand for transit, as most public transportation trips begin
or end at work. Serving employment centers also provides access to job opportunities for residents. As
with population density, higher densities are needed to support fixed-route transit service. In Figure 21,
areas above this threshold are shown with darker colors corresponding to higher densities. Areas with
higher densities can also support greater transit frequencies.
Urban Core: Downtown Jacksonville, Brooklyn, Riverside, Hogan’s Creek, and Brentwood;
Southside: Riverplace, Spring Park, Southpoint, Deerwood Center, Deerwood, Windy Hill,
Baymeadows, Craven, Regency, and the Mayo Clinic;
Westside: Hillcrest, Fairfax, Confederate Point, Jacksonville Heights, and Normandy; and
Jacksonville Beach: Along Highway A1A.
41
Transit Development Plan Major Update | Baseline Conditions
42
Transit Development Plan Major Update | Baseline Conditions
43
Transit Development Plan Major Update | Baseline Conditions
44
Transit Development Plan Major Update | Baseline Conditions
The indices draw on demographic, employment, and geographic characteristics from the ACS and
Longitudinal Employer-Household Dynamics (LEHD) datasets. These measures are then weighted based
on their relevance to transit ridership to generate each index’s score. Together with other information on
transit potential and travel flows, these indices form a basis for planning transit service in the Jacksonville
region.
The Urban Core and the Northside neighborhoods east of New Kings Road;
Southside: San Marco, Spring Glen, San Jose, Craven, and Royal Lakes;
Westside: Jacksonville Heights, Confederate Point, Cedar Hills Estate, Lackawanna, Murray Hill,
Hillcrest, and Hyde Park; and
Arlington: Jacksonville University, Regency Mall, Woodland Acres, and Holiday Hill.
45
Transit Development Plan Major Update | Baseline Conditions
46
Transit Development Plan Major Update | Baseline Conditions
47
Transit Development Plan Major Update | Baseline Conditions
Summary
The areas with the highest propensities for transit will score highly in one or more of the four indices. An
area with a high score in either the Commuter Origin Index or Employment Destination Index is suitable
for peak period service that would connect higher density residential areas with higher density
employment centers. The area’s most suitable for peak period service include:
Areas with a high score in either the Transit-Oriented Populations Origin Index or Activity Destination
Index are most suitable for all-day service, especially during midday and evening periods. Transit-
Oriented Populations are most in need of transit service that connects them to shopping, educational
institutions, government services, and other activity destinations. The areas most suitable for all-day
transit service include:
Urban Core: Downtown Jacksonville, Brooklyn, Riverside, and Urban Core neighborhoods along
Kings Avenue, Main Street, and 21st Street;
Arlington: Areas along University Boulevard; and
Westside: Residential neighborhoods west of Blanding Boulevard.
48
Transit Development Plan Major Update | Baseline Conditions
49
Transit Development Plan Major Update | Baseline Conditions
50
Transit Development Plan Major Update | Baseline Conditions
Population Density
Most public transportation riders will access bus services by walking to a bus stop. Thus, the geographic
areas served by transit are generally those within a quarter- or half-mile distance from a bus stop, or a
ten-minute walk. Denser residential areas have more people living close enough to access a bus stop,
making these stronger markets for transit. Figure 27 shows the population density of Clay County with
darker colors corresponding to higher densities.
Clay County is predominantly characterized by low-density suburban development patterns. The densest
residential areas in Clay County are Orange Park, Bellair-Meadowbrook Terrace, Lakeside, Oakleaf
Plantation, and Middleburg.
Employment Density
Employment density is a strong indicator of demand for transit as most public transportation trips begin or
end at work. Serving employment centers also provides access to job opportunities for residents. Higher
densities are needed to support fixed-route transit service. In Figure 28, areas above this threshold are
shown with darker colors corresponding to higher densities. Areas with higher densities can also support
greater transit frequencies.
Clay County employment centers are concentrated primarily along the State Road 21 (Blanding
Boulevard) corridor between Middleburg and Lakeside and in the neighborhoods of Orange Park and
Meadowbrook Terrace.
Opportunities for fixed and on-demand transit service in Clay County are concentrated primarily in the
northeast portion of the County but are generally found in the following neighborhoods: Orange Park,
Bellair-Meadowbrook Terrace, Oakleaf Plantation, Fleming Island, Lakeside, Middleburg, Green Cove
Springs, and Penney Farms.
51
Transit Development Plan Major Update | Baseline Conditions
52
Transit Development Plan Major Update | Baseline Conditions
53
Transit Development Plan Major Update | Baseline Conditions
54
Transit Development Plan Major Update | Baseline Conditions
The indices are calculated separately for Duval County and Clay County. Because relative scores are
provided within each county, a “Moderate” propensity area for Duval County is not necessarily less
suitable for transit than a “High” propensity area in Clay County.
The highest propensity areas for transit-oriented populations in Clay County (Figure 30) are Orange
Park, Bellair-Meadowood Terrace, Lakeside, Oakleaf Plantation, Middleburg, Fleming Island, and Green
Cove Springs.
The highest propensity areas for commuters (Figure 31) in Clay County are Orange Park, Bellair-
Meadowood Terrace, Fleming Island, Middleburg, and Green Cove Springs.
Job density in Clay County (Figure 32) is highest in Orange Park, Lakeside, Fleming Island, and Green
Cove Springs.
The highest propensity areas in Clay County (Figure 33) are Orange Park, Bellair-Meadowood Terrace,
Fleming Island, Middleburg, and Green Cove Springs.
55
Transit Development Plan Major Update | Baseline Conditions
Summary
The areas with the highest propensities for transit will score highly in one or more of the four indices.
Areas with a high score in either the Commuter Origin Index or Employment Destination Index are
suitable for peak period service that would connect higher density residential areas with higher density
employment centers. The area’s most suitable for peak period service include the Orange Park Mall area
and Green Cove Springs, with some additional demand along Blanding Boulevard.
Areas with a high score in either the Transit-Oriented Populations Origin Index or Activity Destination
Index are most suitable for all-day service, especially during midday and evening periods. Transit-
Oriented Populations are most in need of transit service that connects them to shopping, educational
institutions, government services, and other activity destinations. The areas most suitable for all-day
transit service include the Orange Park Mall area and Green Cove Springs, with additional demand along
Blanding Boulevard and in Keystone Heights.
56
Transit Development Plan Major Update | Baseline Conditions
57
Transit Development Plan Major Update | Baseline Conditions
58
Transit Development Plan Major Update | Baseline Conditions
59
Transit Development Plan Major Update | Baseline Conditions
60
Transit Development Plan Major Update | Baseline Conditions
61
Transit Development Plan Major Update | Baseline Conditions
Future development must be consistent with the identified uses in the Future Land Use Element, which
are further defined in the City of Jacksonville’s Land Development Code and zoning regulations. In the
Future Land Use Map, low-density residential use constitutes the largest land area, followed by
agricultural use and public buildings and facilities.
Duval County’s Future Land Use Map shows a good amount of commercial, multi-use, business park,
and industrial use where future DRIs are located. As shown on this map, the larger DRIs are located
outside the I-295 beltway. The spreading of the development to the outer portions of the County creates
additional challenges for transit service.
62
Transit Development Plan Major Update | Baseline Conditions
63
Transit Development Plan Major Update | Baseline Conditions
64
Transit Development Plan Major Update | Baseline Conditions
65
Transit Development Plan Major Update | Baseline Conditions
66
Transit Development Plan Major Update | Baseline Conditions
67
Transit Development Plan Major Update | Baseline Conditions
68
Transit Development Plan Major Update | Baseline Conditions
69
Transit Development Plan Major Update | Baseline Conditions
70
Transit Development Plan Major Update | Baseline Conditions
Major travel flows connect into downtown Jacksonville, including from the Westside, from the
Southside and Arlington, and from neighborhoods northwest of Downtown.
The highest volume of trips occurs within areas in Arlington and north of downtown Jacksonville.
There is significant travel in Southeast Jacksonville near the Mandarin, Sunbeam, and Avenues
neighborhoods near I-95 and I-295.
Major off-peak travel flows connect into downtown Jacksonville, including from the Westside.
Relative to peak period travel, off-peak period travel is more strongly concentrated as internal flows
within the traffic analysis zone groupings.
The highest volume of inter-county travel is seen between Duval and St. Johns Counties, which
includes St. Augustine and other beach communities like Ponte Vedra Beach.
The second highest volume of inter-county travel is between Duval and Clay Counties, which includes
outlying suburbs of Jacksonville like Lakeside, Orange Park and Bellair-Meadowbrook Terrace. Peak
and off-peak travel flows from these places primarily connect to neighborhoods immediately across
the Clay-Duval County border.
71
Transit Development Plan Major Update | Baseline Conditions
72
Transit Development Plan Major Update | Baseline Conditions
73
Transit Development Plan Major Update | Baseline Conditions
74
Transit Development Plan Major Update | Existing Services & Performance Evaluation
JTA is challenged with providing efficient and convenient transit service that addresses
the demands of a growing population across a City that possesses the largest land
mass in the United States. Additionally, the high volume of freight traffic and the rail
infrastructure in the County pose difficulties to scheduling transit service that operates
efficiently. The mass transit services provided by JTA include regular and express bus
service, community and on-demand shuttles, First Coast Flyer service (BRT), the
downtown Skyway monorail, the St. Johns River Ferry, paratransit services, and
Gameday Xpress service for sporting events.
JTA provides regional service to Clay County through the operation of the Clay Regional Express and
Nassau County via the Nassau Express Select. As of 2019, JTA’s contractor, MV Transportation, is also
providing paratransit service to Clay County’s transportation disadvantaged communities and deviated
fixed-route bus service. JTA also coordinates with surrounding counties on the planning of bus routes to
provide intra-county bus service.
This section provides a profile of existing services in Duval County and Clay County, beginning with a
profile of transit services and infrastructure. A detailed performance evaluation of JTA’s existing fixed
route bus services is provided in Appendix E: Comprehensive Operational Analysis and Appendix F:
Route Profiles. The System Performance Evaluation compares JTA’s performance effectiveness to peer
agencies and recent agency trends to identify strengths and weaknesses of JTA’s services. The Farebox
Report reviews trends in the agency’s farebox recovery ratio and steps that may be taken to improve this
ratio.
First Coast Southeast Commuter Rail: JTA is undertaking the evaluation for a future commuter rail
system.
Jacksonville Skyway Modernization Program: JTA is undertaking a project to modernize the
Skyway with new equipment and an expansion of autonomous service in downtown and the
neighborhoods adjacent to downtown.
Other planned and recommended developments in JTA’s service offerings are discussed in Chapter 7:
Service Framework: Long-Term System Concept.
75
Transit Development Plan Major Update | Existing Services & Performance Evaluation
76
Transit Development Plan Major Update | Existing Services & Performance Evaluation
77
Transit Development Plan Major Update | Existing Services & Performance Evaluation
78
Transit Development Plan Major Update | Existing Services & Performance Evaluation
79
Transit Development Plan Major Update | Existing Services & Performance Evaluation
80
Transit Development Plan Major Update | Existing Services & Performance Evaluation
81
Transit Development Plan Major Update | Existing Services & Performance Evaluation
82
Transit Development Plan Major Update | Existing Services & Performance Evaluation
83
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Skyway
JTA’s automated monorail known as the Skyway is designed to circulate passengers around downtown
Jacksonville. The automated people mover system travels 2.5 miles from the King Street garage across
the St. Johns River and through the central business district, ending at the Convention Center or the
Florida State College at Jacksonville downtown campus.
ReadiRide
ReadiRide is JTA’s on-demand service offered by JTA through Owl Inc. It provides affordable, on-call
transportation to customers within ReadiRide zones.
Ferry
JTA oversees the operations of the St. Johns River Ferry, which provides automobile transportation
between Mayport and Fort George Island.
As of 2017, JTA is a sponsor of Beachside Buggies (also known as Beach Buggy), which provides free
transportation within a portion of Jacksonville, Neptune, and Atlantic Beaches.
Gameday Xpress
JTA provides transportation services to Jacksonville Jaguar games and certain other special events at
TIAA Bank Field. Gameday Xpress service operates two hours before the event’s start and one hour after
the event has ended, picking passengers up and dropping them off at one of six designated parking lots.
Paratransit
Connexion is JTA's paratransit for people with disabilities who are functionally unable to use regular
accessible fixed route bus service for some or all their transportation needs, and for people who are
transportation-disadvantaged.
Governance
JTA is governed by a seven-member Board of Directors. The mayor of Jacksonville appoints three
members who must be confirmed by the Jacksonville City Council; the Florida Governor appoints three
members who must be confirmed by the Florida Senate. Each member serves a four-year, unpaid term
and can be re-appointed for a second term. If a member serves eight consecutive years, they must rotate
off the board. From its membership, the Board elects its own Chairman, Vice Chairman, Secretary and
Treasurer for one-year terms. The seventh member is the District Two Secretary from the Florida
Department of Transportation (FDOT).
84
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Passengers per Revenue Hour: the average ridership per revenue service hour;
Passengers per Revenue Mile: ridership generated per revenue service mile supplied;
Average Load: Calculated as the average number of passenger miles traveled per revenue service
mile;
Subsidy per Passenger: The total subsidy for a route is the net of operating cost and fare revenues.
This figure is divided by boardings to calculate the subsidy per passenger;
Cost per Passenger Mile: Operating costs divided by passenger miles, resulting in the average cost
of transporting a passenger for one mile;
Farebox Recovery Ratio: Revenues as a percent of operating costs; and
On-Time Performance: Departure from a timepoint no more than one minute early and less than six
minutes late.
Routes are evaluated based on nine defined route types and JTA’s Fiscal Year 2018 Route Performance
Standards (Table 17). The standard for on-time performance is 75 percent on-time for all routes.
Community Shuttle routes that were converted to limited connector and ReadiRide service in December
2018 are evaluated using FY 2018 standards and performance data.
Many JTA fixed route bus services perform below the agency’s standards:
In terms of service productivity, most routes are below their route type standard for passengers per
revenue hour, passengers per revenue mile, and average load.
Many routes exhibit sub-standard economic and financial performance, with only one route (81)
exceeding farebox recovery ratio standards for Weekday, Saturday, and Sunday service periods.
JTA routes consistently perform at or above the agency’s on-time performance standard, with trips
arriving on-time 79 percent of the time.
85
Transit Development Plan Major Update | Existing Services & Performance Evaluation
To improve data collection, enhance measurement of system performance, and strengthen its services,
JTA should consider the following strategies:
86
Transit Development Plan Major Update | Existing Services & Performance Evaluation
87
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Route Type Route Passengers per Passengers per Average Farebox Subsidy per Cost per On-Time
Revenue Hour Revenue Mile Load Recovery Ratio Passenger Passenger Mile Performance
28 4.4 0.4 1.9 4% $26.16 $5.65 83%
30 6.4 0.3 1.8 5% $17.54 $3.53 84%
31 6.3 0.5 1.5 5% $17.87 $6.59 83%
32 5.2 0.5 1.9 4% $21.78 $6.01 80%
33 9.6 0.7 1.7 8% $11.41 $5.00 72%
80 4.6 0.2 1.3 4% $24.96 $4.39 66%
Limited
81 38.3 1.5 10.4 31% $2.13 $0.45 89%
Connector
Routes 82 14.4 0.5 1.5 12% $7.25 $2.72 88%
83 3.4 0.2 1.2 3% $34.24 $5.52 90%
84* 6.0 0.3 1.3 5% $18.83 $3.99 90%
Community
85* 4.5 0.2 1.2 4% $25.48 $5.72 86%
Shuttles**
86* 4.2 0.2 0.7 3% $27.32 $10.35 76%
200 7.8 0.4 4.3 6% $14.13 $1.50 70%
201 4.1 0.2 2.4 3% $27.64 $2.23 75%
Express Routes
202 4.7 0.3 2.2 4% $24.47 $3.12 85%
205 8.2 0.4 4.5 7% $13.45 $1.27 72%
Source: JTA FY18 Metrics Workbook, FY18 JTA GTFS Feeds for Trip Statistics.
* New service; Fiscal Year 2018 data used from a comparable route
**Community Shuttles were replaced with Limited Connector and ReadiRide services in December 2018
FY 2018 data and standards for Community Shuttles are used to represent the performance of Routes 84, 85, and 86, which began service in December 2018.
88
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Passengers per Passengers per Average Farebox Recovery Subsidy per Cost per On-Time
Service Revenue Hour Revenue Mile Load Ratio Passenger Passenger Mile Performance
Ferry 97.1 54.0 24.2 46.6% $3.56 $14.85 99%
Skyway 56.5 5.8 5.5 0.0% $7.23 $7.61
ReadiRide* 1.2 0.2 1.0 3.3% $28.96 $6.86
Nassau Express* 0.3 0.0 0.3 1.3% $194.17 $7.16 60%
Gameday Xpress 52.8 5.4 27.4 85% $0.61 $0.81
Source: JTA Calendar Year 2018 Performance Metrics, JTA 2018 Alternative Service Analysis, August 2018 Connexion Ridership, JTA Gameday Xpress 2018
Season Income Statement, December 2018 ReadiRide Invoice Summary.
* Services evaluated using preliminary 2018 data.
89
Transit Development Plan Major Update | Existing Services & Performance Evaluation
ADA: $3.00;
Transportation Disadvantaged, In County: $3.50;
Transportation Disadvantaged, Out-of-County: $6.00; and
Connexion Plus: $6.00.
Performance of Connexion service is summarized in Table 20, with additional detail provided in
Appendix F: Route Profiles.
Facilities are defined as; any structure used to support public transportation services that JTA owns or
has a direct capital responsibility. JTA owns, maintains, and operates several agency and customer-
facing facilities at different locations detailed in this section.
JTA’s office for administrative authority functions (e.g. executives, human resources, finance,
procurement, etc.) is in a leased building at 121 W. Forsyth Street, Jacksonville, Fla. JTA has no capital
responsibility for this building.
Customer-Facing Facilities
Transit Centers
Rosa Parks Transit Station: Rosa Parks Transit Station is the main transfer hub for the city’s transit
system, providing a transfer point for most bus routes in JTA service area, including all of the First
Coast Flyers and the Skyway monorail as well. Rosa Parks Station has 18 bus bays.
Gateway Transit Hub: The Gateway Transit Hub is located on Norwood Avenue east of I-95 and
adjacent to the Brentwood and Norwood neighborhoods north of downtown. Features a bus loop that
connects Jacksonville to the Gateway Town Center with retail and grocery shopping options. Service
to and from Gateway Transit Hub is provided by Routes 12, 21, 51, 86, and First Coast Flyer Green,
providing users with BRT to and from Downtown Jacksonville.
90
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Regency Square Hub: The Regency Square Hub is located off the Arlington Expressway at Atlantic
Boulevard, providing a bus stop that connects users to the to the Regency Square Mall via Routes
10, 18, 19, 23, 202, and First Coast Flyer Red.
Soutel Transit Hub: The Soutel Transit Hub is located on Soutel Drive in northwest Jacksonville and
connects residents to downtown via Routes 3 and 4.
FSCJ Kent Campus Station: This station provides access to Florida State College at Jacksonville’s
Kent Campus via Routes 5, 51, and 80. It has a bus shelter and encased transit system map to aid
users in addition to a bus turnout and crosswalk.
FSCJ South Campus Station: This station is served by Routes 8, 23, and First Coast Flyer Red. It
has two bus shelters and a bus turnout.
Deerwood Village: The bus bay at Southside Boulevard and Baymeadows Road, connected at the
southern extent of route 50, provides a line of access to FSCJ Deerwood and the Deerwood Village
shopping center.
Rosa Parks Transit Station. Figure 51: JTA’s Skyway San Marco Station
Hemming Plaza Station.
Central Station.
Jefferson Street Station.
Convention Center Station.
San Marco Station.
Riverplace Station.
Kings Avenue Station.
91
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Park-n-Ride Lots
Park-n-Ride lots are served by local bus routes and Express bus service to Downtown. Avenues Walk
Park-n-Ride Center is the newest lot to open, featuring 88 parking spots and a 1,400-square foot
customer service building in addition to three bus bays, three bus shelters, bike racks, and ticket vending
services. Table 21 provides information on each Park-n-Ride lot. In addition to the lots listed in the below
table, there are numerous Skyway Park-n-Rides (Convention Center, San Marco, and Kings Avenue
Stations) accessible to users for a fee which then grants free access to the Skyway.
Agency Facilities
In addition to the public-facing facilities owned and operated by JTA, there are other facilities which the
agency uses for administrative, operations, and maintenance purposes.
Myrtle Avenue Operations Campus (100 N. Myrtle Avenue): The Myrtle Avenue Operations
Campus is the central location for bus service administration, storage, and maintenance. It comprises
10 buildings and an 803,000-square-foot parking lot; it includes a Compressed Natural Gas fueling
facility for fleet operations as well. Table 22 details the individual facilities.
92
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Building 1 “F” – Safety & 100 N. Myrtle Ave. Administrative Facility 5,285
Security
Building 2 “G” – 100 N. Myrtle Ave. Administrative Facility 9,300
Administrative
Building 3 “E” – Mass 100 N. Myrtle Ave. Administrative Facility 11,802
Transit Operations
Building 4 “C” – Service 100 N. Myrtle Ave. General Purpose 9,287
Station Maintenance Facility
Building 5 “D” – Vault 100 N. Myrtle Ave. Administrative Facility 1,246
Skyway Operations and Maintenance Center (725 Leila Street): The JTA Skyway Operations and
Maintenance Center is used for the maintenance and storage of Skyway vehicles, maintenance
vehicles, and equipment. It also houses the Skyway operations center.
JTA is developing the asset inventory for the Intercity Bus Terminal (IBT) that was recently
completed. However, at the time the TAM Plan was written, the inventory was not yet available.
JTA is currently constructing the Jacksonville Regional Transportation Center (JRTC) which, after
completion, will be added to JTA’s facility asset base to plan for future SGR needs. This facility will be
a new intermodal transit center, which will have a Skyway station inside the building and is bringing
together the Jacksonville Skyway, JTA bus service, First Coast Flyer service, intercity bus, and rail
service in one facility. JRTC at Lavilla will be situated near the Prime F. Osborn III Convention Center.
The Ultimate Urban Circulator (U2C), as described above, is another project with which JTA is
planning to overhaul and expand the current Skyway system to a wider network and autonomous
vehicles. However, at this stage, it was too early to include in the TAM Plan as the changes to the
existing infrastructure are new and additional assets are unknown.
93
Transit Development Plan Major Update | Existing Services & Performance Evaluation
JTA expects to open the BRT Southwest Corridor by December 2020 which will operate between the
Convention Center in downtown Jacksonville, via Florida State College-Jacksonville (Kent Campus),
to the Orange Park Mall in Clay County. Assets include, among others, traffic signal priority
technology, real-time bus arrival information, and CNG buses.
JTA recognizes the importance of the development of a “Regional Transit Network” to integrate services
across the region. It is important for economic growth and maintaining a high quality of life in a growing
Northeast Florida Region. JTA had supported efforts of the Northeast Florida RTC to create a regional
multimodal transportation plan. A website entitled “TransPortal” was developed by the Northeast Florida
Mobility Coalition through funding provided by the Federal Transit Administration to aid in linking public
and private transportation providers in Northeast Florida with customers. The portal provides a tool that
allows an individual to plan out a trip and generates a list of transportation options for that trip. These
options include services provided by both public and private service providers. Transportation options
provided include: traditional transit and paratransit services, bicycling, walking, car and vanpools,
volunteer driver programs, taxis, motor or long-distance coaches such as Greyhound and Megabus,
passenger rail, and social and not-for-profit agency services. 1 0F0F0F
1 Northeast Florida Coordinated Mobility Plan: A Public Transit and Human Services Transportation Plan for
94
Transit Development Plan Major Update | Existing Services & Performance Evaluation
The Clay County Council of Aging (COA) was the previous transportation provider for the County. The
Florida Commission for the Transportation Disadvantaged reassigned the COA’s transportation
disadvantaged contracts to JTA.
Governance
The Florida Commission for the Transportation Disadvantaged (CTD) contracts with Community
Transportation Coordinators (CTC) to ensure the provision of transportation services to the transportation
disadvantaged. As the CTC for Clay County, JTA is overseen by a Local Coordinating Board intended to
represent a cross-section of the local community. The Northeast Florida Regional Council may make
recommendations to the CTC as the Official Planning Agency designated by the CTD. JTA contracts with
MV transportation to provide CTC services.
Red Line: This weekday route provides service from the Orange Park Mall to Middleburg. It will
provide service to the Clay County Library, Orange Park Library, Orange Park Mall, Orange Park
Medical Center, Orange Park Senior Center, and St. Vincent’s Medical Center.
Blue Line: This weekday route provides service from NAS Jacksonville to the Pier Station. It will
serve the Clay County Courthouse, Clay County Health Department, Kindred Hospital North Florida,
Naval Air Station Jacksonville, Orange Park Library, Orange Park Mall, Orange Park Medical Center,
Orange Park Senior Center, and St. Johns River State College.
JTA Route 5: This JTA route provides service between Orange Park Mall, the Florida State College
at Jacksonville–Kent Campus, and Rosa Parks Transit Station.
Flex service: For a $1 fee, Blue and Red line services will deviate for passenger pick-ups if the
schedule permits.
Express service: The Clay County Regional Express provides service to and from downtown
Jacksonville along Roosevelt Boulevard from Rosa Parks Transit Station to the Black Creek Park-N-
Ride lot. The service runs several trips on weekdays between 5 a.m. and 7:30 p.m.
Paratransit: Connexion is JTA's paratransit for riders in Duval County with disabilities who are
functionally unable to use regular accessible fixed route bus service for some or all their
transportation needs, and for people who are transportation disadvantaged. In Clay County,
paratransit services were coordinated by the Clay County Council on Aging before ceasing operation
in December 2018. JTA currently has a contract with MV Transportation to provide paratransit
services to transportation-disadvantaged Clay County residents.
95
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Additionally, in late 2020, JTA will launch First Coast Flyer Orange service between Orange Park Mall and
Rosa Parks Transit Station.
The Ride Solutions, the public transportation provider for Putnam County, operates a route that services
the Orange Park Mall. This service connects with JTA service at the Mall. It runs from 5:30 a.m. until 7:00
p.m. every weekday.
In addition to Ride Solutions, taxi services in Clay County include Aabac Taxi, Clay Taxi, Orange Park
Taxi, and Westside Taxi. 3 2F2F2F
The Florida Department of Transportation (FDOT) Transit Office has developed the Florida Transit
Information System (FTIS) that includes several web-based systems that allow for the exchange and
analysis of transit data. The Urban Integrated National Transit Database (Urban iNTD) system is one of
four major systems under the FTIS, and can be used to conduct trend analyses, peer evaluations, and
other data queries. This system was used in this analysis to identify peer agencies to JTA based on its
urban area size, three “screening” factors and 14 “peer-grouping” factors. The three screening factors
were used to ensure the peer agencies selected operated a similar combination of modes as JTA. The
Quick Guide for Applying the “TCRP Peer Section Method,” as well as the results of this analysis, are
included in Appendix D: Peer Selection. The “peer grouping factors” were used to identify peer
agencies that are most similar to JTA. There are five “service characteristics” and nine “urban area
characteristics.” A “total likeness score” was assigned based on a combination of these factors, and the
most similar agencies based on these factors were identified as peers. The lower the likeness score, the
more similar the agency to JTA. The cities and respective transit agencies emerging from the screening
are:
Indianapolis, IN: Indianapolis and Marion County Public Transportation (IndyGo);
St. Petersburg, FL: Pinellas Suncoast Transit Authority (PSTA);
Columbus, OH: Central Ohio Transit Authority (COTA);
2Blueprint for Transportation Excellence FY 2018-2022. Jacksonville Transportation Authority. 2017. 20.
32016-2021 Clay County Transportation Disadvantaged Service Plan. Clay County Transportation Disadvantaged
Coordinating Board. 2018. 11.
96
Transit Development Plan Major Update | Existing Services & Performance Evaluation
The measures that are subdivided by mode are included in the following sections under each modal category:
97
Transit Development Plan Major Update | Existing Services & Performance Evaluation
General Measures
JTA’s service area is the largest in comparison to the selected peers and is much higher than the overall
average; however, the service area population is similar to Columbus, St. Petersburg, and Indianapolis.
JTA’s urban area is smaller than the overall average in comparison to its peers, with half of the peers
having a larger urban area and half of the peers having a smaller urban area. JTA’s urban area
population is smaller than five of the selected peer agencies and is also lower than the overall average.
JTA ranks similar in the number of passenger trips to St. Petersburg, Central Ohio, Tampa, and El Paso.
Figure 53 summarizes the square mileage of the service area, service area population, square mileage
of the urbanized area, urbanized area population, and number of passenger trips for JTA and the peer
transit systems selected for analysis. 4 3F3F
4
NTD defines transit service area as the area within ¾-mile on either side of bus route corridors or within
a ¾-mile radius around rail stations.
98
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Figure 53: Urban and Service Area Characteristics Peer Comparison, FY 2017
99
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Labor Measures
The Full Time Equivalent (FTE) count shows the number of employees that work the equivalent of full
time (i.e., one 40-hours per week employee, or two 20-hour per week employees, equals one FTE) at
each agency, in comparison to revenue hours generated and passenger trips generated. Table 23 shows
the number of employees that work full time at JTA and each peer agency, in comparison to revenue
hours generated and passenger trips generated. JTA has a larger number of FTEs, revenue hours per
employee FTE, and passenger trips per employee FTE than the peer group average value.
100
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Table 25 shows that in 2017, JTA’s local revenue made up approximately 75 percent and passenger fare
revenue made up approximately 13 percent of JTA’s operating budget. The remaining 12 percent of funds
in JTA’s operating budget came from state, federal, and other funds. These funds are included in the total
operating funds listed in Table 24.
Table 26 shows that in 2017, federal funds provided approximately 92 percent of the total capital funds
expended by JTA, and state funds made up the remaining eight percent. These funds are included in
capital funds listed in Table 24.
JTA’s expenses and revenue values are higher than the peer group average but are similar to El Paso
(Sun Metro), Columbus (COTA), and Tampa (HART). When examining operating expenses, JTA’s
expenses are approximately 23 percent higher than the peer average value, and JTA’s maintenance and
administration expenses are also higher than their peers. However, JTA’s operating funds are
approximately 22 percent higher than the peer average value. JTA’s capital funds are approximately 16
percent higher than the peer average value and are used for capital expenses related to revenue
vehicles, systems and guideways, facilities and stations, and other capital needs. Table 27 shows JTA’s
agency-wide financial information in comparison to selected peer agencies for Fiscal Year 2017. Figure
54 shows the comparisons in a graph format.
101
Transit Development Plan Major Update | Existing Services & Performance Evaluation
JTA Peer IndyGo PSTA COTA HART MATA Sun Dayton The
Group Metro RTA Rapid
Average
Operating $96,792,327 $74,436,010 $70,404,701 $66,047,790 $144,045,834 $79,925,347 $53,279,153 $64,798,436 $74,153,536 $42,833,285
Expenses
Vehicle $15,642,123 $12,766,196 $13,059,157 $11,345,906 $25,471,563 $9,882,061 $9,834,999 $12,690,693 $12,836,054 $7,009,137
Maintenance
Expenses
Non-Vehicle $5,052,014 $3,987,855 $3,102,078 $2,030,188 $9,322,109 $3,951,220 $1,756,436 $4,572,692 $5,740,539 $1,427,578
Maintenance
Expenses
General $32,336,307 $15,387,479 $15,253,422 $12,527,951 $26,695,645 $31,118,144 $10,715,314 $8,910,188 $11,521,003 $6,358,164
Administration
Expenses
Operating $97,641,482 $76,619,166 70,473,033 71,819,274 149,666,202 81,918,303 $53,449,530 67,494,292 74,187,207 43,945,490
Funds
Capital Funds $26,803,284 $22,640,148 $8,821,675 $14,695,528 $51,808,437 $9,943,461 $9,753,985 $42,064,791 $23,397,639 $20,635,670
Local Revenue $73,194,803 $54,924,653 $39,560,713 $43,445,235 $134,846,872 $46,824,737 $30,595,152 $73,858,968 $52,477,810 $17,787,735
Passenger Fare $12,704,362 $11,590,885 $10,057,717 $14,695,528 $19,688,255 $14,789,726 $7,030,476 $8,316,705 $7,702,909 $10,445,764
Revenue
102
Transit Development Plan Major Update | Existing Services & Performance Evaluation
$250
$200
27M
Expenses and Revenue (Millions)
9M 47M
25M
$150
20M
32M
5M 31M
14M 39M
$100 12M
15M 4M 27M
9M 6M
3M 13M 10M
13M 13M 2M 31M 5M 8M 13M 37M
11M 29M 144M 11M 13M
30M 135M 2M
15M 10M 8M 6M
$50 97M 14M 26M 1M
10M 7M 36M
73M 80M 74M 74M
70M 66M 7M 65M
47M 53M 52M 10M
40M 43M 43M
31M
18M
$-
Revenue
Revenue
Revenue
Revenue
Revenue
Revenue
Revenue
Revenue
Revenue
Expense
Expense
Expense
Expense
Expense
Expense
Expense
Expense
Expense
JTA IndyGo PSTA COTA HART MATA Sun Metro Dayton RTA The Rapid
Operating Expenses Vehicle Maintenance Expenses Non-Vehicle Maintenance Expenses General Administration Expenses
Local Revenue Passenger Fare Revenue Other Non-Fare Revenue
103
Transit Development Plan Major Update | Existing Services & Performance Evaluation
General Measures
Analysis of general characteristics provides an overview of JTA and how it has changed. The number of
passenger trips, passenger miles, revenue miles, revenue hours, and average passenger trip length for
fixed route service for Fiscal Years 2015 through 2017 is included in Table 28.
A comparison of passenger trips, passenger miles, revenue miles, revenue hours, and average
passenger trip length between JTA and its peer agencies is shown in Figure 55, as well as the average
group value for each category for Fiscal Year 2017. JTA is above the peer average value for all the
measures under this category except for fixed route passenger trips.
104
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Passenger Trips Peer Group Average Passenger Miles Peer Group Average
Revenue Miles Peer Group Average Revenue Hours Peer Group Average
5
4
3
2
1
0
JTA IndyGo PSTA COTA HART MATA Sun Dayton The
Metro RTA Rapid
Average Passenger Trip Length Peer Group Average
105
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Vehicle Measures
Analysis of vehicle measures provides an overview of the size of JTA and the number of vehicles
available for service. The number of vehicles available in maximum service, vehicles operated in
maximum service, and revenue miles per vehicles in maximum service for fixed route service for Fiscal
Years 2015 through 2017 is listed in Table 29.
450 50
400 45
350 40
Number of Vehicles
300
35
250
30
200
25
150
20
100
50 15
0 10
5
0
106
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Table 30: JTA Fixed Route Service/Service Effectiveness Measures, FY 2015 – FY 2017
A comparison of average age of fleet (in years), passenger trips per capita, and passenger trips per
vehicles in maximum service, passenger trips per revenue mile, and passenger trips per revenue hour
between JTA and its peer agencies is shown in Figure 58, as well as the average group value for each
category for Fiscal Year 2017. JTA is below the peer group average for all measures except the
passenger trips per vehicles in maximum service.
Source: https://www.columbusunderground.com/wp-content/uploads/2017/12/CMAX-at-Northland-Transit-Center-
1.png, no copyright infringement is intended.
107
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Figure 58: Fixed Route Service/Service Effectiveness Measures Peer Comparison, FY 2017
25 100
(Thousands)
10 40
5 20
0 0
Passenger Trips per Capita Passenger Trips per Vehicles in Max. Service
Peer Group Average Peer Group Average
Passenger Trips per Revenue Mile Passenger Trips per Revenue Hour
4.5 60
4.0 50
Passenger Trips per Revenue Mile
Passenger Trips per Revenue Mile Passenger Trips per Revenue Hour
Peer Group Average Peer Group Average
10.0
8.0
6.0
4.0
2.0
0.0
JTA IndyGo PSTA COTA HART MATA Sun Dayton The
Metro RTA Rapid
108
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Table 31: JTA Fixed Route Expense and Revenue Measures, FY 2015 – FY 2017
FY 2015 FY 2016 FY 2017 Percent Change
(FY 2015 – FY
2017)
Operating Expenses $70,455,887 $71,581,487 $74,234,599 5%
Vehicle Maintenance $10,404,723 $10,777,718 $10,898,333 5%
Expenses
Non-Vehicle $3,782,151 $4,076,337 $3,618,119 -5%
Maintenance
Expenses
General $23,240,593 $23,235,070 $24,922,424 7%
Administration
Expenses
Capital Funds $22,358,543 $24,280,401 $22,133,914 -1%
Passenger Fare $10,844,655 $10,907,338 $10,384,644 -4%
Revenue
A comparison of the amount of JTA’s expenses and revenue for Fixed Route Service for Fiscal Year 2017
in relation to its peer agencies is shown in Table 32. JTA’s expenses and revenue are higher than the
peer average value for all the measures except for the vehicle maintenance expenses. Figure 60 shows
this comparison in graph format.
109
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Table 32: Fixed Route Expense and Revenue Peer Comparison, FY 2017
JTA Peer IndyGo PSTA COTA HART MATA Sun Dayton The
Group Metro RTA Rapid
Average
Value
Operating $74,234,599 $65,136,618 $60,034,216 $61,020,161 $134,095,530 $72,349,970 $44,889,156 $55,276,038 $58,554,063 $34,873,808
Expenses
Vehicle $10,898,333 $11,389,477 $10,494,164 $11,122,143 $24,360,139 $9,090,806 $7,981,152 $11,887,192 $10,475,583 $5,704,638
Maintenance
Expenses
Non-Vehicle $3,618,119 $3,485,903 $2,427,619 $2,006,340 $8,841,964 $3,435,503 $1,503,034 $3,938,349 $4,532,962 $1,201,455
Maintenance
Expenses
General $24,922,424 $13,690,911 $13,906,073 $10,771,001 $25,041,266 $29,733,583 $9,335,774 $7,202,065 $7,962,996 $5,574,528
Administration
Expenses
Capital Funds $22,133,914 $21,721,142 $7,694,779 $14,695,528 $51,808,437 $9,613,755 $7,253,086 $42,064,791 $20,133,962 $20,504,795
Passenger $10,384,644 $10,181,183 $8,998,862 $9,535,246 $18,816,434 $13,633,263 $6,603,898 $7,689,310 $6,911,641 $9,260,806
Fare Revenue
110
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Figure 60: Fixed Route Expense and Revenue Peer Comparison, FY 2017
Expenses
$200
$180 25M
$160 9M
24M
$140
Expenses (Millions)
$120
$100 25M 30M
4M 3M
$80 11M 14M 11M 9M 7M 8M
2M 2M 5M
10M 11M 134M 4M
10M
$60 9M 12M
2M
8M
6M
$40 74M 72M
1M
6M
60M 61M 55M 59M
$20 45M
35M
$0
JTA IndyGo PSTA COTA HART MATA Sun Metro Dayton The Rapid
RTA
$50
Funds and Revenue (Millions)
$40
$30
$20
$10
$0
JTA IndyGo PSTA COTA HART MATA Sun Metro Dayton The Rapid
RTA
111
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Efficiency Measures
The efficiency measures provide an overview of JTA’s operating expenses and maintenance expenses
based on the service area population, trips generated, revenue miles and hours generated, and number
of vehicles. The operating expenses per capita, operating expenses per passenger trip, operating
expense per revenue hour, maintenance expense per revenue hour, and maintenance expense per
vehicle for fixed-route service for Fiscal Years 2015 through 2017 is listed in Table 33.
A comparison of operating expenses per capita, operating expenses per passenger trip, operating
expense per revenue hour, maintenance expense per revenue hour, and maintenance expense per
vehicle between JTA and its peer agencies is shown in Figure 61, as well as the average group value for
each category for Fiscal Year 2017. JTA is above the peer group average for all measures except the
operating expenses per capita, and vehicle maintenance expenses per revenue hour. JTA’s value is the
same as the peer group average value for operating expenses per revenue mile.
112
Transit Development Plan Major Update | Existing Services & Performance Evaluation
$250 $20
$200
$15
$150
Expenses
Expenses
$10
$100
$50 $5
$0 $0
20 50
Expenses (Thousands)
15 40
Expenses
30
10
20
5
10
0
0
113
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Key Takeaways
JTA is above the peer group average value for the number of passenger miles, revenue miles, revenue
hours, and average passenger trip length. However, it provides this service level with a lower than
average number of vehicles available at maximum service and vehicles operated at maximum service. It
also has the highest number of revenue miles per vehicles in maximum service when compared to its
peer agencies. It is below the peer group average value for passenger trips per capita, but it is above the
average peer group value for passenger trips per revenue mile, passenger trips per revenue hour, and
average age of fleet in years. This means that JTA is providing service with an older fleet than the peer
group average, while providing more trips per revenue mile and hour and providing this service with less
vehicles.
JTA’s operating expenses, non-vehicle maintenance expenses, and general administration expenses are
higher than the peer group average, but the amount of capital funds and passenger fare revenue received
is also higher than the peer group average. When examining operating expenses, JTA’s expenses are
approximately 12 percent higher than the peer group average value, but JTA’s vehicle maintenance
expenses are approximately five percent lower than the peer group average. Notably, JTA’s general
administration expenses are approximately 45 percent higher than the peer group average value. When
examining funds received, capital funds and passenger fare revenue are two percent higher than the peer
group average value. Therefore, JTA has higher than average expenses (largely general administration
expenses); however, it also has slightly higher than average funding to offset them.
When examining efficiency, JTA is above the peer group average for operating expenses per revenue
hour, operating expenses per passenger trip, and vehicle maintenance expenses per vehicle. However,
JTA is below the peer group average value for operating expenses per capita and vehicle maintenance
expenses per revenue hour. JTA’s value is the same as the peer group average value for operating
expenses per revenue mile. However, when considering Daytona RTA’s and PSTA’s outlier agency
values for operating expenses per revenue hour, operating expenses per passenger trip, and operating
expenses per revenue mile, JTA’s operating expenses are consistent with its peer agencies.
Figure 62: A JTA bus beneath the Skyway
114
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Each of the identified group of measures is used to evaluate JTA’s service against its identified peers
over a period of three years in a similar fashion as the fixed route peer review. All data was sourced from
the FTA National Transit Database. The following measures are included in this section:
General Measures
Analysis of general characteristics provides an overview of JTA and how it has changed. The number of
passenger trips, passenger miles, revenue miles, revenue hours, and average passenger trip length for
demand-response service for Fiscal Years 2015 through 2017 is included in Table 34.
A comparison of passenger trips, passenger miles, revenue miles, revenue hours, and average
passenger trip length between JTA and its peer agencies is shown in Figure 63, as well as the average
group value for each category for Fiscal Year 2017. JTA is above the peer average value for all the
measures under this category.
115
Transit Development Plan Major Update | Existing Services & Performance Evaluation
400 6
350
300 5
250 4
200 3
150 2
100
50 1
0 0
Passenger Trips Peer Group Average Passenger Miles Peer Group Average
5 250
4 200
3 150
2 100
1 50
0 0
Revenue Miles Peer Group Average Revenue Hours Peer Group Average
14
12
10
8
6
4
2
0
JTA IndyGo PSTA COTA HART MATA Sun Dayton The
Metro RTA Rapid
Average Passenger Trip Length Peer Group Average
116
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Vehicle Measures
Analysis of vehicle measures provides an overview of the size of JTA and the number of vehicles
available for service. The number of vehicles available in maximum service, vehicles operated in
maximum service, and revenue miles per vehicles in maximum service for demand-response service for
Fiscal Years 2015 through 2017 is listed in Table 35.
A comparison of vehicles available in maximum service, vehicles operated in maximum service, and
revenue miles per vehicles in maximum service between JTA and its peer agencies is shown in Figure
64, as well as the average group value for each category for Fiscal Year 2017. JTA is above the peer
average for all measures.
140
50
120
100
40
Number of Vehicles
80
60 30
40
20
20
0 10
117
Transit Development Plan Major Update | Existing Services & Performance Evaluation
A comparison of average age of fleet (in years), passenger trips per capita, and passenger trips per
vehicles in maximum service, passenger trips per revenue mile, and passenger trips per revenue hour
between JTA and its peer agencies is shown in Figure 65, as well as the average group value for each
category for Fiscal Year 2017. JTA is above the peer group average for all measures except the
passenger trips per revenue mile, passenger trips per revenue hour, and average age of fleet (in years). It
should be noted that some of the data points for PSTA are not available because PSTA does not own its
own demand-response fleet.
118
Transit Development Plan Major Update | Existing Services & Performance Evaluation
4.0
(Thousands)
0.4 3.0
2.0
0.2 1.0
0.0 0.0
Passenger Trips per Capita Passenger Trips per Vehicles in Max. Service
Peer Group Average Peer Group Average
5.0 4.0
4.0
3.0
Age of Fleet (Years)
3.0
2.0 2.0
1.0 1.0
0.0 0.0
Passenger Trips per Revenue Hour Average Age of Fleet (in yrs)
Peer Group Average Peer Group Average
0.25
0.20
0.15
0.10
0.05
0.00
JTA IndyGo PSTA COTA HART MATA Sun Dayton The
Metro RTA Rapid
119
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Table 37: JTA Demand-Response Expense and Revenue Measures, FY 2015 – FY 2017
FY 2015 FY 2016 FY 2017 Percent Change
(FY 2015 – FY
2017)
Operating $14,079,521 $13,625,770 $14,177,196 1%
Expenses
Vehicle Data Incomplete $2,575,407 $2,831,049 ---
Maintenance
Expenses
Non-Vehicle $0 $313,667 $176,456 100%
Maintenance
Expenses
General $4,363,297 $4,523,172 $4,664,933 6%
Administration
Expenses
Capital Funds $2,833,303 $406,350 $13,763 -100%
Passenger $1,004,655 $1,074,061 $1,072,358 6%
Fare Revenue
A comparison of the amount of JTA’s expenses and revenue for demand-response service for Fiscal Year
2017 in relation to its peer agencies is shown in Table 38. JTA’s expenses and revenue are higher than
the peer average value for all the measures except for the non- vehicle maintenance expenses and
capital funds. Figure 66 shows this comparison in graph format.
120
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Passenger $1,072,358 $715,888 $1,058,855 $1,333,520 $871,821 $617,985 $426,263 $627,395 $791,268 $1,184,958
Fare Revenue
121
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Expenses
$25
4M
$20 5M
1M
Expenses (Millions)
M 2M
3M
$15 1M
1M
2M 2M
3M M
1M 1M
$10 1M 1M
M
1M
M
M 16M
14M 1M 1M
2M M
M
$5 10M M 10M 10M
8M
6M 6M
5M
$0
JTA IndyGo PSTA COTA HART MATA Sun Metro Dayton The Rapid
RTA
$3.0
Funds and Revenue (Millions)
$2.5
$2.0
$1.5
$1.0
$0.5
$0.0
JTA IndyGo PSTA COTA HART MATA Sun Metro Dayton The Rapid
RTA
122
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Efficiency Measures
The efficiency measures provide an overview of JTA’s operating expenses and maintenance expenses
based on the service area population, trips generated, revenue miles and hours generated, and number
of vehicles. The operating expenses per capita, operating expenses per passenger trip, operating
expense per revenue hour, maintenance expense per revenue hour, and maintenance expense per
vehicle for demand-response service for Fiscal Years 2015 through 2017 is listed in Table 39.
A comparison of operating expenses per capita, operating expenses per passenger trip, operating
expenses per revenue hour, maintenance expenses per revenue hour, and maintenance expenses per
vehicle between JTA and its peer agencies is shown in Figure 67, as well as the average group value for
each category for Fiscal Year 2017. JTA is above the peer group average for all measures, meaning their
expenses are higher than the peer group average value for all values.
123
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Expenses
$50 $80
$40 $60
Expenses
$30
$40
$20
$20
$10
$0 $0
Operating Expenses per Revenue Mile Operating Expenses per Revenue Hour
Peer Group Average - Expenses per Passenger Trip Peer Group Average - Expenses per Capita
Peer Group Average - Expenses per Revenue Mile Peer Group Average - Expenses per Revenue Hour
$20 $30
$25
Expenses (Thousands)
$15
$20
Expenses
$10 $15
$5 $10
$5
$0
$0
124
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Key Takeaways
JTA is above the peer group average value for the general measures and the vehicle measures. JTA’s
demand-response service is generating an above the peer group average number of passenger trips,
passenger miles, revenue miles, and revenue hours, with an above the peer group average number of
vehicles operated and available at maximum service. Therefore, JTA is generating more trips, with more
vehicles operated and available at maximum service than the peer group average values.
When examining the service and service effectiveness measures, JTA is above the peer group average
value for all measures except the passenger trips per revenue mile, passenger trips per revenue hour,
and average age of fleet (in years). Its number of passenger trips per capita is similar to IndyGo, PSTA
and Daytona RTA. When examining passenger trips per revenue mile and passenger trips per revenue
hour, JTA is below the peer average value, however, there are two outliers that are driving the peer
average higher when considering the remaining peer agency values. When not considering PSTA and
The Rapid, JTA is consistent with the other peer agencies. JTA’s average age of the fleet is also lower
than the peer average value.
When examining the expense and revenue measures, JTA is higher than the peer average for all values
except non-vehicle maintenance expenses and capital funds. Notably, JTA’s non-vehicle maintenance
expenses are 149 percent lower than the peer average value, and JTA’s capital funds are 45 percent
lower than the peer agency value. JTA’s operating expenses are 45 percent higher than the peer average
value, vehicle maintenance expenses are 58 percent higher than the peer average value, and general
administration expenses are 67 percent higher than the peer average value. However, passenger fare
revenue is 33 percent higher than the peer average value.
When considering efficiency measures, JTA is above the peer group average value for all measures.
Operating and maintenance expenses are above average, and maintenance expenses greatly increased
between 2015 and 2017. JTA’s operating expenses, though above the peer average value, are similar to
all peer agencies except for Dayton RTA, which could be considered an outlier.
125
Transit Development Plan Major Update | Existing Services & Performance Evaluation
General Measures
Analysis of general characteristics provides an overview of JTA’s ferry service and how it has changed.
The number of passenger trips, passenger miles, revenue miles, revenue hours and average passenger
trip length for ferry service for Fiscal Years 2016 through 2017 is included in Table 40. All values
increased by over 70 percent in the two-year period except for average passenger trip length, which
stayed the same.
126
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Ferry Measures
Analysis of ferry measures provides an overview of the size of JTA and the number of ferries available for
service. The number of ferries available in maximum service, ferries operated in maximum service, and
revenue miles per ferries in maximum service for Fiscal Years 2016 through 2017 is listed in Table 41.
The only value that increased is revenue miles per ferries in maximum service, while the other two values
stayed the same.
127
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Table 43: JTA Ferry Expense and Revenue Measures, FY 2016 – FY 2017
FY 2016 FY 2017 Percent Change
(FY 2016 – FY 2017)
Operating $1,175,606 $2,302,822 96%
Expenses
Ferry $54,013 $93,219 73%
Maintenance
Expenses
Non-Ferry $124,922 $91,506 -27%
Maintenance
Expenses
General $456,203 $1,047,392 130%
Administration
Expenses
Capital Funds $4,758,467 $2,933,482 -38%
Passenger Fare $826,162 $1,247,360 51%
Revenue
128
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Efficiency Measures
The efficiency measures provide an overview of JTA’s operating expenses and maintenance expenses
based on the service area population, trips generated, revenue miles and hours generated, and number
of ferries. The operating expenses per capita, operating expenses per passenger trip, operating expense
per revenue hour, maintenance expense per revenue hour, and maintenance expense per ferry for ferry
service for Fiscal Years 2016 through 2017 is listed in Table 44. All values increased except for ferry
maintenance expenses per revenue hour, which decreased.
Key Takeaways
JTA’s general measure values increased by over 70 percent in the two-year period from 2016 through
2017, except for average passenger trip length, which stayed the same. This means that over the two-
year period, JTA has seen an increase in ridership, as well as an increase in the number of trips and
overall demand for the service. The ferry measures show an 84 percent increase in revenue miles per
ferries in maximum service between 2016 and 2017.
When considering the service and service effectiveness measures, over the two-year period, the average
age of fleet (in years), passenger trips per capita, and passenger trips per ferries in maximum service
increased while passenger trips per revenue mile and passenger trips per revenue hour decreased.
When examining expense and revenue measures, operating expenses, ferry maintenance expenses,
general administration expenses, and passenger fare revenue increased over the two-year period, while
capital funds and non-ferry maintenance expenses decreased. Operating expenses increased by 96
percent, ferry maintenance expenses by 73 percent, general administration expenses by 130 percent,
and passenger fare revenue by 51 percent, while capital funds decreased by 38 percent and non-ferry
maintenance expenses decreased by 27 percent.
A closer look at JTA’s efficiency measures shows an increase between 2016 and 2017 for all measures,
except the ferry maintenance expenses per revenue hour, which decreased by six percent in the two-year
period. Notably, ferry maintenance expenses per vehicle increased by 73 percent.
129
Transit Development Plan Major Update | Existing Services & Performance Evaluation
General:
Expense and Revenue:
Passenger Miles;
Operating Expenses;
Passenger Trips;
Vehicle Maintenance Expenses;
Revenue Miles;
Non-Vehicle Maintenance Expenses;
Revenue Hours; and
General Administration Expenses;
Average Passenger Trip Length.
Capital Funds;
Vehicle: Passenger Fare Revenue; and
Vehicles Available in Maximum Service; Average Fare.
Vehicles Operated in Maximum Service; and
Efficiency:
Revenue Miles per Vehicles in Maximum
Operating Expense per Capita;
Service.
Operating Expense per Passenger Trip;
Service/ Service Effectiveness: Operating Expense per Revenue Hour;
Average Age of Fleet (years); Maintenance Expense per Revenue Hour;
Vehicle Trips per Capita; and
Passenger Trips per Vehicles in Max Maintenance Expense per Vehicle.
Service;
Passenger Trips per Revenue Mile; and
Passenger Trips per Revenue Hour.
General Measures
Analysis of general characteristics provides an overview of JTA and how it has changed. The number of
passenger trips, passenger miles, revenue miles, revenue hours and average passenger trip length for
automated guideway service for Fiscal Years 2015 through 2017 is included in Table 45. Over the three-
year period, all values decreased.
A comparison of passenger trips, passenger miles, revenue miles, revenue hours and average passenger
trip length between JTA and Miami-Dade County DTPW–Transit is shown in Figure 69. JTA falls below
Miami-Dade County DTPW–Transit for all values.
130
Transit Development Plan Major Update | Existing Services & Performance Evaluation
1.0 100
Revenue Hours (Thousands)
Revenue Miles (Millions)
0.8 80
0.6 60
0.4 40
0.2 20
0.0 0
JTA Miami-Dade JTA Miami-Dade
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
JTA Miami-Dade
131
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Vehicle Measures
Analysis of vehicle measures provides an overview of the size of JTA and the number of vehicles
available for service. The number of vehicles available in maximum service, vehicles operated in
maximum service, and revenue miles per vehicles in maximum service for automated guideway service
for Fiscal Years 2015 through 2017 is listed in Table 46.
A comparison of vehicles available in maximum service, vehicles operated in maximum service, and
revenue miles per vehicles in maximum service between JTA and Miami-Dade County DTPW–Transit is
shown in Figure 70. JTA falls below Miami-Dade County DTPW–Transit for all values.
45
25
Revenue Miles per Vehicle (Thousands)
40
Number of Vehicles
20 35
30
15
25
10
20
5 15
10
0
JTA Miami-Dade 5
Vehicles Available in Max Service
0
Vehicles Operated in Max Service JTA Miami-Dade
132
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Table 47: JTA Automated Guideway Service/Service Effectiveness Measures, FY 2015 – FY 2017
FY 2015 FY 2016 FY 2017 Percent Change
(FY 2015 – FY 2017)
Average Age of Fleet 16.6 17.2 18.2 10%
(in years)
Passenger Trips 1.31 0.95 1.02 -23%
per Capita
Passenger Trips 219,305.50 162,135.67 175,603.50 -20%
per Vehicles in
Maximum Service
Passenger Trips 7.80 7.20 6.80 -13%
per Revenue Mile
Passenger Trips 87.60 76.00 74.00 -16%
per Revenue Hour
A comparison of average age of fleet (in years), passenger trips per capita, and passenger trips per
vehicles in maximum service, passenger trips per revenue mile, and passenger trips per revenue hour
between JTA and Miami-Dade County DTPW–Transit is shown in Figure 72. JTA falls below Miami-Dade
County DTPW–Transit for all measures except average age of fleet (in years).
133
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Figure 72: Automated Guideway Service/Service Effectiveness Measures Peer Comparison, FY 2017
Passenger Trips per Capita, per Revenue Mile, and per Revenue
Hour
100.0
90.0
80.0
Passenger Trips per Capita
70.0
60.0
50.0
40.0
30.0
20.0
10.0
0.0
JTA Miami-Dade
Passenger Trips per Capita Passenger Trips per Revenue Mile Passenger Trips per Revenue Hour
18
16
14
Age of Fleet (Years)
12
10
0
JTA Miami-Dade
134
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Table 48: JTA Automated Guideway Expense and Revenue Measures, FY 2015 – FY 2017
FY 2015 FY 2016 FY 2017 Percent Change
(FY 2015 – FY 2017)
Operating $6,156,242 $6,535,724 $6,077,710 -1%
Expenses
Vehicle $1,986,912 $2,358,165 $1,819,522 -8%
Maintenance
Expenses
Non-Vehicle $1,196,615 $1,218,898 $1,165,933 -3%
Maintenance
Expenses
General $1,506,428 $1,438,985 $170,558 -89%
Administration
Expenses
Capital Funds $1,418,614 $621,121 $1,722,125 21%
Passenger --- --- --- ---
Fare Revenue
A comparison of the amount of JTA’s expenses and revenue for Fixed Route Service for Fiscal Year 2017
in relation to Miami-Dade County DTPW–Transit is shown in Table 49. JTA is below Miami-Dade County
DTPW–Transit for all values. Figure 73 shows this comparison in graph format.
Table 49: Automated Guideway Expense and Revenue Measures Peer Comparison, FY 2017
JTA Miami-Dade
Operating Expenses $6,077,710 $28,675,295
Vehicle Maintenance Expenses $1,819,522 $8,997,960
Non-Vehicle Maintenance Expenses $1,165,933 $6,696,907
General Administration Expenses $1,701,558 $4,235,436
Uses of Capital Funds $1,722,125 $4,792,430
Passenger Fare Revenue --- ---
135
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Figure 73: Automated Guideway Expense and Revenue Measures Peer Comparison, FY 2017
Expenses
$60
$50 4M
Expenses ( Millions)
$40 7M
9M
$30
2M
$20
1M 29M
$10 2M
6M
$0
JTA Miami-Dade
$5.0
Funds and Revenue (Millions)
$4.0
$3.0
$2.0
$1.0
$0.0
JTA Miami-Dade
136
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Efficiency Measures
The efficiency measures provide an overview of JTA’s operating expenses and maintenance expenses
based on the service area population, trips generated, revenue miles and hours generated, and number
of vehicles. The operating expenses per capita, operating expenses per passenger trip, operating
expense per revenue hour, maintenance expense per revenue hour, and maintenance expense per
vehicle for automated guideway service for Fiscal Years 2015 through 2017 is listed in Table 50.
A comparison of operating expenses per capita, operating expenses per passenger trip, operating
expense per revenue hour, maintenance expense per revenue hour, and maintenance expense per
vehicle between JTA and Miami-Dade County DTPW–Transit is shown in Figure 74. JTA falls below
Miami-Dade County DTPW–Transit for operating expenses per capita and is above Miami-Dade County
DTPW–Transit for operating expenses per passenger trip, operating expenses per revenue mile, and
operating expenses per revenue hour. Overall, it appears that while JTA’s operating expenses per capita
are lower than Miami-Dade’s, all other operating expenses are higher.
137
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Figure 74: Automated Guideway Service/Service Effectiveness Measures Peer Comparison, FY 2017
$400 $40
$350 $35
$300 $30
$250 $25
Expenses
Expenses
$200 $20
$150 $15
$100 $10
$50 $5
$0 $0
JTA Miami-Dade JTA Miami-Dade
Operating Expenses per Capita Operating Expenses per Passenger Trip
Operating Expenses per Revenue Hour Operating Expenses per Revenue Mile
$340
$120
$330
$100
Expenses (Thousands)
$320
$80
Expenses
$310
$60
$40 $300
$20 $290
$0 $280
JTA Miami-Dade JTA Miami-Dade
138
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Key Takeaways
JTA’s automated guideway transit service is similar in characteristic to Miami-Dade DTPW–Transit’s
automated guideway service. When examining the general measures and vehicle measures for JTA, the
values fall below Miami-Dade for all measures. This is likely because Miami-Dade’s service is interfaced
with its Metrorail service as well as the Brightline service, providing connectivity between routes, boosting
the number of passenger trips, passenger miles, revenue trips, and revenue hours. JTA has a lower
number of vehicles available and operated in maximum service as well, most likely due to demand.
When examining service and service effectiveness measures, JTA’s number of passenger trips per
capita, per revenue mile, and per revenue hour are below Miami-Dade’s. However, JTA’s average age of
fleet is higher than Miami-Dade’s. This means JTA is operating an older fleet with a lower number of
passenger trips for the overall service population. This may be due to the fact that JTA’s service area and
population is about half the size of Miami-Dade’s.
JTA’s expenses and revenue are both lower than Miami-Dade’s. Most notably, Miami-Dade’s operating
expenses amounted to over $28 million in 2017, while JTA’s operating expenses were only $6 million.
Miami-Dade received approximately $4 million in capital funds, while JTA received approximately $2
million.
When examining efficiency, JTA’s operating expenses per revenue hour, per passenger trip, and per
revenue mile, as well as its maintenance expenses per revenue hour, were significantly higher than
Miami-Dade’s. JTA’s maintenance expenses per vehicle were lower than Miami-Dade’s.
In 2014, the JTA entered a partnership with retail outlets Winn-Dixie and Walgreens to sell STAR Cards
and day passes. These “Pass Partners” provide customers with more locations to buy passes and reload
contactless cards.
In 2018, the Northeast Florida Regional Transportation Commission conducted a fare study to examine
regional fare policies and fare media and identify a common transit fare payment system for regional
transit.
139
Transit Development Plan Major Update | Existing Services & Performance Evaluation
This proposal introduced an Automatic Fare Indexing Policy, where fare policies would be adjusted more
frequently based on factors including the Consumer Price Index and JTA’s operating budget and labor
costs.
The proposed fare modifications would also restructure fares on some non-fixed services, including St.
Johns River Ferry and ReadiRide.
Implement recommendations from the Northeast Florida Regional Fare Study: These strategies
will help facilitate coordination of fare collection and provide more convenient regional trips for
passengers. The major recommendations of the study are to:
─ Implement a governance structure and agree to develop a regional fare, cost-sharing framework,
and associated technologies;
─ Develop a cost-sharing model to identify the costs of current services that are associated with
each county served, reflecting that a passenger may begin a trip in a home county and end a trip
in a non-home county;
─ Coordinate fare policies to ensure fares are equitable and established in a consistent manner,
even if not all fares are the same rate;
─ Procure emerging technology while utilizing existing technology that supports fare collection and
payment, including ticketing through an all-in-one smartphone application; and
─ Implement the new fare collection system using an incremental process to minimize the risk of
disruption to passengers and provide a smooth and successful start-up.
Implement recommendations from the Long-Term System Concept for fixed-route services:
These recommendations focus on service optimization, providing high-frequency service along the
busiest corridors and necessary coverage in transit-dependent neighborhoods.
Provide free or discounted transfers between services: With Jacksonville as the largest city by
area in the contiguous United States, free transfers could engage a broader base of riders by
connecting customers to more activity centers around the region. If the transfer policy is updated, the
base fare for JTA services should be revisited to ensure agency revenues remain stable or increase.
Monitor ridership impacts following the implementation of any fare modifications in the future.
Continue Pass Partners program: Continue efforts with Winn-Dixie, Walgreens, and potentially
other pass providers to offer customers additional options for where they can purchase STAR Cards
and day passes.
Continue partnering with local universities: Continue to foster relationships with local educational
entities to offer reduced fare rates for low-income university students.
Continue partnering with private transit service providers: This effort will help keep operating
costs efficient while expanding the transit coverage area and attracting new riders.
140
Transit Development Plan Major Update | Existing Services & Performance Evaluation
Table 51: Fixed-Route Bus Fare Revenue and Operating Expenses for Fixed-Route Bus Services (FY 2014 – FY 2018)
FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2017 – FY 2018 FY 2014 – FY 2018
Total % Change Total % Change
Change Change
Operating
Expenses $66,318,587 $70,455,887 $71,581,487 $74,234,599 $76,037,453 $1,802,854 2.4% $9,718,866 14.7%
Fare
Revenue $11,081,896 $10,844,655 $10,907,338 $10,384,644 $10,452,473 $67,829 0.7% -$629,423 -5.7%
Farebox
Recovery 16.7% 15.4% 15.2% 14.0% 13.7% -1.7% -17.7%
Source: Results for FY 2014 to FY 2017 based on NTD (FY 2014 -FY 2017) data. FY 2018 results based on JTA Revenue Report FY 2018 and JTA Metrics
Workbook FY 2018, including revenue from cash, pass, and mobile app payments.
Table 52: Farebox Recovery Ratio for Non-Fixed Bus Services (2018)
Farebox
46.6% NA* 10% 3.3% 1.3% 85.1%
Recovery
Source: JTA 2018 Route Performance
*The Skyway is free to ride.
141
Transit Development Plan Major Update
Jacksonville is one of the largest cities in the United States, making it very hard to reach out to the public
with face-to-face meetings. It is difficult to obtain feedback on a project with the scope of a TDP, since the
effort is systemwide, containing many recommendations that impact the entire region, as opposed to
projects that are smaller in scale and limited to a specific geographical location.
In close coordination with the JTA, it was decided to use the city’s existing outreach program through the
Citizens Planning Advisory Committee (CPAC) meetings. Jacksonville's more than 200 neighborhoods
are divided into six planning districts, each with a CPAC. The public meeting program for the TDP project
has been closely coordinated with the CPAC members. The primary purpose of the CPACs is to maintain
open and effective communication between Jacksonville residents, businesses, neighborhoods,
community organizations, educational institutions, and city government.
In addition to the CPAC meetings, the public involvement program included reaching out to existing
groups and agencies, such as the North Florida Transportation Organization, the Bike and Pedestrian
Advisory Committee (BPAC), the Jacksonville Transportation Advisory Committee (JTAC) and
CareerSource Northeast Florida. The full list of meetings held during Phase 1 and Phase 2 is listed in
Table 53.
142
Transit Development Plan Major Update | Public and Internal Involvement
Two other public outreach efforts were part of the TDP process. These were an online survey and a face-
to-face survey at three of the major transit hubs in Jacksonville and at the Orange Park Mall in Clay
County (Table 54).
143
Transit Development Plan Major Update | Public and Internal Involvement
The TDP outreach process followed outreach guidelines approved by the Florida Department of
Transportation (FDOT) and the local TPO’s Public Involvement Plan (PIP), which are approved processes
by both the Federal Transit Administration (FTA) and the Federal Highway Administration (FHWA). As
part of the TDP process, a separate meeting was held with the regional workforce organization.
Coordination with the regional workforce also took place through the TPO outreach process. As members
of the TPO committee, all the local governments and agencies were involved with the development of the
TDP from the development of the mission, goals, objectives, alternatives, and the 10-year implementation
program.
The first step in the TDP process was the development of the PIP. The PIP plan was developed in close
coordination with the JTA and submitted by the JTA to the FDOT on March 13, 2019, for review. No
comments on the PIP process was received.
The TDP was presented to CPAC members at two different stages. In Phase 1, members were alerted to
the TDP Update, were provided information about the project and the process, and could provide input
and ask questions. During Phase 2, CPAC members were informed about the analysis of the population
and employment growth, the characteristics of the population, the characteristics of the transit services,
and the strategies that were considered to increase the efficiency of the system while addressing the
service needs in the different markets.
CPAC meetings are well attended, and their membership reflects the diversity of the area they represent.
The membership consists of residents, business owners, and elected officials. Members were engaged in
the discussions and provided pertinent information to the City and its agencies.
In addition to the CPAC meetings, the TDP process was presented to the Citizens Advisory Committee
(CAC) to the North Florida TPO, the Technical Coordinating Committee (TCC) to the North Florida TPO,
the City’s Bike and Pedestrian Advisory Committee (BPAC), the JTAC, and the TPO Board. The sign-in
sheets associated with these meetings are included in Appendix B: Public Outreach Materials. Like the
CPAC meetings, these committee meetings are well attended, and their members represent the different
areas within the study area.
The BPAC was interested in the integration of biking with the transit service. The JTA bike share program
was discussed, which initially will focus on the downtown area. The JTAC meeting discussion focused on
paratransit service and the flex zone service the JTA is currently providing.
The city, JTA, and TPO staff ensured that those present signed in; they were also responsible for writing
up meeting summaries. All sign-in sheets are in the Appendix B of this TDP. The comments made and
the specific questions raised at the meetings are also documented in Appendix B. The public’s interest
and questions covered a wide range of topics, including questions about specific bus routes and bus
stops and questions related to implementation of new modes such as BRT and rail service. Questions
144
Transit Development Plan Major Update | Public and Internal Involvement
were asked about funding sources as well as the socioeconomic data sources used to analyze the future
needs.
4.2 Phase 1
During Phase 1 of the study, 12 public outreach meetings were held, six of which were coordinated with
the different Duval County CPACs. Prior to attending the meetings, a one-page flyer was developed
which contained pertinent information regarding the purpose, goals, schedule, and the TDP development
process. The flyer was distributed to all the CPAC members prior to the meetings by the CPAC secretary.
In addition, a PowerPoint presentation was developed which allowed for a more in-depth discussion
regarding the TDP goals, schedule, and process.
At the end of January, JTA launched an online survey; survey questions are included in Appendix B:
Public Outreach Materials. Public meeting attendees were asked to visit the project website to provide
additional input into the TDP process through the survey. The JTA asked the City of Jacksonville, the
North Florida TPO, and Florida State College at Jacksonville to place the survey on their websites as well.
4.2.1.1 Demographics
Respondents were asked basic demographic questions to comply with Title VI data collection. Additional
demographic questions were also asked to understand other identities that may influence their
perceptions and preferences.
More than 60 percent of respondents stated they were white, while 28 percent stated they were black
or African-American.
Sixty-two percent of respondents stated their annual household income was under $50,000.
Almost all respondents (98 percent) stated they spoke English as their primary language.
Active duty military or veterans counted for 20 percent of respondents.
145
Transit Development Plan Major Update | Public and Internal Involvement
Figure 76: What is your primary reason for not riding any local transit? (n = 39)
More frequent bus service (63 percent) over longer service hours (37 percent);
More weekend service (61 percent) over more weekday service (39 percent);
More bus stops for less walking (71 percent) over fewer bus stops for faster service (29 percent);
Buses running on more streets (53 percent) over buses running more frequently (47 percent); and
Improving existing service (58 percent) over serving new areas (42 percent).
146
Transit Development Plan Major Update | Public and Internal Involvement
4.3 Phase 2
During Phase 2 of the study, 11 public outreach meetings were held. Six of these public outreach
meetings were coordinated with the different CPACs within Duval County. For these meetings, a one-
page flyer was developed which contained pertinent information regarding the data that was analyzed,
the findings based on the analysis of the data, and the strategies that were being considered to address
the transit needs in Duval county. The flyer was distributed prior to the meeting by the CPAC secretary to
all the CPAC members. In addition, a PowerPoint presentation was developed, which allowed for a more
in-depth discussion regarding the TDP data and the findings.
During Phase 2, the meetings and presentations focused on the analysis of the different data items
related to socioeconomic data and ridership information. The assessment of the existing conditions was
presented numerically, as well as, on maps. The analysis and presentation focused on current and future
year data as projected by the North Florida TPO. The growth patterns were displayed for the population
and the employment together with land use densities and transit propensities. The characteristics of the
population was displayed as well. Characteristics displayed included income (where the focus was on the
population at the 150% poverty level), zero-car households, and the elderly population. The different
transit markets and trip types were discussed to explain how these characteristics and growth patterns
affect the transit route planning process.
Large new developments were mapped out and their location and land use characteristics were
discussed. In addition, the travel patterns that were simulated through the use of the travel demand model
were shown. These travel patterns were projected to the year 2030, based on the socioeconomic data
projections developed by the North Florida TPO.
Next, the strategies that were being considered to address the different needs and markets were outlined.
The frequency and time span of service was discussed, as well as, the need to improve effectiveness and
efficiency in the system.
During each meeting, the schedule was shown and all the tasks that were accomplished, being worked
on, and planned to start were outlined on the schedule. Any changes in the schedule were discussed to
ensure that none of the steps within the study would delay the study.
147
Transit Development Plan Major Update | Public and Internal Involvement
recommendations before the final phase of public outreach. Additional discussion of the
recommendations process is provided in Chapter 7:Service Framework - Long-Term System Concept.
4.5 Phase 3
The purpose of Phase 3 of outreach was to solicit public feedback on draft recommendations for changes
to local bus, express buses, First Coast Flyer BRT, ReadiRide zones, and Clay Community Transit (CCT)
routes. To engage the public, the JTA held pop-up events at transit hubs. At the pop-ups, riders could
learn about the draft recommendations, ask questions, and take a survey about their support of the
recommendations. Materials at the event included information boards explaining the TDP process in
English and Spanish, route sheets explaining each recommendation, and iPads to take the survey.
Additional discussion of how public engagement informed the service development process is provided in
Chapter 7: Service Framework: Long-Term System Concept.
For riders that did not have time to take the survey, postcards with a URL to the online survey were
handed out. The survey was also advertised on the JTA website and social media. Route sheets were
linked in the survey so respondents could understand the changes.
4.5.1.1 Demographics
Respondents were asked basic demographic questions to comply with Title VI data collection. Additional
demographic questions were also asked to understand other identities that may influence their
perceptions and preferences.
From those who gave their race or ethnicity, 44 percent stated they were black or African American,
while 39 percent stated they were white.
From those who gave their annual household income, 77 percent stated their household income was
under $50,000.
From those who gave their primary language, 93 percent stated their primary language was English.
From those who gave their military status, 6 percent stated they were active duty or veterans of the
military.
148
Transit Development Plan Major Update
5 SITUATIONAL APPRAISAL
Planning for transit services through the development of a TDP requires consideration
of other transportation plans and policies that affect the region. This section considers
plans and studies that impact Duval and Clay Counties and their potential effects on the
development of JTA’s TDP.
Consideration of these focus areas allows for the identification of potential key initiatives that relate to
JTA’s mission.
A Vision Element;
A Policy Element; and
An Implementation Element.
It establishes long-range goals to provide a policy framework for expenditure of federal and state
transportation funds that will guide transportation decisions in Florida for the next 50 years. There are
seven goals identified in the plan, the first four of which address the performance of Florida’s
transportation system, while the last three address how transportation supports statewide priorities:
Goals 3, 4, 6, and 7 relate directly to the enhancement of transit service and encourage the statewide
effort to promote context sensitive design and complete streets implementation. The FTP identifies
actions to implement the goals of the FTP, with emphasis on transportation decision-making, funding and
finance, and progress tracking and reporting.
149
Transit Development Plan Major Update | Situational Appraisal
This Policy Plan provides three objectives to address planning and investments related to the SIS over
the next five years:
Ensure the efficiency and reliability of multimodal transportation between Florida’s economic regions
and between Florida and other states and nations;
Expand transportation choices and integrate modes for interregional trips; and
Provide transportation systems to support Florida as a global hub for trade, tourism, talent,
innovation, business, and investment.
All three objectives relate to the promotion of transit service. Improving intermodal connectivity and
reliability between regions promotes economic growth and competitiveness for the entire state.
Many of these goals support and promote transit services. The Cost Feasible Plan of the 2040 LRTP
includes transit capacity projects equating to approximately $1 Billion. Project types include BRT,
commuter rail, ferry slip replacement, streetcar, regional transportation center improvements, and Park
and Ride Lots.
150
Transit Development Plan Major Update | Situational Appraisal
develop a Regional Multimodal Transportation Plan for Northeast Florida, including identifying and
securing dedicated funding. The Plan, which was published in April 2017, includes five goals:
Goals 2 and 3 related directly to the promotion of transit service. Projects included in the Regional
Multimodal Transportation Plan were selected using “regional significance” criteria, and “coordinated
regional transit services” was identified as the RTC’s top priority. A series of action items were listed for
the implementation of this project, with immediate, near term, and long-term actions identified.
151
Transit Development Plan Major Update | Situational Appraisal
The goals from the TDP Major Update from Fiscal Year 2014 to 2024 include:
Customer Service: Increase customer satisfaction by providing a superior and reliable customer
experience;
Safety and Security: Ensure safety and security throughout the transit system and in the agency
work environment;
Mobility: Deliver accessible transportation choices, providing mobility, livability, economic prosperity,
and environmental sustainability throughout the community;
Financial Stability: Providing for long-term stability, while increasing our modal share and service;
Education and Training: Inform the community on the value of a quality public transportation system
and develop a highly qualified JTA workforce; and
Effectiveness and Efficiency: To deliver effective and quality multimodal transportation services
and facilities in an efficient manner.
The Route Optimization Initiative objectives were intended to increase ridership, increase annual
recurring revenues, result in no increase in annual operating budget, and to reinvest increased revenue
from ridership into service enhancements. In March of 2015, the ridership was up 10.1 percent compared
to March of 2014. The average weekday ridership was up seven percent. The average ridership on
Saturdays increased by 10 percent and on Sundays by 15 percent. The ridership average over the first
four months of the implementation was up six percent with by more than 200,000 trips over the same
period previous year.
Enhancements included adding a frequent transit network consisting of 22 routes with 30-minute
frequencies or better. The network is over 100 miles long and serves 90 percent of current JTA
customers. Three new express routes were also added connecting to park and rides as a way of
accessing new markets. The changes were completed and rolled out in late 2014 and by all accounts
have been a resounding success.
The downtown portion of the project is in operation. It includes enhancements such as branded stations,
dedicated lanes at Broad, Jefferson, Bay and Forsyth, a queue jump on Forsyth, streetscapes, Transit
Signal Priority (TSP), and ticket vending machines. The second phase of the project, the North Flyer
(Green Line), began service in 2015. It includes 18 branded stations, eight CNG buses, a Park-n-Ride lot
at Lem Turner/I-295, and transit signal priority. The Southeast Flyer (Blue Line), opened in 2016,
operates from Rosa Parks to Avenues Walk Park-n-Ride. This line includes seven branded stations and
152
Transit Development Plan Major Update | Situational Appraisal
serves Rosa Parks Transit Station, the LaVilla neighborhood, Courthouse, the JRTC, Southbank, and
Kings Avenue in the study area. The East Flyer (Red Line) began service from downtown via Arlington
Expressway to the beaches. While the Southwest Flyer (Orange Line) is under final design. This line will
provide service from downtown to the Orange Park Mall.
TOD program
JTA developed a Transit-Oriented Development (TOD) Policy to encourage TOD and redevelopment
outside the Urban Core. It was developed to promote new development and redevelopment in areas
adjacent to transit facilities, such as Skyway stations, bus rapid transit stations, and intermodal stations.
The development will potentially increase transit ridership, as well as raise property values on the
adjacent land. The policy is meant to establish a framework for JTA to use in evaluating development
proposals on property owned or overseen by JTA and facilitate coordination with local jurisdictions and
governmental approval agencies. Transit-oriented development was originally incorporated into the City
of Jacksonville Zoning Code under ordinance 2007-587-E, which created approval procedures, design
standards, and criteria for location and development of transit-oriented developments.
Most recently, the JTA received a $1 million TOD Pilot Program grant from the FTA to analyze what types
of developments or land uses can best support transit service in the downtown area around the U2C
system.
153
Transit Development Plan Major Update | Situational Appraisal
MOVE plan
JTA developed the Mobility Optimized through Vision and Excellence (MOVE) plan to address the digital
evolution impacting the transportation system. The MOVE transit system developed by JTA is meant to
allow customers to use their handheld devices to customize multimodal trips through scheduling and
planning, mobile ticket purchasing and route service updates in real-time. The MOVE plan outlines why it
is a JTA priority, identifies MOVE-related initiatives in the region and Jacksonville area, and lists strategic
investments related to the promotion of advanced technologies.
Simplify the bus schedules to make them easier to understand, contain chronological, accurate and
clear timepoints;
Coordinate the times of bus routes so that transfers are easier to make;
Provide Green Line users direct access to NAS Jacksonville and provide a more streamlined and
frequent routes connecting northeast Clay County with Green Cove Springs;
Increase service frequencies and span of service, as resources are available;
Better inform and educate the public and improve the branding of the flex route service;
Continue to encourage Transportation Disadvantaged (TD) riders to use flex routes, if they are able,
by marketing the flex route system to TD riders and training TD riders on how to effectively use the
service;
Consider regular meetings among Clay County, Clay Transit, and JTA to monitor system
performance and discuss ways to improve service effectiveness and efficiency;
Include a process for Clay County’s staff and/or Board to effectively contribute to public transit
planning decisions; likewise, there should be a process for the public who are interested in Clay
County’s public transit services to offer input and feedback;
Identify additional funding sources, particularly sustainable local sources that are dedicated to public
transit;
Improve pedestrian and bicycle connections to transit;
Increase coordination with local transit stakeholders and customers, including the business
community and health, human service, job and education service providers;
Improve coordination with JTA and Ride Solutions to facilitate transfers, and potentially reduce
duplication and gaps of the transit services;
Continue to identify opportunities to enhance local transit service through regional transit
coordination, plans and initiatives; and
Continue reporting data to the National Transit Database, while maintaining regular data reporting
and monitoring of performance indicators.
154
Transit Development Plan Major Update | Situational Appraisal
Focus on consumer choice and efficiency by developing routes to increase ridership, maintaining
operation of deviated fixed-route systems as funding permits, and by authorizing and funding rides by
transportation network companies, as appropriate;
Maintain and plan for a safe and adequate fleet by using available funds to procure new or
replacement vehicles; and
Support regional transit by coordinating multi-county trips and the Community Transportation
Coordinators of nearby counties.
It is also important to note that Duval County’s population grew by six percent from 2010 to 2017, while
Florida’s grew by eight percent during the same time period. The faster rate of growth of non-car-owners
in Duval County despite the slower rate of general population growth points to an even greater share of
the population that may be reliant on transit. Clay County’s population grew by nine percent in the same
period, a greater growth rate than the rest of the state.
Locating the employment opportunities by industry type throughout a region is an important factor in
identifying potential transit markets. In Duval County, the Health Care and Social Assistance sector is
projected to surpass Retail Trade as the largest employment sector by 2030 and 2040. This statistic is
noteworthy in part because the healthcare sector is projected to grow at nearly double the rate of the
retail sector, approximately 29 percent to 15 percent, respectively. The industries with the greatest
projected growth rates from 2010 to 2040 are Real Estate and Rental and Leasing (40 percent growth),
Administrative and Support and Waste Management and Remediation Services (35 percent growth), and
Other Services except Public Administration (30 percent). In Clay County, Retail Trade will remain the
largest employment sector in 2040, as it was in 2010, but Construction will grow by 164 percent to
become the second-largest industry in the county. Several very small industries will experience very high
growth rates due to low numbers of employees in 2010, but the next fastest-growing industries, besides
Construction, include Transportation and Warehousing (163 percent growth), Manufacturing (128 percent
growth), and Wholesale Trade (83 percent growth). The JTA should pay close attention to the commuting
patterns of employees in these rapidly expanding fields in order to accommodate the influx of the new
workforce.
155
Transit Development Plan Major Update | Situational Appraisal
but the real measure of their effectiveness lies in the implementation of a long list of policies, such as the
following:
Creation of town and village centers in the Northwest, Southwest, and North Jacksonville areas
(Mobility Plan); these centers would provide a locus for concentrated residential and commercial uses
and may be served by transit;
Requirement (in Jacksonville) or incentives (in Clay County) for higher density residential
development and supporting commercial facilities to locate on major arterial or collector roads used
for mass transit routes (Jacksonville 2030 Comprehensive Plan, Future Land Use Policy 3.1.17; Clay
County 2040 Comprehensive Plan, Future Land Use Policy 1.4.5);
Incentives through the Planning and Development Department to encourage new transit-oriented
development and redevelopment outside of the Urban Core (Jacksonville Future Land Use Policy
3.1.18);
Identification of parcels of land where infill or redevelopment is appropriate, and specifically where
transit-oriented development, or a similar development pattern, can be aligned with the JTA’s
proposed Rapid Transit System (Jacksonville Future Land Use Policy 6.3.1; Clay County Future Land
Use Objective 1.6);
Identification of areas where JTA should focus investment in transit stations and related facilities to
act as a catalyst for redevelopment along identified corridors (Jacksonville Future Land Use Policy
6.3.1; Clay County Transportation Policy 1.12.5); and
Targeting of the development of workforce and affordable housing in areas where individuals and
families can make the best use of transportation corridors and mass transit (Jacksonville Future Land
Use Policy 6.3.3).
Members serve a four-year term and can be reappointed for another four years. JTA’s Chief Executive
Officer, National P. Ford, Sr., has served in this capacity since 2012. Just prior to the last major TDP
update, Mr. Ford spearheaded the development of JTA’s strategic plan, the Blueprint for Transportation
Excellence (BTE). In 2016, JTA was named the Outstanding Public Transportation System in North
America for mid-size systems; the BTE was the guiding document that led to the transformation for which
JTA received this recognition.
5.5 Technology
In response to an ever-changing mobility paradigm, JTA has been a demonstrated leader among its peer
agencies in the adoption of innovative technologies and platforms to better serve its transit customers.
JTA recognizes that its future must expand beyond fixed-route and paratransit bus services to include
pedestrians, cyclists, ride sourcing, micromobility, parking and curbside management, and other “Mobility-
as-a-Service” (MaaS) solutions in response to evolving consumer needs and expectations. Indeed, JTA
leadership has fashioned a vision for the Authority that entails the deployment of autonomous vehicles
and the use of artificial intelligence (AI) and data analytics. Moreover, JTA sees as its fundamental role
the preparation of its workforce to assess growing concerns around risk management and cybersecurity
and the leveraging of technology and smart, data-driven decisions that will respond to the transportation
landscape of the future.
156
Transit Development Plan Major Update | Situational Appraisal
In support of these initiatives, JTA’s Technology and Innovation Department is preparing a Strategic
Technology Plan that will supplement the Agency’s overall Blueprint for Transportation Excellence master
strategic plan. This document will outline the strategic technology planning methodology, objectives and
specific elements to assist in accomplishing JTA’s overall mission and business goals. The following
summarizes the various priorities and technology applications, some of which are currently being utilized
and/or under future development or consideration, to address dynamic mobility needs and compliance
requirements. Consistent with JTA’s mission, each is organized around the following primary categories:
safety & security; customer satisfaction; transformative mobility solutions; and employee success.
Cybersecurity
JTA’s Technology Department presently provides oversight and is responsible for maintaining security,
reliability and accuracy of the systems and the infrastructure for successful transit operations and
business functions. To comply with security standards and best practices, JTA is implementing an
enhanced, enterprise-wide cyber security program. This system will:
The integration of a digital security program and identity access management software, policies and
procedures will better ensure that only authorized personnel have appropriate access to technology
resources. Technologies such as facial-recognition can potentially be more effective than a password or
a physical key. Beyond security uses, the facial-recognition technologies, which will be adopted
incrementally, can also be used for fare collection/payment and mobile application purposes. Such
programs respond to the growing number of people, including, potential third-party open source users,
relying on JTA services and data and providing assurances to them that JTA systems meet or exceed
security standards, including National Institute of Standards and Technology (NIST) 800-53 and
Information Security Officer (ISO) 2701 over the next five years.
Sectors relevant for standardization are for instance network safety, device safety, communication
protocols for vehicle to infrastructure and vehicle to vehicle communication, mobile application safety, etc.
Standardization and the development of safety certificates are important. Cooperation with other transport
operators, government and the industry will contribute largely to this ambition. On a regional level it
simplifies cooperation with other transport operators, in offering cross border mobility services for
instance, if they are based on the same standards. It will also reduce costs, in lowering the chance of a
vendor having proprietary knowledge not available to competitors.
Training
On-going security training programs will also be implemented to develop more aware and capable
employees. Such training and development are fundamental to establishing a culture of safety and could
include several modules from mock phishing training to on-going vulnerability testing. In addition, these
157
Transit Development Plan Major Update | Situational Appraisal
trainings can also become relevant in keeping pace with the rapid changes in technology and societal
needs.
“Super App”
The implementation of robust internal systems integration will be a major objective over the next few
years, including the development of an “ultimate multimodal mobile app” that provides a real-time “one
stop shop” for customers interfacing with JTA services. This would provide a regional, unified application
(consistent across phone and website) driven with Bluetooth technology to provide several functions
including, but not limited to:
Elimination of the physical presentation of tickets to operators in combination with modified on-board
mobile ticket readers;
Potential facial recognition technology for account access and fare payments;
A MaaS-based scheduling hub that enables single trip planning, booking and payments across
several mobility vendors/services (i.e., single fixed route bus/bikeshare/Uber trip payment); such
would greatly improve the original intent and relevancy of the existing Transportal 3 platform;
Improved customer service capabilities via the use of mobile chatbots 4 and click-to-chat services
enabling, for example, multilingual communication support and other needs to vulnerable populations;
SMS texts and other multichannel direct messaging to improve customer services and push out
information;
True American Disability Act (ADA) compatibility across the platform;
API Ecosystem: open-ended framework where third-party vendors/individuals can push data back
and forth to leverage available JTA data and information to build new apps; and
Text-to-Pay services.
3 The JTA Transportal is a trip planner that stretches across a 12-county region. The user selects the button and then
158
Transit Development Plan Major Update | Situational Appraisal
5G
The anticipated launch of 5G is also a potential gamechanger for mobility providers. This next generation
standard (anticipated between 2019 and 2020) for wireless communications to replace the current 4G
network will vastly increase capacity, reduce latency and increase download speeds. The deployment of
such a network on JTA fleets will provide enhanced Wi-Fi connectivity, thereby providing a richer
experience to passengers who may want to stream entertainment or conduct work-related business that
requires greater bandwidth. This can potentially increase the attractiveness of transit and expand the
ridership market.
CAD/AVL/APCs
JTA currently uses Clever Devices as a framework for its Computer Aided Dispatch/Automatic Vehicle
Location (CAD/AVL) system. This enables dispatchers to communicate directly with vehicles and manage
routes in real-time, providing location and status of in-service fleets and the ability to manage service
disruptions. JTA is continuing to incorporate efficiencies and improvements in this context to better
address situational awareness, dispatcher efficiencies, improved communications, as well as event-driven
and incident management. JTA’s fleet is also installed with Automatic Passenger Counters (APCs) to
record boarding and alighting data linked with stop location. HASTUS scheduling software (by GIRO) is
currently used to assist staff with designing/modifying bus routes, determining new stops, scheduling
routes, assigning individual drivers into runs, and providing customer information about the network.
Fueling
For the past decade, the JTA has been moving toward a fleet with a smaller carbon footprint,
incorporating Hybrid and Compressed Natural Gas buses. Through its innovative public-private
partnership (P3) with Clean Energy launched in 2016, JTA has offered a publicly accessible compressed
natural gas (CNG) fueling facility at its Myrtle Avenue operations campus. By allowing the public and
other agencies 24-hour access to fuel their vehicles with CNG, the JTA has contributed to increasing the
available supply of CNG in the region, which is in turn reducing and/or eliminating airborne pollutants. The
Clean Energy station is easily accessible for public and private heavy-duty fleet trucks and passenger
vehicles.
This CNG project, one of the JTA's transformative Blueprint initiatives, also included a modification to the
bus maintenance facility and a bus fueling facility; including one single hose dispenser, with the capability
of adding an additional three dispensers. The fueling of CNG buses commenced with the rollout of the
159
Transit Development Plan Major Update | Situational Appraisal
First Coast Flyer BRT Green Line. JTA has established an agency goal to have a fleet of 100 CNG buses
over four years including the entire BRT fleet.
Over the long-term, JTA is looking to replace much of its diesel fleet with zero emissions-based buses. In
2017, the agency was awarded a $1 million Low or No Emission (Low-No) Bus Program Project grant for
new 40-foot battery electric Gillig buses for the Amazon expansion route. The new route serves a Park-n-
Ride and a new Amazon distribution center that employs over 1,500 Jacksonville residents. The charging
stations utilize Jacksonville Electric Authority’s (JEA) Solar Smart Power program to support zero
emissions. Future consideration includes the wholesale upgrade of diesel/hybrid-based technologies with
fuel cells as part of its path toward zero emissions.
Another option would be the introduction of speed charging stations, linked to the Solar Smart Power
program, to enhance the use of clean technologies and improving the added value of them.
160
Transit Development Plan Major Update | Situational Appraisal
Smart Hubs
Like New York, Copenhagen, and Rotterdam, Jacksonville is divided by waterways. In these cities, there
is the opportunity to develop multimodal hubs, where autonomous or regular public transport, water
ferries, cycle infrastructure and facilities are brought together. The trend within urban areas is to transform
unimodal parking facilities to multimodal hubs with facilities for carpools and vanpools, bike sharing, easy-
to-navigate pedestrian walkways, charging stations for electric cars, and proper wayfinding that links to
fast and high-frequency public transport and cycling infrastructure, especially on the edges of city centers.
In Rotterdam, the Netherlands, a technology system will be introduced in 2019 that will enable
passengers to communicate with the system to obtain geographic information (e.g., a person could ask,
“tell me where the nearest restaurant is located”).
In summary, over the next 10-year TDP horizon, there will undoubtedly be new trends and innovative
platforms, like competition between MaaS solutions, important steps in the implementation of
autonomous driving resulting in new mobility patterns, a rise in shared mobility and the growing use of
open-sourced data, that emerge and will shape or potentially redirect agency focus and priorities.
Because of these rapid changes future visions have to be seen as desired paths that can develop or alter
in time, not only because technology is changing, but also because society and its needs are changing.
161
Transit Development Plan Major Update | Situational Appraisal
Parallel to the technological developments there is a growing interest in the behavior of people as it
relates to the rapid developments (e.g., do they keep pace? do they understand and accept these
changes?). JTA’s goal is to be responsive by anticipating these changes and to ultimately use available
technology as a facilitator for what the agency needs to accomplish.
One of the major initiatives that JTA will continue to build on is the use of mobile applications, in which
transportation services and information to automate and combine various functions, can be integrated
seamlessly. This development is primarily related to MaaS. It is, however, important for the JTA to keep in
mind that MaaS is more than a new app. In Europe, for instance, MaaS leads to independent platforms
offering space to a variety of mobility suppliers to use this integrative platform as a means to promote
themselves and their services. For most mobility providers this necessary cooperation means a change in
perception or even of paradigms, forcing them to redefine their services and their relationships with
clients.
At the same time the JTA must consider that part of the population doesn’t want or can’t afford to use
mobile devices. With rapid developments in the availability of open data, JTA can also profit from the
innovative forces of a whole new group of start-ups and Small- and Medium-sized Enterprises that
develop new information services and platforms, for instance for the mentioned MaaS services.
Cooperation with these kinds of organizations may deliver the opportunity to develop the new services
faster at a lower cost.
In general, the adoption of technology should lead to better services to our clients and in the process
increases ridership and user satisfaction. It is relevant to be aware that increasing ridership means
additional consideration should be given to spatial and infrastructure planning.
These characteristics are unique to each transit system and service area, and each community served
may define and measure them differently. Additionally, each transit agency has its own thresholds for cost
effectiveness. Thus, there is no standard for a transit-supporting land use pattern, only examples of
completed local analyses and policy responses. Transit agencies can look to these examples for
methods, policies, regulatory tools and incentives appropriate for the conditions and development culture
of their service areas.
Studies in growing metropolitan regions are referenced below for their land use assessment parameters.
162
Transit Development Plan Major Update | Situational Appraisal
LANta and PSRC share these common parameters in their studies of a transit-supportive environment.
Density of Residential Use and Employment Use Areas. Residential and employment uses are
linked to the origin or destination of most trips. Concentrating residential and employment uses
increases the number of people who want to move in and out of a given area quickly and who may
seek alternatives to a vehicle for their personal or household mobility. Of the five parameters, density
is the simplest to measure and compare.
Mixed Uses. Multiple uses in a single building, on a single lot, or within a block enable people to
accomplish multiple tasks (e.g., job, shopping, child care, and services) within one trip. Travel time to
accomplish multiple tasks in one area is less than compared to dispersed single use destinations
requiring multiple vehicular trips.
Pedestrian Connectivity. Pedestrians need to be able to move safely and conveniently from their
origin to the transit system to the desired uses at their destination. Continuous pedestrian facilities
provide the dedicated space needed to ensure safety.
Parking Management. The availability and convenience of parking at a person’s destination
influences their choice of travel mode. Limited parking options typically increase the time needed to
find parking and/or parking cost, decreasing convenience and discouraging travel by personal
vehicle.
Urban Design. The quality and comfort of the pedestrian space makes time spent on foot less
stressful and more desirable. Pedestrian spaces that are not only connected but also functional in
terms of wayfinding and weather protection and designed with a sense of place are inviting spaces to
traverse or to pause.
15-25 dwelling units per acre and 25-50 jobs per acre for premium bus service on transit or transit-
planned corridors; and
163
Transit Development Plan Major Update | Situational Appraisal
7-15 dwelling units per acre and 25 jobs per acre for basic bus service on transit or transit-planned
corridors.
The Puget Sound Regional Council initiated its guidance for transit-supportive land use densities based
on a literature review. 6 This research found:
16-60 dwelling units per acre to support light rail in the downtown urban core;
12-30 dwelling units per acre to support light rail in city centers; and
8-20 dwelling units per acre to support light rail in suburban areas.
Subsequently, the PSRC developed guidance for densities and land uses in the vicinity of planned light
rail stations as 15-20 dwelling units per acre and 50+ jobs per acre for higher-capacity transit (i.e., light
rail). 7
There are high density residential uses in the urban core. These residential uses reflect capacity, but
population trends in Chapter 2: Baseline Conditions indicate that residents, and thus potential riders
originating in the urban core, have declined. Beyond the urban core, higher density residential uses exist
as relatively small neighborhoods or clusters scattered along the arterial routes. Their size and lack of
contiguity diminishes their impact on transit-friendliness.
Medium density residential uses, while accommodating up to 20 dwelling units per acre, require full urban
services to reach this transit-friendly density and are nominal in size and number.
The City’s land use data also show commercial uses concentrated in the Central Business District, along
the historic although irregular city grid in the urban core, and lining the arterial routes radiating outward
from the urban core. Commercial use of the arterial corridors is narrow and there is no significant increase
in size where an arterial and a collector intersect, with exceptions at University Boulevard at US 1, Route
202 at US 1, and the interchange of Routes 113 and 115. Employment density data in Chapter 2:
Baseline Conditions shows several clusters of 16-30 jobs per acre and 31-60 jobs per acre as well as a
few blocks of less than 60 jobs per acre in the downtown urban core. These higher-density job clusters
are, however, relatively small and dispersed across the City.
Land-based industrial uses, which typically have a lower employment density than commercial uses but
still employ tens of thousands of workers in the Jacksonville area, are clustered in three areas:
164
Transit Development Plan Major Update | Situational Appraisal
This pattern of a dense urban core and radiating commercial corridors easily supports radial routes.
However, connections between radial service lines may be needed to provide efficient mobility—that is,
so that a traveler going to an adjacent commercial corridor is not routed through the city center.
High-density residential is defined by the City as 22 dwelling units per acre or more. This definition
provides a transit-supportive residential density in line with the referenced studies. Additionally, mixed
uses in a single building or property are permitted, further concentrating dwelling and employment units.
At 45-60 feet, building heights are the most likely constraint to greater residential density, though as
stated above, occupancy is likely a more pressing issue.
Low-density residential, defined as less than 8 dwelling units per acre, provides no meaningful support for
transit.
As noted earlier, the City of Jacksonville’s 2030 Comprehensive Plan (2018) and Mobility Plan (2011)
define several policies toward creating a more transit-friendly environment. Themes of these policies
include densifying town centers, concentrating new development near major roads, and identifying areas
to target development that are synergistic with the JTA’s plans and vice versa. For more information, refer
to Section 5.4.
Mixed-Use Patterns
Current Condition
Mixed-use patterns in Jacksonville exist in two forms, mixed-use buildings and mixed-use neighborhoods.
Both are found almost exclusively in the urban core. In the Central Business District, mixed-use buildings
support an active pedestrian streetscape with commercial uses on the ground floor and additional office
and residential uses on the upper floors. In the surrounding parts of the urban core, mixed-use
neighborhoods put varied uses in close proximity to one another even if not integrated in a single building.
Either mix of residential, employment, and service activity concentrates trip origins and destinations.
165
Transit Development Plan Major Update | Situational Appraisal
Pedestrian Connectivity
Sidewalks provide dedicated space for pedestrians, separating them from vehicular traffic. They should
be continuous along transit-served corridors but should also extend into adjacent residential and
employment areas to connect people to the transit corridor. Crosswalks and pedestrian signals, where
warranted, should also be part of this pedestrian network to allow people to safely cross roadways at
reasonable intervals. Finally, beyond the provision of sidewalks, the pedestrian network should be ADA-
compliant, relatively free of obstructions (e.g., sign posts, utility poles, and temporary signage), and
maintained in a state of good repair.
Current Condition
Sidewalks and crosswalks are inconsistent across the City. Many newer commercial corridors and
residential areas have continuous pedestrian facilities while older corridors have significant gaps.
Guide the provision and connectivity of pedestrian spaces, the quality of public space and
streetscape, and the orientation of primary building entrances (Future Land Use Policy 6.3.1);
Support alternative modes of transportation. Such measures may include, but are not limited to, the
provision of sidewalks, bikeways, transit stops, or other facilities to support alternative modes, such
as parking management systems and park-and-ride facilities (Future Land Use Policy 6.3.4); and
Require the use of an unobstructed pedestrian zone in between the roadway and the building façade
along commercial corridors within the Urban Priority Area and Urban Area or some other alternative
regulatory criteria that creates a safe and attractive pedestrian environment (Future Land Use Policy
6.3.6).
166
Transit Development Plan Major Update | Situational Appraisal
Parking Management
Current Condition
The City has used various parking management techniques in the Central Business District to encourage
the use of the transit system. This has manifested itself in the discouragement of surface parking lots and
the promotion of structured parking. But when parking is managed only in the city center and not in
surrounding areas, residents and businesses may choose to avoid the inconvenience of the Central
Business District.
Support alternative modes of transportation. Such measures may include, but are not limited to, the
provision of sidewalks, bikeways, transit stops, or other facilities to support alternative modes, such
as parking management systems and park-and-ride facilities (Future Land Use Policy 6.3.4); and
Use the parking standards of the Downtown Zoning Overlay, as a part of the City’s Land
Development Regulations, for development/redevelopment projects within the CBD (Transportation
Policy 1.6.6).
This second item demonstrates that the City sees value in the expansion of parking management
throughout the CBD. A further expansion would apply the same or similar provisions to transit nodes
throughout the City.
Urban Design
Character and functionality are what distinguish public spaces from public places. Building on a
foundation of pedestrian safety and comfort, visual character, and functional features make public spaces
enjoyable, memorable, and desirable in ways that invite people to return for similar experiences.
Current Conditions
The Central Business District is the only part of the City that displays elements of urban form. This is due,
in part, to historic development patterns as well as to the downtown overlay district. Its buildings have a
consistent physical relationship to sidewalk with the exception of public plazas; are varied in finishes and
materials; and incorporate a basic level of transparency into ground floor uses.
167
Transit Development Plan Major Update | Situational Appraisal
These policies are not as specific as many others identified in this assessment as transit-friendly;
however, they provide a basis for the expanded and tailored use of the existing provisions and guidance
for the downtown in other transit nodes.
The City of Jacksonville has a strong foundation for transit-friendly policies and regulations, particularly in
the Central Business District or downtown. Current conditions and existing policies generally foster higher
residential and employment densities, mixed land use patterns, pedestrian connectivity, parking
management, and quality urban design.
Beyond the urban core, development patterns and development regulations continue to serve the
automobile. Transit is acknowledged in policies but has not yet become a competitive driver of
development location, density, and use, and the associated public infrastructure and parking.
168
Transit Development Plan Major Update | Goals and Objectives
The vision, mission, core values, and goals articulated below lay forth the parameters
and aspirations for the strategic direction of the JTA. These statements of the Agency’s
values serve as a roadmap for the JTA to implement the specific initiatives outlined
throughout the rest of this document. Each of these four elements aligns with the needs
of the community because they are defined by the needs of the community, as elicited
in the Public Involvement Plan (2019) and in the review of state, regional, and local
plans undertaken for this TDP.
The statements in this section are taken verbatim from JTA’s Blueprint for Transportation Excellence
(2018), the Authority’s latest strategic plan. A comparison to other agencies’ missions and goals affirmed
that JTA’s mission and goals are consistent in their focus on providing access to a range of affordable
transportation options, communicating transparently with their customers, stewarding fiscal and
environmental responsibility, and offering opportunities for employee success. Some of the peer plans
that were consulted include:
JTA’s previous Major and Minor Updates to its TDP were also consulted to ensure internal consistency
and progress toward its goals.
169
Transit Development Plan Major Update | Goals and Objectives
Professional excellence;
Personal integrity;
Fiscal responsibility;
Accountability for our work;
A safe work environment;
Transparency to the public; and
Continuous improvement.
JTA: We treat our customers and colleagues with dignity and respect.
170
Transit Development Plan Major Update | System Framework: Long-Term System Concept
7 SYSTEM FRAMEWORK:
LONG-TERM SYSTEM CONCEPT
This chapter documents the process to develop alternatives for the JTA transit system,
proposes recommendations for the TDP’s 10-year horizon, and suggests longer-term
concepts for further exploration and consideration. Taken together, these
recommendations address opportunities to strengthen the agency’s existing fixed route
services, develop new modes of service including regional rail and automated vehicles,
and integrate the agency’s many offerings for the benefit of JTA’s customers.
Full recommendation details for fixed-route and demand response services are provided in Appendix J:
Recommendation Route Profiles. Specific route and demand-response zone recommendations are
further evaluated, prioritized, and phased into service in Chapter 8: 10-Year Transit Plan and the
Phasing Plan of Chapter 9: Implementation Plan.
171
Transit Development Plan Major Update | System Framework: Long-Term System Concept
The Phase 3 survey asked respondents to rank their support for each recommendation on a Likert scale
from 1 (Not Supportive At All) to 5 (Very Supportive). Table 55 shows the average support score for each
recommendation. Most recommendations received positive support, with 57 percent receiving an average
score of 3.5 or above and 94 percent receiving an average score of 3 or above.
Table 55: Average Support Score for Each Recommendation (Phase 3 Survey)
172
Transit Development Plan Major Update | System Framework: Long-Term System Concept
Clay Community Blue - Pier Station, Green Cove Springs, Orange Park, NAS 3.80 5
Transportation Jacksonville
(CCT) Routes Red - St. Vincent's Medical Center (Clay County), 103rd Street 3.80 5
Argyle Forest 4.00 7
Eastside - South 3.86 7
Fleming Island 3.86 7
Golden Glades - The Woods 3.57 7
ReadiRide Jacksonville Heights 3.57 7
Middleburg 3.86 7
Sandalwood 3.86 7
Sherwood Forest 3.71 7
Southside 3.43 7
Increasing the span of service on the realigned Route 28 to match the span of service for the Route 8
segments it replaces;
Introducing a local service underlying First Coast Flyer Red; and
Adding adjacent ReadiRide zones to reduce walk distances to transit along Beach Boulevard.
173
Transit Development Plan Major Update | System Framework: Long-Term System Concept
174
Transit Development Plan Major Update | System Framework: Long-Term System Concept
Simplify services: Routes should be readily understood by customers. This can be achieved by
maintaining the directness of routes and limiting the use of branching patterns, where alternating trips
of a route use different alignments to serve low-demand areas with less frequent service. Routes
should also be simplified by minimizing deviations, which also has the benefit of improving a route’s
runtime. Where service on a corridor must address several travel markets, such as commuters at
peak hour and students or shoppers traveling at midday, overlapping local and express services may
be warranted.
Improve connections to jobs: Job centers outside of Downtown Jacksonville should be served by
both radial and crosstown routes to maximize access to jobs. Industrial areas may require trips timed
to meet common shift start times or flexible on-demand service. Additional Express Select routes can
address markets for transit service from Duval’s neighboring counties into job centers in downtown
Jacksonville.
Provide stronger crosstown connections: To provide greater accessibility to jobs and destinations
in the Jacksonville region, crosstown routes should make connections to First Coast Flyer routes
where possible. In Jacksonville’s urban core, new east-west service along 8th Street and 21st Street
should provide additional opportunities for dense neighborhoods to connect to First Coast Flyer
Green and major job centers like UF Health Jacksonville.
Add new all-day service when appropriate: Additional midday and evening service can reach
customers whose workdays start or end outside of traditional hours while providing greater access to
transit-dependent customers who make trips during the day. Existing underlying service should have
spans matching that of First Coast Flyer service to ensure the local underlying service remains
available whenever First Coast Flyer service is operating. Express and Limited Connector routes with
only peak service should be further evaluated for all-day service where no local service exists.
Figure 79 through Figure 84 illustrate alignments of routes by service type. Given the frequency
improvements proposed, several routes have changed categories (e.g., from “Mainline” to “Frequent”).
Figure 85 highlights locations of existing and proposed ReadiRide services. Figure 86 depicts headways
by route and branch, illustrating where more frequent service can be found. Characteristics of each fixed-
route service are presented in Table 56, with headways and spans of service shown in Table 57 and
Table 58, respectively. Additional detail and justifications for route proposals may be found in Appendix
J: Recommendation Route Profiles.
175
Transit Development Plan Major Update | System Framework: Long-Term System Concept
176
Transit Development Plan Major Update | System Framework: Long-Term System Concept
177
Transit Development Plan Major Update | System Framework: Long-Term System Concept
178
Transit Development Plan Major Update | System Framework: Long-Term System Concept
179
Transit Development Plan Major Update | System Framework: Long-Term System Concept
180
Transit Development Plan Major Update | System Framework: Long-Term System Concept
181
Transit Development Plan Major Update | System Framework: Long-Term System Concept
182
Transit Development Plan Major Update | System Framework: Long-Term System Concept
183
Transit Development Plan Major Update | System Framework: Long-Term System Concept
184
Transit Development Plan Major Update | System Framework: Long-Term System Concept
Clay Community CCT Red St. Vincent's Medical Center (Clay County), 103rd Street
Transportation CCT Blue Pier Station, Green Cove Springs, Orange Park, NAS
(CCT) Routes Jacksonville
Southeast Zone Avenues, Flagler Center
Beaches Zone Jacksonville Beach Area
Highlands Zone Jacksonville Airport Vicinity, Zoo
Northside Zone Gateway Transit Hub, FSCJ Downtown
Ortega Zone Ortega
Northwest Zone Sherwood Forest, Westside Industrial Park
Eastside - South Zone Mayo Clinic
Argyle Forest Zone Argyle Forest, Chimney Lakes
Sandalwood Zone Sandalwood
Golden Glades - The Golden Glades – The Woods
ReadiRide Woods Zone
Jacksonville Heights 103rd Street, Jacksonville Heights
Zone
Arlington Zone Arlington
Mandarin Zone Mandarin
Southside Zone Beach Boulevard, Brooks Rehabilitation Hospital, St.
Johns Plaza
Middleburg Zone Middleburg, St. Vincent’s Medical Center Clay County
Fleming Island Zone Fleming Island
Oakleaf Plantation Zone Oakleaf Plantation, St. Vincent’s Medical Center Clay
County
185
Transit Development Plan Major Update | System Framework: Long-Term System Concept
186
Transit Development Plan Major Update | System Framework: Long-Term System Concept
187
Transit Development Plan Major Update | System Framework: Long-Term System Concept
188
Transit Development Plan Major Update | System Framework: Long-Term System Concept
189
Transit Development Plan Major Update | System Framework: Long-Term System Concept
ReadiRide Golden Glades - 6:00 a.m. - 7:00 p.m. 6:00 a.m. - 7:00 p.m.
The Woods
Zone
Jacksonville 6:00 a.m. - 7:00 p.m. 6:00 a.m. - 7:00 p.m.
Heights Zone
Arlington Zone 6:00 a.m. - 7:00 p.m. 6:00 a.m. - 7:00 p.m.
Mandarin Zone 6:00 a.m. - 7:00 p.m. 6:00 a.m. - 7:00 p.m.
Southside Zone 6:00 a.m. - 7:00 p.m. 6:00 a.m. - 7:00 p.m.
Middleburg 6:00 a.m. - 7:00 p.m. 6:00 a.m. - 7:00 p.m.
Zone
Fleming Island 6:00 a.m. - 7:00 p.m. 6:00 a.m. - 7:00 p.m.
Zone
Oakleaf 6:00 a.m. - 7:00 p.m. 6:00 a.m. - 7:00 p.m.
Plantation Zone
In the next 10 years, JTA seeks to evolve from a transit, ferry, and road agency to a transportation
mobility integrator. In this role, JTA will provide customers with seamless trips across a variety of modes,
be it a U2C automated vehicle, BRT, local bus, ferry, rail, demand-response service, or another mode. If
implemented, these concepts and related recommendations enable JTA to become a more effective
provider of transit and further integrate the growing range of services it provides. The analysis below
reviews existing JTA service concepts and forthcoming investments and proposes strategies to advance
these long-term system concepts over the next decade.
190
Transit Development Plan Major Update | System Framework: Long-Term System Concept
with a faster trip to major destinations than infrequent routes with one-seat rides. In a shared mobility
future, customers may use First Coast Flyer and fixed route transit for the majority of a trip while making
first- or last-mile connections on U2C, ReadiRide, with ride hailing services, by bike, on foot, or via some
other modal choice.
Additional corridors in the Jacksonville region may warrant higher speed, high frequency bus service; an
additional study has been undertaken to identify these corridors and the capital improvements required to
provide BRT service on them and include these in the 2045 LRTP. In the interim, JTA can continue to
increase frequencies on its existing First Coast Flyer routes per the recommendations of this TDP.
7.4.2 Continue the Transformation of the Skyway into the Ultimate Urban
Circulator and Testing of Autonomous Vehicle Concepts
The Skyway Modernization Program and related U2C investments will provide new connectivity within
downtown Jacksonville and its immediate vicinity on modern, autonomous shuttles. An early phase of
these improvements will create a corridor for autonomous vehicles to travel between the Sports Complex
along Bay Street to the JRTC along a mix of ground-level and elevated transitways.
As study of U2C opportunities continues, JTA should continue to refine its estimates of phasing, operating
and capital costs and ensure these estimates are reflected in future TDP Annual Updates. Following the
extension of U2C service to new stations such as the Entertainment and Sports Complex, JTA should
truncate services such as Route 11 and Route 31 at the U2C alignment to avoid duplicating service on
Bay Street.
Beyond the U2C program, JTA is continuing to seek out opportunities to make use of autonomous
vehicles in other areas of the region. The in-development JTA Agile Plan is identifying candidate sites
where short alignments for autonomous vehicle routes could address mobility needs, such as on the
campuses of University of North Florida or between major destinations at St. Johns Town Center. The
routes are intended to be implemented with minimal infrastructure investment and only two vehicles. As it
analyzes opportunities for autonomous vehicle deployment, JTA should continue to prioritize service
concepts that provide a first and last mile connection between transit services and major destinations.
Possible locations for Agile Routes are shown in Figure 87.
191
Transit Development Plan Major Update | System Framework: Long-Term System Concept
192
Transit Development Plan Major Update | System Framework: Long-Term System Concept
JTA should work to connect CCT routes into Duval County, connecting workers in either county to job
centers, such as the Naval Air Station and 103rd Street in Duval County and Orange Park Mall in Clay
County. The CCT Red and Blue routes as proposed in this TDP serve areas of sufficient population and
job density, such that the routes could provide all-day, fixed route service without deviations. Removing
deviated service would improve travel times for CCT routes, which cover a considerable area. Remaining
portions of northeastern Clay County such as Middleburg, Fleming Island and Oak Leaf Plantation would
be better served by demand-response ReadiRide and paratransit service given their land use patterns.
For areas of Clay County such as Keystone Heights, modes such as vanpool, paratransit, or other
demand-response services are potentially suited for the work and medical trips to Gainesville, FL and
northeastern Clay County previously served by CCT Magenta and Teal routes.
For workers with unique commuting challenges that are not easily addressed by fixed route transit, a
vanpool program administered by JTA may be the solution. Vanpool programs administered by
transportation agencies help commuters find others who are traveling to the same destination. These
commuters then share a ride in a van driven by a member of the group and split the costs of fuel and
maintenance. To further lower the cost to participants, the vehicle used in the vanpool is leased at a
subsidized rate through a vanpool program or from an employer.
Such a program would also benefit other commuters in the Jacksonville area and JTA itself. A vanpool
program may be a more cost effective alternative than fixed route transit to JTA for small groups of
commuters. These services may also be more readily implemented for commuters whose trips begin far
from Duval County, such as individuals in Keystone Heights (Clay County) traveling to Gainesville
(Alachua County). Other regional commuters would benefit as vanpools remove single-occupancy
vehicles from the road, lessening congestion.
In analysis for this TDP, Jacksonville-area workforce development programs have expressed an interest
in using vanpools to connect participants in workforce development programs with jobs at major regional
employers. Suggested origin and destinations for vanpools based on the home residences of workforce
development program clients and major employers are suggested in Table 59. Once a vanpool program
is established, a ride matching program would help to determine which pairs of origins and destinations
could support a vanpool.
193
Transit Development Plan Major Update | System Framework: Long-Term System Concept
Southpoint
Mayo Clinic
The Avenues
JTA should conduct a follow-up study to design a vanpool program to be administered by the agency.
Such a program should partner with area workforce development agencies, major employers, and
commuters at large to match commuters into vanpools and consider leasing vehicles with a subsidy to
vanpool participants.
While study of the service continues, service plans for commuter rail on this southeast rail corridor are
reflected in systemwide ridership estimates for 2030. Proposed stations at major activity centers along I-
95 such as the Avenues, Baymeadows Road, and at the JRTC already enjoy nearby service by First
Coast Flyer Blue and other JTA routes, but additional effort will be required to connect commuter rail into
the JTA system. As it continues its efforts to launch commuter rail service, JTA should undertake efforts
to develop a feeder bus plan that leverages these new transportation investments.
194
Transit Development Plan Major Update | System Framework: Long-Term System Concept
without previous deviated service existing in the area. In April 2019, JTA’s three Coastal Cab (subsidized
taxi fare) zones in Arlington, Mandarin, and Southside were converted to ReadiRide zones.
At the time of the TDP analysis, data was not yet available to evaluate these services. Instead, the TDP
recommends continuing to evaluate ReadiRide services while phasing in expansions of ReadiRide
service to other portions of Clay and Duval counties. In addition, JTA should continue to position
ReadiRide as a means of first- and last-mile connections to transit service. To do so, the agency will need
to develop technology and dispatch systems that ensure rides are consistently available on demand with
a short wait time through a mobile app or phone call, rather than primarily through advance reservation.
Such investments in technology and dispatch would support the agency’s transformation as a mobility
integrator across multiple modes.
7.4.7 Continue to Maintain and Improve the St. Johns River Ferry
JTA assumed ownership of the St. Johns River Ferry in March 2016 as well as the responsibility to
operate, maintain, repair, and improve the service over time. JTA has made several capital improvements
since acquiring the ferry, including visual improvements to the Fort Meyers and Mayport Village landings,
slip wall improvements, the removal and replacement of aging terminal bridges and bulkheads,
installation of a high security fence, and others. JTA also introduced mobile ticketing through the myJTA
app and the ferry has seen steady growth in ridership since the acquisition. The ferry provides an
essential connection between the north and south ends of Florida State Road A1A, a major highway in
Northeast Florida, creating a 0.9-mile voyage across the St. Johns River out of an otherwise 24-mile
detour to Interstate 295 and the Dames Point Bridge. JTA wants to reduce the headway of the service
from 30 minutes to 20 minutes to improve this connection. Doing so would require an additional ferry but
could also improve reliability of the service if unintended maintenance is needed on the only vessel
currently in operation.
195
Transit Development Plan Major Update | System Framework: Long-Term System Concept
JTA should explore the possibility of developing several TMAs throughout its entire service area in an
effort to improve the communication of transportation options and to further develop first-/last-mile transit
solutions.
JTA could consider marketing private shuttles to the larger companies that exist in the region and should
consider incentivizing the concept.
Partnerships between TNCs and transit agencies are an area of emerging practice whereby a subsidy is
paid to lower the cost to end users. Based on a recent Transit Cooperative Research Program (TCRP)
study, transit agencies are partnering with TNCs for a variety of reasons, including the following:
196
Transit Development Plan Major Update | System Framework: Long-Term System Concept
Providing connections to activity centers such as health and human services, education/training
facilities, employment centers, and more;
Improving healthcare outcomes; and
Demonstrating innovation.
TNC partnerships can be structured in a variety of ways, and since public money is being used, the
subsidy’s use is usually restricted to a handful of promising use cases. Generally, applicable use cases
are those where fixed-route service is not available (e.g., late-night service), and can be classified in the
following ways:
Geofenced fixed subsidy: An agency provides a fixed subsidy for TNC trips within a defined zone or
area only. As the subsidy is fixed, the total price to the passenger may vary by trip;
Geofenced fixed price: An agency provides a subsidy to ensure a fixed price for TNC trips within a
defined zone or area. As the trip price is fixed, the subsidy paid by the agency may vary by trip;
Fixed price to specific hubs: An agency provides a subsidy to ensure a fixed price for TNC trips
connecting to transit centers or other key activity centers; and
Time-bounded subsidy: An agency provides a subsidy for TNC trips during specific time periods
only (e.g., late-night or off-peak), when fixed-route service is limited or not available (Figure 88).
TNCs can also be used to supplement paratransit service. Eligible paratransit users can be given the
option of using a TNC for a medical appointment or other approved trip purposes, rather than scheduling
a ride on a paratransit vehicle. For JTA, subsidized TNC service could offer the following benefits:
7.4.8.3 Microtransit
Microtransit is a form of on-demand transit service that mimics the interface of TNC service, but operates
with a fixed fleet of transit vehicles. These transit vehicles are typically vans or cut-away-style buses and
197
Transit Development Plan Major Update | System Framework: Long-Term System Concept
can be operated by a transit agency or a third-party vendor (Figure 89). Microtransit service has a variety
of applications including the following:
Service in a dense urban area where larger transit coaches cannot easily maneuver;
Service in a suburban area lacking the density or pedestrian environment to support fixed-route
service;
Service in a university environment during time periods when demand is relatively low and diffused
(i.e., weekend, evening, and/or late-night service);
Service in a rural area where TNCs do not operate; and
Paratransit service with updated technology.
Microtransit services can be generally grouped into either turnkey service or a technology platform:
Turnkey service: An all-in contract to provide a given level of service based on parameters dictated
by the agency. In this model, the vendor would provide the vehicles, drivers, and operations, in
addition to the microtransit booking and dispatching platform.
Technology platform: Model in which an agency pays for a software license from a company that
improves vehicle dispatch on the back end and provides for ride requests via a smartphone app. The
agency would retain control and responsibility for operations, include providing vehicles and drivers.
To be most effective, microtransit service requires more than one vehicle operating in a defined zone
simultaneously. With at least two vehicles, the technology platforms used for microtransit service can
determine which vehicle to assign to each trip request, with the aim of optimizing routing and minimizing
wait times both for passengers waiting for a ride and those already onboard the vehicles. Some
microtransit services operate “corner-to-corner” rather than “curb-to-curb.” This approach requires
passengers to walk out to the end of their block to meet a transit vehicle rather than having the vehicles
spend time serving each individual address.
198
Transit Development Plan Major Update | System Framework: Long-Term System Concept
199
Transit Development Plan Major Update
8.1 Introduction
Evaluation and forecasting for Jacksonville’s transit system was performed for all
proposed changes to JTA’s transit services within the 10-year horizon of this plan. This
chapter addresses the estimation of ridership, service hours and miles, and other
productivity metrics for the current and proposed JTA system.
TBEST cannot model ridership for non-fixed-route transit services, such as JTA’s ReadiRide demand-
response service and Connexion paratransit service. Instead, ridership for these modes was forecasted
using separate methodologies described in the following section.
Relocating the termini for many JTA bus services from Rosa Parks Transit Station to the Jacksonville
Regional Transportation Center (JRTC);
First Coast Flyer Orange service from Downtown Jacksonville to Orange Park Mall;
New Express Select routes to St. Johns, Baker, and Clay Counties;
All other recommended changes to fixed-routes implemented by 2029;
Implementation of the U2C autonomous vehicle system, which will modernize the Jacksonville
Skyway and provide additional ground-level service. All U2C extensions, including those to UF Health,
the Sports Complex, and other proposed destinations, were included in the 2030 future year scenario,
with the exception of a proposed bridge between The District and the Sports Complex; and
The Southeast Rail corridor, which will provide commuter rail service between Jacksonville and St.
Augustine.
200
Transit Development Plan Major Update | 10-Year Transit Plan
TBEST ridership estimates must be calibrated for each route so that the model produces results for the
existing system that are consistent with observed ridership. Once the model is validated against existing
conditions and adjustment factors are in place, future transit demand can be estimated. Estimates for
routes in the future year scenario are adjusted according to the route’s validation factor in the base year.
In the case of new routes implemented in the future, validation factors are applied according to the
average adjustment for routes with the same classification. Application of validation factors to future year
routes may result in inaccurate ridership estimates when future year routes differ significantly in segments
served, available transfers, land uses served, or levels of service. For example, major segment transfers
from Route 8 to Route 28, which has a lower route-level validation factor, may result in ridership
estimates that are biased downward.
Revenue hour and peak vehicle estimates produced by the TBEST model were manually calibrated to
existing conditions. Revenue hours for routes in the August 2018 JTA fixed-route system ranged from 66
percent higher to 31 percent lower than raw TBEST estimates. Similar to how TBEST model ridership
estimates are adjusted to match observed data, base year revenue hour and peak vehicle estimates from
TBEST were calibrated to existing conditions. The difference between existing conditions and TBEST
estimates are largely attributable to the extensive use of interlining in JTA’s system, which reduces the
amount of recovery time needed for routes and the number of peak vehicles to operate service.
Operating costs for fixed-routes were estimated using these adjusted revenue hours. In Chapter 9:
Implementation Plan, annual cost estimates and peak vehicle needs are based on the proposed
changes effective in each year.
8.3.2 ReadiRide
ReadiRide ridership demand was forecasted using NCTR’s methodology for estimating ridership for
demand-response services. The model assumes that demand-response ridership will depend on the size
of transit-oriented populations (such as seniors and people without access to a vehicle), regional variation
in land use and ridership behavior, as well as service characteristics such as fares and the presence of
other transit options. Model parameters were estimated using data from 731 rural demand-response
services across the United States. This equation was used to calculate ridership estimates for each of the
201
Transit Development Plan Major Update | 10-Year Transit Plan
17 existing and proposed ReadiRide zones in Duval and Clay Counties. Details on the methodology, data
sources, and limitations can be found in Appendix H: ReadiRide Ridership Estimation.
8.3.3 Paratransit
Paratransit ridership demand was forecasted using CUTR’s methodology for estimating paratransit
demand for counties in Florida. The model predicts demand for paratransit services by estimating the size
of transportation-disadvantaged populations and applying an estimated average number of trips per
person to find the total number of potential paratransit trips. These estimates were calibrated to observed
2017 ridership for Duval and Clay Counties and scaled according to county-level population growth
forecasts to predict demand for the years 2019 through 2029. Details on the methodology, data sources,
and limitations can be found in Appendix I: Paratransit Ridership Forecasting.
2018 2030
Metric
Weekday Saturday Sunday Weekday Saturday Sunday
Annual Passenger Trips 8,808,200 946,500 655,900 12,642,100 1,256,200 1,062,200
Annual Revenue Hours 552,670 65,312 57,176 677,083 77,391 67,869
The base year and future year scenarios were compared at the annual level based on ridership,
population and employment capture, revenue miles, revenue hours, average speed, average headway,
and operating cost. Table 61 contains a summary of these metrics for each scenario. Annual ridership for
the proposed 2030 fixed-route bus network was estimated by TBEST at 14,960,500 boardings, over 4.5
million more than the base year. The 2030 system will capture 36 percent of the population in Duval and
Clay Counties, a three percent increase over the base year, and 54 percent of employment, an equal
capture to the base year. The forecasted increase in ridership is greater than the increase in population,
as evidenced by the increase in passenger trips per population served from 28.7 trips per person in the
base year to 33.6 trips per person in 2030.
Annual revenue miles as calculated by TBEST will increase by 30 percent to 11,721,632 miles in 2030.
Adjusted TBEST estimates for annual revenue hours increased by 22 percent to 822,343 hours in 2030,
resulting in an increase in average system speed from 13.4 miles per hour in the base year to 14.3 miles
per hour with all proposed changes in 2030. Average system headway improved from 50 minutes to 41
minutes. Overall productivity for fixed-route bus also improved, with an increase in passengers per
202
Transit Development Plan Major Update | 10-Year Transit Plan
revenue mile from 1.15 to 1.28 and passengers per revenue hour from 15.4 to 18.2 in 2030. Annual
operating costs were calculated using fixed rates per revenue hour for each category of standard fixed-
routes, Express Select routes, and Clay Community Transportation routes. In 2018 dollars, the total fixed-
route operating cost per service mile and per passenger decreased from the base year to $8.09 and
$6.34, respectively. Further details on operating costs can be found in Chapter 9: Implementation Plan.
8.4.1.2 Ferry
The forecasted ridership and revenue hours for St. Johns Ferry are summarized in Table 62. Ferry
ridership was forecast according to the average annual growth rate for Duval County. No changes in level
of service were proposed, resulting in zero change in annual revenue hours.
1
2018 total population and total employment based on interpolation of NERPM 2015 and 2030 estimates for Duval
and Clay counties.
2 Service area population and employment include areas within ¼-mile walking distance from fixed bus stops in both
203
Transit Development Plan Major Update | 10-Year Transit Plan
2019 2030
Metric
Weekday Saturday Sunday Weekday Saturday Sunday
Annual Passenger Trips 314,700 92,900 62,800 351,400 103,700 70,100
Annual Revenue Hours 3,497 742 742 3,497 742 742
8.4.1.3 ReadiRide
ReadiRide ridership and revenue miles are forecasted to increase significantly from 2019 to 2030, as
shown in Table 63. Ridership and revenue miles will increase in part due to the implementation of the
proposed new ReadiRide zones: one new zone is proposed to begin service in 2020, one new zone will
begin service in 2021, and seven additional zones (including three in Clay County) will begin service in
2023. Population growth over the 10-year period is also expected to result in higher ridership. Changes to
ReadiRide service provision, such as app-based ride-hailing or improved first- and last-mile connections
to other transit services, may result in even higher ridership than the forecast shown below. ReadiRide
operating costs are based on the number of revenue miles of service provided. Revenue miles are
expected to grow with the number of passenger trips based on the current rate of revenue miles per
passenger trip as calculated from December 2018 ReadiRide data.
2019 2030
Metric
Weekday Saturday Weekday Saturday
Annual Passenger Trips 36,500 3,600 81,500 8,200
Annual Revenue Miles 155,151 15,515 346,663 34,666
8.4.1.4 Paratransit
Paratransit ridership and revenue hours are forecasted to increase with the populations of Duval and Clay
Counties from 2019 to 2030, as summarized in Table 64. Paratransit operating costs are based on the
number of revenue hours of service provided. Revenue hours are expected to grow with an increase in
passenger trips based on the current rate of revenue hours per passenger trip. Ridership figures for 2019
include a full-year estimate for Clay County services.
2019 2030
Metric County
Weekday Saturday Sunday Weekday Saturday Sunday
Annual Passenger Duval 323,900 30,200 24,400 374,900 34,900 28,300
Trips Clay 76,800 7,100 5,800 93,600 8,700 7,100
Annual Revenue Duval 210,786 19,624 15,898 243,929 22,710 18,398
Hours Clay 49,974 4,653 3,769 60,892 5,669 4,593
204
Transit Development Plan Major Update | 10-Year Transit Plan
(STOPS). Recent studies have developed various operational plans based on different frequencies and
route structures in each scenario and conducted extensive analysis of development patterns within the
downtown area. Each of the Skyway extensions was studied individually, including the Brooklyn Station
extension and the Sports Complex extension. The recently completed Transit Concept and Alternatives
Review: Skyway Modernization and Brooklyn Extension report (TCAR 1) estimated an average annual
operations and maintenance cost of $8.25-$9.50 million for alternatives that modernized the existing
Skyway system and included an extension of service to Brooklyn. The Brooklyn Station extension was
submitted for a Build Grant. In the TCAR 1 study, the ridership estimates for the modernized Skyway
system with a Brooklyn extension were estimated to be around 8,000 on an average weekday in 2030.
Analysis of a full system expansion continues. The full system has several potential extensions as shown
in Figure 90. The estimates for the full system are preliminary as the technology for the system is still
being analyzed. In order to develop the preliminary estimates, assumptions about the frequency, vehicle
size, vehicle speed, etc. had to be made. The full system was tested in the STOPS model and the
preliminary estimates range between 10,000 and 20,000 daily riders. As JTA is getting closer to choosing
a technology, the model assumptions will be updated, and new estimates will be developed.
Figure 90: Existing and Potential Skyway Stations Under Full System Expansion
205
Transit Development Plan Major Update | 10-Year Transit Plan
Forty-eight total routes will provide fixed-route service, as shown in Table 66. The frequent bus network in
the JTA system will expand to include eight routes by 2030, with four mainline routes receiving new 15-
minute service on weekdays. In addition to these routes, First Coast Flyer service will expand to
southwestern Duval County and Clay County and continue to provide frequent connections across the
metropolitan area. Express service from Downtown Jacksonville to the Jacksonville International Airport
will provide a faster option during peak hours, and Express Select service will add routes to Baker, Clay,
and St. Johns Counties. The Community Shuttle service class was eliminated after reclassifying those
routes as Limited Connector (Route 85) or Connector (Route 54) services according to proposed service
changes. Four routes (Route 18, 30, 83, and 86) will be replaced by pieces of new routes, extensions of
other routes, or ReadiRide service to provide more efficient connections throughout Duval County. The
new Jacksonville Regional Transportation Center will serve as the central connection for 33 JTA routes.
In Clay County, deviated-fixed-routes will be converted to fixed-routes with fixed local bus stops, greater
coverage, and improved connections to other JTA transit services.
4 JTA’s paratransit services provide coverage across all of Duval and Clay counties. Therefore, paratransit estimates
are omitted from service area and ridership estimates in this table.
5
2018 total population and total employment based on interpolation of NERPM 2015 and 2030 estimates for Duval
and Clay counties.
6 Service area population and employment include areas within ¼-mile walking distance from fixed transit stops and
areas served by ReadiRide in both Duval and Clay counties based on interpolation of NERPM 2015 and 2030
estimates
206
Transit Development Plan Major Update | 10-Year Transit Plan
After entering service in 2018 with four demand-response zones, ReadiRide will continue to expand to
include 17 zones by 2023 with increasing ridership as the population of the region grows. Demand for
paratransit ridership is also forecast to increase by 2030. Other new services will support the growth of
ReadiRide, paratransit, and fixed-route transit, including the Ultimate Urban Circulator system of
autonomous vehicles and the Southeast Rail corridor.
As service grows to match demand, average headways and wait times will decline. Table 67 illustrates
average fixed-route bus system headways for the peak and off-peak periods in 2018 and 2030. Additional
high-frequency service on U2C routes will further reduce wait times for many passengers. Figures for
average headways are unweighted and represent the average of route-level average headways.
2018 2030
Peak Off-Peak Peak Off-Peak
Average Headway
43.0 44.8 34.3 33.2
(minutes)
Note: PM Peak headways shown for Peak, Midday headways shown for Off-Peak
Over time, the recommended service improvements reflect a steady increase in resources for First Coast
Flyer, Frequent, and Express routes, while the share of resources are held steady in the Connector and
Limited Connector categories (Table 68). After the addition of Frequent service on four Mainline routes,
the Mainline category will represent a reduced share of fixed-route services. As the Jacksonville region
grows, ReadiRide demand-response services are expected to provide an increasing share of coverage
service that might have otherwise been provided by infrequent Community Shuttle services. As JTA
continues to evolve from a provider of fixed-route transit to a mobility integrator spanning several modes,
other services such as automated vehicles and rideshare could also address these first- and last-mile
needs.
207
Transit Development Plan Major Update | 10-Year Transit Plan
2019 2030
Service Class Annual Annual
Share Share
Revenue Hours Revenue Hours
First Coast Flyer 123,469 18% 166,651 22%
Frequent Routes 185,320 27% 189,164 25%
Mainline Routes 239,157 35% 228,870 30%
Connector Routes 99,761 15% 116,836 15%
Limited Connector Routes 5,120 1% 8,796 1%
Community Shuttles 6,814 1% -- --
Express Routes 6,756 1% 21,406 3%
Express Select Routes 2,142 0.3% 10,251 1%
Clay Community
8,759 1% 19,259 3%
Transportation Routes
208
Transit Development Plan Major Update
9 IMPLEMENTATION PLAN
The Transit Development Plan’s implementation plan identifies the phasing and
financial planning strategies necessary to implement the constrained 10-Year Transit
Plan improvements described in Chapter 8. The Phasing Plan sets a proposed
schedule of implementation for improvements that will support planned capital projects,
constrain operating cost growth, and prioritize the most effective recommendations for
implementation. The Financial Plan forecasts JTA’s costs and revenues for operating
and capital needs and includes strategies to implement the recommended 10-Year
Transit Plan.
Support planned JTA service changes and capital improvements: Implementation will be timed
to leverage or otherwise implement existing JTA plans. Coming improvements include:
─ Spring 2020: Opening of the Jacksonville Regional Transportation Center (JRTC) Phase II,
which involves the relocation of the termini for many fixed-route bus services from Rosa Parks
Station to the JRTC bus bays;
─ March 2020: Introduction of new Select Express services in St. Johns County;
─ Fall 2020: Introduction of new Select Express service in Baker County;
─ December 2020: Beginning of First Coast Flyer Orange service from JRTC to Orange Park Mall
in Clay County;
─ 2021: Introduction of a new Select Express service in Clay County;
─ 2022 to 2024: Initial implementation of U2C transformation of the JTA Skyway system. The U2C
BUILD grant Phase 1 identifies a new corridor between JRTC and the Sports/Entertainment
District; and
─ 2025 to 2028: Introduction of Southeast Rail service.
Because the timing and scope of U2C and Southeast Rail improvements remain under study, the
phasing plan does not assume service changes related to those projects will occur in a particular
year. However, TDP recommendations envision feeder bus and network improvements to ensure
integration of JTA fixed-route transit, automated vehicle, and rail services (Chapter 7: System
Framework: Long-Term System Concept).
Constrain phasing plan to reasonable increases in costs: The phasing of proposals is sensitive to
existing JTA service proposals, including the introduction of First Coast Flyer Orange service and new
Express Select service in FY 2021. The first two years of the phasing plan (FY 2020 and FY 2021)
include only cost-neutral recommendations and existing plans by JTA. From FY 2022 onward,
increases in operating costs are limited to an additional $2 million each year plus expected inflation of
209
Transit Development Plan Major Update | Implementation Plan
operating costs.
Implement related improvements at the same time: Routes that have related recommendations
will be implemented at the same time. For instance, the realignment of Route 10 and Route 19 and
the increase in the span of service for Route 202 will occur at the same time that Route 18 is
eliminated. In this way, the access to transit enjoyed by JTA customers will not be interrupted by
changes. Moreover, JTA will be able to focus its resources in outreach and service planning in a
particular area to ensure smoother implementation of proposals.
FY 2020: Relocation of service to JRTC and Northside changes related to First Coast Flyer Green
and Soutel Hub. First full year of implementation for services added in FY 2019, including the Clay
County Magenta Line and the ReadiRide Mandarin, Southside, and Arlington Zone.
FY 2021: Implementation of First Coast Flyer Orange and related improvements in Jacksonville’s
Westside.
FY 2022: Improvements along Atlantic Boulevard in Arlington and additional cross-town service
through Jacksonville’s Urban Core.
FY 2023: Service improvements in Southside Jacksonville along Beach Boulevard and San Jose
Boulevard, modifications to service in Clay County, and additional ReadiRide zones.
FY 2024: New connectivity to the Jacksonville airport and the Northside.
FY 2025: Modifications to service in Jacksonville’s Southside.
FY 2026: Additional frequent service along Riverside and St. John’s Avenue.
FY 2027: Additional frequent service along Edgewood Avenue and connections into St. John’s
County.
FY 2028: Additional frequent service along St. Augustine Road.
FY 2029: Additional frequent service along Normandy Boulevard.
Under this plan, all proposed improvements identified in Chapter 7: System Framework: Long-Term
System Concept will be implemented within the 10-Year TDP horizon. Details of service improvements
are presented in Table 69.
210
Transit Development Plan Major Update | Implementation Plan
Implementation
Fiscal Year Location Route Description
2020 1 Systemwide Existing Fixed Routes Relocate termini from Rosa Parks Station to
JRTC
Regional Baker Express Select Implement new fixed-route service
St. Johns Express Select Implement new fixed-route service
Northside 3 Eliminate service to Amtrak
4 Realign route to serve Amtrak and end service
at the Soutel Transit Hub.
22 Realign to Soutel Hub
Northwest Zone Implement new ReadiRide zone
2021 Westside FCF Orange Implement Southwest BRT Service in late 2020
20 Convert Route 5 to Underlying Service to
Southwest BRT in late 2020
53 Extend hourly to Cecil area, replacing Route 30
80 Realign to 103rd Street
ReadiRide Jacksonville Implement new ReadiRide zone
Heights Zone
Regional Clay Express Select Implement new fixed-route service replacing
Route 201
2022 Arlington 10 Realign route onto Atlantic Boulevard, increase
frequency and span of service
19 Extend route to serve Kona Avenue (includes
elimination of Route 18)
23 Realign route
202 Extend to downtown, increase span and
frequency
Urban Core 11 Extend route to serve Gateway Plaza.
12 Extend route to serve Soutel Transit Hub.
21 Realign route and increase span
31 Extend to Edward Waters
32 Realign to Paxon School
2023 Arlington / 8 Eliminate service to UNF, adjust frequency
Southside
24 Extend route
25 Realign route
27 Increase span of service
28 Extend to FSCJ South, realign
1
Note that FY 2020 includes the first full year of implementation for services added in FY 2019, including the Clay County Magenta
Line and the ReadiRide Mandarin, Southside, and Arlington Zone.
211
Transit Development Plan Major Update | Implementation Plan
Implementation
Fiscal Year Location Route Description
29 Realign to serve Art Museum Drive, replacing
existing 205
33 Extend to Southpoint/Belfort Road
Eastside–South Zone Implement new ReadiRide zone
Sandalwood Zone Implement new ReadiRide zone
Golden Glades–The Woods Implement new ReadiRide zone
Zone
Clay County / CCT Blue Modify service
Westside
CCT Red Modify service
Argyle Forest Zone Implement new ReadiRide zone
Fleming Island Zone Implement new ReadiRide zone
Middleburg Zone Implement new ReadiRide zone
Oakleaf Plantation Zone Implement new ReadiRide zone
2024 Airport 206 New express service
82 Extend span, extend alignment (net increase)
85 Realign to FSCJ North
Regional St. Johns Express Select Increase service to include midday trips and
extended peak period service
2025 Southside 17 Realign route to serve Old Kings Road South
28 Increase weekday frequency on extended
alignment
50 Eliminate 50B, increase frequency
200 Increase span and frequency
2026 Southside 16 Increase frequency on short-turn
2027 Northside 51 Increase frequency on short-turn
Westside / 26 Extend route to connect with FCF Blue
Southside
2028 Southside 17 Increase frequency on short-turn
2029 Westside 14 Extend route to FSCJ Kent Campus and
eliminate service along Normandy Boulevard
15 Extend trips to Amazon with increased
frequency of service
212
Transit Development Plan Major Update | Implementation Plan
The financial plan should be adjusted in future years as the scope and funding of major capital projects
such as U2C and First Coast Commuter Rail services are refined, and as regional priorities are
reevaluated.
9.2.1 Assumptions
The Financial Plan estimates financial needs for the proposed 10-Year Transit Plan based on the
recommended improvements and the assumptions described in this section. The timing and cost of major
improvements such as Southeast Rail and Skyway modernization are not included as these projects are
still in development. As a consequence, the financial plan should be adjusted in future years as the scope
and funding of major capital projects such as U2C and First Coast Commuter Rail services are refined,
funding availability and ridership demand changes, and as regional priorities are reevaluated.
Current year costs and expected growth rates are shown in Table 70. Additional assumptions regarding
Operating and Capital Revenues are provided in Table 71.
Paratransit Operating Cost per Revenue Hour (Clay) $35.03 2019 Contract Cost
FY18 actual expenditures and revenue
Skyway Operating Cost per Revenue Hour $441.59
hours
ReadiRide Operating Cost per Revenue Mile $2.50 2019 Contract Cost
Express Select Operating Cost per Revenue Hour $42.00 2019 Contract Cost
FY18 actual expenditures and revenue
Ferry Operating Cost per Revenue Hour $581.64
hours
Clay Community Transportation Cost per Revenue Hour $36.09 2019 Contract Cost
FY18 actual expenditures and revenue
Gameday Xpress Cost per Revenue Hour $215.55
hours
Avg. ann. growth rate for 2015-2020,
Duval County Population Growth 0.92%
Florida BEBR
Avg. ann. growth rate for 2015-2020,
Clay County Population Growth 2.38%
Florida BEBR
Operating Costs Inflation Rate 3.00% 20-year cashflow analysis
See details below on how unallocated
Unallocated Operating Costs 0%
expenses are forecasted
Capital Cost Inflation Rate 3.00% FDOT Construction Cost Index
213
Transit Development Plan Major Update | Implementation Plan
Federal Formula Funds (e.g. 2% annual Escalation factor based on long-term annual year-over-year
5307, 5337, 5339) growth growth in the Federal Formula Funding program nationwide.
Assumes a fixed sum through the planning horizon of the
State Block Grant 0% growth
TDP
State Trip and Equipment Assumes a fixed sum through the planning horizon of the
0% growth
Grant TDP
Includes both realized and unrealized funding. Includes 5339
discretionary, future capital grants (e.g. new starts, small
Discretionary and Other N/A
starts, other), and associated local match. Agency relies
extensively on discretionary grants to cover capital needs.
Expected future Low or No Emission Vehicle Program (Low-
Low-No Grant N/A
No) awards. Based on previous award received by JTA.
Bi-Annual Fare Increase
5.00% Based on JTA fare increase formula
Assumption
Fare revenue divided by 2019 ridership. Indexed to grow
Revenue per Passenger $1.32
every 2 years.
Non-Fare Directly Generated 2% year over Includes a variety of non-fare revenue such as advertising.
Revenue year growth Assumption is that this revenue will track with inflation.
Real Estate Sales N/A One-time revenue source.
City of Jacksonville
2% Assume revenue will track with inflation
Paratransit Contribution
Transfer to JTA Funds Revenue source represents internal fund transfers from bus
2%
(Operating) to other modes. Will track with inflation (operating).
Revenue represents transfer from JTA reserve fund to cover
Transfer to JTA Funds
N/A remaining capital cost shortfall after all other sources and
(Capital)
transfers (capital)
Assume state gas tax revenue will track with projected
Gas Tax 1% increases in annual Vehicle Miles Traveled nationwide
(FHWA)
Based on Jacksonville Pension Plan forecast for annual
Sales Tax 4.25%
sales tax revenue growth over the next 20 years
214
Transit Development Plan Major Update | Implementation Plan
The second type of costs are the net costs associated with future service improvements. Compared to the
cost of operating JTA’s current service, the service improvements in the TDP will result in $144 million of
additional operating costs over the next 10 years. These costs include the expansion of paratransit in
Clay County, bus route re-alignments to the new Jacksonville Regional Transportation Center, and the
recommendations for new or re-aligned routes in this TDP.
The final type of costs are unallocated costs, which include all agency functions not tied to a specific
mode, along with JTA’s operating contingency. It should be noted that the TDP does not include any
changes in operating costs due to the JTA Skyway replacement/U2C project. As planning and design are
still ongoing, the TDP does not incorporate the operating costs of these improvements.
215
Transit Development Plan Major Update | Implementation Plan
Ten-Year
FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Total
Baseline Operating Costs
Bus $84,455 $86,989 $89,599 $92,287 $95,055 $97,907 $100,844 $103,869 $106,985 $110,195 $968,185
ADA Paratransit $9,098 $9,458 $9,831 $10,219 $10,623 $11,043 $11,479 $11,933 $12,404 $12,894 $108,982
Skyway $7,526 $7,752 $7,985 $8,224 $8,471 $8,725 $8,987 $9,256 $9,534 $9,820 $86,279
Ferry $3,073 $3,165 $3,260 $3,358 $3,459 $3,563 $3,670 $3,780 $3,893 $4,010 $35,232
ReadiRide $483 $497 $512 $527 $543 $560 $576 $594 $611 $630 $5,533
Baseline Subtotal $104,635 $107,861 $111,187 $114,616 $118,151 $121,797 $125,556 $129,432 $133,428 $137,549 $1,204,211
ADA Paratransit $2,090 $2,204 $2,325 $2,451 $2,585 $2,726 $2,875 $3,031 $3,197 $3,371 $26,855
Fixed-Route Bus $1,048 $3,854 $5,709 $7,397 $9,581 $12,346 $14,085 $16,676 $18,528 $22,138 $111,361
Skyway - - - - - - - - - - -
Proposed Service $3,139 $6,058 $8,033 $9,848 $12,166 $15,072 $16,959 $19,707 $21,725 $25,509 $138,215
Subtotal
Other Costs
Unallocated Operating $30,175 $30,175 $30,175 $30,175 $30,175 $30,175 $30,175 $29,706 $29,706 $27,134 $297,769
Expenses
Total Operating $137,949 $144,094 $149,395 $154,638 $160,492 $167,043 $172,690 $178,845 $184,859 $190,191 $1,640,195
Costs
FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Ten-Year Total
Planning
$1,306 $1,332 $1,358 $1,386 $1,413 $1,441 $1,470 $1,500 $1,530 $1,560 $14,296
Expenses
216
Transit Development Plan Major Update | Implementation Plan
The second category of funding is revenue directly generated by JTA. This includes farebox revenue,
advertising/concession revenue, and the sale of assets (including real-estate). Farebox revenue is the
single largest component of funding in this category. The improvements outlined in this TDP will indirectly
impact farebox revenue by impacting ridership. Moreover, JTA has a policy of increasing its fares every
two years according to a formula based on inflation and average increase in operating costs.
The third source of operating funds are Local and Other funding. This category includes dedicated gas
tax and sales tax revenue, the largest source of operating funding for the entire agency. Additional
sources of money include internal transfers between modal funds and a City of Jacksonville paratransit
contribution.
As sales and gas tax revenue is a critical component of agency funding, JTA is heavily impacted by
macro-economic and consumer trends that impact these revenue sources. A drop-in consumer spending
would impact sales tax revenue, while greater fuel efficiency, reduction in vehicle miles travelled, or
transition to electric vehicles would reduce gas tax revenue.
Over the next 10 years, maintaining the existing system will require $132 million in funding. Buses to
support service expansion will require an additional $19.5 million.
217
Transit Development Plan Major Update | Implementation Plan
Table 74: Operating Revenue Forecast (figures in thousands; excludes planning 5307 revenue)
Ten-Year
FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Total
State and Federal
FTA 5310 $342 $348 $355 $362 $370 $377 $385 $392 $400 $408 $3,740
FTA 5307 PM $5,409 $5,518 $5,628 $5,741 $5,855 $5,972 $6,092 $6,214 $6,338 $6,465 $59,232
FTA 5311 $1,104 $1,081 $1,120 $1,161 $1,204 $1,204 $1,204 $1,204 $1,204 $1,204 $11,688
State Block Grant $4,076 $4,076 $4,076 $4,076 $4,076 $4,076 $4,076 $4,076 $4,076 $4,076 $40,758
State Trip and Equipment Grant $1,597 $1,597 $1,597 $1,597 $1,597 $1,597 $1,597 $1,597 $1,597 $1,597 $15,970
Other Federal/State Assistance
$572 $584 $595 $607 $619 $632 $644 $657 $670 $684 $6,266
Grants
Job Access and Service
$1,390 $1,897 $1,901 $1,932 $2,997 $2,997 $2,997 $2,997 $2,997 $2,997 $25,104
Development Grants
Subtotal - State and Federal $14,490 $15,101 $15,273 $15,475 $16,718 $16,855 $16,995 $17,137 $17,283 $17,431 $162,758
Direct Revenue
Farebox Revenue $14,279 $14,279 $14,993 $14,993 $15,743 $15,743 $16,530 $16,530 $17,356 $17,356 $157,803
Directly-Generated (non-fare) $1,323 $1,349 $1,376 $1,404 $1,432 $1,460 $1,489 $1,519 $1,550 $1,581 $14,482
Subtotal - Direct Revenue $15,602 $15,628 $16,369 $16,397 $17,174 $17,203 $18,019 $18,049 $18,906 $18,937 $172,285
City of Jacksonville Paratransit $1,472 $1,502 $1,532 $1,563 $1,594 $1,626 $1,658 $1,691 $1,725 $1,760 $16,123
Transfers to JTA funds $19,181 $19,565 $19,956 $20,356 $20,763 $21,178 $21,601 $22,033 $22,474 $22,924 $210,032
Gas Tax $19,266 $19,459 $19,653 $19,850 $20,048 $20,249 $20,451 $20,656 $20,862 $21,071 $201,566
Sales Tax $70,805 $73,814 $76,952 $80,222 $83,631 $87,186 $90,891 $94,754 $98,781 $102,979 $860,016
Subtotal - Local and Other $110,725 $114,340 $118,093 $121,990 $126,036 $130,238 $134,602 $139,135 $143,843 $148,734 $1,287,737
Expansion Funding
Farebox Revenue from Service
-$58 $689 $1,166 $2,505 $3,717 $3,765 $4,255 $4,524 $4,988 $5,090 $30,641
Expansion
Total Operating Revenue $140,759 $145,758 $150,901 $156,367 $163,646 $168,062 $173,872 $178,846 $185,019 $190,191 $1,653,421
218
Transit Development Plan Major Update | Implementation Plan
Ten-Year
Investment FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Total
Vehicles
Fixed-route Bus $6,962 $8,160 $9,106 $11,543 - $9,950 $7,883 $18,676 $19,236 $12,922 $104,439
Clay County Express $1,084 $625 $1,088 $746 $346 $1,148 $602 $757 $1,124 $134 $7,654
CTC Paratransit $1,129 $2,907 $691 $1,140 $4,090 $1,309 $3,474 $694 $1,322 $4,741 $21,497
Non-Revenue Fleet Replacement $202 $197 $156 $2,237 $691 $222 $168 $2,707 $227 $904 $7,712
Technology
IT Infrastructure $517 $517 $517 $517 $517 $517 $517 $517 $517 $517 $5,168
Facilities
Bus Stops $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $20,000
Bus Shelter and Passenger
$500 $500 $500 $500 $500 $500 $500 $500 $500 $500 $5,000
Amenities
Facility Improvements - - - - - - - - - - -
Fixed Guideway 2
Ferry Improvements - - - - - - - - - - -
Service Expansion
Other
Miscellaneous - - - - - - - - - - -
Total $12,444 $25,149 $14,058 $19,053 $8,143 $15,646 $15,144 $28,235 $26,555 $26,717 $191,144
2
Capital plan does not include costs for any unfunded future-year fixed-guideway investments as costs and funding have not been finalized yet.
219
Transit Development Plan Major Update | Implementation Plan
JTA receives an annual allocation of capital funding from the FTA through formula funding. Formula funds
are based on the amount of service being provided and population of the Jacksonville metropolitan area;
as such, formula funding is fairly predictable. Formula funds are most often used for state of good repair
investments such as replacing buses, investing in core technology, and renovating passenger facilities.
Formula funds generally do not produce enough revenue to cover the full cost of a major capital
investment. FTA requires transit agency recipients to cover at least 20 percent of the cost of a project with
a local match. JTA’s match contribution is covered by toll revenue credits and incorporated into all
formula fund figures presented in this chapter. Federal formula grants are broken into several sections, as
detailed below, each with specific restriction on funding eligibility.
5307 Urbanized Area: 5307 funding represents the largest share of formula funding to JTA. These
funds can be used on any capital expenditure. There are a few subsets to 5307 funding at JTA,
including funding for planning and an FHWA contribution for ferries.
5337 Fixed-Guide State of Good Repair: 5337 funding can be used only on state of good repair
investments on fixed-guideway modes such as the Skyway.
5339 Bus and Bus Facility: 5339 funding is reserved for procurement of new revenue vehicles and
bus-related maintenance facilities. In addition to 5339 Formula Grants, JTA expects to receive
discretionary grants to support bus purchases and facility investments.
The Capital Budget draws from JTA’s reserve fund to meet any capital costs that exceed the amount
generated by other sources. The Financial Plan assumes that unspent operating funds can be applied to
capital in any given year. Moreover, the agency can take advantage of any prior year surpluses in capital
funding.
220
Transit Development Plan Major Update | Implementation Plan
FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Ten-Year Total
FTA 5307 $7,010 $7,150 $7,293 $7,439 $7,587 $7,739 $7,894 $8,052 $8,213 $8,377 $76,753
FTA 5337 $857 $874 $891 $909 $927 $946 $965 $984 $1,004 $1,024 $9,382
FTA 5339 $1,853 $1,899 $1,947 $1,995 $2,045 $2,096 $2,149 $2,202 $2,257 $2,314 $20,758
Discretionary and Other - $8,844 $103 $3,536 $3,606 $1,000 - $2,476 $12,204 $12,231 $44,000
5307 SU NFTPO $1,020 $1,040 $1,061 $1,082 $1,104 $1,126 $1,149 $1,172 $1,195 $1,219 $11,169
5307 FHWA Transfer for Ferry $325 $331 $338 $344 $351 $358 $365 $373 $380 $388 $3,553
FTA 5310 $974 $993 $1,013 $1,033 $1,054 $1,075 $1,097 $1,119 $1,141 $1,164 $10,663
JTA Transfer from Operations $2,810 $1,664 $1,507 $1,729 $3,154 $1,019 $1,182 $1 $160 $13,225
Total $14,848 $22,795 $14,152 $18,908 $19,830 $15,360 $14,800 $17,178 $26,555 $26,717 $191,143
221
Transit Development Plan Major Update | Implementation Plan
The Capital Budget is balanced by assuming the agency will be able to obtain future year discretionary
federal and state funding at a rate similar to what JTA has received in the past (Table 78). Future year
discretionary funds are largely required in the out-years of the plan when the agency faces major fleet
replacement and expansion needs.
222
Transit Development Plan Major Update | Implementation Plan
FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Ten-Year Total
Operating Revenue $140,759 $145,758 $150,901 $156,367 $163,646 $168,062 $173,872 $178,846 $185,019 $190,191 $1,653,421
(-) Existing Transit Service $134,810 $138,036 $141,361 $144,790 $148,326 $151,972 $155,730 $159,138 $163,134 $164,682 $1,501,980
Remaining Funding Balance $5,949 $7,722 $9,540 $11,576 $15,320 $16,090 $18,141 $19,708 $21,885 $25,509 $151,441
(-) Expansion Service $3,139 $6,058 $8,033 $9,848 $12,166 $15,072 $16,959 $19,707 $21,725 $25,509 $138,215
Net Operating Balance $2,810 $1,664 $1,507 $1,729 $3,154 $1,019 $1,182 $1 $160 $0 $13,225
FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Ten-Year Total
New Capital Revenue $14,848 $22,795 $14,152 $18,908 $19,830 $15,360 $14,800 $17,178 $26,555 $26,717 $191,143
(-) Existing System Expenditures $12,444 $14,957 $14,058 $18,684 $8,143 $15,646 $15,144 $25,850 $24,927 $21,717 $171,570
Remaining Funding Balance $2,404 $7,838 $95 $224 $11,687 -$286 -$344 -$8,672 $1,628 $4,999 $19,574
(-) Service Expansion Expenditures $0 $10,192 $0 $370 $0 $0 $0 $2,385 $1,628 $5,000 $19,574
Remaining Balance $2,404 -$2,353 $95 -$145 $11,687 -$286 -$344 -$11,057 $0 $0 $0
Net Capital Balance $2,404 -$2,353 $95 -$145 $11,687 -$286 -$344 -$11,057 $0 $0 $0
223
Transit Development Plan Major Update | Implementation Plan
1 Make Intelligent Transportation System (ITS) investments to improve 3.2.2 Duval County Fixed-Route
calculations of revenues by route Transit Service Profile
2 Develop a three-variable cost model for the agency: 3.2.2 Duval County Fixed-Route
Transit Service Profile
5 Continue strategies to improve the farebox recovery ratio. 3.5 Farebox Report
7 Continue the Transformation of the Skyway into the Ultimate Urban 7.5 Long-Term System Concepts
Circulator and Testing of Autonomous Vehicle Concepts
8 Rebuild the Foundation for Transit Service in Clay County 7.5 Long-Term System Concepts
11 Expand ReadiRide Services in Coordination with Fixed Route Services 7.5 Long-Term System Concepts
12 Develop Additional First and Last Mile Services 7.5 Long-Term System Concepts
14 Make facility and bus stop improvements required to support 10-Year 9 Implementation Plan
Transit Plan implementation
15 Make new and replacement vehicle purchases required to support 10- 9 Implementation Plan
Year Transit Plan
16 Prepare Annual TDP Updates and monitor progress towards 9 Implementation Plan
completing TDP Action Items.
224
Transit Development Plan Major Update | Implementation Plan
225
Transit Development Plan Major Update
A.1 Introduction
Transportation affects everyone. A region’s residents, workers, and visitors depend
upon a regional transportation system to conduct daily business and carry out the
essentials of living. Transportation is generally a public-sector function, in which
government delivers critical elements of the transportation infrastructure and service to
permit travel within the region. As such, the success of any changes to the public
transportation system is dependent upon a proactive public outreach effort from the
onset of efforts to make changes through to final conclusions and ultimately into
implementation.
While technical specialists can gain a strong understanding of the needs and desires of a community, it is
imperative that the affected community weigh in on all alternative ideas and identify preferences, as well
as to help guide decision-making by relaying what is important to their respective community. The positive
value of implementing an inclusive public involvement effort generally results in conclusions and
recommendations that conform to community desires and therefore result in public support for a project’s
conclusions. The Jacksonville Transportation Authority (JTA) is committed to conducting a public
involvement program that focuses on soliciting community interaction and incorporates a consideration of
community impacts and opinions throughout its studies and certainly for the transit development plan
(TDP).
A comprehensive public involvement program is being conducted as part of this transit development plan
(TDP). The program consists of formal and informal meetings with the general public, governmental
agencies, elected officials, municipal staff, local transportation providers and others.
This document, the Public Involvement Plan (PIP), describes the scope and timing of the public
involvement program that will be conducted as part of the current TDP. The PIP is a working document
that will be updated and amended over the course of the project to incorporate the latest public
involvement policies and techniques as they evolve during the life of the project. The PIP outlines the
public involvement approach and activities required to be undertaken as part of the project development,
including lists of the contact persons (officials, agencies, and media) and the means used to involve them
in the process.
226
Transit Development Plan Major Update | Public Involvement Plan
The Coastal Cab of Jacksonville to offer taxi service in select areas within Arlington, Mandarin and
Southside
Gameday Xpress for various sporting events at TIAA Bank Field
Connexion, JTA's paratransit for people with disabilities who are functionally unable to use regular
accessible fixed route bus service for some or all of their transportation needs, and for people who
are transportation disadvantaged
ReadiRide on-demand services.
JTA has a challenging role serving the largest city in the continental U.S. in terms of landmass. The goal
of the JTA is to provide mobility options and improve the flow of traffic into and throughout Duval County.
An integrated transportation network is a critical element in any community to properly manage growth,
provide mobility and offer a good quality of life.
JTA is governed by a seven-member Board of Directors. The mayor of Jacksonville appoints three
members who must be confirmed by the Jacksonville City Council; the Florida Governor appoints three
members who must be confirmed by the Florida Senate and the District 2 Secretary of the Florida
Department of Transportation (FDOT). Each member serves a four-year, unpaid term and can be re-
appointed for a second term. If a member serves eight consecutive years, they must rotate off the board.
From its membership, the Board elects its own Chairman, Vice Chairman, Secretary and Treasurer for
one-year terms.
JTA has developed a new transit vision including technology improvements and efficiencies in transit
services offered. This scope of services updates the TDP for consistency and provides the
implementation schedule for the TDP 10-year planning period.
Regular bus service: the JTA's fleet has 232 vehicles, as of October 2018, that travel 12.5 million
miles per year on 47 routes; 157 diesel, 62 compressed natural gas, 13 hybrid buses. Plus 105
paratransit vehicles, 10 Skyway cars, and one ferry.
Express bus service: five once-daily early morning routes are offered which originate from an outlying
area and go directly to their destination with no intermediate stops, then return in late afternoon.
First Coast Flyer: a bus rapid transit (BRT) system; three of four planned routes are in operation.
JTA Connexion: paratransit for the disabled and elderly, provided by private vendors with specially
equipped vehicles and drivers.
ReadiRide, offered by the JTA through Owl Inc., provides affordable, on-call transportation to
customers within the Beaches, Highlands, Northside, Southeast and Southwest communities.
Stadium shuttle: game day bus transportation from suburban, downtown and Park-n-Ride locations to
the stadium and back.
Jacksonville Skyway: Automated people mover system which travels 2.5 miles from the King Street
parking garage across the St. Johns River and through the central business district, ending at the
Convention Center or the Florida State College at Jacksonville downtown campus.
The Coastal Cab of Jacksonville to offer taxi service in select areas within Arlington, Mandarin and
Southside.
227
Transit Development Plan Major Update | Public Involvement Plan
Park-n-Ride: Parking facility available in combination with express bus service or JTA Skyway.
Coordination with neighboring county transportation providers to offer service throughout the First
Coast region.
The JTA is contemplating several services and modes for future transit to serve the region:
First Coast Flyer: One additional route is planned for the First Coast Flyer BRT system.
First Coast Commuter Rail: JTA is undertaking evaluations for a future commuter rail system.
Jacksonville Skyway Modernization Program: JTA is undertaking a project to modernize the Skyway
with new equipment and an expansion of autonomous service in downtown and the neighborhoods
adjacent to downtown.
Jacksonville Regional Transportation Center (JRTC) at Lavilla: JTA is currently constructing a new
intermodal transit center, which in which will have a Skyway station inside the building and is bringing
together the Jacksonville Skyway, JTA bus service, First Coast Flyer service, intercity bus, and rail
service in one facility. JRTC at Lavilla will be situated near the Prime F. Osborn III Convention Center.
The JTA has the responsibility to identify, plan and prepare Jacksonville's hurricane evacuation routes.
The JTA and the City of Jacksonville established a Hurricane Preparedness Plan that will provide
emergency evacuation/patient transport and move civilians and/or emergency service personnel with
mass transit.
The FDOT requires a TDP to serve as the basis for defining public transit needs, which is a prerequisite
to receiving state funds. The TDP Rule (Florida Administrative Code 14-73.001) requires that the TDP be
a transit provider’s planning, development, and operational guidance document and, therefore, a strategic
blueprint for meeting the mobility needs within a service area. The federal government has a similar
requirement for transit agencies receiving federal funds.
Finally, TDPs have increasingly emerged as a powerful marketing tool for transit services within a study
area and can function as a catalyst for general education and awareness outreach that often is required
to sustain the growth of the multimodal transportation system.
Fixed route
Paratransit/transportation disadvantaged
Vanpool
Fixed guideway
Bus rapid transit (BRT).
228
Transit Development Plan Major Update | Public Involvement Plan
This TDP will also address the emerging technologies such as Autonomous Vehicles (AV), Mobility as a
Service (MAAS) and Transportation Network Companies (TNCs). All these different technologies allow for
additional flexibility for the JTA to work together with mobility services, such as Uber and/or Lyft.
The TDP outreach process will follow outreach guidelines approved by the Florida Department of
Transportation (FDOT) and/or the local TPO’s Public Involvement Plan, approved by both the Federal
Transit Administration (FTA) and the Federal Highway Administration (FHWA). The provider is authorized
to establish time limits for receipt of comments. The TDP shall include a description of the process used
and the public involvement activities undertaken. As required by Section 341.052, F.S., comments must
be solicited from regional workforce boards established under Chapter 445, F.S. The Department, the
regional workforce board, and the TPO shall be advised of all public meetings where the TDP is to be
presented or discussed and shall be given an opportunity to review and comment on the TDP during the
development of the mission, goals, objectives, alternatives, and ten- year implementation program.
The project team will develop specific measurable, relevant, achievable goals that express the desired
outcome towards meeting regional transit needs. A draft list of goals will be shared with the public through
the public involvement program for confirmation or modification. From this exchange a final list of project
goals will be developed.
229
Transit Development Plan Major Update | Public Involvement Plan
The resulting project needs and goals will be incorporated into this PIP.
Stakeholders will be identified first through discussions with JTA officials. They will be able to identify
those individuals and groups that have traditionally had an interest in transit. We expect to reach out to
these individual stakeholders through early discussions one-on-one or in larger groups such as the public
meetings, to broaden the field of stakeholders. The iterative process of seeking new names from those
identified tends to converge on a representative list. It is recognized that additional names can always be
added. The project team, with the concurrence of the JTA project manager, will establish a list that will be
updated throughout the study.
At the onset of the project and working in cooperation with Communications and Marketing and
Government Affairs as well as the JTA project manager, the project team will seek to identify those key
officials and determine the most effective way in which to engage them in the project. All one-on-one
briefings, brief progress reports, and draft copies of documents will be coordinated through JTA
Government affairs with elected officials and with the JTA project manager for all other communications.
Follow-up discussions may be conducted at the request of the officials.
As specific recommendations are formulated, elected officials covering areas in which significant changes
in transit are proposed, should be engaged as well. One-on-one briefings and brief summary documents
are expected to serve as a means to alert and inform these officials. The project team can respond to
additional inquiries as necessary.
230
Transit Development Plan Major Update | Public Involvement Plan
through discussion with these officials, determine the level and Figure A-2: Communicating with FDOT
nature of communication needed to meet their needs.
A.3.5 Media
The media (television, radio, newspapers, social media
outlets) represent an important means of communicating
project information to the affected public. JTA has an
established external affairs department that will support this
project. All communication with public news media will be
through JTA personnel, primarily the JTA project manager and
JTA external affairs staff. Consultant staff may be asked to
supply information, prepare responses for written or oral use,
but will not communicate directly with news media.
Timely responses to all news media inquiries are critical to the image of the agency and confidence in the
project. For inquiries in person, for example at public meetings, responses should be made directly.
Where additional research is necessary, the JTA staff member should obtain contact information to
respond and the deadline for a timely response. Consultant staff may be asked to prepare responses for
use by JTA within the stated deadline.
For inquires in other cases, the JTA staff member should again obtain contact information to respond and
the deadline for a timely response. Consultant staff may be asked to prepare responses for use by JTA
within the stated deadline.
231
Transit Development Plan Major Update | Public Involvement Plan
JTA should advise the consultant of any review required prior to responding to news media. None are
assumed at this time and the JTA project manager and JTA external affairs staff will respond directly to all
matters related to this project.
A.4.2 Advertisements
Advertisements for public meetings associated with this TDP will be published in the local newspaper.
The size, placement, and duration of publication will conform to state and JTA requirements. Notice of
public meetings will also be published on the JTA website and broadcast through any social media used
by JTA.
JTA will encourage but not require stakeholder organizations to also publish advertisements, in the same
format as those issued directly by JTA, through their own newsletters, websites, and social media.
232
Transit Development Plan Major Update | Public Involvement Plan
also feasible to conduct a meeting with groups for purposes of discussing the TDP. As is true of
communication described in preceding sections, this project will follow the guidance of the
Communications and Marketing and Government Affairs groups. JTA staff will attend such meetings. The
consultant staff will supply technical resources.
This point of conduit will be supplied with current information on the study including any fact sheets,
project documents, scope, and schedule. It is anticipated that inquires may go beyond the information
readily available. The point of contact will advise those inquiring that the request is being forwarded to the
project team and that responses should be made within three business days. Where additional time is
required or a direct discussion between the individual inquiring and the project team, the individual
inquiring will be advised and a time for further follow up established.
233
Transit Development Plan Major Update | Public Involvement Plan
It is anticipated that the TDP project will be included as an agenda item at these meetings. Project staff
will be available to make a brief presentation and respond to questions from CPAC members.
Presentation material and hand-outs will be prepared in advance of the meeting. Project staff will prepare
a summary of the meeting including questions and any need for follow-up.
It is anticipated that these meetings will take no more than two hours and that project staff may not need
to remain beyond the period in which the TDP is presented.
The JTA will be responsible for any meeting logistics beyond that already in place by the CPAC. Meeting
summaries will be distributed to the project team within five working days of the meeting.
During the third phase of the study, to present the final plan, the project team will set up display material
at three major transfer hubs (i.e., Rosa Parks – Downtown, Regency Mall – East side, Gateway Shopping
Center – North side). They will engage in a dialogue with riders and be available to respond to questions.
JTA staff should be present to address questions and issues beyond the scope of this TDP as riders may
take advantage of the team’s presence to bring up concerns for which they did not have a ready
opportunity to discuss otherwise. JTA staff may decide to extend public engagement to additional
supplemental meetings with no involvement from the Consultant or Consultant staff.
The Consultant is responsible for presentation development and presentation at the meetings unless
otherwise noted specifically. The Consultant will assist JTA staff in the PIP approval by FDOT.
234
Transit Development Plan Major Update | Public Involvement Plan
235
Transit Development Plan Major Update | Public Involvement Plan
The study covers the entire JTA service area and therefore affects nearly everyone who depends on
transit.
The study covers a diversity of communities, businesses and facilities that are located within the
region and represents a major challenge for public involvement.
The region includes new and old affluent residential areas, and areas that are distressed, where residents
of these communities also have limited transportation choices and limited time available to get to
workshops/meetings. There are also many small “mom-and-pop” businesses and large-scale malls and
commercials shopping areas, and multiple high-rise office buildings. The region is also home to major
hospitals, colleges and universities, as well as courthouses and government services, and major sports
venues. Each of these groups has an interest in the outcome of the project.
Highlighting the benefits of this project will be the first priority from a public involvement standpoint. It will
be important to reaffirm the benefits and needs of public transportation and highlight the potential for
improvement. Due to the expanse of the study area, engendering political and community buy-in will be of
utmost importance. Bilingual (English/Spanish) informational materials will be prepared upon direction of
the Communications and Marketing Group.
This TDP will specifically address specific that have emerged with respect to JTA transit service:
The public involvement program will gather input and vet feedback on these issues, ultimately
incorporating this into the final TDP.
For the final phase of the project the project team will create an online survey to solicit feedback on the
recommendations. This survey will capture general thoughts on route recommendations. The collected
data will help inform service planning recommendations.
236
Transit Development Plan Major Update | Public Involvement Plan
A.7.3 Website
JTA will establish a website for the project. The Consultant will provide materials to populate the
information provided on the website.
5 Develop Short and Mid-Range Transit Network April 2019 June 2019
237
Transit Development Plan Major Update | Public Outreach Materials
238
Urban Core Citizens Planning Advisory Committee
January 7, 2019 Meeting Summary
Ed Ball Building, 214 W. Adams St.
Meeting Attendance
CPAC Members: Staff and Elected Officials:
Chair: Michelle Tappouni City Council at Large Group 5: Samuel Newby
Vice Chair: Kim Pryor Code Compliance: Timothy Myers
Eastside Community Coalition: Tia Keitt Florida Department of Transportation: Derek Dixon
Good Neighbor M.A.N.I.A.: Celia Miller Jacksonville Public Library: Laura Minor
Good Neighbor M.A.N.I.A.: Hallie Williams-Bey JTA: Cheryl Riddick
Parks at the Cathedral: Greg Radlinski JTA: Surya Teeple
Planet Watch Neighborhood: Juanita Senior Council on Elder Affairs: Carrence Bass
Planet Watch Neighborhood: Terry Canty Downtown Investment Authority: James Klement
The Plaza: Glen VanVorst Public Works: Jeff Foster
Grand Boulevard Crime Watch: Delores Swain Planning and Development: Connor Corrigan
Grand Boulevard Crime Watch: Johnny Swain Planning and Development: Jody McDaniel
2nd Mile Ministries: Becca Dingler Planning and Development: Blair Knighting
TRUE Commission Chair: Niki Brunson Planning and Development: Christian Popoli
Excused: Churchwell Lofts: Dimitri Demopoulos Neighborhood Services Office: Amy Holliman
Visitors:
Richard Lewis: The Plaza Eric Miller: Downtown Vision Alliance
Cindy Watson: JASMYN Brenda Boydston: Fresh Ministries
Evie Welch: Sheriff’s Watch Zone 1-Sector A Laura Eldredge: Fresh Ministries
Opal Bryant: District 13 for Rep. Tracie Davis
1. Call to Order/Verify Quorum: CPAC Chair Michelle Tappouni called the meeting to order at
5:31 p.m. After members introduced themselves, staff confirmed a quorum.
2. Presentations:
x Planning and Development: Julie Duggins, Consultant with PaleoWest (678-360-6243:
jduggins@paleowest.com), and Blair Knighting, City Planner II (904-255-7854:
Bmullins@coj.net), reported on the National Register for Historic Places. The Planning
Department was awarded a grant on July 2018, which is to be completed within one year.
The grant is composed of three projects: (1) nominate the Durkee Gardens neighborhood as
a National Register Historic District, (2) complete a National Register Multiple Property Listing
nomination for the Moncrief Road African American Cemeteries and an individual National
Register nomination for Memorial Cemetery, and (3) register multiple historic structures
designed and built by Jacksonville’s first seven known African American Builders and
Designers and Individual Site National Register Nomination for 301 Spruce St., the site of the
Mt. Calvary Church.
x Planning and Development: Jody McDaniel, City Planner III, and Krista Fogarty, City Planner
II, reported on the Brownfields Assessment Grant. This EPA grant funding can be used for
Phase 1 Environmental Site Assessments, Phase II Environmental Site Assessments, and Clean-
Up Planning. The goals of the program are to protect the environment, promote
partnerships, strengthen the marketplace and sustain reuse. Please call Jody McDaniel with
addresses you suspect need an environmental assessment.
x Public Works: Jeff Foster, Solid Waste Environmental Engineering Manager, reported on an
EPA Clean Up Grant. The area for the assessment grant is bounded on the south by Webster
Street and Hollybrook Avenue on the east. McCoy’s Creek bisects the east portion. The City-
owned parcel RE#056258 1002 that is located along the southern end of the site is the
subject of the assessment grant application. The southern portion of the site was a former
dump site area that operated from the 1920s to 1950s. During the assessment of the pond
site during construction, soil and groundwater impacts along with buried waste and surficial
debris was discovered on the southern Hollybrook Park site. The cleanup of the site will be
239
Page 2 of 3 Urban Core January 7, 2019 Meeting Summary
required to fully implement the recommendations of the creek widening and flood plain
evaluation that is being conducted by Wood Environmental (formerly AMEC Foster Wheeler).
3. Approval of Previous Meeting’s Summary: Kim Pryor motioned to approve the October 1, 2018
CPAC meeting summary. Glen VanVorst seconded the motion. One minor change to the
summary was made and the amended motion passed unanimously.
4. Chair Report: Michelle Tappouni reported that requirements of Executive Order 2014-03 for
CPAC attendance will be followed in 2019, and the February meeting will include information
about subcommittee selection and responsibilities.
5. Public Official Report: Samuel Newby, At Large District 5 Council Member (snewby@coj.net:
630-1387), reported the City budget included $4 million for City Council to allocate to projects
they chose. Council Members selected public safety and crime prevention, quality of life,
infrastructure, affordable housing and homelessness.
6. Subcommittee Reports
x TRUE Commission Report: Niki Brunson, (nikibrunson@outlook.com) reported that the main
project of the TRUE Commission at the moment is the subcommittee on Parks and Recreation
Maintenance. One proposal is to develop a management plan and form a committee of
citizen volunteers who would be willing to inspect the parks for compliance.
x Land Use and Zoning Report: Connor Corrigan, City Planner 1 (CCorrigan@coj.net: 255-7844)
reported that there were two applications for restaurants in the Five Points area. Since there
is no representation on the CPAC from Five Points, CPAC members are not comfortable
making a recommendation without representation from their district. He also informed the
CPAC that the waiver of liquor distance on 4250 Moncrief Rd., which the Planning
department recommend for denial and the CPAC supporting that denial, has been
withdrawn.
7. Staff Reports
x Municipal Code Compliance: Timothy Myers, Code Compliance Supervisor (TMyers@coj.net:
255-7037), reported that since the last CPAC meeting in November, Code Compliance has
performed 3,400 inspections in Planning District 1, compared to 1,110 inspections citywide.
The Mid-Westside neighborhood is scheduled for inspection in January 2019.
x Neighborhood Department: Stephanie Burch, Director of Neighborhoods (stephanieb@coj.net:
255-8902) reported that Public Works will be attending a CPAC meeting soon to review right-
of-way maintenance and to bring a schedule for street sweeping in the Urban Core. The
Housing Division has opened its universal application for Community Development Block
Grant (CDBG), Housing Opportunities for Persons with AIDS (HOPWA) and Emergency
Solutions Grant (ESG) funding. A mandatory grant workshop will be held Wednesday,
January 9, from 9 a.m. to noon at the Legends Center at 5130 Soutel Dr. The application
deadline is February 7, 2019. The Infill Development Incentive Program (IDIP) Grant is funded
with City dollars. It will pay for liens, closing costs and other expenses associated with
affordable housing. An email will be sent out as soon as the grant application is available.
Please contact her office to be added to the email list regarding the launch of the IDIP
Grant. She also reported that bill 2018-0871 updates Chapter 122 of the Ordinance Code to
bring it up to state compliance and to improve the efficiency of acquisition and disposition
of City owned property and that Animal Care. Animal Care and Protective Services will
continue to have $19 adoption fees throughout January 2019.
x Florida Department of Transportation: Derek Dixon, Transportation Systems Coordinator
(derek.dixon@dot.state.fl.us; 360-5653), announced that detailed information on FDOT
projects can be found at your10and95.com and NFLroads.com.
x Jacksonville Public Library: Laura Minor, Liberian III (LMinor@coj.net: 630-1944), reported that
the January and February calendar of events for children and computer programs are
available. On Saturday, January 26, from 10 a.m. to 3 p.m. the Mapping Our Past event will
240
Page 2 of 3 Urban Core January 7, 2019 Meeting Summary
celebrate the Library’s latest addition to its map collection and the newly updated Jordan
and Shirley Ansbacher Gallery.
x JTA: Cheryl Riddick, Senior Manager of Customer Engagement (CRiddick@jtafla.com; 632-
5522), reported Jacksonville Regional Transportation Center at LaVilla will have a Topping
Out Ceremony on location at 9 to 10 a.m. on Thursday, January 10. Surrya Teeple with JTA
announced that the Transportation Development Plan is under way. JTA will be seeking
public input during future meetings.
x Department of Elder Affairs: Carrence Bass, Executive Director (cbass@coj.net: 630-4670),
announced that they are seeking members to serve on the Council on Elder Affairs (COEA) .
Additional information and requirements for service can be found on the City’s website here:
http://www.coj.net/departments/boards-and-commissions/council-on-elder-affairs.
8. Old Business:
x Former CPAC member Darcel Harris is serving on the Task Force for Safety and Crime
Reduction. The chair expressed that she would like Darcel to make a report on the Task
Force activities in a few months.
x The implosion of the City Hall Annex at 220 East Bay St. will take place on Sunday, January 20,
at 8 a.m. Restricted access to several city blocks surrounding the site will begin at 7 a.m.
9. Coordinator’s Report: Amy Holliman, Urban Core CPAC Coordinator (aholliman@coj.net: 255-
8260), announced that CommUniverCity registration is under way. Registration forms are due
January 22, 2019. There are six organizations listed in the Urban Core directory that are no
longer active. Fresh Ministries is on that list, but has been attending meetings and will submit
their application next month after they have met membership requirements.
10. Adjourn: Chair Michelle Tappouni adjourned the meeting at 7:21 p.m.
A copy of the audio recording of this Urban Core CPAC meeting is available through a Public Information Request
by calling 630-CITY. Details about Public Records can be found on the City’s Website: Public Records.
241
North Citizens Planning Advisory Committee
January 9, 2019 Meeting Summary
Oceanway Senior Center, 12215 Sago Ave. W., Jacksonville FL 32218
Attendance
CPAC Members Visitors
Chair – Eagle Bend – Mike Getchell Nancy Burnett – Oceanway Manor
Vice Chair – M & M Dairy, Inc. – Teresa Moore
Charter Member – Dot Mathias Donald Drake
Copper Hill HOA – Rev. Joseph Tate Deborah Fonzelle – Victoria Lakes Dr.
Council Appointee District 7- Tommy Ruffin Don Green – Captiva Bluff
Amelia View HOA – Jane Love Kathy McFatter
Amelia View HOA – Dotty Boland Donna Philbrick – San Mateo
Duval County Council PTS/PTA – Vicki Drake Sharise Riley
Eagle Bend – Jim Mazur Al Shaffer
Heckscher Drive CC – Jim Sumara Carson Tranquille – City Council Candidate District 2
Lydia Estates – Michael Wozniak Lynn Vandenhoy – San Mateo
Lydia Estates – Shelley Wozniak William Willard – Spaulding Road
Northlake HOA – Josephine Fiveash - Porter
1. Call to Order/Verify Quorum: Chair Mike Getchell called the meeting to order at 5:35 p.m.
Michelle Godwin verified a quorum.
2. Approval of the Previous Meeting Summary: CPAC member Joseph Tate motioned to approve
November’s summary. CPAC member Teresa Moore seconded. The motion unanimously passed.
3. Neighborhood Coordinator’s Report – Neighborhood Coordinator Michelle Godwin announced that
the Neighborhood Services Office is taking registrations for the CommUniverCity training. The classes
will be held from 6 p.m. to 8 p.m. on Tuesday and Thursday nights beginning February 5, 2019.
Graduation is scheduled for February 28, 2019. Ms. Godwin also reminded CPAC members that it is
required that all CPAC members take ethics training at least every four years. She informed them
that the Ethics Department provides free ethics training every other month from 12 p.m. to 1 p.m. at
City Hall. Ms. Godwin also informed members that it is very important that they notify her when they
are not able to attend meetings, because it is a requirement of the bylaws for the CPAC.
Michelle Godwin may be contacted at (904) 255-8236 or michellegw@coj.net.
4. Presentation: Bill Brinkley, General Manager said the Republic Service’s facility center off of Imeson
Road processes all of the recycling material in Duval County, St. Johns County, Beaches and
Nassau County, and every once in a while, Clay County. The Imeson Road center processes about
350 tons of recyclable material. Mr. Brinkley advised there has been a change in how recycling is
processed and sold. Republic Recycling is trying to get back to basics and will only process items
that are not contaminated. The goal is to get the contaminated recycling material rate down from
Page 1 of 5 January 9, 2019 North CPAC Summary
242
North Citizens Planning Advisory Committee
January 9, 2019 Meeting Summary
Oceanway Senior Center, 12215 Sago Ave. W., Jacksonville FL 32218
the 26.6 percent to 10 percent. Mr. Brinkley encouraged everyone to visit Republic Services website,
RecyclingSimplified.com to learn more about recycling. Mr. Brinkley offered these recycling tips:
don’t leave the lids or tops on cans, bottles and plastic jugs if they are wet; don’t bag your
recyclables they get caught in the single stream recycling systems; soiled paper is considered
greasy or wet paper; don’t recycle motor oil containers, aerosol cans, or propane tanks. Mr. Brinkley
advised Republic will take shredded paper but without the plastic bag. Mr. Brinkley announced
that the new schedule will be available by the end of the month and will be color coded like last
years schedule.
Mr. Brinkley may be contacted at bbrinkley@republicservices.com.
5. Elected Officials: The Chair welcomed and thanked the elected officials for attending the meeting
x Reggie Gaffney, City Council Member District 7, announced that he has been working with small
businesses to insure they are established and able to take part in the $45 billion dollar that will to be
invested in Jacksonville, in the next five to 10 years. He also announced that thanks to the
commitment of the current administration Mayor Curry, and Sam Mousa, and chief of staff Brian
Huff. The City was able to hire 22 young men on the spot. Councilmember Gaffney announced that
the Task Force on Safety and Crime Reduction was approved on January 8, 2019 and will assist
in the efforts to reduce crime. Council Member Gaffney reviewed several projects with CPAC
members, such as the widening of Hard Road Bridge and improving sidewalks. Council Member
Gaffney asked that if there is a need or problem in the community, to please call him.
Council Member Reggie Gaffney may be contacted at (904) 630-1384 or rgaffney@coj.net
x Samuel Newby, City Council Member at Large District 5, announced that an extra $1 million dollars
was added to the public safety and crime prevention program with the help of Council Members
Gaffney and Ju’Coby Pittman. Council Member Newby announced as part of the quality of life
program, they received an extra $1.8 million dollars to be allocated to parks and maintenance and
$712,000 for affordable housing and home assistance. Council Member Newby also announced
that the Urban Rest Stop, located on the main campus of the Sulzbacher Center, has opened. It is a
place where the homeless have access to hot showers, meals and are able to wash their clothes
and have a library. Council Member Newby also announced that an additional $3 million was
allocated to bring grocery stores to areas that are considered food desserts, and an additional $15
million from JEA for septic tanks.
Council Member Samuel Newby may be contacted at (904) 630-1387 or SNewby@coj.net
x Ju’Coby Pittman, City Council Member District 8, announced that she is getting out and listening to
her constituents, youth, businesses and churches, in order to find out what Jacksonville needs.
Council Member Pittman announced she will be hosting a town hall meeting on Thursday, January
17, 2019 beginning at 5 p.m. at the A. Philip Randolph Career Academy, 1157 Golfair Blvd. Council
Member Pittman said she would like to start an initiative to have ambassadors in the various
neighborhoods in District 8, charged with reporting issues to her so they can be resolved in a timely
manner. Council Member Pittman has handled 400 C.A.R.E issues that have occurred while in
office. Councilmember Pittman would like to have a Saturday Town Hall meeting twice a month for
those who are not able to make meetings during the week.
Council Member Ju’Coby Pittman may be contacted at (904)630-1385 or JPittman@coj.net
x CPAC Chair Mike Getchell opened the floor for questions and comments. Mr. Ruffin commented
that the Clara White Mission is a great cause, and that he and his wife have supported it for years.
Mr. Ruffin also thanked council Members Gaffney, Pittman and Newby for attending the North
CPAC meeting. Mr. Ruffin also asked council members in Planning District 6 to consider
implementing a rotation schedule of the council members who attend the CPAC meetings. Council
members agreed. Ms. McFatter thanked council members for their support. CPAC Vice Chair
Teresa Moore reminded everyone how important it is to rally together and make it down to City Hall
when you have an issue. Ms. Riley asked Council Member Gaffney whether the jobs provided for
the 22 young men were permanent, and will there be money in the budget for these jobs next year.
Council Member Gaffney said the jobs are permanent, and will be in the budget next year.
x Council Member Gaffney asked CPAC members approval for the use an estimated $2.5 million of
243
North Citizens Planning Advisory Committee
January 9, 2019 Meeting Summary
Oceanway Senior Center, 12215 Sago Ave. W., Jacksonville FL 32218
the Community Redevelopment Area (CRA) funds to place a “Welcome to Jacksonville” sign on
Cole Road. Council Member Gaffney explained the money used for the project will include road
and sidewalk improvement, from Duval Road, east and west of the bridge and along Cole Road.
The plan has not been finalized as of yet. CPAC Chair, Mike Getchell asked for a motion to obtain
tentative approval of Council Member Gaffney’s proposed road improvement. Mr. Ruffin moved to
give Council Member Gaffney tentative approval for the new “Welcome to Jacksonville” sign. Ms.
Mathias seconded the motion. The motion unanimously passed.
6. Staff Reports:
x Jacksonville Sheriff’s Office (JSO) – Zone 6 Assistant Chief Gregory Burton announced that crime is
down by 1 percent in Duval County. Violent crime is down 1 percent, property crime is down 4
percent. In Zone 6 violent crimes are down 5.05 percent and property crime is down 7.78 percent.
Chief Burton announced that JSO launched a new website on Tuesday, January 8, 2019. The
enhanced version of the Sheriff’s Office website, www.jaxsheriff.org has been designed to provide
quick access to features you need to use. The site includes feeds from official JSO social media
accounts and includes resources that keep you informed about AMBER alerts, completed calls for
dispatched service, and crime maps. Chief Burton brought everyone’s attention to the “Open
Data and Transparency” site where you can find the latest available data on officer-involved
shootings, Jacksonville homicides, info sheets and open data report briefs. He advised that this is
Sheriff Mike William’s attempt at providing the transparency citizens requested.
Assistant Chief Gregory Burton may be contacted at (904) 696-4335.
x Council of Elder Affairs (COEA) – Carrence Bass, Executive Director COEA, announced that the
Council on Elder Affairs is looking for members to advocate and get out in the community to listen
to the concerns and interests of seniors, then bring them back to council members and the Mayor.
There are 19 member and 14 are appointed by councilmembers. The other five are appointed at
large by the Mayor. Ms. Bass announced that COEA is currently seeking new members for Council
District 7. Members must be 55 or older, not employed with the City of Jacksonville, an organization
that receives funding, whether it’s State, local, or federal for senior items or senior services. If you
have questions or interested about the application, please visit the COEA website,
www.bit.ly/COEA-COJ. Councilmember Newby asked if he could appoint someone. Ms. Bass said
that the Mayor appoints the COEA at large members but, will take recommendations.
Carrence Bass may be contacted at (904) 630-4670 or Cbass@coj.net
x Jacksonville Public Library (JPL) – Michael Sullivan, East Region Manager, advised that Mr. Rogers is
still working with the real estate division of public works and reviewing available parcels for the New
Oceanway Branch Library. Mr. Sullivan announced that the Friends of the Jacksonville Library will
hold its book sale, at the University Park Branch Library starting Thursday, January 17, 2019 through
Saturday, January 19, 2019. You can buy one bag of books and get two bags free. Mr. Sullivan also
announced that the 30th annual unveiling of the Jacksonville Black History Calendar for 2019 is
scheduled at the Main Library at 4 p.m. located in the Hicks Auditorium, Thursday, January 17, 2019.
Mr. Sullivan announced that “Mapping our Past” celebrating the Lewis Ansbacher Map Collection
is scheduled all day Saturday, January 26, 2019. Mr. Sullivan announced that the Jacksonville
Public Libraries will be closed, Monday, January 21, 2019, in observation of Dr. Martin Luther King Jr.
Day. Mr. Sullivan also announced that the Jax Book Fest is scheduled at the Main Library on
Saturday, February 23, 2019 from 10 a.m. to 3 p.m. R.L. Stine, author of the Goosebumps series, will
be the guest author for the Jax Book Fest.
Michael Sullivan may be contacted at (904) 248-1703 or michaels@coj.net
x Jacksonville Transportation Authority (JTA) – Cheryl Riddick, Community Engagement Manager,
announced that construction of the Jacksonville Region Transportation Center LaVilla is out of the
ground and progress is being made. The center will open the first quarter of 2020. Ms. Riddick spoke
briefly about the JTA Transit Development Plan for fiscal year 2019-2029. She provided information
that outlines how the plan is developed. For more information about the project, contact Ms.
Riddick or Michelle at 904-255-8236.
Cheryl Riddick may be contacted at (904) 444-1234 or criddick@jtafla.com
x Municipal Code Compliance (MCCD) – Elaine Lancaster announced that MCCD has been working
Page 3 of 5 January 9, 2019 North CPAC Summary
244
North Citizens Planning Advisory Committee
January 9, 2019 Meeting Summary
Oceanway Senior Center, 12215 Sago Ave. W., Jacksonville FL 32218
in the Riverview area and the 45th Street and Moncrief Avenue area. Ms. Lancaster informed CPAC
members that if they place a C.A.R.E ticket and have not seen any action on it, to please call 630-
City and get an update on the issue. If it hasn’t been updated, please call or email Ms. Lancaster
and she will follow-up on the C.A.R.E. item. Ms. Lancaster announced that MCCD did a follow up
inspection at Polly Town and progress has been made. Jim Sumara, thanked Ms. Lancaster for
responding to his email while on vacation. Ms. Lancaster informed CPAC members that the dump
trucks traveling along Black Hammock Island are state dump trucks and are legal.
Elaine Lancaster may be contacted at (904) 255-7007 or elainel@coj.net
x Duval County Public School (DCPS) – Darryl Willie, School Board member, District 4, introduced
himself to CPAC members. Mr. Willie announced that Duval County Publics Schools is working on a
few big things, such as safety, resources and getting the budget in order. CPAC Vice Chair Teresa
Moore asked what is going to be done about the overcrowding of New Berlin Elementary and
changing the way overcrowding is calculated in the Duval County School System. He said that
several methods are used to calculate overcrowding of schools. Mr. Willie said that Duval County
Public Schools (DCPS) needs to figure out how to build more schools, but that is hard to do without
funding. Mr. Willie also said that if DCPS creates programs in other areas based on the choice
model, it would alleviate some of the crowding.
Darryl Willie may be contacted at 904-390-2347 or willied@duvalschools.org
x Parks, Recreation and Community Development – Keith Meyerl, Chief, DC Recreation and
Community Programming, announced that construction is under way for the Jim King Boat Ramp
project. They will be moving the docks water ward off of the bank. Phase 1 of the Palm Fish Camp
dock improvements will beginning January 21, 2019. The boat ramp will be closed during
construction. A new beach road is currently under construction for Huguenot Park. The road will go
through the middle of the park and will be the new main access road for the park. Additional
camp sites that will be accessible by the new road will be added and the old roads that were
closer to the shore will become a pedestrian and bike path. The San Mateo Little League drainage
project is currently going out to bid and is expected to start sometime during the summer. The Joe
Carlucci project is currently out to bid. The boat ramp has been closed since Hurricane Irma. They
will be expanding the docks. The project is estimated to be completed in six months. Jim Mazur
asked if Half Moon Island is going to receive a boat ramp. Mr. Meyerl answered that it is still in the
works. Mr. Mazur asked if Parks and Recreation request for repairs were primarily through 630-City.
Mr. Meyerl affirmed that the main way Parks, Recreation and Community Development find out
about needed repairs. Is through 630-CITY. The maintenance supervisors check the 630-City report
daily. Brian Ragin informed Mr. Meyerl that some of the dock cleats have not been repaired on the
fishing dock at Burt Maxwell. Mr. Meyerl said he will speak with the supervisor of that project to
address the broken cleats. Mr. Ragin also advised that it is impossible to get out during low tide at
the Burt Maxwell boating dock. Mr. Meyerl said he will bring it up to the Chief of waterfronts.
Keith Meyerl may be contacted at (904) 255-7936 or Kmeyerl@coj.net
x Subcommittee/Liaison Reports
x Governmental Affairs and Planning & Development–Teresa Moore and Samuel Walker, City Planner I
The Governmental Affairs Committee made the following motions:
Old Business
x 2018-0668: Deferred - A town hall meeting will be scheduled to solicit input from the
community. The notice will be provided once the meeting is scheduled.
x 2018-0761: Deferred - Councilmember Al Ferraro ordered the developers of this application to
hold another community meeting to insure all interested parties have an opportunity to meet
with the developers and voice their concerns or opinions.
New Business
x E-18-98 - Exception: 0 Lem Turner Road, between Pace Road and Terrell Road – This application
seeks to allow the establishment of a yard waste mulching/recycling station on property
owned by the Jacksonville Aviation Authority. Tommy Ruffin made a motion not to oppose this
exception with the following conditions: 1) Relocated the facility as far as possible from
residential units. 2) Consider installing a soundproof barrier. 3) Establish firm hours of operation
Page 4 of 5 January 9, 2019 North CPAC Summary
245
North Citizens Planning Advisory Committee
January 9, 2019 Meeting Summary
Oceanway Senior Center, 12215 Sago Ave. W., Jacksonville FL 32218
that are resident friendly. The motion was seconded by Dot Mathis. CPAC members
unanimously approved.
x 2018-0863 – Planned Unit Development (PUD): 0 Newcomb Road, east of the Flamingo Lake RV
Park – This application will change an existing industrial PUD to add a solar farm as an allowed
use on the property with access via Newcomb Road from Lem Turner Road. Tommy Ruffin
made a motion to approve with comment. The description of the visual screening is vague as
the developer could put up any type of material that is at least 6 feet high with 85 percent
opacity to satisfy criteria. CPAC would like a more definitive specification provided regarding
the visual screening (fence). Reverend Joseph Tate seconded the motion. CPAC members
unanimously approved.
x 2019-0003 – Conventional Rezoning: 0 Dunn Creek Road, just north of New Berlin Road – This
rezoning proposes a commercial development near the intersection of Dunn Creek and New
Berlin Roads on a 6 acre undeveloped parcel. Dot Mathis made a motion to oppose this bill.
Tommy Ruffin seconded. The CPAC feels commercial development of this parcel would
encroach into the existing residential community. Also, infrastructure around the location is
substandard. CPAC members unanimously approved.
Samuel Walker, City Planner I, may be contacted at (904) 255-7823 or Walkers@coj.net
x Membership - Sharon Bivins, Absent, No Report
x Transportation – Dick Berry: Absent, No Report
x Ad-Hoc- Taxation, Revenue, Utilization and Expenditures (T.R.U.E) – Jim Mazur announced that a
meeting was held today to discuss Parks and Recreation. The T.R.U.E Commission is doing a study
on the parks in order to create a checklist which will be used to assess all of the parks problems
and the maintenance needs at each park. Mr. Mazur announced that he has not been appointed
to the T.R.U.E Commission. His appointment has been deferred by the Rules Committee.
7. Chair’s Report – Mike Getchell discussed the deferment of Jim Mazur’s appointment to the T.R.U.E
Commission and read the letter written to the Rules Committees on behalf of the North CPAC in
support of Mr. Mazur. Several CPAC members voiced their support of Mr. Mazur to the T.R.U.E
Committee.
8. Unfinished Business – None
9. New Business – None.
x Public Comments/Concerns/Announcements: Carson Tranquille introduced himself to CPAC
members and announced he will be running for the Council District 2 seat.
x Motion to Adjourn: Chair Mike Getchell adjourned the meeting at 7:50 p.m.
Next CPAC Meeting: Wednesday, February 13, 2019, 5:30 p.m. Oceanway Senior Center, 12215 Sago
Ave. W.
Next Governmental Affairs Subcommittee Meeting: Thursday, February 7, 2019, 5:30 p.m. Oceanway
Senior Center 12215 Sago Ave. W.
Summary prepared by: Michelle Godwin, Neighborhood Coordinator, Neighborhood Services Office,
(904) 255-8236 or MichelleGW@coj.net
A copy of the audio recording of this North CPAC meeting is available through a Public Information
Request by calling 630-CITY. Details about Public Records can be found on the City’s Website:
http://www.coj.net/departments/public-affairs/public-records-request.aspx
246
Northwest Citizens Planning Advisory Committee
January 10, 2019 Meeting Summary
The Legend’s Center, Community Room, 5130 Soutel Drive, 6 p.m.
Meeting Attendance
CPAC Members: City Staff:
CPAC Chair: Tyrona Clark-Murray At Large Group 5 Council Member: Samuel Newby
CPAC Vice Chair: Doretha Tompkins District 8 Council Member: Ju’Coby Pittman
Cherokee Cove: William Anthony Neighborhoods Department: Stephanie Burch
Better Living: Elaine Billups Jacksonville Public Library: Donna Carroll
Grand Park: Jacqueline Harrington Jacksonville Public Library: Sharon Kirkes
Sherwood Forest Community: Mildred Jennings Public Works: John Kochanski
New Town Success Zone: George Maxey Florida Department of Transportation: Derek Dixon
Moncrief Springs: Carlotta McIntosh Parks, Recreation and Community Services: Jackson Gray
Timber Oaks HOA: Velma Rounsville Jacksonville Sheriff’s Office: St. Matthew Kreuger
Ribault Manor: Bettye Scott JEA: Berdell Knowles
Carver Manor/Lincoln Estates: Larry Solomon Municipal Code Compliance: Ernest Murphy
Timber Oaks: Rhonda Boyd Municipal Code Compliance: Elaine Lancaster
Ribault Manor: Linda Kittles JTA: Cheryl Riddick
Better Living: Bertha Richardson JTA: Jeanette Berk
TRUE Commission Representative: Camilla Collins Animal Care and Protective Services: Devron Cody
Neighborhood Services Office: Amy Holliman
State Attorney’s Office: Leah Hogg
State Attorney’s Office: Thomas Mangun
State Attorney’s Office: Brian Jefferson
Council on Elder Affairs: Carrence Bass
Visitors:
Murphy Nmezi: Royal Terrace Kim Perry (2)
Gwen Nmezi: Royal Terrace (2) Tom Larson: Self-Help Credit Union*
Jackie Nash: Council on Elder Affairs Barbara McKnight
Celeste Mills Rosemary Thornton
Veronica Glover: For Our Future Florida Jermaine Lazenberry
Christian Gonzalez-Orbegno* Theresa Connal
Ted Nash Jeff Edwards: Rail Yard District Business Council
Albert Chester: New Town Pharmacy *have met three meeting CPAC membership requirement
(2) have attended two consecutive meetings
1. Call to Order/Verify Quorum: Chair Tyrona Clark-Murray called the meeting to order at 6:01
p.m. The meeting began with reciting the Pledge of Allegiance, after which staff confirmed
that a quorum is present. Northwest CPAC Chair reviewed Jacksonville Ordinance Code
Sec. 350.305. - Campaigning; prohibited in public work places. “It shall be unlawful and a
class A offense for any person to engage in political campaigning in a public building in
locations where public employees are working. This prohibition shall apply to a public officer
or employee’s support or opposition to a referendum affecting the City if Jacksonville; nor
shall this prohibition apply to rooms rented in public buildings for the purpose of political
campaigning; nor shall it apply to the city’s senior citizen and community centers.”
2. Approval of the Summary: Velma Rounsville made a motion to approve the summary of the
November 8, 2018 CPAC meeting as written. The motion was seconded by Elaine Billups and
was unanimously approved.
3. Presentation: Jeanette Burk with JTA’s Economic Development and Long Range Planning
Department reported on the planning and implementation schedule for the Major Transit
Development Plan update. The 10-year transit plan is updated every five years with input
from the community.
4. Elected Officials Report: Samuel Newby, At Large District 5 Council Member
(snewby@coj.net: 630-1387), reported that the City’s 2019 budget included $4 million for City
Council to allocate to projects they chose. Councilmembers selected public safety and
crime prevention, quality of life, infrastructure, affordable housing and homelessness.
247
Page 2 of 3 Northwest CPAC January 10, 2019 Meeting Summary
5. Unfinished Business: Trout River Boulevard and Lem Turner Road improvement updates from
Glen Weiss (read by Amy Holliman): Since the last CPAC meeting, Public Works has
repainted the arrows, stop bar and yellow line on Trout River Boulevard and repainted all the
white and yellow lines on Trout River Boulevard from Lem Turner Road to Ridge Avenue
(about one mile). The Florida Department of Transportation (FDOT) has removed all the dirt
and sand on the sidewalk to the north of Trout River Boulevard, filled potholes and addressed
the business owners about parking on sidewalks. FDOT staff will seek funding for new lighting
at the intersection, and for upgraded crosswalks and handicap ramps. The traffic island at
the intersection was a 2007 project of the City of Jacksonville at the request of the Riverview
Neighborhood Association. Maintenance of the island is the responsibility of the City by
agreement with FDOT.
6. Chair’s Report: Chair Tyrona Clark-Murray reviewed the attendance requirements for CPAC
members. She emphasized that three consecutive unexcused absences will result in a
member’s removal from the CPAC. To avoid an unexcused absence, call or email Amy
Holliman (255-8260 or aholliman@coj.net) to be excused from the meeting. Sunshine Law
and Ethics training for CPAC members is required every four years. Finally she reminded
everyone that CPAC meetings follow Robert’s Rules of Order. A handout containing a brief
description of processes is available for review.
7. Subcommittee and Liaison Reports
x Transportation: Tyrona Clark-Murray reported that the topic at the December 2018 TPO
meeting was alternative fuels. A company manufacturing Compressed Natural Gas is
planning to open a second manufacturing facility in West Jacksonville. However, due to a
lack of skilled labor in the field, most employees will be recruited from out of town. After
much discussion, members agreed that Jacksonville must work to improve its educational
opportunities to meet the demands of modern industry and manufacturing, preferably
beginning at the high school level.
x TRUE Commission: Camilla Collins reported that the TRUE Commission has created a
subcommittee to research and analyze maintenance of the City’s parks and recreation
facilities. One proposal is to develop a management plan and form a committee of citizen
volunteers who would be willing to inspect the parks for compliance.
8. Elected Officials Report: Ju’Coby Pittman, District 8 Council Member (JPittman@coj.net: 630-
1387), reported that copies of her District 8 newsletter are available. She also asked to report
issues to 630-CITY. She will assist with issues that are slow getting resolved. Please contact her
if you need assistance or would like to report an ongoing issue.
9. Staff Reports
x Jacksonville Sheriff’s Office: Sgt. Matthew Krueger (Matthew.Krueger@jaxsheriff.org),
reported that officers officially have body cameras. He explained that they are not always
on, but turn on with the touch of a button and the camera is constantly recording a 30
second preview. So that if the record button is switched on, the thirty seconds prior to the
incident is also captured as a part of the recording.
x Florida Department of Transportation: Derek Dixon, Transportation Systems Coordinator
(derek.dixon@dot.state.fl.us; 360-5653), announced that detailed information on FDOT
projects can be found at your10and95.com and NFLroads.com.
x Neighborhood Department: Stephanie Burch, Neighborhoods Department Director
(stephanieb@coj.net: 255-8902), reported the Housing Division has opened its universal
application for Community Development Block Grant (CDBG), Housing Opportunities for
Persons with AIDS (HOPWA) and Emergency Solutions Grant (ESG) funding. The application
deadline is February 7, 2019. The Infill Development Incentive Program (IDIP) Grant is
funded with City dollars. It will pay for liens, closing costs and other expenses associated
with affordable housing. An email will be sent out as soon as the grant application is
available. Please contact Stephanie Burch to be added to the email list regarding the
launch of the IDIP Grant. She also reported that Bill 2018-0871 updates Chapter 122 of the
Ordinance Code to bring it up to state compliance and to improve the efficiency of
acquisition and disposition of City owned property. She also reported that Animal Care
and Protective Services will continue to have $19 adoption fees throughout January 2019.
248
Page 3 of 3 Northwest CPAC January 10, 2019 Meeting Summary
x Municipal Code Compliance: Earnest Murphy, Municipal Code Compliance Senior Officer
(EMurphy@coj.net: 255-7096), reported that the last systematic inspection was in the
Lackawanna neighborhood resulting in 527 cases cited. Elaine Lancaster, Municipal Code
Compliance Supervisor introduced herself saying that she works in the Riverview, Moncrief
and Lake Forest neighborhoods.
x Jacksonville Public Library: Donna Carroll Donna Carroll, Bradham Brooks Library Manager
(dcarroll@coj.net: 726-5142), reported that the Jacksonville Book Fest is February 23, 2019,
10 a.m. to 3 p.m. with special guest author R.L. Stine. On Saturday, January 26, from 10 a.m.
to 3 p.m. the Mapping Our Past event will celebrate the Library’s latest addition to its map
collection and the newly updated Jordan and Shirley Ansbacher Gallery.
x Neighborhood Services Office: Amy Holliman, Northwest CPAC Coordinator (aholliman@coj.net:
255-8260), announced that CommUniverCity registration is underway. Registration forms are
due to the Neighborhood Services Office by January 22, 2019.
x State Attorney’s Office: Thomas Mangun, Attorney (TMangun@coj.net), reported that he
and his colleague, Leah Hogg, Attorney (LHogg@coj.net), with the State Attorney’s Office
will be working in the Northwest District neighborhoods on the program to get to know the
community to assist with crime prevention solutions. They will attempt to find the root of the
criminal activity and work with the community and neighborhood organizations to
alleviate those issues. They will be attending to the CPAC and community meetings. For
more information, or to invite them to a neighborhood meeting, please contact Brian
Jefferson, Community Prosecution Coordinator (BrianJ@coj.net).
x Department of Elder Affairs: Carrence Bass, Executive Director (cbass@coj.net: 630-4670),
announced that the department is seeking members to serve on the Council on Elder
Affairs (COEA). Additional information and requirements for service can be found on the
City’s website here: http://www.coj.net/departments/boards-and-commissions/council-on-
elder-affairs.
10. Public Comments
x CPAC guest Rosemary Thornton announced that the Cultural Council is seeking artists for
several projects throughout Jacksonville. The deadline for application is February 7. Visit
www.culturalcouncil.org for more information. Renewed Community Initiatives has
completed a mural on the Mr. K Barbeque and Seafood building at 4906 Soutel Dr. The
2016 Neighborhood Matching Grant provided funding for this project.
x CPAC guest Jeff Edwards shared information about the Rail Yard Business District. The
Beaver Street area, now known as the Rail Yard District, houses over 100 unique small
businesses. Many of these business owners are now coming together to make change in
their community.
x CPAC member George Maxey, representing New Town Success Zone, announced the Dr.
Martin Luther King Jr. Day of Service projects will take place in New Town on January 19,
2019 from 8:30 a.m. to 1 p.m. The Steps to Success Program assists residents with financial
planning. Please contact NTSZ for more information at 470-8899.
11. Adjourn: CPAC Member Elaine Billups motioned to adjourn the meeting. Member George
Maxey seconded and all members agreed. The meeting adjourned at 7:43 p.m.
Next CPAC Meeting: Thursday, February 14, 2019, 6 p.m. at the Legends Center, Community
Room, 5130 Soutel Dr.
To receive supplies for your neighborhood clean-up, please contact Dan Durbec with the City of
Jacksonville Clean It Up, Green It Up program at 255-8276 or ddurbec@coj.net.
A copy of the audio recording of this Urban Core CPAC meeting is available through a Public
Information Request by calling 630-CITY. Details about Public Records can be found on the
City’s Website here: Public Records.
249
Southwest Citizens Planning Advisory Committee
March 11, 2019 Meeting Summary
Lane Wiley Senior Center, 6710 Wiley Road, Jacksonville FL
1. Call to Order/Verify Quorum: Chair Shirley Lowry called the meeting to order at 6:40 p.m. Michelle
Godwin verified a quorum.
2. Approval of the Previous Meeting Summary: Tom Martin moved that February’s summary be approved.
Don Ingram seconded the motion. CPAC approved unanimously.
3. Elected Officials’ Reports:
x Kevin Kuzel, Executive Council Assistant to Council Member Jim Love, District 14, announced that the
Task Force on Safety and Crime Reduction has made several appointments to the various
subcommittees. Council Member Love has chosen to be a part of the mentoring subcommittee. Mr.
Kuzel announced that Council Member Love has been appointed by Council President Aaron
Bowman to be the head of the Short Term Rental Committee. Legislation has been proposed and filed
at the state level in Tallahassee. Mr. Kuzel announced that a meeting was held today to discuss the
Berkman Plaza II Building. Mr. Kuzel announced that a development group plans to convert the
building into a resort hotel and amusement park.
Council Member Jim Love may be contacted at 630-1380 or jimlove@coj.net.
4. Presentations:
x Jeanette Berk of Gannett Fleming, Inc. presented on the JTA Transit Development Plan. Ms. Berk
advised that JTA is making people aware of the Transit Development Plan by visiting various
committees and speaking with the riders. The Transit Development Plan is required in order to obtain
state funds. Ms. Berk stated that JTA develops a Transit Development Plan every year and develops
major updates every five years. Ms. Berk announced that this is an effort to reach out to the public to
determine their public transportation needs. The information gathered will be used to analyze and
develop an operational short-term plan of one to three years and a long term plan of five to 10 years.
JTA must provide a final plan to FDOT by September 1, 2019.
Cheryl Riddick may be contacted at (904) 632-5522 or criddick@jtafla.com
5. Staff Reports:
x Jacksonville Sheriff’s Office (JSO) – Lt. Jessie York provided information regarding the Sheriff’s Watch
Page 1 of 4 March 11, 2019 Southwest CPAC Summary
250
Southwest Citizens Planning Advisory Committee
March 11, 2019 Meeting Summary
Lane Wiley Senior Center, 6710 Wiley Road, Jacksonville FL
Program. Lt. York stated that Sheriff’s Watch is a community engagement program, and is a great way
to build a relationship with the officers that patrol Jacksonville neighborhoods. Lt. York advised Sheriff’s
Watch is also the best way for the residents and the officers to share information about what’s going on
in their neighborhoods, allowing them to address any issues or concerns they may have. You may find
your neighborhood’s Sheriff’s Watch meeting date by visiting, http://www.jaxsheriff.org/Your-Sheriff-s-
Office/citizen-involvement/sheriff-s-watch.aspx . Lt. York announced that in the last 30 days homicides
have increased compared to last year from four to seven. Four shootings occurred on 103rd Street as a
result of robberies; four people were shot, including a 16 year old girl. Robberies to individuals are up
4.8 percent; robberies to business are down 29 percent; residential burglaries are down 16 percent;
burglaries to businesses are down 29 percent and auto thefts are down 7 percent. Lt. York advised that
the program, Coffee and Conversations with a Cop is offered at various businesses. Visit the
www.JaxSheriff.org website to find the various locations, dates and times. Lt. York also announced that
interested citizens are welcome to take part in the Citizens Police Academy, a 12-week program for
active citizens, providing an insider’s look at policing. Lt. York also advised that residents are able to
schedule a walk in their neighborhoods with Sheriff Williams and his team. To schedule one, please
contact the community engagement officer at (904) 630-2160. Lt. York announced that JSO is hiring.
There are positions open for corrections officers and civilians. Visit www.JoinJSO.com to view available
positions or call (904) 713-4870 to speak to a recruiter.
Lt. York may be contacted at (904) 573-3165.
x Jacksonville Fire and Rescue Department – (JFRD) – Chief Jack Griggs announced that the new Fire
Station 61 on Collins and Old Middleburg Road should be in service by the end of the year. He also
announced that another station is being built at 5845 Aviation Ave., just south of Normandy Boulevard
and 103rd Street. There is a rescue truck at almost every station per the Fire Chief’s initiative. Chief
Griggs recommended that when you change your clocks for daylight-savings time, that you also
replace the batteries in your smoke detectors and test it. Chief Griggs informed CPAC members that if
they don’t have a smoke detector, citizens may request one by calling 630-City.
Jack Griggs may be contacted at (904) 786 - 3786 jgriggs@coj.net
x Jacksonville Electric Authority (JEA) – Renee Goode, Government Relations Coordinator, announced
that customers have reported receiving calls from scammers who are asking for customers, updated
contact information, or insisting that they purchase prepaid debt cards or their phone service will be
disconnected. Ms. Goode informed CPAC members that they may update their contact information
by going to www.JEA.com. Ms. Goode asked that customers contact JEA by calling (904) 665-6000 to
report any suspicious calls. If possible, please provide the number the call originated from. The number
will be shut down within one hour. Ms. Goode announced that JEA Board Meetings are open to the
public and scheduled for the fourth Tuesday of each month. The meetings are held at JEA’s Downtown
Headquarters, located at 21 W. Church Street, 19th Floor. JTA Board Members will make a decision
regarding the move of the JEA headquarters in April. JEA has narrowed the choices for the new JEA
headquarters to three locations; one is lot J of the TIAA Bank Field, the second is a vacant lot across
from the new Duval County Courthouse and the third is on King Street across from the Skyway. Ms.
Goode also announced that JEA has launched an educational campaign titled; “Invasion of the
Fatbergs,” which is intended to educate customers about things that should never go down a drain or
flushed down the toilet, even if it says it’s flushable. You can watch the videos by visiting
www.Fatberginvasion.com.
Renee Goode can be contacted at goodrr@jea.com
x Jacksonville Public Libraries (JPL) – Lynne Baldwin, Executive Assistant I, announced that the new
library schedules have started for the regional branches. Ms. Baldwin also announced that free tax
assistance is still available at the West Regional Library on Friday’s from 10 a.m. to 2 p.m. and then will
be available at the Webb Wesconnett Library beginning Friday, March 22, 2019 from 10 a.m. to 2 p.m.
Ms. Baldwin announced that early voting has begun and will continue through March 17, 2019 from 10
a.m. to 6 p.m. at the following libraries; Argyle, Murray Hill and West Branch. A Veterans Service Officer
will meet with veterans every second Tuesday at the Webb Wesconnett Library from 10 a.m. to 2 p.m.
251
Southwest Citizens Planning Advisory Committee
March 11, 2019 Meeting Summary
Lane Wiley Senior Center, 6710 Wiley Road, Jacksonville FL
as part of a partnership with the Military Affairs and Veterans Department. Ms. Baldwin also announced
that DCPS Art Displays will be available to view beginning March 23, 2019 through April 24, 2019 at
each library. Ms. Baldwin also advised that the City is working on a proposal to repaint or replace the
various library signs that are in need of repair.
Lynne Baldwin may be contacted at (904) 338-4383 or lbaldwin@coj.net.
x Municipal Code Compliance Division (MCCD) – Bruce Chauncey, Zone 4 Compliance Supervisor,
announced that 1,557 inspections were completed in Zone 4 between February 11, 2019 and March
11, 2019. These included 242 junk vehicle inspections, 696 nuisance inspections, 19 nuisance board ups,
226 residential inspections, 38 inspections of unsafe structures, 206 zoning, and 10 commercial
inspections. The Municipal Code Compliance Division completed 8,982 inspections throughout
Jacksonville. Mr. Chauncey also announced that the Municipal Code Compliance Division is hiring.
Bruce Chauncey may be contacted at (904) 255-7035 or Brucec@coj.net
x Planning and Development (PDD) – Andy Hetzel, City Planner III, presented the following report:
• AD-19-017 (companion) Administrative Deviation – 2841 Doric Ave.: Request to reduce lot area
from 9,900 sq. feet to 9,375 sq. feet
• AD-19-018 (companion) Waiver to Road Frontage – 2841 Doric Ave.: Request to reduce road
frontage requirement from 72 feet to 62.5 feet.
• 2018-0608 PUD Rezoning – South side of 103rd Street, west of Connie Jean Road: PUD rezoning
seeks to permit school bus storage expansion.
• 2019-0041 Conventional Rezoning – 10354 Sandler Rd.: Request to rezone property from RR-Acre to
RLD-60 zoning district.
• V-18-13 Zoning Variance – 7228 Worthington Rd.: Request to increase lot coverage above 50% for
accessory structure on property.
• 2019-0069 Conventional Rezoning – 4040 Ricker Rd.: Request to rezone property from PUD to RMD-
D zoning district.
• 2019-0078 Conventional Rezoning – 1306 Lakeshore Blvd.: Request to rezone property from PUD to
RMD-A zoning district.
• 2019-0079 Conventional Rezoning – 9681 Noroad: Request to rezone property from RR-Acre to
RLD-50 zoning district.
• 2019-0081 Conventional Rezoning – 8835 Hipps Rd.: Request to rezone property from RLD-60 to
RLD-50 zoning district.
• E-19-08 Zoning Exception – 1660 Lane Ave. S.: Request permit for a daycare for up to 60 children.
• AD-19-010 Administrative Deviation – 5120 Salonika Ln.: Request to increase fence height from 4
feet to 6 feet in required front yard.
Andy Hetzel may be contacted at (904) 255-7821 ahetzel@coj.net
x Public Works – Roy Birbal, Chief of Public Buildings, had no report, but was available to take questions on
behalf of Public Works. Tom Martin stated that a concrete island located near the Argyle Forest
Boulevard entrance of the New WaWa Fuel Station near Old Middleburg Road S., is confusing people
because it looks as though the island is in the middle of the right turn lane. People are running over it or
swerving to miss it. Mr. Martin is afraid the island’s location will cause an accident.
Roy Birbal may be contacted at (904) 255-4330 or Rbirbal@coj.net
x Duval County Public Schools (DCPS) – Tracy Pierce, Chief of Marketing and Public Relations, introduced
himself, and announced he and Jim Culbert will be visiting all of the CPACs on a rotating schedule.
They will be updating CPAC members on what is happening in the school district. Mr. Pierce announced
Duval County Public Schools will be hosting several community meetings throughout the City to
facilitate discussion about the aging schools in Duval County. Consultant group Cooperative Strategies
has completed a study of each of Duval County’s school buildings, and have developed a Facility
Condition Index (FCI), which indicates the condition of the schools throughout the County. Mr. Pierce
said most of Duval County Public Schools are on the low end of the index, meaning major repairs and
updates are needed. Mr. Pierce advised, over $1 billion worth of projects have been identified. Several
community meetings will be held to go through a school by school analysis of what’s being
252
Southwest Citizens Planning Advisory Committee
March 11, 2019 Meeting Summary
Lane Wiley Senior Center, 6710 Wiley Road, Jacksonville FL
recommended. The meeting for Planning District 4 will be held at Edward H. White High School March
21, 2019 at 6 p.m.
Tracy Pierce may be contacted at (904) 390-2996 or piercet@duvalschools.org
6. Subcommittee/Liaison Reports:
x Cecil Area – Bruce Tyson reported that a bus tour of Cecil Field is scheduled for May 9, 2019. The costs
for tickets are $ 20 and the tour will begin at 8:00 a.m. The registration deadline is May 6, 2019. Mr. Tyson
announced that on the east side of the runway, a 1.5 million sq. ft. distribution center is being
completed. Possible tenants will be a Lowes Distribution Center.
x Transportation – Tom Martin reported for February 6 , 2019 North Florida TPO meeting:
x North Florida TPO approved the Citizens Advisory Committee Membership (CAC) request for a
member representing Duval County at Large, and an Amelia Island representative.
x North Florida TPO approved the FDOT request to amend the FY 2018/19 through FY 2022/23
Transportation Improvement Program (TIP) by adding operational funding for the U2C Program,
the Bay Street Innovation Corridor, and for JTA grants and miscellaneous.
x North Florida TPO approved the JTA request to amend the FY 2017/18 through FY 2021/22
Transportation Improvement Program (TIP). This amendment is for a LowNo Grant. This grant is for
vehicles with no or low tail pipe emissions. This grant is for the Hurricane Resilience Grant Award.
x North Florida TPO received a list of study requests for inclusion in the FY 2019/20 Unified Planning
Work Program (UPWP). Some additional studies may be included later, but the list will be trimmed.
The approval of the FY 2019/20 UPWP is scheduled for the May meeting.
x North Florida TPO received an update of JTA’s Transit Development Plan from Suraya Temple and
Jeanette Berk of the consulting firm Gannett Flemming, Inc.
The next North Florida TPO CAC meeting will be held Wednesday, April 3, 2019 at 2 p.m.
x Neighborhood Coordinator’s Report – Neighborhood Coordinator Michelle Godwin announced that
CPAC members need to notify Ms. Godwin when they are not able to make meetings. Three
unexcused absences is automatic removal from CPAC. Ms. Godwin welcomed Dr. Willie Crosby Jr. of
Sweetwater Church of Christ as a new member to the Southwest CPAC. Ms. Godwin advised that if
you would like to become a CPAC member but are not part of a home owners association or
neighborhood association, that City of Jacksonville City Council Members are able to appoint CPAC
representatives for their district. You may reach out to your District Council member, and inform them
that you are interested in representing your District on the Southwest CPAC.
Michelle Godwin may be contacted at (904) 255-8236 or michellegw@coj.net.
7. Chair’s Report – CPAC Chair, Shirley Lowry announced she and the other five CPAC chairs were invited
to speak during Class 4 of the CommUniverCity Training. Ms. Lowry encouraged anyone who hasn’t
attended the CommUniverCity Training to do so next year.
8. Unfinished Business - None
9. New Business – CPAC Chair, Shirley Lowry announced that the Southwest CPAC will be starting a Land
Use and Zoning (LUZ) Subcommittee. Dr. Willie Crosby Jr. has volunteered to be the chair of the new
LUZ subcommittee and is looking for volunteers to join.
x Mr. Martin announced that FDOT will host a public meeting regarding the Hart Talleyrand Expressway
project. The meeting will be held Thursday, March 14, 2019 from 4 p.m. to 6 p.m. at the FDOT Urban
Office Training Center, 2198 Edison Ave.
10. Public Comments/Concerns/Announcements-
11. Adjourn: Chair Shirley Lowry adjourned the meeting at 7:45 p.m.
Next CPAC Meeting: April 8, 2019 6:30 p.m. Lane Wiley Senior Center 6710 Wiley Rd., Jacksonville, FL 32210.
Summary prepared by: Michelle Godwin, Neighborhood Coordinator, 255-8236 or michellegw@coj.net.
A copy of the audio recording of this Southwest CPAC meeting is available through a Public Information Request by calling
630-CITY. Details about Public Records can be found on the City’s Website: Public Records.
253
Greater Arlington Beaches Citizens Planning Advisory Committee
March 20, 2019 Meeting Summary
Pablo Creek Regional Library, 13295 Beach Boulevard, Jacksonville, FL 32246
Meeting Attendance
Excused:
Caroline Forest Homeowners Assoc. - Kacy Evans
Council Appointee – District 1 – Michele Davis
Queens Harbour POA – Ramsey Salem - Chair
Call to Order/Verify Quorum- Vice Chair Shacter called the March 2019 GAB CPAC meeting to
order at 6:30 pm. Rosemary Wesolowski verified that a quorum was present.
Approval of the Previous Meeting Summary – The February 2019 meeting summary was
approved by the CPAC.
Presentation(s): Brad Martin, JaxEx Airport Operations and Facilities Manager and Michael
Stewart, Director of External Affairs, JAA discussed a variety of topics with the CPAC.
Mr. Martin stated that JaxEx is only resurfacing the runway(s) at the airport; they do not have
plans to extend the runway(s). Mr. Martin stated that neither he nor JAA was aware that
Resolution 2019-182 would be introduced to extend the runway(s). Upon learning of this
legislation Jacksonville Airport Authority sent out a memo to City Council members stating JAA is
not interested in discussing extending the runways at JaxEx. City Council members voted to
withdraw the resolution from consideration. Mr. Martin fielded questions/complaints in regard to
noise associated the planes taking off and landing at JaxEx. There are a couple of ways a
complaint about a loud plane can be reported. One can call 904-641-3606 to register a
complaint or go to FlyJacksonville.com and file your complaint electronically.
1|Page
254
Michael Stewart provided an overview of the various uses of each the airports that Jacksonville
Aviation Authority (JAA) operates. The airports are:
x Jacksonville International Airport (JAX) provides commercial air travel to major U.S. cities.
There are eight major airlines and a network of regional airline carriers that provide some
200 daily arrivals and departures at JAX.
x Herlong Recreational Airport (HEG) located off Normandy Boulevard is Jacksonville's
general aviation recreational and sport flying airport.
x Jacksonville Executive or JaxEx (CRG) helps to divert general aviation traffic away from
Jacksonville International Airport (JAX) and its large commercial planes. Since the airport
is located near a number of residential areas, JaxEx (CRG) has become a noise sensitive
airport. As a result, the airport has established a Noise Abatement Program. JAA leases
space to two Fixed Base Operators at JaxEx: Craig Air Center and Sky Harbor. They and
their tenants provide hangar, tie down and fueling services to more than 300 aircraft
based at the airport.
x Cecil Airport (VQQ) is the Jacksonville Aviation Authority's third general aviation airport,
fourth airport overall and a spaceport. Cecil Airport is a former military base that closed
in 1999. Cecil Airport's facilities are ideal for aircraft maintenance, repair and overhaul
(MRO) operations and a variety of aviation-related industrial and commercial
development. Cecil Airport is the base of operations for corporate aircraft, general
aviation, air cargo and National Guard and Reserve aviation. The airport has four, 200-
foot wide runways, three of which measure 8,000 feet. The fourth runway is 12,500 feet in
length, one of the longest in Florida.
Staff Reports:
JSO (Jacksonville Sheriff’s Office) – Lieutenant Valentine stated in the past 30 days in Zone 2
violent crime is down 30.34 % and property crime is down 20.04%. Lt. Valentine announced that
this would be his last GAB CPAC meeting; Lt. Valentine is transferring to the Urban Core (Zone 1)
District. Lt. Valentine reported JSO has made contact with 58 individuals pan-handling in the
GAB district and made 17 pan-handling arrests in the GAB area. Everyone was encouraged to
not give panhandlers money, but to call JSO. JSO can direct those pan-handling to shelters,
medical services and social services if that is what the individual really needs. There were over
400 guns stolen out of vehicles (mostly unlocked) in 2018. Everyone was reminded to remove
their valuables, especially guns from their cars and to participate in the 9 pm Routine.
x The 2019 Jacksonville Black History Calendars are available; they can be found in the
lobby.
x Outsmart the Scammers is a class that to help you identify and prevent common scams.
The class will be held on Friday, April 19, 2019 2-3 pm at the Pablo Creek Regional Library.
2|Page
255
x US Attorney’s Office will lead a discussion on Cyber Security. This will address the threat
to the privacy and economic security of American consumers and businesses.
Cyberbullying will also be covered. This program will be held on Tuesday, April 9, 2019 3 –
5 pm at the Pablo Creek Regional Library.
x Jacksonville Public Library and the American Association of Retired Persons (AARP)
Foundation partner each year to bring free tax preparation to the community. AARP Tax-
Aide sites are serviced by IRS-certified volunteers that provide FREE tax counseling and
preparation services to millions of low- and middle-income taxpayers, with special
attention to those ages 60 and older. There is no income or age limit for assistance at
AARP TaxAide sites; however, AARP sites cannot assist rental property owners or small
business owners.
Duval County Public Schools – Michelle Begley, Chief Financial Officer introduced herself and
informed the CPAC that the Duval County Public Schools will be attending the CPAC’s on a
regular basis. Several CPAC members expressed their concern for student safety due to traffic
issues for those students that attend Alimicani Elementary on San Pablo Road.
FDOT – Derrick Dixon announced a FDOT Public Meeting to discuss possible changes to the
Beach Boulevard/Southside Boulevard intersection. The meeting will be held at the Regency
Square Library, 9900 Regency Square Boulevard, 32225 on April 1, 2019. There will be an open
house 4:30 to 6:30 pm and public comments will be taken starting at 6:30 pm.
JTA – Cheryl Riddick introduced JTA team member Jeanette Berk. Ms. Berk provided an
overview of the JTA Transportation Development Plan (TDP) to the CPAC. Ms. Berk will return to
the April meeting to discuss the TDP in detail.
Neighborhoods Department – Stephanie Burch informed the CPAC mosquito season kicks off in
April. Ms. Burch encouraged everyone to be vigilant to empty or drain standing water around
their homes. Last year mosquito activity was high and several individuals were diagnosed with
West Nile Virus. Experts are expecting a similar mosquito season this year. If you plan to spend
time outside, please use insect repellant that contains DEET and wear long sleeves and pants.
Ms. Burch reminded the CPAC that kitten season is also upon us. Animal Care and Protective
Services is actively looking for individuals and families to foster kittens. It was also recommended
if you find a litter of kittens outside, please leave them alone. The mother will return and take
care of the litter.
Planning & Development Department – Connie Patterson stated the Renew Arlington CRA
Overlay draft was sent to the Office of General Council to finish processing the ordinance. To
view the Renew Arlington CRA Overlay draft visit:
http://www.coj.net/departments/planning-and-development/docs/current-planning-
division/arlington-cra-zoning-overlay-draft_crescimbeni-rev.aspx
3|Page
256
Connie Patterson, 255-7822 or Constancep@coj.net
LUZ (Land Use and Zoning)/Governmental Affairs – LUZ Subcommittee Chair Mike Anania passed
the gavel to CPAC Vice Chair Melody Shacter to present the LUZ Subcommittee report. Vice
Chair Shacter informed the CPAC that the LUZ Subcommittee reviewed a few LUZ applications
and the subcommittee will make one motion.
The motion is:
Deny of Zoning Exception E-19-13 at 5918 Commerce Street. The following observations
were made:
x The applicant is within the boundaries of the Old Arlington Action Plan (NAP) which was
approved by City Council in 2007 and is inconsistent with the plan.
x On page 64 of the approved NAP it states “the Jacksonville Planning and Development
Department should NOT support intensification of commercial uses through rezoning,
PUD’s and exceptions unless it can demonstrate that there will be a benefit to the
neighborhood.”
x It was not demonstrated that there is a benefit to the neighborhood.
x It is inconsistent with the vision of the community and the recommendation of the NAP.
x It abuts the Renew Arlington Community Redevelopment Act and is inconsistent to its
intent.
The CPAC voted unanimously to deny the application.
Environment – Lad Hawkins – City Beautiful Jacksonville is bringing the former Charleston South
Carolina Mayor,Joe Riley to Jacksonville to share his wisdom and experience about making
cities attractive, livable, and thriving. The event will take place on April 4, 2019, 11:30 to 1:30 pm
at the Main Library Conference Center.
Membership – Vice Chair Shacter introduced new member Delmas Harper, POISE, Inc. to the
CPAC.
Ad-Hoc Committees:
TRUE (Taxation, Revenue, and Utilization of Expenditures) Commission – John Roberts stated the
TRUE Commission is still following the finances associated with park maintenance.
4|Page
257
x The St. Johns River Clean-up was a success. The event had 419 volunteers city-
wide; collected 561.5 bags of garbage which weighed 5.5 tons; the volunteers
saved the city $20,640.84.
x Reminded the CPAC that they have the opportunity to make
recommendation(s) to the City of Jacksonville’s Capital Improvement Plan.
Rosemary asked the CPAC members if they would like to have a special meeting
to identify neighborhood capital improvement projects or if they preferred to
email their recommendations to her. The CPAC chose to send their
recommendations to Rosemary.
Chairs Report – Vice Chair Shacter - no report.
Public Comment –
x Member Pete Miller stated he attended a City Council Meeting to express his concern
about the Atlantic Boulevard / San Pablo Road area. These roads are operating over
capacity and with the planned development of Terra Bella and Harbortown
communities this will further impede the roads. Mr. Miller expressed disappointment that
traffic studies are not being completed prior to approval for future development. The
roadways are operating beyond capacity and the future planned development will
negatively impact the already crowded roads.
x Member Pete Miller announced the upcoming ‘A Brush With Nature’ will again be hosted
at The Jacksonville Arboretum & Gardens in conjunction with First Coast Plein Air Painters.
The plein air painting event is open to the public free of charge from 9 a.m. to 5 p.m.
Saturday, March 30 and Sunday, March 31. Activities include artists’ demonstrations
each day, art activities for children, entertainment and food vendors.
x Member Joan Becker requested that the room be set-up a little differently so all the
guests can hear the speakers better. The fan/air conditioner runs continually and makes
it very hard to hear.
Motion to Adjourn
The next meeting of the District 2 CPAC will be Monday, April 8, 2019 at 6:30 pm
at the Pablo Creek Regional Library, 13295 Beach Boulevard, Jacksonville FL, 32246
5|Page
258
Southeast Citizens Planning Advisory Committee
March 25, 2019 Meeting Summary
NEFAR Temporary Training Room, 10300 Southside Boulevard, Jacksonville, FL 32256
Meeting Attendance
1. Call to Order/Verify Quorum: Chair D’Onofrio called the meeting to order. Rosemary
Wesolowski verified that a quorum was present.
2. Approval of the Previous Meeting Summary: A motion was made by Will Herron to
approve the February 2019 meeting summary and Ernst Cornehl made a second; the
summary was approved.
The express lanes construction along I-295 from I-95 to the Buckman Bridge began in July
2014 and will open in Spring 2019. The first express lanes in Northeast Florida were
constructed for $89 million. Prior to the express lanes being constructed, noise walls were
built to lessen the potential noise of construction and the additional traffic noise for
residents that live along the corridor. The express lanes project includes:
•construction of two additional 12-foot travel lane (toll lanes)
•noise walls along I-295 in various locations
•building drainage ponds
•installing electronic tolling systems at various locations to collect tolls
Page | 1
259
With the construction of express lanes, this segment of I-295 will be ten lanes wide. Access
points will be located west of the San Jose Boulevard (SR 13) interchange and at the I-95
south interchange. Once in the express lanes, you will not be able to exit at San Jose
Boulevard or Old St. Augustine Road. Traffic entering I-295 from San Jose Boulevard (SR
13) or from Old St. Augustine Road will not have access to the express lanes.
The Express Lanes will use the SunPass system to pay for the tolls. SunPass is Florida’s
Prepaid Toll Program. I-295 tolls will be collected electronically only, no cash tolling or toll
booths. The SunPass works on all Florida toll roads (including Florida Express Lanes) and
most bridges. The SunPass also work on toll roads in Georgia, Texas, South Dakota, South
Carolina and North Carolina with more states to be added. You can access and
manage your Sun Pass account on their mobile app or online.
Purchasing a SunPass is easy as there are over 3,100 retail locations throughout Florida.
Locally we can buy a SunPass at Publix, CVS, AAA Auto Club South and Walgreens. Most
locations should sell both Mini and Portable transponders. Please visit www.SunPass.com
or call 1-888-TOLLFLA for additional information and prices.
Danny Becton, City Council District 11 – announced that his Neighbor and Taxpayer
Protection legislation 2018-271 has passed and was signed by the Mayor. Councilman
Becton’s stated this initiative (2018-271) is for improving new neighborhoods and
protecting tax payers.
For additional information or updates, please visit Council Member Becton’s website at:
www.DannyBecton.org
Duval County Public Schools – Regan Copeland, Parent Academy Supervisor and Dr. Kelly
Coker – Daniel, Assistant Superintendent, Accountability and Assessment introduced
themselves and shared a copy of the Spring 2019 Parent Academy Catalog. The Parent
Academy of Duval County Public Schools is a free family resource that promotes parental
involvement, enhances student achievement, and supports a caregiver's need for
personal and individual growth. Parent Academy courses are offered in schools, libraries,
community centers, and faith-based institutions throughout the community. The Parent
Academy focuses on the following three fundamental categories:
1. Student Achievement- through workshops and activities provide parents and caregivers
with the necessary tools to promote students' academic achievement as well as provide
support in navigating the school system.
Page | 2
260
2. Parenting & Advocacy - workshops and activities provide innovative tools and strategies
to effectively enhance parenting, student advocacy, and leadership skills.
3. Personal & Individual Growth - workshops and activities provide empowering information,
motivation, and encouragement for the personal and professional growth of parents and
caregivers.
To learn more about the Parent Academy, programs and scholarships, call 390-2000.
JPL (Jacksonville Public Library) – Ann Fridl stated several of the Parent Academy classes
are taught at various public libraries throughout the city. The Southeast Regional Library
will host a debate for the City Council At-Large District 3 candidates on April 18, 2019 at
6:30 pm. Wednesday, April 24, 2019, 4 p.m. San Marco Branch Library explore All Things
Prelutsky in this celebration of National Poetry Month. Award-winning poet, Jack Prelutsky
was the first U.S. Children's Poet Laureate, and the author of more than 50 collections of
poetry. His books have been popular for more than forty years and are revered for being
both engaging, and educating. This program is geared for school-age children from 5 –
12 years old. Also at the San Marco Poetry Open Mic will be held on Tuesday, April 30,
2019, 6 - 7:30 p.m. Participants need to bring an original poem, song or an old favorite.
Poetry must be appropriate in language, content and be under three minutes in length.
JTA – Cheryl Riddick introduced Jeanette Burk, a consultant working for JTA. Ms. Burk
informed the CPAC that she will work with JTA on their long range Transportation
Development Plan. Ms. Burk provided an overview of different phases of the
Transportation Development Plan and stated she will attend future CPAC meetings.
Neighborhoods – Stephanie Burch informed the CPAC mosquito season kicks off in April.
Ms. Burch encouraged everyone to be vigilant to empty or drain standing water around
their homes. Last year mosquito activity was high and several individuals were diagnosed
with West Nile Virus. Experts are expecting a similar mosquito season this year. If you plan
to spend time outside, please use insect repellant that contains DEET and wear long
sleeves and pants. Ms. Burch reminded the CPAC that kitten season is also upon us.
Animal Care and Protective Services is actively looking for individuals and families to foster
kittens. It was also recommended if you find a litter of kittens outside, please leave them
alone. The mother will return and take care of the litter.
Planning and Development Department – Arimus Wells did not have a report, but was
available for questions.
Contact Arimus Wells at arimusw@coj.net
Public Works – Duane Kent stated he did not have a report, but was available for
questions.
6. Subcommittee/Liaison Reports (3 minute time limit) –
LUZ (Land Use and Zoning) – Pete Gentry stated that the subcommittee reviewed a
number of LUZ applications and no motions were made.
Beautification/Parks/Environment – Dick Cardell - no report.
Education – George Banks – not in attendance
Membership - Vacant
Ad-Hoc:
North Florida TPO – Jim Hill – stated the NFTPO continues to provide updates on BayJax
Innovation Corridor. The Innovation Corridor (located in downtown Jacksonville on Bay
Street) will serve as the test bed for many of the emerging technologies from the TPO's
Page | 3
261
North Florida Smart Region Plan. To learn more about the corridor, you can watch a
three minute overview video at: https://vimeo.com/304203596
8. Chairs Report – Chair D’Onofrio informed the CPAC that we have the opportunity to
submit recommendations for the City of Jacksonville Capital Improvement Project list. To
compile the recommendations, the SE CPAC has started an Ad-hoc committee. The CIP
Recommendations Ad-hoc committee will meet on Tuesday, April 9, 2019 at the Avenues
Mall Food Court at 6:30 pm. Everyone is encouraged to join us. As a reminder, a capital
improvement project must have a total cost greater than $100,000 and a lifespan of
more than ten years and must add to, enhance the value of, or extend the life of the
City’s physical assets. Also, Chair D’Onofrio inquired if anyone would like to serve as the
Membership Subcommittee Chair; please let Chair D’Onofrio or Rosemary know.
9. Unfinished Business – none
10. New Business – none
11. Public Comment- Carmen Mazzeo stated the Northeast Florida Chapter of Community
Associations Institute will offer Education Day & Expo on Thursday, April 25, 2019, from
8:30 am - 5:00 pm at the Renaissance World Golf Village Resort, 500 South Legacy Trail,
St. Augustine, FL, 32092. The classes are designed to help HOA’s.
Ann Clapp stated that she attended the annual Fish-A-Thon on March 22, 2019 at Hanna
Park. The event was a fishing tournament featuring games, activities, contests and lunch
for local senior citizens. Awards given for largest fish, smallest fish, most fish, prettiest fish
and ugliest fish. Games include horseshoes, miniature golf, dancing and a picnic table
decorating contest
12. Motion to Adjourn – meeting adjourned at 8:00 pm
Page | 4
262
Greater Arlington Beaches Citizens Planning Advisory Committee
April 8, 2019 Meeting Summary
Pablo Creek Regional Library, 13295 Beach Boulevard, Jacksonville, FL 32246
Meeting Attendance
Excused:
Caroline Forest Homeowners Assoc. - Kacy Evans
Clifton Civic Association - Melody Shacter - Vice Chair
Council Appointee – District 1 – Michele Davis
Ibis Point Owners Association – Nina Pougiouklidis
Monument Oaks HOA - Eddi Parsons
Call to Order/Verify Quorum- Chair Salem called the April 2019 GAB CPAC meeting to order at
6:30 pm. Rosemary Wesolowski verified that a quorum was present.
Approval of the Previous Meeting Summary – The March 2019 meeting summary was approved
by the CPAC.
Presentation(s): Jeanette Berk, Senior Planning Manager, Gannett Fleming, Inc. introduced
herself and informed the CPAC that Gannett Fleming, Inc. is working on the Transportation
Development Plan on behalf of JTA.
Ms. Berk stated JTA is required by the state to update their Transportation Development Plan
(TDP) every ten years for state funding. The TDP is based on current needs and forecasted future
growth, the TDP includes a list of multi-modal transportation projects that are needed and can
be funded over a 20-year horizon. The Plan is updated every three to five years with projects that
are needed the most and can be funded, considering new growth trends, developments and
technologies.
1|Page
263
By 2040, it is estimated Jacksonville population will be approximately 1.1 to 1.4 million individuals
with a working population of 520,000 to 640,000. As transportation technology continues to
advance and change, the strategy and services offered to the public will need to reflect those
advancements. Ms. Berk shared various maps that reflected potential growth areas, areas
under-served by mass transit, various new methods to cross bridges and areas that currently are
regularly bottlenecked with traffic.
Ron Salem, Council Elect, At-Large District 2 - introduced himself to the CPAC and
acknowledged his past involvement with the GAB CPAC. Mr. Salem served as the GAB CPAC
Chair in the mid 1990’s. Mr. Salem will take office on July 1, 2019 as the City Council At-Large
District 2 representative. To ensure the council member transition goes smoothly, Mr. Salem
stated that the current At-Large District 2 ECA, Nikki Evans will remain his aide once he takes
office. Mr. Salem informed the CPAC that he resides in the GAB district and is involved with the
Renew Arlington CRA. Mr. Salem encouraged the CPAC members to participate in the
upcoming Renew Arlington Zoning Overlay Community Meeting on May 8, 2019, 11:30 am to
1:00 pm. The meeting will take place in the Lynwood Roberts Room in City Hall. Mr. Salem asked
everyone to help get the word out about the meeting to the Arlington residents and encourage
their attendance.
Staff Reports:
JSO (Jacksonville Sheriff’s Office) – Lieutenant Bouye introduced himself to the CPAC. This is Lt.
Bouye first day working in Zone 2. Lt. Bouye shared the following statistics: In the past 30 days
robbery to individuals is up 6% and burglary to businesses is up 40%.
x Early voting for the run-off elections will begin on April 29, 2019 and end on May 12, 2019.
x Outsmart the Scammers is a class that to help you identify and prevent common scams.
The class will be held on Friday, April 19, 2019 2-3 pm at the Pablo Creek Regional Library.
x US Attorney’s Office will lead a discussion on Cyber Security. This class will address the
threat to the privacy and economic security of American consumers and businesses.
Cyberbullying will also be covered. This class will be held on Tuesday, April 9, 2019 3 – 5
pm at the Pablo Creek Regional Library.
x Jacksonville Public Library and the American Association of Retired Persons (AARP)
Foundation partner each year to bring free tax preparation to the community. AARP Tax-
Aide sites are serviced by IRS-certified volunteers that provide FREE tax counseling and
preparation services to millions of low- and middle-income taxpayers, with special
attention to those ages 60 and older. There is no income or age limit for assistance at
AARP TaxAide sites; however, AARP sites cannot assist rental property owners or small
business owners.
Jackie Spiritas – spiritas@coj.net
2|Page
264
JEA- Renee Goode provided a promotional hand-out for the Invasion of the Fatbergs video. This
is a very entertaining three minute video used to educate the community on what should not be
flushed down our sinks or commodes. You can watch the video at FATBERGINVASION.com. Ms.
Goode also informed the CPAC about a JEA scam. So far JEA has received 179 calls from
individuals in our city that received a phone call where the caller stated they were calling from
JEA. The caller requested prepaid credit cards be purchased by the JEA customer and sent to a
specific address in order to keep their JEA power/water accounts on. These calls are a scam.
Ms. Goode assured everyone that JEA will never call them and make this type of request. If you
have any questions, concerns or receive strange phone calls about JEA services; hang up and
call JEA at 665-6000. Ms. Goode announced JEA has selected the site for their new
headquarters. The new headquarters will be located at 325 W. Adams Street; this is a downtown
location near the Duval County Court House. JEA plans to start construction as soon as possible.
JEA will be placing a piece of real estate for sale at the corner of Atlantic and Southside
Boulevards; this is the old Coggin Pontiac dealership. The land is currently getting appraised.
Planning & Development Department – Connie Patterson reiterated information for the Renew
Arlington Zoning Overlay Community Meeting on May 8, 2019, 11:30 am to 1:00 pm in the
Lynwood Roberts Room in City Hall. To view the Renew Arlington CRA Overlay draft visit:
http://www.coj.net/departments/planning-and-development/docs/current-planning-
division/arlington-cra-zoning-overlay-draft_crescimbeni-rev.aspx
LUZ (Land Use and Zoning)/Governmental Affairs – on behalf LUZ Subcommittee Chair Mike
Anania, Chair Salem stated that the LUZ Subcommittee reviewed three applications and no
motions or actions were made.
Beautification/Parks – Larry Belge – stated you can get good, free landscaping advice from
area nurseries. Local nurseries are familiar with the types of plants that grow well in our area
and what growing conditions they like.
Environment – Lad Hawkins – announced the Ed Austin Regional Park is turning 25 years old this
year. Mr. Hawkins has spoken to the Parks Director Daryl Joseph in regard to the possibility of
having a celebration at the parks to honor the anniversary.
3|Page
265
Membership – Chair Salem introduced Harley Herndon as the primary member for Cypress Cove
Good Neighbor Group and presented him with his CPAC Mayoral Appointment letter.
Transportation – Will Messer – informed the CPAC that a number of State of Florida road projects
will be completed in our CPAC district this year. The projects are:
x Southside Connector over the Arlington Expressway will undergo rehabilitation activities
until the summer of 2019. The project includes coating of steel beams, minor concrete
repairs, replacement of structural steel rivets and the replacements of expansion joints
which assist in protecting the bridge from movement. There will be periodic single lane
closures during off peak driving hours between the hours of 7:30 pm and 7:00 am.
x The Wonderwood Bridge project will be completed by summer 2019.
x The University Boulevard and Atlantic Boulevard Intersection Safety Improvement project
started in January 2019. The scope of the project will include: adding an additional left
turn lane from westbound Atlantic Boulevard to southbound University Boulevard; adding
a right turn lane from northbound University Boulevard to eastbound Atlantic Boulevard;
extending the length of the existing right turn lane from southbound University Boulevard
to westbound Atlantic Boulevard; relocating Lawrence Place (a city street) to provide a
safer connection to University Boulevard and replace/upgrade existing signal mast arms.
Ad-Hoc Committees:
TRUE (Taxation, Revenue, and Utilization of Expenditures) Commission – John Roberts stated the
TRUE Commission continues to work on the Park Maintenance project and a draft report has
been completed. The TRUE Commission is hopeful that the Parks, Recreation and Social Services
Department will start maintaining their own records and look at the parks maintenance budgets
for major Florida cities.
Mr. Roberts informed the CPAC that the Council on Elder Affairs is actively looking for new
members. If you are interested, please call Carrence Bass, Executive Director, Council on Elder
Affairs at 255-5413 or CBass@coj.net.
North Florida TPO – Will Messer – stated as mentioned in the presentation earlier, North Florida
Transportation Planning Organization (NFTPO) is actively engaged in the Path Forward Long
Range Transportation Plan (LRTP). The LRTP guides investment into the region’s transportation
systems for the next 20-25 years. The NFTPO is the independent transportation planning agency
for our region. Every five years, the TPO updates the Long Range Transportation Plan (LRTP) to
address road, transit, freight, bike and pedestrian needs over the next 20-25 years. From the
current survey NFTPO we know that today 91% of us commute alone in our vehicles, 4% car-pool,
3% take the bus and 3% walk or ride a bike as their primary mode of transportation.
Mr. Messer informed the CPAC that the next Tech and Beer Meeting would be held at TIAA Field
on April 11, 209 at 5:30 pm. Tech and Beer is community of tech professionals and enthusiasts
that are inspired and passionate about technology in all forms and applications. Tech and Beer
focus is to connect the Jacksonville Tech community through a conversation. The upcoming
technical advances for Bay Street will probably be a hot topic at this meeting.
4|Page
266
to identify neighborhood capital improvement projects or if they preferred to
email their recommendations to her. The CPAC chose to send their
recommendations to Rosemary.
Chairs Report – Chair Salem stated the next CPAC Chair meeting with Mr. Sam Mousa, City of
Jacksonville, Chief Administrative Officer will be held on May 10, 2019 at 8:30 am in City Hall.
Please share any questions or concerns that you may have with Chair Salem prior to the
meeting. Chair Salem announced that at the May GAB CPAC meeting as a group, the CPAC
members will review the CIP recommendations and vote on them prior to submitting a final
report.
Motion to Adjourn
The next meeting of the District 2 CPAC will be Wednesday, May 22, 2019 at 6:30 pm
at the Pablo Creek Regional Library, 13295 Beach Boulevard, Jacksonville FL, 32246
5|Page
267
North Citizens Planning Advisory Committee
April 10, 2019 Meeting Summary
Oceanway Senior Center, 12215 Sago Ave. W., Jacksonville FL 32218
Attendance
CPAC Members Visitors
Chair – Eagle Bend – Mike Getchell Marion Burke
Charter Member – Dot Mathias Donald Drake – Captiva Bluff
Copper Hill HOA – Rev. Joseph Tate Don Green – Captiva Bluff
Copper Hill HOA – Bessie Williams Deb Green – Captiva Bluff
Council Appointee District 7- Tommy Ruffin Jamie Lacy – San Mateo
Blue Grass Northwood – Sharon Bivins Kathy McFatter – Cole Rd
Duval County Council PTS/PTA – Vicki Drake Pat Medly
Eagle Bend – Jim Mazur Donna Philbrick – San Mateo
Heckscher Drive CC – Jim Sumara Al Saffer - Armsdale
Lydia Estates – Michael Wozniak Cristina Salas – Cedar North HOA
Lydia Estates – Shelley Wozniak Victoria Schultz - DCPS
Northlake HOA – Josephine Fiveash - Porter Tamika Smith – Captiva Bluff HOA
Wingate Estates – Paul Fenning Carson Tranquille – Bay Harbor
Wingate Estates – Kiz Fenning Lynn Vandenhoy – San Mateo
Victoria Preserve – Ingrid Montgomery Jeanette Berk – Gannett Fleming, Inc.
1. Call to Order/Verify Quorum: Chair Mike Getchell called the meeting to order at 5:34 p.m.
Michelle Godwin verified a quorum.
2. Approval of the Previous Meeting Summary: CPAC member Joseph Tate motioned that the
March meeting summary be approved. CPAC member Dot Mathias seconded. The motion
unanimously passed.
3. Presentation:
x Jeanette Berk of Gannett Fleming, Inc. presented on the JTA Transit Development Plan. Ms. Berk
advised that JTA is making people aware of the Transit Development Plan by visiting various
committees and speaking with riders. The Transit Development Plan is required in order to obtain
state funds. Ms. Berk stated that JTA develops a Transit Development Plan every year and develops
major updates every five years. Ms. Berk announced that this is an effort to reach out to the public
to determine their public transportation needs. The information gathered will be used to analyze
and develop an operational short-term plan of one to three years and a long term plan of five to 10
years. JTA must provide a final plan to FDOT by September 1, 2019.
Cheryl Riddick may be contacted at (904) 632-5522 or criddick@jtafla.com
4. Elected Officials:
x Sirretta Williams, Executive Council Assistant to Council Member Reggie Gaffney, District 7, thanked
everyone for their support on behalf of Council Member Reggie Gaffney.
5. Staff Reports:
x Jacksonville Sheriff’s Office (JSO) – Zone 6 Assistant Chief Gregory Burton announced that
Ordinance 2017-8017E passed on January 2019. The ordinance prohibits tractor-trailers from
traveling on specific road ways. Citations for vehicles that are not in compliance with the new law
are still in development and are complaint driven. Chief Burton asked CPAC members to call to
make a complaint if they see a tractor-trailer that is not in compliance. Chief Burton also
announced that property crime is down significantly in Duval County. Burglaries to residences are
down 45 percent, burglaries to businesses are down 32 percent and burglaries to automobiles are
down 50 percent. There have been no homicides in Zone 6 this year. This time last year, there were
three. There were two traffic fatalities so far this year. Chief Burton announced that Chief Williams
has decided that JSO will continue to assist with the Guardian program at Duval County Public
Schools until enough guards are hired.
Assistant Chief Gregory Burton may be contacted at (904) 696-4335.
x Jacksonville Fire and Rescue Department (JFRD) - Fire District Chief Suppression 56, Gary Kuehner,
reminded CPAC members to change the batteries in their smoke detectors If they have not already
done so. Citizens without smoke detectors may call 630-City to have their names placed on a list
with the Fire Prevention Division, and if in stock, they will provide and install a smoke detector. Chief
Kuehner announced that a full-time rescue truck and staff are now at Station 37, located at 10151
Busch Dr. N. Chief Kuehner also announced he and JSO Chief Burton have participated in the
active shooter drill at the Jacksonville International Airport (JIA) in order to prepare the airport for
such an event. An implosion is scheduled for Friday, April 12 at the New Berlin Power Plant. Chief
Kuehner informed CPAC members that they can always have their blood pressure checked at any
fire station between the hours of 9 a.m. and 6 p.m. Chief Kuehner advised that fire stations no
longer provide safety seat installations. He believes the Florida Highway Patrol may be able to assist
with that.
District Chief Gary Kuehner can be contacted at 904-630-0861 or gkuehner@coj.net.
x Jacksonville Public Library (JPL) – Michael Sullivan, East Region Manager, announced that there are
no updates regarding the Oceanway Library. The consultants are still looking for the right property
site. Mr. Sullivan announced that Folk It Up Music Festival will take place during Art Walk on May 1,
2019 at the Main Library and Hemming Park from 5 p.m. to 9 p.m. Mr. Sullivan also announced that
three Comic Con events will take place at various branches. The first will be held at the Beaches
Branch Library on Saturday, April 13, 2019 from 11 a.m. to 3 p.m., the second will be held at the
Main Library on Saturday, May 4, 2019 from 10 a.m. to 3 p.m. and third will be held at the South
Mandarin Branch on Saturday, May 11, 2019 from 11 a.m. to 3 p.m. Mr. Sullivan announced that the
Military Affairs and Veterans Department will provide Veteran’s Services Information Sessions at
Charles Webb Wesconnett Regional Library on the second Tuesday of each month from 10 a.m. to
2 p.m. Mr. Sullivan also announced that a 2019 City Council Candidate Forum will be held on
Thursday, April 18, 2019 from 6:30 p.m. to 9 p.m. at the Highlands Regional Library, 1826 Dunn Ave.
The candidates for Districts 8 and At-Large Group 1 will be available for questions.
Michael Sullivan may be contacted at (904) 248-1703 or michaels@coj.net
x Municipal Code Compliance (MCCD) – Elaine Lancaster, Senior Code Compliance Officer,
announced that the Municipal Code Compliance Division will be releasing a newsletter each
month with helpful tips and information, as well as the MCCD inspection statistics for the month. Ms.
Lancaster introduced Ernest Murphy, senior code compliance officer for Zone 4. Ms. Lancaster
reported that 1,430 inspections were completed in Zone 4 between March 13 and April 10, 2019.
The Municipal Code Compliance Division completed 10,992 inspections throughout Jacksonville.
Elaine Lancaster may be contacted at (904) 255-7007 or elainel@coj.net
x Park, Recreation & Community Services – Bob Skalitzky, Chief of Natural and Marine Resources,
announced the Parks, Recreation and Community Services Department is preparing for summer
camp. Summer camp consists of three two-week sessions. The first session begins June 17th.
Registration begins May 7, 2019 at 12 p.m. Register at
https://web1.vermontsystems.com/jacksonville.html. Mr. Skalitzky also announced that Parks,
Recreation and Community Services offers 300 summer camp vouchers to children in need. Those
who are interested in receiving vouchers must fill out a Voucher Verification Application and attend
a Voucher Verification event, which are scheduled April 22 through April 26. Voucher verification
locations can be found at www.Jaxparks.com. Mr. Skalitzky also announced that the department is
still hiring life guards, summer camp counselors and park managers for the Rec & Roll program,
which is free. Mr. Skalitzky provided the following updates:
x Huguenot Park: The new beach road will be completed by Memorial Day. All of the camp sites
will be open and the next phase of construction includes adding electrical pedestals at each
site.
x Palm Fish Camp: Phase one of dock installation is completed. Phase two of the project has
been awarded and the contract is being prepared.
x Joe Carlucci: Dock repair and installation has been contracted. Estimated completion is early
July.
x Betz Tiger Point Preserve: Road improvement, kayak launch, pavilions and Americans with
Disabilities Act (ADA) walkways are being installed.
x Seaton Creek Historic Preserve: Road installation to improve the kayak launch and possible rest
rooms
x Half-Moon Park: A boat landing is being created, including boat launch docks, pavilions and
restrooms. The project will start in May 2019.
x Bert Maxwell Boat Ramp: A few of the docks have been repaired, but the park is in design stage
for a dredging project.
6. Subcommittee/Liaison Reports
x Governmental Affairs and Planning & Development –Tommy Ruffin and Samuel Walker, City Planner I
The Governmental Affairs Committee made the following motions:
New Business
x 2019 – 0161 – Conventional Rezoning: Heckscher Drive – This application seeks to rezone 6
properties totaling approximately 3 acres from Industrial Water (W) to RLD-90/RLD-100A in order
to bring existing homes on those properties into consistent zoning districts. This rezoning and its
companion Land Use Amendment application are City sponsored. A motion to approve was
made by Tommy Ruffin and seconded by Mike Getchell. CPAC members unanimously
approved.
Erin Abney, City Planner I, will be replacing Sam Walker and may be contacted at (904) 255-
7849 or eabney@coj.net
x Capital Improvement Program (CIP) – Tommy Ruffin reported that three suggestions were made at
the CIP Ad Hoc Subcommittee meeting on Thursday, April 4, 2019. Mr. Ruffin said that the
committee will continue to accept Capital Improvement Project ideas at the next CIP Ad Hoc
Subcommittee meeting scheduled for Thursday, May 2, as well as the next North CPAC meeting
scheduled for Wednesday, May 8. The three suggestions are as follows:
x Heckscher Drive Community:
1. Build a park on the Northside of Fire Station 40, located at 9350 Heckscher Drive. Tear down the
existing building that is not in use, in order to build pickle ball courts, fishing pier and green
space for the community and visitors to enjoy.
2. Install sidewalks/bike trail from the Mayport Ferry over Sisters Creek Bridge, which will provide
access to the existing parks located on the west side of the water. This would increase ferry
ridership from the beaches area.
x Northlake Subdivision:
1. Install sidewalks on each side of all streets in the Northlake community – approximately 2.5
miles. The sidewalks will increase the safety of residents and enhance the value of the City’s
assets – City easement.
x Membership - Sharon Bivins announced that she will be manning a booth for the North CPAC at
this year’s Sheriff’s Watch Safety Fair. The Safety Fair is scheduled for April 20, 2019 from 10 a.m. to 2
p.m. at Lonnie Miller Park, 7689 Price Ln. Volunteers are welcome to assist Ms. Bivins with the booth.
Ms. Bivins asked CPAC members if there were any location suggestions for the next North CPAC
sponsored cleanup.
x Transportation – Vacant.
x Ad-Hoc- Taxation, Revenue, Utilization and Expenditures (T.R.U.E) – Jim Mazur reported that the
T.R.U.E commission received a presentation about the City switching the staff to the Oracle
Computer system. With the change of the systems, City staff will be better able to share
information. The T.R.U.E commission asked if there is a possibility to allow citizens to have access to
the Oracle system, in order to view audit information.
Next CPAC Meeting: Wednesday, May 8, 2019, 5:30 p.m. Oceanway Senior Center, 12215 Sago Ave. W.
Next Governmental Affairs Subcommittee Meeting: Thursday, May 2, 2019, 5:30 p.m. Oceanway Senior Center
12215 Sago Ave. W.
Summary prepared by: Michelle Godwin, Neighborhood Coordinator, Neighborhood Services Office, (904) 255-
8236 or MichelleGW@coj.net
A copy of the audio recording of this North CPAC meeting is available through a Public Information Request by calling 630-CITY.
Details about Public Records can be found on the City’s Website: http://www.coj.net/departments/public-affairs/public-
records-request.aspx
Meeting Attendance
CPAC Members City Staff
CPAC Chair: Tyrona Clark-Murray Duval County Public School Board: Warren Jones
CPAC Vice Chair: Doretha Tompkins City Council District 10 Assistant: Gerrie Ford-Hardin
Better Living: Elaine Billups City Council District 8 Assistant: Mercedes Parker
Grand Park: Jacqueline Harrington Art in Public Places: Glenn Weiss
Sherwood Forest Community Network: Mildred Jennings Duval County Public Schools: Dana Kriznar
New Town Success Zone: George Maxey Duval County Public Schools: Don Nelson
North Riverside: Linda Moore Jacksonville Sheriff’s Office: Lt. Greg Terrell
Moncrief Springs: Carlotta McIntosh Jacksonville Fire and Rescue: Brandon Smith
Timber Oaks HOA: Velma Rounsville Neighborhoods: Stephanie Burch
Carver Manor/Lincoln Estates: Larry Solomon Florida Department of Transportation: Derek Dixon
New Town Success Zone: Brenda Ford Municipal Code Compliance: Tim Myers
Municipal Code Compliance: Thomas Register
Excused: Roxsan Currier Municipal Code Compliance: Stephen Shore
Jacksonville Public Library: Donna Carroll
JTA: Jeanette Berk
State Attorney’s Office: Brian Jefferson
Neighborhood Services Office: Amy Holliman
Visitors:
Waynetta McGraw: Jacksonville Ranch Club* Rosemary Thornton: RECI
Kim Perry: Lake Forrest* Tracie Thornton: RECI
Reginal Fitzpatrick: Fairfax Neighborhood Carol Gamble: Moncrief Springs
Paula Hamilton: Fairfax neighborhood Leola Williams: Sherwood Forest
Linda White: Fairfax neighborhood Catherine Powell: Sherwood Forest
Shirley Keith *have met three meeting CPAC membership requirement
(2) have attended two consecutive meetings
1. Call to Order/Verify Quorum: Chair Tyrona Clark-Murray called the meeting to order at 6
p.m. The meeting began with reciting the Pledge of Allegiance, after which staff confirmed
that a quorum was present. Velma Rounsville motioned to approve the March 14, meeting
summary. Elaine Billups seconded the motion. The motion was unanimously approved.
2. Presentation: Jacksonville Cultural Council’s Art in Public Places – Glenn Weiss, Director
(glenn@culturalcouncil.org: 358-3600) announced that they have selected Donald
Gialanella from Tampa as the artist for the installation in front of the Legends Center.
Samples of his work are online at donsculpture.com. The artist uses reclaimed objects as the
sculpture materials such as tools, utensils, electronic game components, computer hardware
and a myriad of mass produced plastic objects that are given new life as figurative
sculptures. Art in Public Places is seeking community input to inspire the installation. Please
consider completing an online survey at surveymonkey.com/r/Winton-Legends. Additional
meetings will be scheduled for the community to meet the artist.
3. Elected Officials Report: Warren Jones, Duval County Public School Board Member District 5
(jonesw2@duvalschools.org: 390-2372), shared the Facility Master Planning Scenarios,
submitted to DCPS on April 9, 2019. The recommendations are based on the data alone and
have not taken factors such as historic or community values into consideration. School Board
Member Jones encouraged everyone to offer their suggestions for the plan. There is no
funding for the plan, or source of funds currently available for the recommendations.
4. Unfinished Business: Chair Tyrona Clark-Murray reported that the Office of Finance and
Administration’s request for all CPAC’s input on Capital Improvement Projects (CIP) for the
district is due May 15, 2019. An ad hoc subcommittee will meet on April 18, 2019 at 6:30 p.m.
in the Legends Center to discuss recommendations from the Northwest CPAC to the CIP.
272
Page 2 of 3 Northwest CPAC April 16, 2019 Meeting Summary
5. Chair’s Report: Chair Tyrona Clark-Murray reported that she, Doretha Tompkins and Kim Perry
attended a City Council meeting to speak in support of bill #2019-209. The ordinance is
drafted to define and identify simulated gambling devices as a public nuisance and noxious
use; to prohibit the use of simulated gambling devices for certain circumstances; to create
an amortization period for simulated gambling establishments and to create an
enforcement mechanism for violations. An amendment to the bill to include language
prohibiting set up near schools, residences or churches was also introduced at the meeting.
6. Subcommittee and Liaison Reports
x Transportation: Larry Solomon reported that upgrades to New Kings Road continue. Florida
Department of Transportation (FDOT) is adding new sidewalks, lighting and resurfacing to
U.S. 1 (Kings Road) from Edgewood Avenue to Trout River Boulevard. The work is scheduled
for completion by fall 2019. Upgrades to the sidewalks on the Lem Turner Road bridge at
the Ribault River continues with construction during the evening hours. This work is
scheduled for completion by spring 2020.
7. Staff Reports
x Jacksonville Sheriff’s Office: Lt. Greg Terrell (Gregory.Terrell@jaxsheriff.org) reported that
year to date robberies to businesses have decreased in the area. Year to date,
aggravated battery has increased slightly in this area. Robberies to individuals are down
year to date. Lt. Terrell reported that on Sundays Lonnie Miller Park is often filled to
capacity. JSO is now on site to ensure public safety. For example, JSO can ensure access
for a rescue vehicle to get to an emergency in the park in case of an accident.
x Jacksonville Fire and Rescue: Chief Brandon Smith (BrabdonS@coj.net: 630-0434) reported
that three fire stations in the area are receiving upgrades. Fire Station 18 at Myrtle Avenue
and Moncrief Road is being remodeled, Fire Station 36 at Edgewood Avenue and Blossom
Drive is acquiring additional property, and Fire Station 34 on Dunn Avenue is being
remodeled. Adults ages 17-21 and living within zip codes 32202, 32205, 32206, 32208, 32209,
32210, 32211, 32218, 32244,or 32254 can be eligible for free Fire and Rescue training in
preparation for employment. Sign up dates are Saturday, April 20, 2019 at noon at 115 Julia
Street, and Saturday June 15, 2019 at 10 a.m. at the Legends Center. Additional
information on the program can be found at myjfrd.com
x Neighborhoods Department: Stephanie Burch, Director (sburch@coj.net: 255-8902),
reported that it’s kitten season. Please do not bring kittens less than eight weeks old into
Animal Care and Protective Services. After kittens are weaned they can be brought to
ACPS for adoption. There is also a prevalence of mosquito activity this time of year. Please
call 630-CITY to report mosquitos. Protect yourself and your family from mosquito borne
illness. There were 24 Neighborhood Matching Grants issued this cycle. The next
application cycle will begin in the fall. A Landlord Training session offered by the
Neighborhoods Department is slated for June. Additional details are forthcoming. CPAC
Vice Chair Doretha Tompkins reported that a tire business at Lem Turner Road and Leonid
Drive has stacks of tires that she fears is a mosquito breeding ground. Stephanie Burch said
although there is no legislative authority to cite for mosquitos, Municipal Code Compliance
and Mosquito Control can visit the business and offer some suggestions to reduce the
occurrence of breeding mosquitos.
x Florida Department of Transportation: Derek Dixon, Transportation Systems Coordinator
(Derek.Dixon@dot.state.fl.us: 360-5653), was available to answer questions. There were
several comments about the condition of Broward Road, specifically regarding the dips in
the road before and after the bridges. Derek will check the resurfacing schedule. All active
and future state road projects can be found on nflroads.com. Later in the meeting, Derek
Dixon confirmed that Broward Road is a city road.
273
Page 3 of 3 Northwest CPAC April 16, 2019 Meeting Summary
x Municipal Code Compliance: Timothy Myers, Municipal Code Compliance Senior Officer
(TMyers@coj.net: 255-7037), reported that a Code Compliance newsletter will be sent out
monthly. A systematic inspection in the Lackawanna neighborhood resulted in 462 cases
totaling 754 violations. Within the Northwest district, there were almost 2,500 inspections
compared to 10,437 inspections citywide since last month. Tim Myers answered several
questions from CPAC members and visitors regarding code compliance issues.
x Jacksonville Public Library: Donna Carroll, Librarian Senior (Dcarroll@coj.net: 765-5402 x
245), reported that a District 8 and an At Large candidate forum is planned for April 18,
2019 at the Highlands Regional Library. Comic-Con this year is scheduled for three
locations. The first one was April 13, 2019 at the Beaches Branch Library; the second will be
Saturday, May 4, 2019 at the Main Library from 10 a.m. to 3 p.m.; the third will be Saturday,
May 11, 2019 from 11 a.m. to 3 p.m. at the South Mandarin Branch Library. Veterans
Services staff will be at the Main Library on May 14, 2019 to assist veterans.
x JTA: Janette Berk, Community Engagement, reported that JTA is collecting public data to
develop a plan for future public transportation needs. That plan will be developed and
presented to the public for further input.
8. Public Comments:
x Rosemary Thornton reported that the Mayor’s Youth at Work program will begin accepting
applications through April 15, 2019, for youth ages 15 to 21. The Sheriff’s Office has planned a
safety fair for April 20, 2019 in Lonnie Miller Park. The next meeting of the Council on Elder
Affairs is scheduled for April 24, 2019 in City Hall beginning at 10 a.m. Contact the Executive
Director for the Council on Elder Affairs, Carrence Bass, at 630-4670 or cbass@coj.net for
more information.
x Linda White announced that Fairfax neighborhood is creating a neighborhood organization
and looks forward to attending and being represented at the CPAC.
9. Adjourn: CPAC Velma Rounsville motioned to adjourn the meeting. Larry Solomon seconded
the motion and all agreed. The meeting adjourned at 7:58 p.m.
Next CPAC Meeting: Thursday, May 9, 2019, 6 p.m. at the Legends Center, Community Room,
5130 Soutel Dr.
To receive supplies for your neighborhood clean-up, please contact Dan Durbec with the City of
Jacksonville Clean It Up, Green It Up program at 255-8276 or ddurbec@coj.net.
A copy of the audio recording of this Urban Core CPAC meeting is available through a Public Information
Request by calling 630-CITY. Details about Public Records can be found on the City’s Website here:
Public Records.
274
Urban Core Citizens Planning Advisory Committee
May 6, 2019 Meeting Summary
Ed Ball Building, 214 W. Adams St.
Meeting Attendance
CPAC Members Staff and Elected Officials
Chair: Michelle Tappouni City Council Member District 5: Lori Boyer
Vice Chair: Kim Pryor Downtown Investment Authority: Guy Parola
2nd Mile Ministries: Becca Dingler Duval County Public School: Dana Kriznar
Churchwell Lofts: Dimitri Demopoulos JSO: Lt. Rickie Valentine
Eastside Community Coalition: Tia Keitt Municipal Code Compliance: Gary Roberts
Fresh Ministries: Brenda Boydston Planning and Development: Connor Corrigan
Good Neighbor M.A.N.I.A.: Celia Miller Neighborhoods Department: Brian Mosier
Grand Boulevard Crime Watch: Delores Swain Jacksonville Public Library: Marshell Berry
Grand Boulevard Crime Watch: Johnny Swain JTA: Cheryl Riddick
Parks at the Cathedral: Greg Radlinski JTA: Jeanette Burk
Parks at the Cathedral: Cathy Reed Neighborhoods: Shaun Rycroft
Planet Watch Neighborhood: Juanita Senior Neighborhood Services Office: Amy Holliman
Planet Watch Neighborhood: Terry Canty JEA: Renee Goode
The Plaza: Glen VanVorst
Excused - JASMYN: Cindy Watson
Visitors
Richard Lewis: The Plaza Diane Brentmoser
Larry H. Gwyn: Maceo Elks Lodge John Shermentoro: SPAR
Susan Noonan Ben Fraizer
1. Call to Order/Verify Quorum: CPAC Vice-Chair Kim Pryor called the meeting to order at 5:32
p.m. After members introduced themselves, staff confirmed a quorum.
2.Approval of Previous Meeting’s Summary: Glen VanVorst motioned to approve the March 4,
2019 CPAC meeting summary, Dimitri Demopoulos seconded. The motion passed unanimously.
3.Public Comment: CPAC guest Richard Lewis requested that Council Member Jim Love speak to
the CPAC about Ordinance 2019-238 that seeks to regulate vacation rentals.
4.Presentation: Council Member Lori Boyer shared a presentation on three Ordinances before City
Council that address a Downtown Zoning Overlay update. Ordinance 2019-195 is a text
amendment to the zoning code in order to change parking standards within the overlay
district. Ordinance 2019-196 amends Ordinance Code Chapter 656 of the Zoning Code to
revise the Downtown Overlay Zone and the downtown district regulations. Ordinance 2019-197
seeks to rezone the Downtown Overlay District. All historic structures within the Overlay District
are exempt from design standards. The bills support the necessary zoning for the Emerald
Necklace Pathway that has been proposed by Groundwork Jacksonville.
5.Subcommittee and Liaison Reports
x Governmental Affairs Subcommittee Chair Tia Keitt reviewed the following items from the
subcommittee meeting:
o 2019-229 – seeks to rezone approximately 7.35 acres of land from Commercial residential
Office (CRO) and Industrial Light (IL) to PUD at 648 Union St. E. The rezoning to PUD is being
sought for a mixed use development with a maximum of 473 multi-family residential units,
and a maximum of 750,000 square feet of commercial retail uses and service establishments.
Greg Radlinski made a motion for the CPAC approval of 2019-229. Glen VanVorst seconded
the motion and it passed unanimously.
o WLD 19-13 – seeks a waiver of liquor distance at 4250 Moncrief Rd. from 500 feet to 400 feet.
CPAC member Celia Miller motioned that the CPAC recommend denial of the application,
based on the prevalence of liquor stores currently in the area. Dimitri Demopoulos seconded
the motion. After discussion, the motion passed with eight for and three opposed.
o 2019-196 – seeks to revise the Downtown Overlay Zone and downtown district regulations
and companion Ordinances 2019-195 and 2019-197. Dimitri Demopoulos made a motion to
generate a letter of support for these Ordinances. Glen VanVorst seconded and the motion
unanimously passed.
x Transportation Planning Organization (TPO) representative Celia Miller reported that at the
North Florida TOP serves Duval, Clay, Nassau and St. Johns counties. Maintenance of the
underpasses along I-95 is an ongoing issue in the Urban Core. The razing of the Hart Bridge
Expressway through the entertainment district is another major transportation issue in the Urban
275
Page 2 of 2 Urban Core May 6, 2019 Meeting Summary
Core area. Celia Miller will keep us informed of these issues as they are discussed at the
Citizens Advisory Committee with the TPO.
6.Staff Reports
x Jacksonville Sheriff’s Office: Lt. Rickie Valentine, Patrol and Enforcement Zone 1
(Rickie.Valentine@jaxsheriff.org), reported that violent crime levels have not changed in the
previous 30 days in Zone 1. Property crime has decreased over 10 percent in the previous 30
days. Kim Pryor asked about the shower trailer that is parking in Springfield. Lt. Valentine
reported that the organization is permitted through the city to pass out food and to park on
the street. Both the municipal code compliance and the Sheriff’s Office are aware of the issue
and will continue to cite them if they are out of compliance.
x Municipal Code Compliance: Gary Roberts, Code Compliance Supervisor
(GDRoberts@coj.net), reported that in April 2019 the Urban Core reported 2,489 code
compliance cases. Over 70 percent of those were nuisance property cases. There were 240
unsafe structures cited in the Urban Core last month.
x JEA: Renee Goode, Government Relations Coordinator (goodrr@jea.com), reported that JEA
will move to 325 W. Adams St. Construction is scheduled to begin in April 2020 and will take
approximately 18 months to complete. Please call 665-6000 if you have any concerns about
JEA utilities in your neighborhood. You can also call to request a JEA ambassador to give a
presentation about JEA and energy savings to your community organization.
x Jacksonville Public Library: Marshelle Berry, North Region Public Library Manager
(MBerry@coj.net), reported that there are four libraries within the Urban Core; Eastside Brown,
Dallas Graham, Brentwood Branch and the Main Library. Art work by students from Andrew
Jackson High School will be on display at the Brentwood Branch Library in May. The Eastside
Brown Branch Library had an unplanned closing today due to construction fumes. The Dallas
Graham Library is scheduled to have a new air conditioning unit installed in August pending
board approval. The library will be closed during installation. All libraries are gearing up for
summer learning programs and summer lunch programs. Please check jaxpubliclibrary.org for
additional information.
x Neighborhood Services Office Department: Amy Holliman (aholliman@coj.net: 255-8260),
announced that attendance policy will be enforced and organizations with three consecutive
unexcused absences will be removed from the CPAC. Please call or email Amy Holliman if you
are unable to attend to avoid an unexcused absence.
x JTA: Cheryl Riddick, Community Engagement Manager (CRiddick@jtafla.com: 632-5522),
announced that the Transit Development Plan Phase II update will be presented by Jeanette
Burk. The purpose of the update is to assess and improve efficiency with public input. Public
input is the first phase, second is data analysis, and third is site visits to the transit hubs. Jeanette
Burk reviewed the data collection and analysis. The final report expected in fall 2019.
x Neighborhoods: Shaun Rycroft, Housing Property Analyst (srycroft@coj.net: 255-8272)
announced that the 2019 Neighborhood Matching Grant cycle will begin in August with
applications due by December. Now is the time to begin planning neighborhood projects and
raising matching funds. The City of Jacksonville’s Matching Grant Program is designed to give
up to $5,000 in financial assistance to registered neighborhood organizations that are
interested in reducing blight within the neighborhood and enhancing the community.
7. Public Comments: CPAC Member Celia Miller stated that her neighborhood organization,
Good Neighbor MANIA has not received LUZ notices even though there have been zoning
changes in here area. Staff confirmed that the organization is property registered. Planning
Department, Planner I, Conner Corrigan will look into this.
8. Duval County Public Schools: Dana Kriznar, Deputy Superintendent (kriznard@duvalschools.org),
reported that a request for a referendum to increase the city’s retail sales tax by one half cent
to assist with the funding of for school facility updates will be voted on by the School Board
tomorrow, May, 7, 2019. The state of Florida has created a website for anonymous reporting of
safety issues. Any threats should be reported to getfortifyfl.com.
9. Adjourn: Chair Michelle Tappouni adjourned the meeting at 8:37 p.m.
A copy of the audio recording of this Urban Core CPAC meeting is available through a Public Information Request by
calling 630-CITY. Details about Public Records can be found on the City’s Website: Public Records. 276
Southwest Citizens Planning Advisory Committee
May 13, 2019 Meeting Summary
Lane Wiley Senior Center, 6710 Wiley Road, Jacksonville FL
Attendance
CPAC Members: Staff and Officials:
Chair – Hyde Grove Terrace – Shirley Lowry City Council Member – Garrett Dennis, Council District 9
Budget Automotive Repair – Linda Barrow Executive Council Assist. To CM Jim Love CD 14 – Kevin Kuzel
Budget Automotive Repair – Darrell Barrow Duval County Public School – Tracy Pierce
Cedar Hills Estates – Jacquelyn Woods FDOT – Derek Dixon
Cedar Hills Estates – Johnny Carter Jacksonville Fire and Rescue Department – Jack Griggs
Charter Member – Don Ingram Jacksonville Public Library – Lynne Baldwin
Hyde Grove Terrace - Peggy Meyers Jacksonville Public Library – Shawn Norton
Springtree HOA – Dewey Walker Jacksonville Sheriff’s Office – Jamie Eason
Sweetwater Church of Christ – Dr. Willie Crosby JTA /Gannett Fleming – Jeanette Berk
Watermill Masters HOA – Tom Martin Municipal Code Compliance Dept. – Robert Bautochka
Visitors: Neighborhood Services Department – Bryan Mosier
Paul Cilien Neighborhood Services Department – Shaun Rycroft
William Fonferek- Westland HOA Neighborhood Services Office– Michelle Godwin
Karen Harris – Melissa Estates North FL Green Chamber – Mary Tappouni
Nathlyn Hemmingway - Navy Excused:
Cathy Manns Blue Lake Estates – Annette Brown
Carol McGrapth - Navy Confederate Point Civic Assoc. – James Nolting
Leila Miller – Cedar Hill Fishweir Neighborhood Watch - Bernice Gremer
Lorraine Patin Murray Hill Historic Preservation - Len Burroughs
Christina Purdy – Cecil Pines Vice Chair – Trinity Ministries – Bruce Tyson
1. Call to Order/Verify Quorum: Chair Shirley Lowry called the meeting to order at 6:36 p.m. Michelle
Godwin verified a quorum.
2. Approval of the Previous Meeting Summary: Tom Martin moved that the March meeting summary be
approved. Don Ingram seconded the motion. The motion passed unanimously.
3. Elected Officials’ Reports:
x Kevin Kuzel, Executive Council Assistant to Council Member Jim Love, District 14, announced that
Council Member Jim Love is working to move his Short Term Vacation Rental bill 2019-238 through
before terming out in June. The bill is designed to protect surrounding residents from the problematic
activities that could occur during a short term rental. One of the provisions within the bill states the
owner must live in the structure, or live within 200 feet of the property being rented. The bill has gone
before the Planning Commission which deferred it. Mr. Kuzel also announced that the Murray Hill
community is having a community meeting tonight to discuss an application for rezoning the Jones
College property located 1195 South Edgewood Ave. to be redeveloped as a storage facility. The
meeting will be held at the Fishweir Brewing Company, beginning at 7 p.m., located at 1183 South
Edgewood Ave. Mr. Kuzel thanked the members of the CPAC for their interest and encouraged them
to tell more people about the CPAC.
Council Member Jim Love may be contacted at 630-1380 or jimlove@coj.net.
x City Council Member, District 9, Garrett Dennis, discussed his cannabis decriminalization bill. He
explained that the bill would impose civil citations for adults in possession of less than 20 grams of
marijuana. He said that under the bill, a violator would be cited and fined $100 for the first offense of
simple possession. Incarceration can create a “vicious cycle” that can lead to people losing jobs and
worse, taxpayers pay $864 to process an inmate, and $60 a day to house an inmate.
Council Member Garrett Dennis may be contacted at 630-1395 or garrettd@coj.net
4. Presentations:
x Mary Tappouni of the Florida Chapter of The U.S. Green Chamber of Commerce presented on the
North Florida Green Chamber, how citizens and businesses can become involved. Ms. Tappouni
informed CPAC members that the Green Chamber’s mission is to assist in creating environmentally
friendly, sustainable business practices, to facilitate education, and networking opportunities for
businesses, non-profits, governmental agencies, and individuals. The purpose of the Green Chamber is
277
Southwest Citizens Planning Advisory Committee
May 13, 2019 Meeting Summary
Lane Wiley Senior Center, 6710 Wiley Road, Jacksonville FL
to create long-term sustainability programs and policies that advocate for the betterment of the
community and the environment. Ms. Tappouni announced that on Wednesday, May 29, 2019, from 2
p.m. to 4 p.m. the North Florida Green Chamber will host a lecture on “Understanding Recycling and
Why do we Recycle Like That in North Florida?”, at the Jessie Ball DuPoint Center, 40 E. Adams St., Suite
300.
Mary Tappouni may be contacted at (904) 388-1350 or mary@breakinggroundcontracting.com
x Shawn Norton, Librarian III of Murray Hill Public Library, presented on the summer reading program. The
program will begin in June and run through the end of July. All ages can read to earn free books and
prizes, and explore a ton of fun stuff. Mr. Norton said space themed summer reading activities meant
to engage children will take place at various libraries around town. Mr. Norton also announced that
people can support the summer reading program by making a $5 donation to JPL’s Hi Five For
Reading. Each $5 donation offsets the cost for one child to attend the Summer Learning programs
offered at any the Jacksonville Public Libraries.
Shawn Norton may be contacted at (904) 630-2409 or at snorton@coj.net .
x Staff Reports:
x Jacksonville Sheriff’s Office (JSO) – Lt. Jamie Eason reported that residential burglaries and violent
crime are down in Zone 4, and that auto burglaries are up by two percent. Lt. Eason advised that calls
are taken by priority, meaning a shooting may take priority over a burglary. Lt. Eason also advised that
Sheriff Mike Williams is working with City Council to realign zones. The zone shift may take two years. Lt.
Eason also advised that the Next Door app can be used to post pictures and video of suspicious
activity in your neighborhood. She stated that you can invite the sheriff office to your Next Door site
and communicate with JSO, and information will go to JSO’s PIO communication center.
Lt. Jamie Eason may be contacted at (904) 573-3165.
x Jacksonville Fire and Rescue Department (JFRD) - Fire Battalion Chief Suppression 56, Jack Griggs
advised that hurricane season runs from June 1 to November 30, and that everyone should start
preparing their emergency kits and restock batteries, flashlights, candles, first aid kits. As well as have a
battery or hand cranked radio in their emergency supplies. Chief Griggs advised CPAC members to
plan their evacuation route well in advance, and if advised, evacuate as soon as possible. Also have a
family emergency plan, which should include what you are going to take and where you are going to
go. Make sure wherever you are evacuating to accepts pets. You should have the necessary
documents you may need for your pets. Chief Griggs informed CPAC members that they should have
at least three days’ worth of nonperishable food, a gallon of water for each person and pet per day
for three days, for drinking as well as for sanitation.
Battalion Chief Jack Griggs can be contacted at jgriggs@coj.net.
x Duval County Public Schools (DCPS) – Tracy Pierce, announced that the School Board voted to
approve a resolution seeking a special election on Nov. 5, 2019, to ask voters to support a half-cent
sales tax over 15 years to pay for a $2 billion plan to upgrade school’s infrastructure. The issue will go to
City Council, which will consider whether and when the proposal goes to voters. The master plan is still
in development, but will call for 40 small schools to be consolidated into approximately 17 schools. The
plan will assist in providing a savings in operation costs and enable the school to provide more services
for students.
x Florida Department of Transportation (FDOT) – Derek Dixon, Bike/Ped and ADA Coordinator,
announced that the express lanes on I-295 between I-95 and the Buckman Bridge will open on May
18th. The peak travel time for the corridor will be from 6 a.m. to 10 a.m. and 3 p.m. to 7 p.m. Monday
through Friday. During these hours, there will be a minimum toll charge of 50 cent, which may be
adjusted based on the level of congestion in the express lanes. Mr. Dixon said that to use the express
lanes you must have a portable Sun Pass transponder or Sun Pass Sticker. The Transponder and sticker
may be purchased at Publix, Walgreens and CVS. The transponder may be used in multiple vehicles,
and the sticker must be mounted to your windshield; however the sticker can only be used for one
vehicle. Mr. Dixon advised that the cash or toll by plate will not be accepted, and that only two axle
vehicles are allowed in the express lanes. A $25 fine will be accessed if you drive in the express lane
278
Southwest Citizens Planning Advisory Committee
May 13, 2019 Meeting Summary
Lane Wiley Senior Center, 6710 Wiley Road, Jacksonville FL
279
Southwest Citizens Planning Advisory Committee
May 13, 2019 Meeting Summary
Lane Wiley Senior Center, 6710 Wiley Road, Jacksonville FL
x North Florida TPO CAC approved the JTA request to amend the FY 2018/19 through FY 2022/23
Transportation Improvement Program (TIP) for funding the Bus Rapid Transit (BRT) Southwest
Corridor, New Start Program.
x North Florida TPO CAC approved the Joint Certification Process (FDOT and TPO) as required
annually under federal regulations.
x North Florida TPO CAC received the final short list of requested studies for inclusion in the FY
2019/20 Unified Planning Work Program (UPWP). The approval of the FY 2019/20 Unified Planning
Work Program (UPWP) is scheduled for the June meeting.
x North Florida TPO CAC received a draft copy and a staff presentation on the highlights of the FY
2019/2020 through FY 2023/2024 Transportation Improvement Program (TIP). The final draft is
available on the TPO website, and is 340 pages long. The approval of the FY 2019/2020 through FY
2023/2024 Transportation Improvement Program) is scheduled for the June meeting.
x North Florida TPO CAC received an update presentation on the Smart North Florida (Smart
Regions and Smart Cities) by Jeff Sheffield, TPO Executive Director. More information is available
on the North Florida TPO website under the ITS tab.
The next North Florida TPO CAC meeting will be held Wednesday, June 5, 2019 at 2 p.m.
x Capital Improvement Plan (CIP) - Chair Shirley Lowry presented the CPAC with the suggestions for the
FY 2020/2024 Capital Improvement Plan (CIP), from Christina Purdy of Cecil Pines and Thomas Martin of
Watermill Master HOA. Thomas Martin motioned to submit the presented CIP suggestions to Teresa
Eichner, Capital Improvement Plan Administrator. Linda Barrow seconded and the motion passed
unanimously.
x Neighborhood Coordinator’s Report – Neighborhood Coordinator Michelle Godwin reminded CPAC
members that Ethics training will be held during June’s CPAC meeting. If your name is highlighted in
yellow on the attendance sheet, please plan to attend the CPAC meeting in June. The Office of Ethics
Compliance and Oversight will provide the training.
Michelle Godwin may be contacted at (904) 255-8236 or michellegw@coj.net.
6. Chair’s Report – CPAC Chair, Shirley Lowry reported that the Cecil Field Behind the Scenes Bus Tour was
very informative. Participants toured Jinko Solar Plant, and watched the assembly of the solar modules
for residential, commercial and utility projects. Participants also toured Logistic Services International
(LSI, Inc.), which provides aviation training programs and technical support services to the U.S.
Government, foreign military Branches and the defense industry. Mr. Martin elaborated on the bus tour
as well.
7. Unfinished Business - None
8. New Business - None
9. Public Comments/Concerns/Announcements
x Jeanette Berk of Gannett Fleming, Inc. provided an update on the JTA Transit Development Plan.
10. Adjourn: Chair Shirley Lowry adjourned the meeting at 8:40 p.m.
Next CPAC Meeting: June 10, 2019 6:30 p.m. Lane Wiley Senior Center 6710 Wiley Rd., Jacksonville, FL 32210.
Summary prepared by: Michelle Godwin, Neighborhood Coordinator, 255-8236 or michellegw@coj.net.
A copy of the audio recording of this Southwest CPAC meeting is available through a Public Information Request by calling
630-CITY. Details about Public Records can be found on the City’s Website: Public Records.
280
Southeast Citizens Planning Advisory Committee
May 20, 2019 Meeting Summary
NEFAR Temporary Training Room, 10300 Southside Boulevard, Jacksonville, FL 32256
Meeting Attendance
1. Call to Order/Verify Quorum: Chair D’Onofrio called the meeting to order. Rosemary
Wesolowski verified that a quorum was present.
2. Approval of the Previous Meeting Summary: A motion was made by Will Herron to
approve the April 2019 meeting summary and Pete Gentry made a second; the
summary was approved.
The mission of the OIG, "Enhancing Public Trust in Government Through Independent and
Responsible Oversight," is accomplished through investigations, audit, and contract
oversight activities.
Page | 1
281
conduct criminal investigations, but does investigate fraud or duplication of services.
OIG does not investigate JSO.
If you would like to speak to the Inspector General or report fraud, waste and/or abuse,
you can reach Ms. Green or her team at:
Physical Address: Yates Building, 231 East Forsyth Street, Suite 470, Jacksonville, FL 32202
Kirby Oberdorfer, Deputy Director, Ethics Office, provided an overview of the work the
Ethic’s Office offers.
The basis for government ethics laws are an attempt to regulate conflicts of a public
official or COJ employee who is looking out more for their own benefit than for the
public interest. The conflict is between the official’s personal interests and the public
interest. The public official or employee is expected to be focused 100% on the interests
of the public, not on how they can use their position to help themselves (or
family/friends/business).
For CPAC meetings, Sunshine Laws require CPAC meetings to be open to the public,
properly noticed (minimum of 24 hours); minutes of these meetings are required to be
recorded and available to the public. CPAC members must also follow Sunshine Laws
too.
Any communication between two or more CPAC members of the same CPAC on a
matter that could come before the CPAC or CPAC Subcommittee can only occur at a
noticed meeting and be heard by the public. CPAC members cannot have telephone
conversations, hand written notes, emails, texts or communications via social media on
any issue that may come up or be voted on at a CPAC meeting. CPAC members can
discuss anything outside of CPAC related topics (sporting events, gardening tips,
shopping, recipes, movie reviews, etc.) without any concern. A CPAC member can
converse with a CPAC member from a different CPAC and discuss CPAC issues, but they
cannot discuss CPAC issues with a member from their own CPAC.
Public comment is required at each CPAC and must be recognized before any vote on
any topic occurs. CPACs can set a time limit on how long a person(s) or group can have
to speak, but they must be given the opportunity.
Gifts to staff or CPAC members from any lobbyist cannot be accepted. It is unlawful to
receive a fee, gift, and tip, loan in exchange for work done, vote or motion in the course
of your duties as a CPAC member. There is one exception: small food item(s) and flower
/ plant “appreciation for job well done” gifts. It was recommended not to accept gifts of
over $100 from a person that is a lobbyist; employer of a lobbyist; or is subject to approval
from your CPAC even if it is a personal friend. To clarify, a lobbyist is any paid person who
Page | 2
282
seeks to influence a governmental decision. This is broad and can be someone coming
to your CPAC to influence you.
Voting conflicts can occur. Most often conflicts due to your employment (you or your
family are doing business with the City of Jacksonville.) Voting conflicts will be handled
individually. Individuals will be required to disclose that there is a conflict of interest and
complete the appropriate form and not vote on that issue.
Council Member Becton has been working with Nathaniel P. Ford Sr., Chief Executive
Officer of the Jacksonville Transportation Authority in regard to Parcel C. Parcel C has a
total of 42.55 acres, but only 35 to 40 acres can be developed. Parcel C is currently
zoned to be developed as office space, multi-family units or hotels. Council Member
Becton has made the recommendation that the City of Jacksonville should purchase
Parcel C and develop the land as a multi-facet park. As this area continues to grow in
population, there are no parks close to this densely populated area for anyone to enjoy.
Council Member Becton asked for the support of the CPAC to help him with this goal
and to consider putting this request on the SE CPAC CIP recommendation list.
Page | 3
283
JPL (Jacksonville Public Library) – Ann Fridl stated JPL will kick off a number of summer
programs. One of the biggest summer programs will be Countdown to Summer Learning.
The Countdown to Summer Learning program is a summer reading program for children
and adults alike. When you check out books at the public library, remember to get your
bookmark from the adult or children’s desk. Once you read for 15 minutes a day for five
consecutive days you can turn in your bookmark for a prize or save up your bookmarks for
a larger prize at the end of summer. For more information, visit your local library. The Hi $5
For Reading Campaign is underway. The Hi $5 Campaign is the Jacksonville Public Library
Foundation’s funding appeal for city libraries’ six-week summer reading program for
children and youth is called Hi $5 for Reading. Each $5 donated will provide materials and
activities to help students retain over the summer the educational gains they made during
the previous school year. It is shown that without reading and math during the summer,
children can lose one to two months of learning. Another way to support JPL is becoming
a member of the Friends of the Library Group. The South Mandarin Library Friends of the
Library group will hold a book sale at the South Mandarin branch on Saturday, July 13,
2019, 10:00 am to 5:00 pm.
For complete details for all upcoming events and activities offered by JPL, please visit:
https://www.jaxpubliclibrary.org/
JTA – Cheryl Riddick introduced Jeanette Burke, JTA consultant. Ms. Burke stated JTA is
currently working on their Transit Development Plan (TDP), a 10-year horizon plan intended
to support the development of an effective multi-modal transportation system. JTA will
look at NFTPO and the community for input. JTA is interested in hearing your thoughts on
flow of traffic, bus routes and learn the demand for public transit for you and your
community. You can share your feedback with Cheryl Riddick or Suraya Teeple at JTA.
Contact Cheryl Riddick at 632-5522 or criddick@jtafla.com or
Suraya Teeple at 598-8711 or steeple@jtafla.com
Military Affairs – Caroline Adkins extended an invitation to the CPAC for the Memorial Day
Remembrance on Memorial Day at the Veterans Memorial Wall, 1145 East Adams Street
(located between TIAA Bank Field and the Baseball Grounds of Jacksonville). The pre-
ceremony event will begin at 8:00 a.m. with music presented by the Navy Band Southeast
and the Jacksonville Children’s Choir. The remembrance ceremony will begin at 8:30
a.m.
Neighborhoods Code Compliance – Robert Crawford inquired if the CPAC members were
receiving the Code Compliance newsletter and if they liked the newsletter? The CPAC
members confirmed that they have received the newsletter and they like and
appreciated the information. Mr. Crawford announced that Municipal Code Compliance
will conduct a systematic inspection in the Windy Hills community
Contact Robert Crawford at 255-7042 or robertc@coj.net
Parks, Recreation and Social Services Department – Keith Meyerl announced JaxParks has
33 outdoor pools that will be open Memorial Day weekend through Labor Day. Outdoor
pools are open 1 to 7 pm Monday through Friday; 11 am to 6 pm on Saturdays and 2 - 6
pm on Sundays. JaxParks camps are for ages 6 - 17. Most camps are offered in three, two-
week sessions, from June 17 through July 26, 2019. To learn more information about
JaxParks Summer Camps visit: http://www.coj.net/departments/parks,-recreation-and-
community-services/recreation-and-community-programming/jaxparks-summer-camp.
The 2019 Jacksonville Jazz Festival returns to Downtown Jacksonville over Memorial Day
weekend, May 24-27. This is the 39th year Jacksonville will host this event. Construction at
County Dock Park should begin this summer.
Page | 4
284
Planning and Development Department - Arimus Wells did not have a report, but was
available for questions.
Contact Arimus Wells at arimusw@coj.net
Ad-Hoc:
North Florida TPO – Jim Hill stated at the May NFTPO CAC meeting, the representative
approved a FDOT District 2 preliminary engineering project at the western end of J.
Turner Butler Boulevard (S.R. 202 or JTB).
TRUE (Taxation, Revenue and Utilization of Expenditures) Commission – Jimmy Daniel – not
in attendance
7. Chairs Report – Chair D’Onofrio welcomed everyone to the NEFAR Office / SE CPAC
meeting location. Chair D’Onofrio recognized and thanked Mr. Glen East, NEFAR CEO,
for allowing the SE CPAC to meet at his facility. Chair D’Onofrio informed the CPAC that
she and Vice Chair Malmind attended a CPAC Chairs meeting with Mr. Sam Mousa, City
of Jacksonville Chief Administrative Officer on May 10, 2019. At the CPAC Chairs
meeting there was a presentation from the U.S. Census Bureau to complete the 2020
census. In the near future, the SE CPAC will have a presentation from the U.S. Census
Bureau.
Chair D’onofrio reminded the CPAC that the SE CPAC recommendation for the City of
Jacksonville Capital Improvement Project (CIP) list is due May 29, 2019. A capital
improvement project must have a total cost greater than $100,000 and a lifespan of
more than ten years and must add to, enhance the value of, or extend the life of the
City’s physical assets. The SE CPAC formed a temporary Ad Hoc subcommittee and met
on April 9, 2019. A couple of recommendations were identified at this meeting and some
follow up on the 2018 SE CPAC CIP recommendations were identified. CPAC members
were encouraged to send any additional CIP recommendations to Rosemary before
noon on May 28, 2019.
9. Unfinished Business -
10. New Business – Will Herron, Primary Representative for Shiloh Creek Neighborhood
Association made a motion to extend an invitation to the St. Johns River Water
Management and ask them to attend to the SE CPAC LUZ Subcommittee meetings and
Page | 5
285
provide professional expertise on permitting on new developments. The motion received
a second; there was no discussion. The motion passed.
Gary Weise, Alternate for Secret Cove made a recommendation to have Public Works
Storm Water Chief, Steve Long attend a meeting with St. Johns River Water Management
to answer additional questions about storm water run-off.
11. Public Comment- Shaun Rycroft, Housing Property Analyst informed the CPAC that
applications for the Matching Grant Program should be available in August 2019. The
deadline to submit the grant application will be in December 2019. If you have any
questions or would like to talk to Mr. Rycroft about the potential project, please call 904-
255-8272 or email: srycroft@coj.net
12. Motion to Adjourn – meeting adjourned at 8:22 pm
Page | 6
286
Transit Development Plan Major Update | Public Outreach Materials
287
288
289
290
291
292
293
e - ~ct..·. I
294
JTAC Member Contact List
mtn¿n il, zol?
Telephone Good
Member Name Email
Number Standing
¡-
I Brown, Barbara (e04)703-6321 BBrown4l"l"@email.com @y
@r
a
- Burrell, Toni (e04)22e-6661 ToniburrellL955@vahoo.com
t3
ir¡
Layla (407) 558-9290 Newdo9610@gmail.com
G
,Caplino,
@
V
$orlew,
Dorothy (904)514-e051 127corlew(ôcomcast. net @/
Davis, Russ (e04)993-8433 RusseI I @ rad iorustv.com @,(
Flores, Theresa (904)631-8163 teresatchr@att.net @/
Hansard, Doug (e04)707-3622 hansard2L5@email.com @v
Hathaway, Wanda (e04)613-5784 wa nda hathawav9S@va hoo.com @V
* Hoffmeyer,
Sharon
(e04)e23-5182 shoffmever(ôqmail.com @
v
Hoffmeyer, Kalei (e04)238-6284 Khoffmeyerl. @gma il.com @V
Johnson, Walter (904)333-3312 Jo h nso n052ow(ôema i l.com @
V
Kendrick, Latoya (904)576-5862 LatoyadanielleS@email.com @t/
***Laster, Henry (904)416-9306 henrvwlaster@att.net @
Lentz, Charlene (904)771-3909 N/A @
Martignetti, William (904)e82-6480 Bi llv1508@comcast. net @r'
*****Metcalf, Sue (904)537-7510 sue.a. metca lf60(ôgma il.com @
Miller, Angela (e04)616-7947 Angiem iller825@gmail.com @
Molengraft, Sherry (904)400-5783 molengraft l. @ya hoo.com @l/
Morales, Jose (904)955-41e6 iosem@theilrc.ore @t/
Moody, David (904)3e6-0377 blsuv134@bellsouth.net @r'
l lPage
295
JTAC Member Contact List
ttçç, .l*'. ìr"rrr$\
Niang, Abdoulaye
O.,
't Rood, Andy (904) 333-6372 rad io rexa ndv@ema i l.com @v
q
'ü*Sapp, Barbara (904)418-4131 sap64lady@smail.com @v
a.
$utherlin, Marylou (904) 314-7e47 Marylousutherlinl@gmail.com @t/
a
'.t Turner, Erica (e04)881-1168
(.904\742-0311
Ericaturne1203012@gmail.com @r'
a (e04)438-9321 @
C
\
* Current chair
a
,
o
** current Vice-Chair
ì¡
I
t
.a
-..
I
{.
I
{
2lPage
296
297
298
299
300
301
302
303
304
305
306
307
308
Transit Development Plan Major Update | Public Outreach Materials
B.3 Presentations
309
CNG Strategy/Overview
JACKSONVILLE TRANSPORTATION
Transit Development Plan FY2019 - 2029
AUTHORITY
Jeanette Berk
Gannett Fleming, Inc.
310
Agenda
Schedule of Study
311
Purpose of TDP
10-Year
Horizon Plan
Develop an Effective Multimodal Transportation System within Duval County
TDP Rule
FL Admin. Code Basis for Defining Public Transit Needs
14-73.001
Strategic
Blueprint
Planning, Development, and Operational Guidance Document
Marketing
Tool
Catalyst for General Education and Awareness Outreach
312
Steps of TDP
1 Coordination with Public Involvement Plan & Public Meetings
2 Assessment of Existing Conditions
3 Comprehensive Operational Analysis
4 Develop Service Framework and Workshop
5 Short and Mid-Range Transit Network
6 Develop an Implementation Plan
7 TDP Major Update Document
313
Schedule of TDP
Phase I – Initial Phase II – Outreach on Phase III – Outreach
Outreach on Technical Analysis on Plan Findings and
Needs / Goals Findings and Potential Recommended
and Objectives Strategies Strategies
Nov. Dec. Jan. Feb. Mar. Apr. May Jun. Jul. Aug.
2018 2018 2019 2019 2019 2019 2019 2019 2019 2019
3. Comprehensive 6. Develop an
Operational Analysis Implementation Plan
Questions?
315
6
CNG Strategy/Overview
JACKSONVILLE TRANSPORTATION
Transit Development Plan FY2019 - 2029
AUTHORITY
Suraya Teeple
Project Manager
316
Agenda
Questions/Comments
317
Recap of Transit Development Plan
TDP Purpose 10-Year
Develop an Effective Multimodal Transportation System within Duval County
Horizon Plan
TDP Rule
FAC 14-73.001 Basis for Defining Public Transit Needs
Strategic
Blueprint
Planning, Development, and Operational Guidance Document
Marketing
Tool
Catalyst for General Education and Awareness Outreach
Phase I – Initial Outreach Phase II – Outreach on Technical Phase III – Outreach on Plan
TDP Schedule on Needs / Goals and
Objectives
Analysis Findings and Potential
Strategies
Findings and Recommended
Strategies
Nov. Dec. Jan. Feb. Mar. Apr. May Jun. Jul. Aug.
2018 2018 2019 2019 2019 2019 2019 2019 2019 2019
1. Coordination with Public Involvement Plan & Public Meetings
Above Above
672,642 684,178
78% 75%
1,200,000
1,000,000
800,000
≡ Zero Car Households Zero Car HHs,
2010 Zero Car HHs, 2017
600,000 25,351, 7% 28,351, 8%
400,000
200,000
0
2010 2030 2040 Non-Zero Car Non-Zero Car
HHs, 317,099, HHs, 319,432,
Total Employment Total Population 93% 92%
320
Transit Potential – Transit Propensity
Transit-Oriented
Population Origin Index
Highest Propensity
Areas
≡ The Urban Core and the
Northside neighborhoods
east of US 23.
≡ San Marco, Spring Glen,
San Jose, Craven, Royal
Lakes.
≡ Jacksonville Heights,
Confederate Point, Cedar
Hills Estate, Lackawanna,
Murray Hill, Hillcrest,
Hyde Park.
≡ Jacksonville University,
Regency mall, Woodland 321
322
Transit Potential – Transit Propensity
Areas with high transit
potential:
≡ Downtown Jacksonville,
Brooklyn, Riverside,
Hogan’s Creek and
Brentwood. Jobs per plus people per acre
≡ Riverplace, Spring Park,
Southpoint, Deerwood,
Deerwood Center, Windy
Hill, Bay Meadows,
Regency, and the Mayo
Clinic.
≡ Hillcrest, Normandy,
Fairfax, Confederate
Point, Jacksonville
Heights, and Normandy.
≡ Jacksonville Beach
323
Land Use / Growth
Employment by Industry
≡ Retail Trade is the largest employment sector in 2010
≡ Largest employment sector is projected to be Health Care and Social Assistance
in 2030 and 2040
Land Use Patterns
≡ In 2010, Residential Use constitutes the largest land area, followed by
Governmental Use.
≡ In 2030, Low Density Residential Use constitutes the largest land area, followed
by Agricultural Use and Public Buildings and Facilities.
324
Land Use / Growth – Approved DRIs
325
Travel Pattern Analysis
Peak Period Travel
≡ Major flows connect
downtown Jacksonville
from Southside and
Arlington.
≡ Highest volume occurs in
Arlington and north of
downtown Jacksonville.
≡ Significant amount of
travel in Southeast and
Southwest Jacksonville.
326
Travel Pattern Analysis
Off-Peak Period
Travel
≡ Major flows connect
downtown Jacksonville
from the Northeast.
327
Travel Pattern Analysis
County-to-County
Trips
≡ Highest volume between
Duval and St. Johns.
≡ Second highest volume
between Duval and Clay.
328
Strategies to Improve Service
329
Strategies to Improve Service
330
CNG Strategy/Overview
331
16
Transit Development Plan Major Update | Public Outreach Materials
B.4 Flyers
332
Jacksonville Transportation Authority
Participate in the Transportation Development Plan!
The Jacksonville Transportation Authority (JTA) is formulating a Transit Development Plan (TDP)
to guide improvements to the transit system in the Jacksonville area. This study will outline the
steps necessary to advance an effective multimodal transportation system that will meet the
mobility needs of the residents, workers, and visitors in Duval County. Changes in travel
patterns, fluctuations in the economy, rising and falling financial resources, and advances in
technology all suggest a need to periodically reexamine the transit system and adapt to evolving
conditions.
Contact:
From now until June 2019, the JTA will be reaching out to Suraya Teeple
you to obtain information on your transportation needs Project Manager
and to obtain your thoughts on improving mobility in steeple@jtafla.com
Duval County. (904) 598-8711
333
Jacksonville Transportation Authority
What is a Transit Development Plan?
10-Year Develop an Effective Multimodal Transportation System within
Horizon Plan Duval County
TDP Rule
(FAC 14-73.001)
Basis for Defining Public Transit Needs
3. Comprehensive 6. Develop an
Operational Analysis Implementation Plan
336
Jacksonville Transportation Authority
Participate in the Transportation Development Plan!
The Jacksonville Transportation Authority (JTA) is formulating a Transit Development Plan (TDP)
to guide improvements to the transit system in the Jacksonville area. This study will outline the
steps necessary to advance an effective multimodal transportation system that will meet the
mobility needs of the residents, workers, and visitors in Duval County. Changes in travel
patterns, fluctuations in the economy, rising and falling financial resources, and advances in
technology all suggest a need to periodically reexamine the transit system and adapt to evolving
conditions.
Contact:
From now until June 2019, the JTA will be reaching out to Suraya Teeple
you to obtain information on your transportation needs Project Manager
and to obtain your thoughts on improving mobility in steeple@jtafla.com
Duval County. (904) 598-8711
337
Jacksonville Transportation Authority
What is a Transit Development Plan?
10-Year Develop an Effective Multimodal Transportation System within
Horizon Plan Duval County
TDP Rule
(FAC 14-73.001)
Basis for Defining Public Transit Needs
3. Comprehensive 6. Develop an
Operational Analysis Implementation Plan
B.5 Boards
341
JTA 2019 Transit Development Actualización del plan de desarrollo
Plan Update de tránsito de JTA 2019
What is a Transit Development Plan? ¿Qué es un plan de desarrollo de tránsito?
A Transit Development Plan (TDP) is a study that guides improvements Un Plan de Desarrollo de Tránsito (TDP) es un estudio que guía las mejoras a un sistema de tránsito.
to a transit system. Over time, this document needs to be updated to Con el tiempo, este documento debe actualizarse para reflejar los cambios en los patrones de
reflect changes in travel patterns, the economy, government funding, and viaje, la economía, el financiamiento gubernamental y la tecnología. La Autoridad de Transporte
technology. The Jacksonville Transportation Authority (JTA) is updating its de Jacksonville (JTA) está actualizando su TDP para mejorar el tránsito en el área de Jacksonville.
TDP to improve transit in the Jacksonville area. At the end of the study, Al final del estudio, JTA creará un documento que describe los cambios necesarios para crear un
JTA will create a document that outlines necessary changes to create a sistema de transporte que satisfaga las necesidades de los residentes, trabajadores y visitantes
transportation system that will meet the needs of residents, workers, and del Condado de Duval.
visitors in Duval County.
342
JTA 2019 Transit Development Plan Update
Summary of Proposed Changes
Route Type Route Proposed Changes Route Type Route Proposed Changes
1 Eliminate service to Jacksonville International Airport and increase frequency 80 Extend route to serve Oak Hill Village Shopping Plaza.
of service to FSCJ North. 81 No proposed changes.
Frequent 3 Eliminate service to Amtrak and increase frequency of service. 82 New midday service to River City Marketplace.
Routes 5 No proposed changes. Limited Connector 83 No proposed changes.
8 Eliminate service to UNF. Routes 84 Extend route to serve Durbin Park. Add Select peak-hour trips
50 Eliminate service to Deerwood and increase frequency of service. to Citicards Way.
4 Realign route to serve Amtrak and end service at the Soutel Transit Hub. 85 Eliminate service north of Busch Drive. Extend service to FSCJ North.
10 Realign route onto Atlantic Boulevard, increase frequency and span of service. 86 Eliminate.
11 Extend route to serve Gateway Plaza. GREEN No proposed changes.
12 Extend route to serve Soutel Transit Hub. First Coast Flyers BLUE Add bus stops along Phillips Highway.
13 No proposed changes. RED No proposed changes.
14 Extend route to FSCJ Kent Campus and eliminate service along Normandy Boulevard. 200 Increase span and frequency of service.
15 Increase frequency of service and extend service on select trips to Cecil Airport, 201 No proposed changes.
Mainline FSCJ Cecil, and Amazon Fulfillment Center on weekdays. 202 Extend route to downtown, and increase span and frequency of service.
Routes Express Routes
16 Increase frequency of service between Roosevelt Square Shopping Center and downtown. Add bus stops along Arlington Expressway Service Road.
17 Realign route to serve Old Kings Road South. Increase frequency of service between 205 Realign route to serve Art Museum Drive.
University Square and downtown. 206 New express service connecting downtown and the airport.
18 Eliminate route. Southeast No proposed changes.
19 Extend route to serve Kona Avenue. Beaches No proposed changes.
51 Increase frequency of service between Amtrak and the Gateway Transit Hub. Highlands No proposed changes.
53 Extend route to serve Amazon Fulfillment Center, Cecil Airport, and FSCJ Cecil Northside No proposed changes.
on an hourly basis.
Ortega No proposed changes.
21 Realign route and increase span of service.
Southside New zone serving neighborhoods lacking fixed-route service.
22 Realign route.
Sherwood Forest New zone serving neighborhoods lacking fixed-route service.
23 Realign route to serve neighborhoods along Arlington Road North.
ReadiRide Zones Eastside – South New zone serving neighborhoods lacking fixed-route service.
24 Extend route to connect with First Coast Flyer Red.
Argyle Forest New zone serving neighborhoods lacking fixed-route service.
25 No proposed changes.
Sandalwood New zone serving neighborhoods lacking fixed-route service.
Connector 26 Extend route to connect with First Coast Flyer Blue.
Golden Glades –
Routes 27 Increase span of service. New zone serving neighborhoods lacking fixed-route service.
The Woods
28 Extend route to serve FSCJ South and realign route on Baymeadows Road. Jacksonville Heights New zone serving neighborhoods lacking fixed-route service.
30 Eliminate route. Middleburg New zone serving neighborhoods lacking fixed-route service.
31 Extend route to Canal Street. Fleming Island New zone serving neighborhoods lacking fixed-route service.
32 Realign route. Clay Community RED Realign route and extend to 103rd Street.
33 Realign route. Transportation (CCT) BLUE Realign route.
343
Actualización del plan de desarrollo
de tránsito de JTA 2019
Resumen de los cambios propuestos
Tipo de ruta Ruta Cambios Propuestos Tipo de ruta Ruta Cambios Propuestos
1 Elimine el servicio al Aeropuerto Internacional de Jacksonville y aumente la frecuencia del 80 Extender la ruta para servir a Oak Hill Village Shopping Plaza.
servicio a FSCJ Norte.
81 No hay cambios propuestos.
Rutas 3 Eliminar el servicio a Amtrak y aumentar la frecuencia del servicio.
82 Nuevo servicio de mediodía a River City Marketplace.
Frecuentes 5 No hay cambios propuestos.
8 Eliminar el servicio a UNF. Rutas de Conector 83 No hay cambios propuestos.
Limitadas Extender la ruta para servir al Parque Durbin. Añadir Seleccionar viajes
50 Eliminar el servicio a Deerwood y aumentar la frecuencia del servicio. 84
de hora pico a Citicards Way.
4 Vuelva a alinear la ruta para servir a Amtrak y finalice el servicio en el Soutel Transit Hub. Eliminar el servicio al norte de Busch Drive. Extender el servicio a FSCJ
85
10 Vuelva a alinear la ruta en Atlantic Boulevard, aumente la frecuencia y la duración Norte.
del servicio.
86 Eliminar.
11 Extender la ruta para servir Gateway Plaza.
Green (Línea Verde) No hay cambios propuestos.
12 Extender la ruta para servir a Soutel Transit Hub.
13 No hay cambios propuestos. First Coast Flyers Blue (Línea Azul) Añadir paradas de autobús a lo largo de la autopista Phillips.
14 Extienda la ruta al campus de la FSCJ Kent y elimine el servicio a lo largo Red (Línea Roja) No hay cambios propuestos.
de Normandy Boulevard. 200 Incremento de horas y frecuencia de servicio.
15 Aumente la frecuencia del servicio y extienda el servicio en viajes selectos
Rutas de la 201 No hay cambios propuestos.
al Aeropuerto Cecil, FSCJ Cecil y Amazon Fulfillment Center entre la semana.
Línea Principal Extienda la ruta a Downtown, y aumentar la duración y la frecuencia del
16 Aumentar la frecuencia del servicio entre el centro comercial Roosevelt Square y Rutas Expresas 202 servicio. Añadir paradas de autobús a lo largo de Arlington Expressway
Downtown.
Service Road.
17 Vuelva a alinear la ruta para servir Old Kings Road South. Aumentar la frecuencia de servicio 205 Realinear ruta para servir Art Museum Drive.
entre Plaza de la universidad y Downtown. 206 Nuevo servicio expreso que conecta el centro y el aeropuerto.
18 Eliminar ruta. Southeast No hay cambios propuestos.
19 Extender la ruta para servir a la avenida Kona. Beaches No hay cambios propuestos.
51 Aumente la frecuencia de servicio entre Amtrak y Gateway Transit Hub. Highlands No hay cambios propuestos.
53 Extender la ruta para servir a Amazon Fulfillment Center, Cecil Airport y FSCJ Cecil en una Northside No hay cambios propuestos.
base por hora. Ortega No hay cambios propuestos.
21 Realinear la ruta y aumentar la duración del servicio. Southside Nueva zona al servicio de barrios que carecen de servicio de ruta fija.
22 Realinear ruta. Sherwood Forest Nueva zona al servicio de barrios que carecen de servicio de ruta fija.
23 Vuelva a alinear la ruta para dar servicio a los vecindarios a lo largo de Arlington Road North. Zonas de ReadiRide Eastside – South Nueva zona al servicio de barrios que carecen de servicio de ruta fija.
24 Extender la ruta para conectar con First Coast Flyer Red. Argyle Forest Nueva zona al servicio de barrios que carecen de servicio de ruta fija.
25 No hay cambios propuestos. Sandalwood Nueva zona al servicio de barrios que carecen de servicio de ruta fija.
26 Extender la ruta para conectar con First Coast Flyer Blue. Golden Glades –
Rutas del Nueva zona al servicio de barrios que carecen de servicio de ruta fija.
The Woods
Conector 27 Aumentar la duración del servicio.
Jacksonville Heights Nueva zona al servicio de barrios que carecen de servicio de ruta fija.
28 Extienda la ruta para servir a FSCJ Sur y vuelva a alinear la ruta en Baymeadows Road.
Middleburg Nueva zona al servicio de barrios que carecen de servicio de ruta fija.
30 Eliminar ruta.
31 Extender ruta a Canal Street. Fleming Island Nueva zona al servicio de barrios que carecen de servicio de ruta fija.
32 Realinear ruta. Clay Community Red (Línea Roja) Realinear ruta y extender para server a la Calle 103a.
33 Realinear ruta. Transportation (CCT) Blue (Línea Azul) Realinear ruta.
344
Transit Development Plan Major Update | Public Outreach Materials
B.6 Surveys
345
TRANSIT SURVEY
Please help JTA improve transit service by completing the
survey below.
STOP Questions 12 and 13 are for non-riders only. JTA riders please proceed to question 14. Questions 14-21 are optional.
12. What are the start and end points of the commute you make 16. What is your age?
the most often? Please provide an address or description of 13 or under 14-17 18-25
where each place is located. 26-35 36-64 65 or over
Start Point:
17. Which of the following best describes your employment status?
Full-Time Part-Time Unemployed
End Point:
Student Retired Other_______
Disabled and unable to work
13. What is your primary reason for not riding any local transit 18. What is your approximate household income?
service?
Less than $5,000 $5,000-$9,999 $10,000-$14,999
No service near my home
$15,000-$24,999 $25,000-$34,999 $35,000-$49,999
Doesn't go where I need to go
$50,000-$74,999 $75,000-$99,999 More than $100,000
I've experienced issues with transit service in the region
19. What is your race/ethnicity?
I need more information
American Indian/Alaska Native Asian
I'm not interested in taking transit
Black/African-American Hispanic/Latino
Other ________________________
Native Hawaiian/Pacific Islander White
14. What is the primary language you speak at home? Other_______
English Spanish Other____________________ 20. What is your gender?
15. If English is not your preferred language, how well do you Female Male Non-Binary / Third Gender
speak English? Self-describe or prefer not to say
Very well Well Not well Not at all 21. Are you an active duty member or veteran of the US Armed
Forces?
Yes No
Please provide any additional comments you have below.
English Menu
June 11, 2019 — The team will be at Rosa Parks Transit Station from 3 – 5:30 p.m.
June 12, 2019 — The team will be at Gateway Transit Hub from 10:00 a.m. – 12:00 p.m.
and Regency Square Mall from 2 – 4:00 p.m.
June 13, 2019 — The team will be at Orange Park Mall from 7 – 9:00 a.m.
For those unable to actively participate at one of the pop-up events, you're welcome to
complete the survey online.
RELATED PAGES
ADA Accessibility
347
https://www.jtafla.com/campaigns/tdp-survey-june-2019/ 1/3
Transit Development Plan Major Update | Public Outreach Survey Results
Never 37%, 39
Other 8%, 8
No response 1%, 1
0 10 20 30 40 50
Number of Responses
Riders were asked why they use JTA (Figure C-2) and the survey allowed respondents to choose
multiple responses. The most frequently chosen reason was that they do not own a car (35 percent),
followed by the bus is cheaper than gas or maintenance (23 percent).
348
Transit Development Plan Major Update | Public Outreach Survey Results
Figure C-2: Which of the following describe the reasons that you use JTA? Select all that apply. (n = 91)
0 10 20 30 40
Number of Responses
Respondents that marked they never ride JTA were asked why they do not ride (Figure C-3). Most
respondents (36 percent) chose “other” and gave reasons for not riding such as that transit doesn’t fit in
their schedule, is inconvenient, or they own a car. The second-most chosen option was that respondents
were not interested in taking transit (31 percent).
Figure C-3: What is your primary reason for not riding any local transit? (n = 39)
Other 27%, 29
No response 13%, 14
0 10 20 30 40
Number of Responses
349
Transit Development Plan Major Update | Public Outreach Survey Results
Figure C-4: Origin and Destination for Most Recent One-Way Trip (n = 64)
College 5%, 3
3%, 2
Home 64%, 41
20%, 13
Medical 5%, 3
6%, 4
Other 14%, 9
16%, 10
Recreation/Social 2%, 1
13%, 8
Shopping/Groceries 3%, 2
9%, 6
Work 8%, 5
31%, 20
0 10 20 30 40 50
Number of Responses
Origin Destination
Respondents were asked how long the one-way transit trip usually takes (Figure C-5). Most trips were
under an hour (67 percent), with 22 percent of trips less than 30 minutes.
Figure C-5: From door to door, how much time does this one-way transit trip usually take? (n = 64)
0 10 20 30 40
Number of Responses
350
Transit Development Plan Major Update | Public Outreach Survey Results
Respondents were asked what type of bus fare they used on their most recent trip (Figure C-6).
Responses were varied, with single ride (27 percent), senior STAR card (22 percent), 31-day pass (16
percent), and 1-day pass (11 percent) representing the majority of rides.
Figure C-6: On your most recent JTA trip, what type of bus fare did you pay? (n = 64)
Respondents were asked if they used at STAR card on their most recent trip. Exactly 50 percent (31
respondents) responded they had, and 50 percent said they had not.
JTA riders were asked what other mode they would have used if the bus was not available (Figure C-7).
Most respondents said they would use taxi, Uber, or Lyft (34 percent), while 19 percent stated they would
not have made the trip at all.
Figure C-7: If a bus had not been available for your most recent transit trip, how would you have made the trip? (n =
64)
Taxi/Uber/Lyft 34%, 22
Bike 8%, 5
Walk 5%, 3
Other 5%, 3
0 10 20 30
Number of Responses
351
Transit Development Plan Major Update | Public Outreach Survey Results
Figure C-8: Based on your experience riding JTA, how strongly do you agree with the following statements? (n = 65)
Riders were more likely to choose more frequency over longer span of service.
0 10 20 30 40 50
Number of Responses
352
Transit Development Plan Major Update | Public Outreach Survey Results
Riders were more likely to choose more weekend service over more weekday service.
0 10 20 30 40 50
Number of Responses
Riders were more likely to choose closely-spaced stops instead of farther stops, even if that meant the
bus would run slower.
0 10 20 30 40 50
Number of Responses
0 10 20 30 40 50
Number of Responses
353
Transit Development Plan Major Update | Public Outreach Survey Results
Riders were more likely to choose improving existing service over expanding service to new areas.
Figure C-13: Trade-Off Question: Expand Service vs. Improve Service (n = 65)
0 10 20 30 40 50
Number of Responses
C.1.7 Demographics
Respondents were asked basic demographic questions to comply with Title VI data collection. Additional
demographic questions were also asked to understand other identities that may influence their
perceptions and preferences. These questions were asked of all respondents, regardless of their rider
status.
Respondents were asked the primary language they speak at home. Almost all of respondents (98
percent) said their primary language is English. One respondent marked Spanish and one respondent
marked other. Respondents who marked that a language other than English was their primary language
were asked their level of English proficiency. One respondent said they spoke English “very well” and the
other said they spoke English “well.”
Respondents were asked their age (Figure C-14). Most respondents said they were between 36 and 64
(47 percent), while 40 percent said they were older than 65.
18-25 5%, 5
26-35 9%, 9
36-64 47%, 47
65 or over 40%, 40
0 10 20 30 40 50
Number of Responses
354
Transit Development Plan Major Update | Public Outreach Survey Results
Respondents were asked their current employment status (Figure C-15). Most respondents said they
worked full-time (40 percent), while retired workers made up 35 percent.
Figure C-15: Which of the following best describes your employment status? (n = 102)
Full-Time 40%, 41
Retired 35%, 36
Part-Time 13%, 13
Disabled and unable to work 5%, 5
Other 4%, 4
Student 2%, 2
Unemployed 1%, 1
0 10 20 30 40 50
Number of Responses
Respondents were asked their household income (Figure C-16). Sixty-two percent of respondents said
their household income was under $50,000.
355
Transit Development Plan Major Update | Public Outreach Survey Results
Respondents were asked their race or ethnicity (Figure C-17). More than 60 percent of respondents
marked they are white, while 28 percent marked they were black or African-American.
White 61%, 59
Black/African American 28%, 27
Hispanic/Latino 6%, 6
Other 4%, 4
Asian 1%, 1
Native Hawaiian/Pacific Islander 0%, 0
American Indian/Alaska Native 0%, 0
0 10 20 30 40 50 60 70
Number of Responses
Respondents were asked their gender (Figure C-18). Slightly more respondents were female than male.
Three respondents noted they were a gender other than female or male, or preferred to not respond.
Female 50%, 50
Male 47%, 47
Self-describe or prefer not to say 3%, 3
0 10 20 30 40 50 60
Number of Responses
Respondents were asked if they were affiliated with the US Armed Forces, either as an active duty
member or a veteran (Figure C-19). Twenty percent of respondents said they were affiliated.
Figure C-19: Are you an active duty member or veteran of the US Armed Forces? (n = 101)
Yes 20%, 20
No 80%, 81
0 10 20 30 40 50 60 70 80 90
Number of Responses
356
Transit Development Plan Major Update | Public Outreach Survey Results
30%, 28
70%, 64
Most responses (65 percent) were taken online, while 35 percent were taken in-person at pop-up events
in the JTA’s service area (Figure C-21).
35%, 32
65%, 60
Pop-Up Online
Table C-1 shows the average support score for each recommendation. Most recommendations received
positive support, with 57 percent receiving an average score of 3.5 or above and 94 percent receiving an
average score of 3 or above.
357
Transit Development Plan Major Update | Public Outreach Survey Results
358
Transit Development Plan Major Update | Public Outreach Survey Results
Clay Community Blue - Pier Station, Green Cove Springs, Orange Park, NAS 3.80 5
Transportation Jacksonville
(CCT) Routes Red - St. Vincent's Medical Center (Clay County), 103rd Street 3.80 5
Argyle Forest 4.00 7
Eastside - South 3.86 7
Fleming Island 3.86 7
Golden Glades - The Woods 3.57 7
ReadiRide Jacksonville Heights 3.57 7
Middleburg 3.86 7
Sandalwood 3.86 7
Sherwood Forest 3.71 7
Southside 3.43 7
C.2.3 Demographics
Respondents were asked basic demographic questions to comply with Title VI data collection. Additional
demographic questions were also asked to understand other identities that may influence their
perceptions and preferences.
Respondents were asked their race or ethnicity (Figure C-22). A plurality of respondents (44 percent)
stated they were black or African American, while 39 percent marked they were white or Caucasian.
0 10 20 30 40 50
Number of Responses
359
Transit Development Plan Major Update | Public Outreach Survey Results
Respondents were asked their household income (Figure C-23). More than three-quarters of
respondents (77 percent) said their household income was under $50,000.
Respondents were asked the primary language they speak at home. Almost all respondents (93 percent)
said their primary language is English. One respondent marked Spanish and three respondents marked
other. Respondents who marked that a language other than English was their primary language were
asked their level of English proficiency. One respondent said they spoke English “very well” and the other
three said they spoke English “well.”
Respondents were asked their age (Figure C-24). The responses were evenly split between among the
age ranges with no one group represented heavily.
18-25 15%, 8
26-35 15%, 8
36-50 31%, 17
51-64 31%, 17
65 or older 7%, 4
0 10 20 30
Number of Responses
360
Transit Development Plan Major Update | Public Outreach Survey Results
Respondents were asked their current employment status (Figure C-25). Most respondents said they
worked full-time (63 percent).
Figure C-25: Which of the following best describes your employment status? (n = 52)
Full-time 63%, 33
Retired 10%, 5
Student 8%, 4
Part-time 8%, 4
Disabled/Unable to work 8%, 4
Unemployed 4%, 2
0 10 20 30 40 50
Number of Responses
Respondents were asked if they were affiliated with the US Armed Forces, either as an active duty
member or a veteran. Six percent of respondents said they were affiliated.
Respondents were asked their gender (Figure C-26). More respondents were male (55 percent) than
female (41 percent), with two respondents marking they were not male or female.
Male 55%, 31
Female 41%, 23
Other 4%, 2
0 10 20 30 40 50
Number of Responses
361
Transit Development Plan Major Update | Peer Selection
D PEER SELECTION
For the 2014 Transit Development Plan (TDP), the following peer transit systems were identified:
Using the TCRP Peer Selection Method, these systems were evaluated as peer transit systems for this
current update of the TDP. The TCRP Peer Selection Method applies three screening factors and up to
14 peer grouping factors to the National Transit Database (NTD) data for each system. A “Likeness
Score” is determined for each screening and peer grouping factor and then for all of the factors
collectively. A Likeness Score of under 0.50 indicates a good match, between 0.50 and 0.74 a
satisfactory match, between 0.75 and 0.99 a potential match, and above 0.99 an undesirable match.
The overall Likeness Score for the ten 2014 peer cities is shown in Table D-1. Two of these systems are
considered a good match, two a satisfactory match, three a potential match, and three an undesirable
match, indicated as white, yellow, orange, or red.
Total
NTD Likeness
ID Agency Name Location State Score
40040 Jacksonville Transportation Authority Jacksonville FL 0.00
50016 Central Ohio Transit Authority Columbus OH 0.39
40027 Pinellas Suncoast Transit Authority St. Petersburg FL 0.41
40041 Hillsborough Area Regional Transit Authority Tampa FL 0.51
40003 Memphis Area Transit Authority Memphis TN 0.53
40035 Central Florida Regional Transportation Authority Orlando FL 0.61
30006 Greater Richmond Transit Company Richmond VA 0.64
70005 Kansas City Area Transportation Authority Kansas City MO 0.69
30083 Transportation District Commission of Hampton Roads Hampton VA 2.02
40008 Charlotte Area Transit System Charlotte NC 2.36
40018 Transit Authority of River City Louisville KY 71.59
362
Transit Development Plan Major Update | Peer Selection
An analysis of peers that have a Likeness Score below 1.00—indicating a good, satisfactory, or potential
match—is illustrated in Table D-2. An analysis of the specific characteristics that cause the candidate
peer systems to fall into a category other than “good match” is illustrated in Table D-3. Note that none of
the candidate peer cities registered greater than a score of 0.50 for “Rail Only,” “Heavy Rail,” “Population
Density,” or “Percent College Students.” Seven systems registered high on the factor “Service Area
Type.” Jacksonville is listed as the “only agency operating within an urban area; no non-urban service”
while many of the other systems were either “service to multiple urban areas (may also include non-urban
areas) and is the primary service provider within at least one urban area central city” or “agency serves
the urban area's central city, where other agencies also provide service to portions of the urban area.”
Most of these candidate peer cities were not comparable with respect to the percent of service
purchased. The remaining deviations from a “good match” are noted in the table.
A second analysis was developed that identified candidates with a Total Likeness Score of less than 1.0.
The results shown in Table D-4 highlight where these candidate peers differ from JTA.
Some of the other notable differences between this list of peers and JTA is:
None of these candidate peers operate rail of any kind, unlike the 2014 peers.
Ben Franklin (Washington) has an appreciably lower population than the JTA area. Others are half
the population of the JTA service area. Indianapolis is larger.
JTA is running more service than most of the candidate peers.
JTA generally has a larger budget.
363
Transit Development Plan Major Update | Peer Selection
Table D-2: Listing of Candidates with Likeness Score of Less Than 1.0
Total
NTD Likeness
ID Agency Name Location State Score
40040 Jacksonville Transportation Authority Jacksonville FL 0
50050 Indianapolis and Marion County Public Transportation Indianapolis IN 0.3
50016 Central Ohio Transit Authority Columbus OH 0.39
40046 Sarasota County Area Transit Sarasota FL 0.58
40042 Birmingham-Jefferson County Transit Authority Birmingham AL 0.62
50005 Metro Transit System Madison WI 0.65
60032 New Orleans Regional Transit Authority New Orleans LA 0.68
60018 Metropolitan Tulsa Transit Authority Tulsa OK 0.71
60022 Capital Area Transit System Baton Rouge LA 0.74
70002 Transit Authority of Omaha Omaha NE 0.75
40017 Lexington Transit Authority Lexington KY 0.9
70010 Des Moines Area Regional Transit Authority Des Moines IA 0.9
30014 Cumberland Dauphin-Harrisburg Transit Authority Harrisburg PA 0.91
40002 Knoxville Area Transit Knoxville TN 0.92
18 Ben Franklin Transit Richland WA 0.93
80005 Mountain Metropolitan Transit Colorado Springs CO 0.94
While the overall scores are at least a “potential match” for key indicators like Urban Area Population,
Total Revenue Miles Operated, and Total Operating Budget, the analysis suggest that these systems are
less similar to JTA in these critical areas.
We therefore recommend retaining the top six to eight peer agencies. We also recommend noting where
these peers differ from the JTA so that analysis can take these areas into account.
364
Transit Development Plan Major Update | Peer Selection
Total Percent
Total Urban Revenue Total Service Percent Population Service Percent
Likeness Area Miles Operating Population Area State College Growth Percent Demand Service
Agency Name Location State Score Rail Population Operated Budget Density Type Capital Students Rate Poverty Response Purchased Distance
Jacksonville Transportation
Jacksonville FL 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Authority
Central Ohio Transit
Columbus OH 0.39 0 0.30 0.22 0.34 0.35 0.00 1.00 0.32 0.04 0.17 0.36 0.93 1.36
Authority
Pinellas Suncoast Transit St.
FL 0.41 0 1.31 0.10 0.57 0.28 2.00 0.00 0.03 0.37 0.10 0.24 0.40 0.33
Authority Petersburg
Hillsborough Area Regional
Tampa FL 0.51 0 1.31 0.31 0.23 0.28 2.00 0.00 0.03 0.37 0.10 0.36 1.82 0.33
Transit Authority
Memphis Area Transit
Memphis TN 0.53 0 0.07 0.86 0.84 0.00 0.00 0.00 0.07 1.91 0.58 0.16 1.82 1.17
Authority
Central Florida Regional
Orlando FL 0.61 0 0.49 1.06 0.25 0.33 3.00 0.00 0.10 1.74 0.20 0.22 0.91 0.23
Transportation Authority
Greater Richmond Transit
Richmond VA 0.64 0 0.13 0.09 1.02 0.05 2.00 1.00 0.25 1.52 0.03 0.36 1.34 1.11
Company
Kansas City Area
Kansas City MO 0.69 0 0.38 0.12 0.02 0.08 3.00 0.00 0.24 1.82 0.09 0.56 1.51 1.91
Transportation Authority
Transportation District
Commission of Hampton Hampton VA 2.02 20 0.28 0.18 0.07 0.32 2.00 0.00 0.00 3.94 0.08 0.19 0.10 1.11
Roads
Charlotte Area Transit
Charlotte NC 2.36 20 0.25 0.28 0.28 0.12 3.00 0.00 0.40 5.67 0.19 0.36 1.82 0.70
System
Transit Authority of River
Louisville KY 71.59 0 0.15 0.08 0.17 0.03 0.00 0.00 0.03 1000.00 0.02 0.13 0.42 1.19
City
365
Transit Development Plan Major Update | Peer Selection
Table D-4: Likeness Scores for Systems with Total Likeness Score of Less Than 1.0
Total Percent
Total Urban Revenue Total Percent Population Service Percent
Likeness Area Miles Operating Population Service State College Growth Percent Demand Service
Agency Name Location State Score Population Operated Budget Density Area Type Capital Students Rate Poverty Response Purchased Distance
Jacksonville Transportation
Jacksonville FL 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Authority
Indianapolis and Marion
County Public Indianapolis IN 0.3 0.39 0.31 0.38 0.04 0.00 1.00 0.20 0.24 0.04 0.07 0.19 1.41
Transportation
Central Ohio Transit
Columbus OH 0.39 0.30 0.22 0.34 0.35 0.00 1.00 0.32 0.04 0.17 0.36 0.93 1.36
Authority
Sarasota County Area
Sarasota FL 0.58 0.62 1.73 2.83 0.00 2.00 0.00 0.01 0.00 0.13 0.24 0.09 0.42
Transit
Birmingham-Jefferson
Birmingham AL 0.62 0.52 2.33 1.65 0.52 0.00 0.00 0.19 0.71 0.09 0.12 1.82 0.75
County Transit Authority
Metro Transit System Madison WI 0.65 1.61 0.92 0.73 0.35 0.00 1.00 0.77 0.86 0.03 0.15 0.64 1.97
New Orleans Regional
New Orleans LA 0.68 0.20 0.46 0.27 0.77 2.00 0.00 0.04 0.89 0.49 0.22 3.18 1.02
Transit Authority
Metropolitan Tulsa Transit
Tulsa OK 0.71 0.65 2.36 4.20 0.04 0.00 0.00 0.02 0.23 0.23 0.01 0.33 1.84
Authority
Capital Area Transit
Baton Rouge LA 0.74 0.84 2.31 2.38 0.27 1.00 1.00 0.05 0.12 0.39 0.26 0.67 1.12
System
Transit Authority of Omaha Omaha NE 0.75 0.49 1.70 2.41 0.32 0.00 0.00 0.18 0.92 0.15 0.33 1.82 2.21
Lexington Transit Authority Lexington KY 0.9 2.67 2.70 3.06 0.65 0.00 0.00 0.40 0.85 0.43 0.06 0.68 1.12
Des Moines Area Regional
Des Moines IA 0.9 1.35 1.38 2.43 0.13 1.00 1.00 0.21 0.50 0.19 0.54 1.78 2.06
Transit Authority
Cumberland Dauphin-
Harrisburg PA 0.91 1.47 3.23 3.59 0.21 0.00 1.00 0.16 0.36 0.32 0.11 0.88 1.48
Harrisburg Transit Authority
Knoxville Area Transit Knoxville TN 0.92 0.94 3.55 3.76 0.60 0.00 0.00 0.13 0.89 0.09 0.23 1.82 0.83
Ben Franklin Transit Richland WA 0.93 3.94 0.54 1.97 0.05 0.00 0.00 0.16 0.38 0.01 0.24 1.20 4.58
Mountain Metropolitan Colorado
CO 0.94 0.88 2.21 3.70 0.50 0.00 0.00 0.22 0.25 0.03 0.27 2.18 2.88
Transit Springs
366
Transit Development Plan Major Update
Route operating statistics: span of service, frequency by time period, interlined routes, and
percentage recovery time
Service productivity measures: annual ridership, average daily riders, passengers per revenue
hour, passengers per revenue mile, passengers per trip, and average vehicle load
Financial performance: annual operating cost, annual revenue, cost per passenger, subsidy per
passenger, cost per passenger mile, and farebox recovery ratio
On-time performance: by period and day type, as well as runtime by segment.
JTA offers bus service on a more limited basis during several holidays throughout the year, as noted in
Table E-1, which also details the level of service provided per each holiday. The data collected during
holiday periods was assessed depending on the level of service operated that day (e.g., Thanksgiving
service data was assessed with other Sunday data).
367
Transit Development Plan Major Update | Comprehensive Operational Analysis
In the case of Community Shuttles 302, 305, and 307, these deviated fixed route services were converted
to fixed route operation in December 2018, with some changes to the alignment of Route 305 as it
became Route 85. Route 303 was discontinued and not replaced. JTA also introduced demand response
service ReadiRide covering an area similar to the deviated zones of the Community Shuttles 302, 303,
305, and 307. Route 9 was discontinued and replaced by First Coast Flyer Red. While the two routes
share the same alignment and have a similar span of service, First Coast Flyer Red operates at higher
frequencies and with wider stop spacing. Performance data for the First Coast Flyer Route 9 should be
interpreted in this context.
Several JTA routes underwent alignment changes between the August 2018 and December 2018 service
periods (see Table E-3). For these routes, August 2018 service period data was used for the analysis.
Table E-3: Alignment Changes Between August 2018 and December 2018 Service Periods
368
Transit Development Plan Major Update | Comprehensive Operational Analysis
Limited Connector 4 – 5 trips per day Weekday only Peak hours only Limited stops
Community Fixed
60 min Weekday / Saturday 6:00 a.m. – 7:00 p.m.
Shuttles* stops/deviations
Express Routes 4 – 5 trips per day Weekday only Peak hours only Limited stops
Source: JTA
*Community Shuttles were converted to ReadiRide and Limited Connector services in December 2018
Several JTA routes were reclassified between the August 2018 and December 2018 periods. These
routes were evaluated using Fiscal Year 2018 route performance standards and compared against other
routes in these service types as of the August 2018 service period (Table E-5). In the case of Route 9,
the route is evaluated according to First Coast Flyer standards, while community shuttles 302, 305, and
307 were evaluated against Community Shuttle standards from Fiscal Year 2018. Averages shown for
performance measures exclude First Coast Flyer Red, which uses Route 9 Fiscal Year 2018 data.
New services were also introduced in December 2018, including the Nassau Express Select and
ReadiRide services. Preliminary data for these services is provided in their respective route sheets.
369
Transit Development Plan Major Update | Comprehensive Operational Analysis
370
Transit Development Plan Major Update | Comprehensive Operational Analysis
371
Transit Development Plan Major Update | Comprehensive Operational Analysis
Weekday Peak: 6:00 a.m. to 9:00 a.m. and 3:00 p.m. to 6:00 p.m.
Weekend Core Service: 8:00 a.m. to 5:00 p.m. Saturday and Sunday.
The following statistics are shown by day of week for each route:
Span of Service: The range of the start time of the first trip for a route to the end of the last trip for
a route, excluding gaps in midday service (Table E-9).
Frequency by Time Period: This measures how often service is offered at stops on a route,
including both the route trunk and branches as applicable. Stops visited only on select trips were
excluded from calculations, and values were rounded for display (Table E-10).
Interlined Routes: Other routes that a bus is interlined with are displayed in Table E-11. For each
route, other routes are shown if they share the same schedule block at any point on Weekdays,
Saturdays, or Sundays, respectively. In some cases, trips on different routes in a block may be
connected through deadheading; in these cases, customers are not able to obtain a single-seat ride
between the routes listed.
Percent Recovery Time: Total recovery hours divided by total revenue hours for each route. In
cases where a route interlines with other routes, recovery time may be distributed unevenly
between routes (Table E-12). As a result, some routes show either no recovery time (0 percent
recovery time on Route 200 on Weekdays) or excessive recovery time (22.3 percent recovery time
on Route 13 on Weekdays).
372
Transit Development Plan Major Update | Comprehensive Operational Analysis
Table E-9: Span of Service for JTA Fixed Route Bus Operations
373
Transit Development Plan Major Update | Comprehensive Operational Analysis
374
Transit Development Plan Major Update | Comprehensive Operational Analysis
Community 85* 45 45 45
Shuttles*** 86* 6 trips 6 trips
375
Transit Development Plan Major Update | Comprehensive Operational Analysis
376
Transit Development Plan Major Update | Comprehensive Operational Analysis
377
Transit Development Plan Major Update | Comprehensive Operational Analysis
378
Transit Development Plan Major Update | Comprehensive Operational Analysis
379
Transit Development Plan Major Update | Comprehensive Operational Analysis
Overall, routes consistently performed below the passengers per revenue hour standard on Saturdays
and Sundays, with only ten of the forty-four evaluated routes having performed above the standard on
Weekdays. Twelve routes exceeded the standard for passengers per revenue mile on Weekdays, with
fewer routes performing above standard on Saturdays and Sundays. Fourteen routes performed above
standard for Average Load on Weekdays.
380
Transit Development Plan Major Update | Comprehensive Operational Analysis
381
Transit Development Plan Major Update | Comprehensive Operational Analysis
382
Transit Development Plan Major Update | Comprehensive Operational Analysis
383
Transit Development Plan Major Update | Comprehensive Operational Analysis
384
Transit Development Plan Major Update | Comprehensive Operational Analysis
385
Transit Development Plan Major Update | Comprehensive Operational Analysis
386
Transit Development Plan Major Update | Comprehensive Operational Analysis
387
Transit Development Plan Major Update | Comprehensive Operational Analysis
388
Transit Development Plan Major Update | Comprehensive Operational Analysis
389
Transit Development Plan Major Update | Comprehensive Operational Analysis
390
Transit Development Plan Major Update | Comprehensive Operational Analysis
391
Transit Development Plan Major Update | Comprehensive Operational Analysis
392
Transit Development Plan Major Update | Comprehensive Operational Analysis
393
Transit Development Plan Major Update | Comprehensive Operational Analysis
394
Transit Development Plan Major Update | Comprehensive Operational Analysis
395
Transit Development Plan Major Update | Comprehensive Operational Analysis
Metrics used to evaluate economic and financial performance are reported for FY18 for Weekdays (Table
E-16), Saturdays (Table E-17) and Sundays (Table E-18) are as follows:
Annual Operating Cost: The cost of operating service. Operating costs at the route level are
estimated based on total fixed route operating costs and vehicle revenue hours. In Fiscal Year 2018,
JTA operated 644,292 vehicle revenue hours at an operating cost of $76,257,023, or $118.36 per
revenue hour.
Annual Revenue: Allocated cash fare and pass revenue at the route level. Revenues are estimated
at the per-passenger level and allocated to routes based on their respective ridership. In Fiscal Year
2018, JTA reported $9,949,653.81 in cash fare and pass sales revenue for 10,400,863 passengers,
or $0.96 in revenue collected per revenue.
Cost per Passenger: Average cost per unlinked passenger trip.
Subsidy per Passenger: The total subsidy for a route is the net of operating cost and fare revenues.
This figure is divided by boardings to calculate the subsidy per passenger. Route-level statistics are
visualized and compared to JTA standards and averages in Figure E-10, Figure E-11, and Figure
E-12.
Cost per Passenger Mile: Operating costs divided by passenger miles, resulting in the average cost
of transporting a passenger for one mile. Route-level statistics are visualized and compared to JTA
standards and averages in Figure E-13, Figure E-14, and Figure E-15.
Farebox Recovery Ratio: Revenues as a percent of operating costs. Route-level statistics are
visualized and compared to JTA standards and averages in Figure E-16, Figure E-17, and Figure
E-18.
Overall, fixed bus routes consistently performed below the agency’s standards for subsidy per passenger,
especially during weekend service. A select number of mainline and frequent routes outperformed the
agency’s cost per passenger mile standards on Weekdays and Saturdays, though most exceeded this
standard on Sundays. Only Routes 11, 19, 21, 22 and 81 exceeded the agency’s farebox recovery ratio
standards on Weekdays, with only Route 81 having exceeded its farebox recovery ratio during Saturday
and Sunday service.
396
Transit Development Plan Major Update | Comprehensive Operational Analysis
397
Transit Development Plan Major Update | Comprehensive Operational Analysis
398
Transit Development Plan Major Update | Comprehensive Operational Analysis
399
Transit Development Plan Major Update | Comprehensive Operational Analysis
400
Transit Development Plan Major Update | Comprehensive Operational Analysis
401
Transit Development Plan Major Update | Comprehensive Operational Analysis
402
Transit Development Plan Major Update | Comprehensive Operational Analysis
403
Transit Development Plan Major Update | Comprehensive Operational Analysis
404
Transit Development Plan Major Update | Comprehensive Operational Analysis
405
Transit Development Plan Major Update | Comprehensive Operational Analysis
406
Transit Development Plan Major Update | Comprehensive Operational Analysis
407
Transit Development Plan Major Update | Comprehensive Operational Analysis
408
Transit Development Plan Major Update | Comprehensive Operational Analysis
409
Transit Development Plan Major Update | Comprehensive Operational Analysis
410
Transit Development Plan Major Update | Comprehensive Operational Analysis
411
Transit Development Plan Major Update | Comprehensive Operational Analysis
For the purposes of this analysis, early arrivals to the last timepoint were considered not on time. JTA
fixed routes are expected to be on-time at 75 percent or more of timepoints.
On-time performance by time period and day of week are visualized in Figure E-19 and Figure E-20.
Time periods are based on the day of week and hour of the trip start time as follows:
AM Early: Weekday trips starting at or after 4:00 a.m. and before 6:00 a.m.
AM Peak: Weekday trips starting at or after 6:00 a.m. and before 9:00 a.m.
Midday: Weekday trips starting at or after 9:00 a.m. and before 3:00 p.m.
PM Peak: Weekday trips starting at or after 3:00 p.m. and before 6:00 p.m.
Evening: Weekday trips starting at or after 6:00 p.m.
Saturday: All Saturday trips
Sunday: All Sunday trips.
In the August 2018 service period, JTA fixed routes were 69 percent on-time, 4 percent early, and 17
percent late to timepoints. On-time performance was lowest in the PM Peak, where 71 percent of
timepoints were reached on time.
412
Transit Development Plan Major Update | Comprehensive Operational Analysis
413
Transit Development Plan Major Update | Comprehensive Operational Analysis
Figure E-20: On Time Performance by Route and Time Period, Evenings, Weekends
414
Jacksonville Transportation Authority | Transit Development Plan
E.4 Conclusion
Many JTA fixed route bus services perform below the agency’s standards.
In terms of service productivity, most routes are below their route type standard for passengers per
revenue hour, passengers per revenue mile, and average load.
Many routes exhibit sub-standard economic and financial performance, with only one route (81)
exceeding farebox recovery ratio standards for Weekday, Saturday, and Sunday service periods.
JTA routes consistently perform at or above the agency’s on-time performance standard, with trips
arriving on-time 79 percent of the time.
To improve data collection, enhance measurement of system performance, and strengthen its services,
JTA should consider the following strategies:
415
Transit Development Plan Major Update
F ROUTE PROFILES
Routes within these types are shown in Table F-2. First Coast Flyer Red and Routes
84, 85, and 86 are represented with August 2018 data from comparable routes 9, 302,
305, and 307, respectively.
Table F-2: Services by Type
Type Routes and Services
First Coast Flyer Green, Blue, Red (9)
Frequent Routes 1, 3, 5, 8, 50
Mainline Routes 4, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 51, 53
Connectors Routes 21, 22, 23, 24, 25, 26, 27, 28, 30, 31, 32, 33, The minimum and maximum of the scale correspond to the highest and lowest value
Limited Connector Routes 80, 81, 82, 83 within the route type, respectively.
Community Shuttles* 84 (302), 85 (305), 86 (307)
Express Routes 200, 201, 202, 205
*Community Shuttles were replaced with Limited Connector and ReadiRide services in
December 2018
416
Transit Development Plan Major Update | Route Profiles
417
Transit Development Plan Major Update | Route Profiles
Definitions
Section Measure Definition Section Measure Definition
Level of Service Span of Service The range of the start time of the first trip for a Demographics Low-Income Annual household income under $30,000.
route to the end of the last trip for a route, Household
excluding gaps in midday service. Transit-Supportive 16 to 34; 65 and older.
Frequency Most common headways observed at stops Age
on a route, including both the route trunk and Ridership Trend Average Weekday Average ridership per weekday.
branches as applicable. Stops visited only on Ridership
select trips are excluded from calculations, Boardings per Maximum Load Maximum observed average load at any stop for
and values are rounded for display. Trip a given trip.
Interlined Routes For each route, other routes that a bus may Performance Passengers per The average ridership per revenue service hour.
interline with. For each route, other routes are Revenue Hour
shown if they share the same schedule block Passengers per Ridership generated per revenue service mile
at any point on Weekdays, Saturdays, or Revenue Mile supplied.
Sundays, respectively. In some cases, trips Average Load Calculated as the average number of passenger
on different routes in a block may be miles traveled per revenue service mile.
connected through deadheading; in these Farebox Recovery Revenues as a percent of operating costs.
cases, customers are not able to obtain a Ratio
single-seat ride between the routes listed. Subsidy per The total subsidy for a route is the net of
Percent Recovery Time Total recovery time divided by total revenue Passenger operating cost and fare revenues. This figure is
hours for each route. In cases where a route divided by boardings to calculate the subsidy per
interlines with other routes, layover time may passenger.
be distributed unevenly between routes. Cost per Passenger Operating costs divided by passenger miles,
Weekday Peak Period 6 AM to 9 AM, 3 PM to 6 PM. Mile resulting in the average cost of transporting a
Weekend Core Period 8 AM to 5 PM. passenger for one mile.
On-Time Performance An on-time departure is no more than one minute
Route Map Ridership Activity Activity is the sum of boardings and alightings early and less than six minutes late.
by stop. Activity at adjacent stops is combined Runtimes Weekday Scheduled Minimum, Median, and Maximum running time for
and smoothed through kernel density Running Time a one-way trip in minutes by direction and
estimation. Activity is visualized on a unique branch.
scale for each route on a color scale that Deviation Difference between scheduled runtime and actual
highlights the contrast between activity. runtime. Positive values indicate that actual
runtimes are slower than scheduled runtimes. An
asterisk (*) indicates insufficient data was
available to generate a runtime deviation for that
segment.
418
Transit Development Plan Major Update | Route Profiles
419
Transit Development Plan Major Update | Route Profiles
420
1 - North Main (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
421
1 - North Main (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
Subsidy per Passenger B: Dunn & Lem Turner to A: Dunn & Monaco to
-1.2 1.6
Dunn & Monaco River City Market Place
A: River City Market
Dunn & Monaco to 48th &
-0.1 Place to Jax -4.0
Main
International Airport
B: Dunn & Monaco to
Cost per Passenger Mile 48th & Main to 8th & Main 0.0 0.8
Dunn & Lem Turner
8th & Main to Rosa Park B: Dunn & Lem Turner
-0.6 -2.9
Station to FCSJ North
On-Time Performance
422
1 - North Main (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
423
1 - North Main (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
424
3 - Moncrief (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
425
3 - Moncrief (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
426
3 - Moncrief (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
427
3 - Moncrief (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
428
4 - Kings (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
429
4 - Kings (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
Subsidy per Passenger Cleveland & Edgewood to 13th St. & Canal to
0.5 1.4
New Kings &Soutel Kings Rd. & Spires
New Kings &Soutel to Kings Rd. & Spires to
-1.1 -1.0
Soutel Hub Rosa Park Station
On-Time Performance
430
4 - Kings (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
431
4 - Kings (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
432
5 - Park/Blanding (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
433
5 - Park/Blanding (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
434
5 - Park/Blanding (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
435
5 - Park/Blanding (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
436
8 - Beach/Town Center (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
437
8 - Beach/Town Center (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
438
8 - Beach/Town Center (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
439
8 - Beach/Town Center (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
440
10 - Atlantic (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
441
10 - Atlantic (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
Subsidy per Passenger Royal Palms & Atlantic to A: Atlantic & Kernan to
-0.6 -1.3
Atlantic & Kernan Plaza St.
Atlantic & Kernan to B: Atlantic & Kernan to
1.1 -0.3
Regency Square Hub Royal Palms & Atlantic
B: Royal Palms &
Regency Square Hub to
-2.0 Atlantic to 3rd St & 1st 0.1
Cost per Passenger Mile Cesery & Expressway
Ave
Cesery & Expressway to B: 3rd St & 1st Ave to
-1.0 -2.1
Rosa Park Station South Beach Regional
On-Time Performance
442
10 - Atlantic (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
443
10 - Atlantic (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
444
11 - A Philip Randolph (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
445
11 - A Philip Randolph (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
Farebox Recovery Ratio Bay & Philip Randolph to Phoenix & 8th to 21th
-1.6 -0.8
Rosa Park Station St & Phoenix
On-Time Performance
446
11 - A Philip Randolph (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
447
11 - A Philip Randolph (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
448
12 - Myrtle/Lem Turner (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
449
12 - Myrtle/Lem Turner (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
450
12 - Myrtle/Lem Turner (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
451
12 - Myrtle/Lem Turner (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
452
13 - Commonwealth/Lane (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
453
13 - Commonwealth/Lane (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
454
13 - Commonwealth/Lane (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
455
13 - Commonwealth/Lane (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
456
14 - Edison (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
457
14 - Edison (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
458
14 - Edison (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
459
14 - Edison (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
460
15 - Post/Normandy (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
461
15 - Post/Normandy (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
462
15 - Post/Normandy (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
463
15 - Post/Normandy (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
464
16 - Riverside/Wilson (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
465
16 - Riverside/Wilson (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
466
16 - Riverside/Wilson (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
467
16 - Riverside/Wilson (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
468
17 - St. Augustine (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
469
17 - St. Augustine (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
470
17 - St. Augustine (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
471
17 - St. Augustine (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
472
18 - Atlantic/Monument (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
473
18 - Atlantic/Monument (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
474
18 - Atlantic/Monument (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
475
18 - Atlantic/Monument (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
476
19 - Arlington (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
477
19 - Arlington (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
478
19 - Arlington (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
479
19 - Arlington (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
480
21 - Boulevard/Gateway (Connector Routes)
Transit Development Plan Major Update | Route Profiles
481
21 - Boulevard/Gateway (Connector Routes)
Transit Development Plan Major Update | Route Profiles
Farebox Recovery Ratio Boulevard & 8th Street to Pearl & 30th to
-0.3 -0.5
Rosa Park Station Gateway Hub
On-Time Performance
482
21 - Boulevard/Gateway (Connector Routes)
Transit Development Plan Major Update | Route Profiles
483
21 - Boulevard/Gateway (Connector Routes)
Transit Development Plan Major Update | Route Profiles
484
22 - Avenue B (Connector Routes)
Transit Development Plan Major Update | Route Profiles
485
22 - Avenue B (Connector Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
486
22 - Avenue B (Connector Routes)
Transit Development Plan Major Update | Route Profiles
487
22 - Avenue B (Connector Routes)
Transit Development Plan Major Update | Route Profiles
488
23 - Townsend/Southside (Connector Routes)
Transit Development Plan Major Update | Route Profiles
489
23 - Townsend/Southside (Connector Routes)
Transit Development Plan Major Update | Route Profiles
490
23 - Townsend/Southside (Connector Routes)
Transit Development Plan Major Update | Route Profiles
491
23 - Townsend/Southside (Connector Routes)
Transit Development Plan Major Update | Route Profiles
492
24 - Mayport (Connector Routes)
Transit Development Plan Major Update | Route Profiles
493
24 - Mayport (Connector Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
494
24 - Mayport (Connector Routes)
Transit Development Plan Major Update | Route Profiles
495
24 - Mayport (Connector Routes)
Transit Development Plan Major Update | Route Profiles
496
25 - San Jose (Connector Routes)
Transit Development Plan Major Update | Route Profiles
497
25 - San Jose (Connector Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
498
25 - San Jose (Connector Routes)
Transit Development Plan Major Update | Route Profiles
499
25 - San Jose (Connector Routes)
Transit Development Plan Major Update | Route Profiles
500
26 - Oakleaf/Buckman (Connector Routes)
Transit Development Plan Major Update | Route Profiles
501
26 - Oakleaf/Buckman (Connector Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
502
26 - Oakleaf/Buckman (Connector Routes)
Transit Development Plan Major Update | Route Profiles
503
26 - Oakleaf/Buckman (Connector Routes)
Transit Development Plan Major Update | Route Profiles
504
27 - Philips/Avenues (Connector Routes)
Transit Development Plan Major Update | Route Profiles
505
27 - Philips/Avenues (Connector Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
506
27 - Philips/Avenues (Connector Routes)
Transit Development Plan Major Update | Route Profiles
507
27 - Philips/Avenues (Connector Routes)
Transit Development Plan Major Update | Route Profiles
508
28 - Sunbeam/Southside (Connector Routes)
Transit Development Plan Major Update | Route Profiles
509
28 - Sunbeam/Southside (Connector Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
510
28 - Sunbeam/Southside (Connector Routes)
Transit Development Plan Major Update | Route Profiles
511
28 - Sunbeam/Southside (Connector Routes)
Transit Development Plan Major Update | Route Profiles
512
30 - Cecil (Connector Routes)
Transit Development Plan Major Update | Route Profiles
513
30 - Cecil (Connector Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
514
30 - Cecil (Connector Routes)
Transit Development Plan Major Update | Route Profiles
515
30 - Cecil (Connector Routes)
Transit Development Plan Major Update | Route Profiles
516
31 - Talleyrand (Connector Routes)
Transit Development Plan Major Update | Route Profiles
517
31 - Talleyrand (Connector Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
518
31 - Talleyrand (Connector Routes)
Transit Development Plan Major Update | Route Profiles
519
31 - Talleyrand (Connector Routes)
Transit Development Plan Major Update | Route Profiles
520
32 - McDuff (Connector Routes)
Transit Development Plan Major Update | Route Profiles
521
32 - McDuff (Connector Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
522
32 - McDuff (Connector Routes)
Transit Development Plan Major Update | Route Profiles
523
32 - McDuff (Connector Routes)
Transit Development Plan Major Update | Route Profiles
524
33 - Spring Park/Philips (Connector Routes)
Transit Development Plan Major Update | Route Profiles
525
33 - Spring Park/Philips (Connector Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
526
33 - Spring Park/Philips (Connector Routes)
Transit Development Plan Major Update | Route Profiles
527
33 - Spring Park/Philips (Connector Routes)
Transit Development Plan Major Update | Route Profiles
528
50 - University (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
529
50 - University (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
530
50 - University (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
531
50 - University (Frequent Routes)
Transit Development Plan Major Update | Route Profiles
532
51 - Edgewood (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
533
51 - Edgewood (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
534
51 - Edgewood (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
535
51 - Edgewood (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
536
53 - Commonwealth/Cassat (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
537
53 - Commonwealth/Cassat (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
538
53 - Commonwealth/Cassat (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
539
53 - Commonwealth/Cassat (Mainline Routes)
Transit Development Plan Major Update | Route Profiles
540
80 - NAS Shuttle (Limited Connector Routes)
Transit Development Plan Major Update | Route Profiles
541
80 - NAS Shuttle (Limited Connector Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
542
80 - NAS Shuttle (Limited Connector Routes)
Transit Development Plan Major Update | Route Profiles
543
80 - NAS Shuttle (Limited Connector Routes)
Transit Development Plan Major Update | Route Profiles
544
81 - Dinsmore Shuttle (Limited Connector Routes)
Transit Development Plan Major Update | Route Profiles
545
81 - Dinsmore Shuttle (Limited Connector Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
546
81 - Dinsmore Shuttle (Limited Connector Routes)
Transit Development Plan Major Update | Route Profiles
547
81 - Dinsmore Shuttle (Limited Connector Routes)
Transit Development Plan Major Update | Route Profiles
548
82 - Amazon Shuttle (Limited Connector Routes)
Transit Development Plan Major Update | Route Profiles
549
82 - Amazon Shuttle (Limited Connector Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
550
82 - Amazon Shuttle (Limited Connector Routes)
Transit Development Plan Major Update | Route Profiles
551
82 - Amazon Shuttle (Limited Connector Routes)
Transit Development Plan Major Update | Route Profiles
552
83 - Pritchard Shuttle (Limited Connector Routes)
Transit Development Plan Major Update | Route Profiles
553
83 - Pritchard Shuttle (Limited Connector Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
554
83 - Pritchard Shuttle (Limited Connector Routes)
Transit Development Plan Major Update | Route Profiles
555
83 - Pritchard Shuttle (Limited Connector Routes)
Transit Development Plan Major Update | Route Profiles
Note: This route sheet uses representative Fiscal Year 2018 data
from Route 302. Frequencies and spans of service are represented
by December 2018 service levels.
556
84 - Philips/Gran Bay (Community Shuttles)
Transit Development Plan Major Update | Route Profiles
557
84 - Philips/Gran Bay (Community Shuttles)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
558
84 - Philips/Gran Bay (Community Shuttles)
Transit Development Plan Major Update | Route Profiles
559
84 - Philips/Gran Bay (Community Shuttles)
Transit Development Plan Major Update | Route Profiles
Note: This route sheet uses representative Fiscal Year 2018 data
from Route 305. Frequencies and spans of service are represented
by December 2018 service levels.
560
85 - Highlands/Busch Dr (Community Shuttles)
Transit Development Plan Major Update | Route Profiles
561
85 - Highlands/Busch Dr (Community Shuttles)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
562
85 - Highlands/Busch Dr (Community Shuttles)
Transit Development Plan Major Update | Route Profiles
563
85 - Highlands/Busch Dr (Community Shuttles)
Transit Development Plan Major Update | Route Profiles
Note: This route sheet uses representative Fiscal Year 2018 data
from Route 307. Frequencies and spans of service are represented
by December 2018 service levels.
564
86 - Northside (Community Shuttles)
Transit Development Plan Major Update | Route Profiles
565
86 - Northside (Community Shuttles)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
566
86 - Northside (Community Shuttles)
Transit Development Plan Major Update | Route Profiles
567
86 - Northside (Community Shuttles)
Transit Development Plan Major Update | Route Profiles
568
102 - First Coast Flyer Green Line (First Coast Flyer)
Transit Development Plan Major Update | Route Profiles
569
102 - First Coast Flyer Green Line (First Coast Flyer)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
570
102 - First Coast Flyer Green Line (First Coast Flyer)
Transit Development Plan Major Update | Route Profiles
571
102 - First Coast Flyer Green Line (First Coast Flyer)
Transit Development Plan Major Update | Route Profiles
572
107 - First Coast Flyer Blue Line (First Coast Flyer)
Transit Development Plan Major Update | Route Profiles
573
107 - First Coast Flyer Blue Line (First Coast Flyer)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
574
107 - First Coast Flyer Blue Line (First Coast Flyer)
Transit Development Plan Major Update | Route Profiles
575
107 - First Coast Flyer Blue Line (First Coast Flyer)
Transit Development Plan Major Update | Route Profiles
Note: This route sheet uses representative Fiscal Year 2018 data
from Route 9. Frequencies and spans of service are represented
by December 2018 service levels.
576
109 - First Coast Flyer Red Line (First Coast Flyer)
Transit Development Plan Major Update | Route Profiles
577
109 - First Coast Flyer Red Line (First Coast Flyer)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
578
109 - First Coast Flyer Red Line (First Coast Flyer)
Transit Development Plan Major Update | Route Profiles
579
109 - First Coast Flyer Red Line (First Coast Flyer)
Transit Development Plan Major Update | Route Profiles
580
200 - Mandarin Express (Express Routes)
Transit Development Plan Major Update | Route Profiles
581
200 - Mandarin Express (Express Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
582
200 - Mandarin Express (Express Routes)
Transit Development Plan Major Update | Route Profiles
583
200 - Mandarin Express (Express Routes)
Transit Development Plan Major Update | Route Profiles
584
201 - Clay Regional Express (Express Routes)
Transit Development Plan Major Update | Route Profiles
585
201 - Clay Regional Express (Express Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
586
201 - Clay Regional Express (Express Routes)
Transit Development Plan Major Update | Route Profiles
587
201 - Clay Regional Express (Express Routes)
Transit Development Plan Major Update | Route Profiles
588
202 - Mayport Express (Express Routes)
Transit Development Plan Major Update | Route Profiles
589
202 - Mayport Express (Express Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
590
202 - Mayport Express (Express Routes)
Transit Development Plan Major Update | Route Profiles
591
202 - Mayport Express (Express Routes)
Transit Development Plan Major Update | Route Profiles
592
205 - Beaches Express (Express Routes)
Transit Development Plan Major Update | Route Profiles
593
205 - Beaches Express (Express Routes)
Transit Development Plan Major Update | Route Profiles
On-Time Performance
594
205 - Beaches Express (Express Routes)
Transit Development Plan Major Update | Route Profiles
595
205 - Beaches Express (Express Routes)
Transit Development Plan Major Update | Route Profiles
Level of Service
Measure Weekday Saturday Sunday
596
Blue Line (Clay Community Transportation)
Transit Development Plan Major Update | Route Profiles
Level of Service
Measure Weekday Saturday Sunday
597
Red Line (Clay Community Transportation)
Transit Development Plan Major Update | Route Profiles
CONNEXION
Level of Service
Measure Weekday Saturday Sunday
Span 8:00am - 5:00pm 8:00am - 5:00pm 8:00am - 5:00pm
Frequency By reservation (requires 2 hours’ notice)
Route Map
598
Connexion
Transit Development Plan Major Update | Route Profiles
GAMEDAY XPRESS
Level of Service Route Map
Measure
Span Operates during Jaguar’s games and special events at TIAA
Bank Field.
Frequency 2 hours before event; 1 hour following event.
599
Gameday Xpress
Transit Development Plan Major Update | Route Profiles
600
Nassau Express Select
Transit Development Plan Major Update | Route Profiles
READIRIDE
Level of Service Route Map
Measure Weekday Saturday Sunday
Span 6:00am - 7:00pm 6:00am - 7:00pm
Frequency By reservation (requires 2 hours’ notice)
601
ReadiRide
Transit Development Plan Major Update | Route Profiles
READIRIDE (CONTINUED)
ReadiRide Demographics by Zone
Population Jobs
ReadiRide Zone Acres Population Jobs per Acre per Acre
Beaches 12,072.4 40,509 20,144 3.4 1.7
Highlands 23,004.2 22,402 31,694 1.0 1.4
Northside 2,938.8 12,518 15,363 4.3 5.2
Ortega 7,940.4 23,727 4,770 3.0 0.6
Southeast 32,414.3 18,032 22,928 0.6 0.7
Source: 2015 American Community Survey, 2015 Longitudinal Employer-Household Dynamics (LEHD)
602
ReadiRide
Transit Development Plan Major Update | Route Profiles
SKYWAY
Level of Service Route Map
Measure Weekday Saturday Sunday
Span 6:00am - 9:00pm Special events only Special events only
Frequency Peak: 4 min
Off-Peak: 8 min
603
Skyway
Transit Development Plan Major Update | Route Profiles
604
St. Johns River Ferry
Transit Development Plan Major Update
G.1 Introduction
Transit demand estimation for the fixed route transit system was performed using the Transit Boardings
Estimation and Simulation Tool (TBEST) software, developed by FDOT. This program produces
estimates for ridership, revenue hours and miles, vehicle requirements, costs, and other service and
service area metrics.
Scenario A: Base year 2015 with TBEST default block-level employment data.
Scenario B: Base year 2015 with Northeast Regional Planning Model (NERPM) 2010 zonal
employment data.
Scenario C: Base year 2015 with NERPM 2015 zonal employment data (interpolated from NERPM
2010 and 2040 zonal employment data).
After import, route types were modified in TBEST as shown in Table 1 below. These categories are
especially important for calibrating the ridership estimates of new services in these route types. These
categories also play a role in ridership estimates for scenarios. In addition, the two BRT routes, the First
Coast Flyer Blue and the First Coast Flyer Green, have BRT characteristics configured as shown in
Figure G-1.
The fare levels set according to JTA are shown in Table G-1.
605
Transit Development Plan Major Update | Transit Demand Estimation with TBEST
Scenario A used the default block-level 2016 employment data based on the TBEST recommended
Florida 2018 Socioeconomic (SE) data set.
Scenario B used the 2010 zonal employment data based on the Northeast Regional Planning Model
(NERPM).
Scenario C used the 2015 zonal employment data based on NERPM. The 2015 zonal employment
data was not available to date and was interpolated based on 2010 and 2030 zonal employment data
from NERPM.
606
Transit Development Plan Major Update | Transit Demand Estimation with TBEST
Interlined Routes
TBEST provides an opportunity for the user to define interlined patterns between two routes, such that a
customer does not need to alight and re-board to make a transfer. For all three testing scenarios the First
Coast Flyer Blue and the First Coast Flyer Green were set as interlined routes.
Observed Ridership
Observed ridership for JTA routes were used to calibrate the results of the model. Average weekday,
Saturday, and Sunday ridership for October 2017 through September 2018 were analyzed. The GTFS
files reflect the period from August 6, 2018 to December 2, 2018. However, because several data points
were missing during this time period and because the average daily ridership numbers were very similar
based on the two different time periods, the average daily ridership was based on the October 2017
through September 2018 period. The average daily ridership numbers are shown in Table G-3.
607
Transit Development Plan Major Update | Transit Demand Estimation with TBEST
608
Transit Development Plan Major Update | Transit Demand Estimation with TBEST
Table G-5: Base Year Total Population and Employment Data Comparison
The validation factors obtained from the Scenario C base year model were used for future year forecasts.
609
Transit Development Plan Major Update | Transit Demand Estimation with TBEST
service area wage, an annual growth rate of 1.02% was used to grow the service area wage to year
2030.
The year 2030 employment data was developed through interpolation of the Year 2045 LRTP NERPM
datasets for the years 2015 and 2045.
Table G-6: Base Year 2018 and Future Year 2030 Model Results
Table G-7: Future Year Test 2030 Average Daily Ridership Forecasts by Route
610
Transit Development Plan Major Update | Transit Demand Estimation with TBEST
611
Transit Development Plan Major Update | Transit Demand Estimation with TBEST
year test scenario. To build the future network, service characteristics of the routes were changed as
outlined below.
Route alignments were changed to reflect proposed changes, including short turn route patterns and
select trip extensions. All routes serving Rosa Parks Transit Station were realigned downtown to serve
the Jacksonville Regional Transportation Center (JRTC), which will begin serving JTA buses in 2020. Due
to this change, it was expected that ridership, revenue hour and miles, and cost outputs from TBEST
would vary from the base year. The new station is located on the edge of Downtown Jacksonville
approximately 1.2 miles from Rosa Parks Transit Center. Some routes accessing JRTC from the
Westside may show lower ridership capture because they no longer travel through downtown, while
routes accessing JRTC from the Southside and Arlington may capture more ridership by traveling through
downtown on the way to JRTC.
Stops were added along all road segments receiving new bus service, spaced approximately every 1,000
feet or at key intersections. Stops were removed from areas where fixed route service would be
discontinued. The CCT Red and Blue routes were converted from deviated-fixed routes to fixed routes,
requiring the addition of 218 regularly spaced local bus stops along their alignments, which include
Rampart Road and Ricker Road in Duval County. A total of 606 new stops were added to the fixed route
network. Areas with new local service requiring new stops included Jammes Road and Ricker Road
(Route 80), Leonid Road and Capper Road (Route 85), Arlington Road and Lone Star Road (Route 23),
Gate Parkway West (Route 25), Bartram Park Boulevard (Route 54), Florida Boulevard in Neptune Beach
(Route 24), and the eastern end of Beach Boulevard (Route 29).
Headways were adjusted at the trip level by adding or removing trips within each hour to achieve the
proposed frequency for each time period. Span of service was also controlled at the trip level, with the
hours of service for each route determined by the first and last trip on weekdays, Saturdays, or Sundays.
In-vehicle travel time and travel speed were adjusted in tandem to reflect changes in route length, where
possible. TBEST automatically updates running times by time of day according to the prior average travel
speed set for a route. In the case of new routes, or cases where significant changes in length or speed
were anticipated, new running times were estimated for each time of day using an approximation based
on automobile travel times.
BRT adjustment factors for the four First Coast Flyer routes were configured as originally set for the base
year scenario.
612
Transit Development Plan Major Update | Transit Demand Estimation with TBEST
Fares for the future scenario were adjusted according to JTA’s proposed modifications as of July 2019,
which would take effect in Fiscal Year 2020. The new fare levels are shown in Table G-8.
JTA Route Number TBEST Route Type 2018 Fare Proposed 2020 Fare
Routes 1 to 54 Bus – Crosstown $ 1.50 $ 1.75
Skyway People Mover – Rapid $ 0.00 $ 0.00
Limited Connector Routes 80 to 85 Bus – Radial $ 1.50 $ 1.75
Express Routes 200 to 206 Bus – Express $ 2.00 $ 2.75
First Coast Flyer Bus – BRT $ 1.50 $ 1.75
St. Johns Ferry Other – Radial $ 6.00 $ 7.00
Express Select Routes 800 to 803 Bus – Express $ 3.00 No change
Source: www.jtafla.com/riding-jta/fares-passes/proposed-fare-modifications (Accessed 7/24/2019)
Interlined Routes
Interlined routes were configured in the same manner as the previous scenarios, with First Coast Flyer
Blue and Green interlined through downtown. Other interlining could not be anticipated for the future
system and was not modeled for consistency with the base year scenario.
Estimated layover time was changed from 10% of revenue hours in the base year to 13.7% of revenue
hours in the future year, to reflect average layover time of existing JTA fixed route services. Layover
estimates were not altered for St. Johns Ferry or Express Select Routes, and no layover was allocated for
Skyway or Southeast Rail service.
613
Transit Development Plan Major Update | Transit Demand Estimation with TBEST
Ridership Validation
Validation factors were applied from the base year scenario at the route level for all routes still in service
in 2030. New routes use validation factors according to the average adjustment for routes with the same
vehicle type and classification. Table G-10 contains the validation factors applied to each route in the
future year scenario.
Route Number Route Name Weekday Factor Saturday Factor Sunday Factor
1 North Main 0.82 1.39 0.99
3 Moncrief 0.46 0.92 0.57
4 Kings 0.43 1.04 0.65
8 Beach/Town Center 0.59 0.69 0.7
10 Atlantic 0.87 0.71 1.11
11 A Philip Randolph 0.46 1.13 0.63
12 Myrtle/Lem Turner 0.38 0.82 0.49
13 Commonwealth/Lane 0.74 1.23 0.92
14 Edison 0.33 0.81 0.44
15 Post/Normandy 0.41 0.73 0.35
16 Riverside/Wilson 0.44 0.62 0.42
17 St. Augustine 0.93 1.17 0.9
19 Atlantic/Monument 0.43 0.43 0.26
20 Arlington 0.4 0.78 0.42
21 Boulevard/Gateway 0.24 0.58 0.36
22 Avenue B 0.32 0.72 0.53
23 Townsend/Southside 0.37 0.41 0.34
24 Mayport 1.39 1.14 0.95
25 San Jose 0.42 0.48 0.5
26 Oakleaf/Buckman 0.45 0.36 0.31
27 Philips/Avenues 0.64 0.65 0.5
28 Sunbeam/Southside 0.27 0.26 0.22
29 Beaches 1.34 0.93 1.73
31 Talleyrand 0.11 0.22 --
32 McDuff 0.12 0.2 --
33 Spring Park/Philips 0.21 0.31 --
50 University 0.51 0.6 0.44
51 Edgewood 0.38 0.57 0.33
53 Commonwealth/Cassat 0.46 0.57 0.59
54 Philips/Gran Bay 2.92 1.31 --
80 NAS Shuttle 0.24 -- --
81 Dinsmore Shuttle 1.74 1.52 1.25
82 Amazon Shuttle 37.67 11.71 12.76
85 Highlands/Busch Dr 1.09 0.45 --
102 FCF Green 1.98 4.39 2.92
105 FCF Orange 3.38 5.53 3.33
614
Transit Development Plan Major Update | Transit Demand Estimation with TBEST
Route Number Route Name Weekday Factor Saturday Factor Sunday Factor
107 FCF Blue 1.5 3.33 2.59
109 FCF Red 3.38 5.53 3.33
200 Mandarin Express 0.12 -- --
202 Mayport Express 0.12 0.05 --
206 Airport Express 0.82 -- --
800 Nassau Express Select 0.21 -- --
801 St. John’s Express Select 0.21 -- --
802 Baker Express Select 0.21 -- --
803 Clay Express Select 0.09 -- --
901 CCT Red 0.65 -- --
902 CCT Blue 1.41 -- --
903 CCT Magenta 0.67 -- --
Table G-11: Future Year 2030 Average Daily Ridership Estimates by Route
615
Transit Development Plan Major Update | Transit Demand Estimation with TBEST
G.5 Limitations
TBEST is a stop-level land-use based ridership estimation model and thus is limited by the accuracy of
population and employment forecasts and the size of data geometries available. All modeling was based
on TAZ-level employment data and parcel-level population and land use data. Smaller geometries
provide more precise estimates in a given area but may increase the uncertainty of forecasts within each
geometry.
616
Transit Development Plan Major Update | Transit Demand Estimation with TBEST
Ridership validation at the route level ensures that the model produces ridership estimates based on
existing conditions. However, estimation for new routes or routes with significant changes may have
limited accuracy due to differences from the base year in route length, available transfers, land uses
served, or levels of service. In these cases, the applicability of base year validation factors is reduced.
Running times, layover time, and revenue hours calculated by the model are limited by the software’s and
modeler’s abilities to estimate in-vehicle travel times for each route pattern by time of day. When the
alignment or length of a route changes, TBEST uses the original average speed to predict new running
times. For new routes or significant changes to existing routes, the modeler estimated running times for
each time period. Since layover time and revenue hours are estimated based on running times and
interlining, these outputs are directly limited by the accuracy of these in-vehicle travel time estimates and
lack of block scheduling in TBEST. For this reason, revenue hours from the base year scenario were
adjusted against existing revenue hours data. The same adjustment factors were used on model outputs
to estimate revenue hours for the future year scenario.
TBEST does not model non-revenue aspects of fixed-route operations. Therefore, future year estimates
for deadhead hours and deadhead miles were calculated based on the existing proportion of revenue to
non-revenue hours and miles for each route. The proportions of deadhead time and distance for new
routes were selected from existing routes with similar operational characteristics.
617
Transit Development Plan Major Update
H.1 Introduction
ReadiRide is JTA’s demand-response transit service for areas of Duval County with persons who have
limited access to fixed-route transit. The service began in December 2018 with five zonal service areas
and was expanded in July 2019 to include three additional zones. By 2030, JTA plans to implement
ReadiRide service in 17 total communities, including service in Clay County. This appendix describes the
methodology used to estimate ridership, revenue miles, and operating costs for each existing and
proposed ReadiRide zone between 2019 and 2029.
H.2 Methodology
The National Center for Transit Research (NCTR) developed a methodology for estimating ridership of
rural demand-response transit services in 2016. 1 Based on nationwide trends in demand-response
ridership, the model uses demographic data and service characteristics to calculate a single ridership
estimate. Following ridership estimation, existing average ReadiRide trip length and operating cost per
revenue mile were used to calculate annual revenue miles and annual operating costs.
H.2.1 Background
ReadiRide ridership estimation was performed using Model #1 from the NCTR report, which calculates
ridership based on seven characteristics of the demand-response service: service area population,
percentage of population over 65 years old, percentage of population without access to a vehicle,
percentage of population with access to a different demand-response service, whether the agency also
operates a fixed-route service, whether the agency operates strictly within a municipality, and the fare. In
addition, a set of constants accounts for regional differences in ridership behavior. The model’s final
equation was calibrated against National Transit Database data from 731 rural demand-response transit
agencies across the United States. This equation is described below:
NCTR also considered the influence of disabled populations on ridership but did not find a statistically
significant effect, due to the availability of the demand-response services to the general public.
1Mattson, Jeremy. “Estimating Ridership of Rural Demand-Response Transit Services for the General Public.”
National Center for Transit Research, August 2016.
618
Transit Development Plan Major Update | ReadiRide Ridership Estimation
H.2.2 Estimation
Ridership Estimation
Ridership for each of the 17 ReadiRide zones was calculated independently using the Model #1 equation.
Estimates from the American Community Survey (ACS) provided the total, senior, and no-car population
in each zone. JTA also operates a fixed route service, and Florida is in FTA region 5, resulting in the
inclusion of those constants. The final input was the $2.00 ReadiRide fare.
NCTR’s model assumes 365 annual days of service and calculates average estimated annual ridership.
ReadiRide operates Monday through Saturday for a total 307 days per year. To calculate annual
ridership, the result from the Model #1 equation was scaled from seven days per week to six days per
week. Daily ridership was found according to the 307-day service year.
Population estimates for Duval and Clay Counties from the Bureau of Economic and Business Research
(BEBR) were used to approximate future growth of population, and therefore ReadiRide demand. The
average rate of growth from 2015 to 2020 for each county was applied to the base year annual revenue
miles to calculate future year ReadiRide revenue miles.
Cost Estimation
ReadiRide is a contracted service for which JTA pays a fixed rate of $2.50 per revenue mile. Annual
operating costs for each ReadiRide zone was found by applying this rate to the estimated revenue miles
for each forecast year.
H.4 Limitations
The ridership estimation model developed by NCTR was designed and calibrated for rural demand-
response services. Jacksonville and many of the existing and proposed ReadiRide zones are likely
denser than the areas for which the model is intended. In addition, the model was formulated to estimate
ridership for the entire service area of a demand-response service, rather than a zone-by-zone
calculation. However, the desired output of zone-level estimates required a zone-by-zone approach, and
the consistency of the model’s estimates relative to existing data were found to be sufficient evidence that
the NCTR model could accurately forecast ridership for JTA’s ReadiRide service.
In estimating revenue miles, some correlation between the size, population, or density of each ReadiRide
zone and average trip distance was expected. Despite some evidence that these factors may influence
average trip distance, no meaningful trend was identified in the existing December 2018 data. The use of
a single average revenue miles per passenger trip across ReadiRide zones of varying size likely limits the
619
Transit Development Plan Major Update | ReadiRide Ridership Estimation
accuracy of the resulting estimates. Greater accuracy may be achievable with additional data, as one
month of data during initial implementation may misrepresent future travel behavior and use of the
service.
620
Transit Development Plan Major Update
I.1 Methodology
Future paratransit ridership was estimated for the years 2019 through 2029 using a methodology
developed by the Center for Urban Transportation Research (CUTR) at the University of South Florida in
2013. CUTR’s forecasting tool was created specifically for Florida transit agencies to predict demand for
paratransit services. The model identifies the existing travel behaviors of transportation-disadvantaged
(TD) populations, calculating a daily per-capita paratransit trip rate, and applies the rate to future
population forecasts to predict demand. The population groups forming potential sources of ridership for
paratransit services are identified as follows:
General TD populations: Disabled, elderly, and low-income residents lacking car ownership. These
populations may have access to fixed-route transit, school buses, or special services for people with
disabilities.
Critical-need TD populations: Severely disabled residents and people without access to a vehicle
or transit services in Duval County.
Estimates of paratransit ridership are provided in Table I-1 through Table I-4 for Clay County and Table
I-5 through Table I-8 for Duval County. By 2030, 117,565 and 415,344 paratransit trips are forecast for
Clay County and Duval County, respectively. Projections of paratransit ridership were combined with an
estimate of revenue hours per passenger trip to estimate annual paratransit costs for the ten-year
financial plan (see Chapter 9: Implementation Plan and Appendix K. Financial and Implementation
Plan).
The existing travel patterns of transportation disadvantaged groups and the current shares of the
populations of Clay and Duval counties that are disabled, elderly, low-income, or any combination of the
three are calculated based on survey data from the US Census’ 2017 American Community Survey
(ACS) and the National Household Travel Survey (NHTS). 1 Severe disability rates are calculated using
data from the Census Bureau’s Survey of Income and Program Participation (SIPP). Population growth
calculations for Duval and Clay County are based on data from the Florida Bureau of Economic and
Business Research (BEBR).
To determine the percent of population with access to fixed route transit in each county, block group-level
population estimates from the 2017 ACS were compared to each county’s 2017 transit network. In Duval
County, any block group within a quarter-mile of a fixed route JTA transit stop was considered to have
access to fixed-route transit. In Clay County, any block group within a quarter-mile of a Clay Transit
deviated fixed-route was considered to have access to fixed-route transit.
Paratransit ridership is sourced from 2017 National Transit Database (NTD) unlinked passenger trips for
JTA (Duval County) and the Clay County Council on Aging (Clay County).
1 The ACS table used is B18130, Age by Disability Status by Poverty Status.
621
Transit Development Plan Major Update | Paratransit Ridership Estimation
I.3 Limitations
The number of paratransit riders in 2017 in Duval and Clay counties are 10.9 percent and 14.1 percent,
respectively, of the number of annual trips estimated by the CUTR methodology. The project team
calibrated the future predictions of annual paratransit ridership—from 2018 to 2029—by multiplying the
CUTR forecast by these same percentages. Possible explanations for the discrepancy between actual
and predicted values include:
The CUTR methodology produces the expected demand for a paratransit service, but such a service
in the greater Jacksonville region is not widespread enough or marketed well enough to produce that
high a demand.
Other JTA and Clay County services are effective at serving transportation disadvantaged
populations such that less paratransit service is demanded than the model forecasts.
622
Transit Development Plan Major Update | Paratransit Ridership Estimation
Note: the below data is pulled from ACS 2017 data on worksheet 6. Please change cells on that worksheet if more recent ACS data becomes available.
623
Transit Development Plan Major Update | Paratransit Ridership Estimation
Table I-2. Clay County Paratransit Demand Estimation, General Transportation Disadvantaged Population.
624
Transit Development Plan Major Update | Paratransit Ridership Estimation
Table I-3. Clay County Paratransit Demand Estimation, Critical Need Transportation Disadvantaged Population.
% with a
Total Population % of Total Pop with % of Severe Total Severe
Total Population with Severe
County Pop. By Age with a Severe Severe Disability by Disability Below Disability Below
a Disability by Age Disability by
Disability by Age Age Poverty Level Poverty Level
Age
Low Income Non Disabled Trip Rate Low Income & Not Disabled = C + F CALCULATION OF DAILY TRIPS
625
Transit Development Plan Major Update | Paratransit Ridership Estimation
Table I-4. Clay County Paratransit Demand Estimation, Forecast of General and Critical Need Transportation Disadvantaged Populations.
General TD Population Forecast 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Overlapping Circle Component
E - Estimate non-elderly/disabled/ low income 3,787 3,856 3,926 3,997 4,069 4,143 4,218 4,294 4,372 4,451 4,532 4,614 4,698 4,783
B - Estimate non-elderly/ disabled/not low income 15,406 15,685 15,970 16,259 16,554 16,854 17,159 17,470 17,787 18,109 18,437 18,772 19,112 19,458
G - Estimate elderly/disabled/low income 562 572 583 593 604 615 626 637 649 661 673 685 697 710
D- Estimate elderly/ disabled/not low income 11,940 12,156 12,377 12,601 12,829 13,062 13,299 13,540 13,785 14,035 14,289 14,548 14,812 15,081
F - Estimate elderly/non-disabled/low income 1,510 1,537 1,565 1,594 1,622 1,652 1,682 1,712 1,743 1,775 1,807 1,840 1,873 1,907
A - Estimate elderly/non-disabled/not low income 18,654 18,992 19,336 19,687 20,044 20,407 20,777 21,153 21,537 21,927 22,325 22,729 23,141 23,561
C - Estimate low income/not elderly/not disabled 17,052 17,361 17,676 17,996 18,322 18,654 18,993 19,337 19,687 20,044 20,407 20,777 21,154 21,537
TOTAL GENERAL TD POPULATION 68,911 70,160 71,432 72,726 74,045 75,387 76,753 78,144 79,561 81,003 82,471 83,966 85,488 87,037
TOTAL POPULATION 209,450 213,246 217,111 221,047 225,053 229,132 233,285 237,514 241,819 246,202 250,664 255,208 259,833 264,543
Critical Need TD Population Forecast 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Total Critical Need TD Population 9,596 9,770 9,947 10,127 10,310 10,497 10,688 10,881 11,079 11,279 11,484 11,692 11,904 12,120
Total Daily Trips Critical Need TD Population 6,088 6,198 6,310 6,425 6,541 6,660 6,780 6,903 7,028 7,156 7,285 7,417 7,552 7,689
Annual Trips (CUTR methodology) 2,221,938 2,262,211 2,303,215 2,344,961 2,387,464 2,430,737 2,474,795 2,519,651 2,565,320 2,611,817 2,659,157 2,707,355 2,756,427 2,806,387
626
Transit Development Plan Major Update | Paratransit Ridership Estimation
Note: the below data is pulled from ACS 2017 data on worksheet 6. Please change cells on that worksheet if more recent ACS data becomes
available.
627
Transit Development Plan Major Update | Paratransit Ridership Estimation
Table I-6. Duval County Paratransit Demand Estimation, General Transportation Disadvantaged Population.
628
Transit Development Plan Major Update | Paratransit Ridership Estimation
Table I-7. Duval County Paratransit Demand Estimation, Critical Need Transportation Disadvantaged Population.
% with a
Total Population % of Total Pop with % of Severe Total Severe
Total Population with Severe
County Pop. By Age with a Severe Severe Disability by Disability Below Disability Below
a Disability by Age Disability by
Disability by Age Age Poverty Level Poverty Level
Age
Low Income Non Disabled Trip Rate Low Income & Not Disabled = C + F CALCULATION OF DAILY TRIPS
629
Transit Development Plan Major Update | Paratransit Ridership Estimation
Table I-8. Duval County Paratransit Demand Estimation, Forecast of General and Critical Need Transportation Disadvantaged Populations.
General TD Population Forecast 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Overlapping Circle Component
E - Estimate non-elderly/disabled/ low income 22,190 22,487 22,787 23,092 23,400 23,713 24,030 24,351 24,676 25,006 25,340 25,679 26,022 26,370
B - Estimate non-elderly/ disabled/not low income 55,486 56,228 56,979 57,740 58,512 59,294 60,087 60,890 61,703 62,528 63,364 64,210 65,069 65,938
G - Estimate elderly/disabled/low income 7,420 7,519 7,620 7,721 7,825 7,929 8,035 8,143 8,251 8,362 8,473 8,587 8,701 8,818
D- Estimate elderly/ disabled/not low income 37,303 37,802 38,307 38,819 39,337 39,863 40,396 40,936 41,483 42,037 42,599 43,168 43,745 44,330
F - Estimate elderly/non-disabled/low income 7,617 7,719 7,822 7,926 8,032 8,140 8,249 8,359 8,471 8,584 8,698 8,815 8,932 9,052
A - Estimate elderly/non-disabled/not low income 72,760 73,732 74,718 75,716 76,728 77,754 78,793 79,846 80,913 81,994 83,090 84,201 85,326 86,466
C - Estimate low income/not elderly/not disabled 100,937 102,286 103,653 105,038 106,442 107,865 109,306 110,767 112,247 113,747 115,268 116,808 118,369 119,951
TOTAL GENERAL TD POPULATION 303,713 307,772 311,885 316,053 320,277 324,558 328,895 333,291 337,745 342,259 346,833 351,468 356,165 360,925
TOTAL POPULATION 910,699 922,870 935,204 947,702 960,368 973,203 986,209 999,389 1,012,745 1,026,280 1,039,996 1,053,895 1,067,980 1,082,253
Critical Need TD Population Forecast 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Total Critical Need TD Population 32,772 33,210 33,654 34,104 34,559 35,021 35,489 35,964 36,444 36,931 37,425 37,925 38,432 38,945
Total Daily Trips Critical Need TD Population 15,480 15,687 15,897 16,109 16,325 16,543 16,764 16,988 17,215 17,445 17,678 17,915 18,154 18,397
Annual Trips (CUTR methodology) 5,650,352 5,725,866 5,802,390 5,879,936 5,958,518 6,038,151 6,118,847 6,200,623 6,283,491 6,367,466 6,452,564 6,538,800 6,626,187 6,714,743
630
Transit Development Plan Major Update | Route Recommendation Profiles
631
Transit Development Plan Major Update | Route Recommendation Profiles
632
1 - North Main (Frequent Route)
Transit Development Plan Major Update | Route Recommendation Profiles
633
1 - North Main (Frequent Route)
Transit Development Plan Major Update | Route Recommendation Profiles
634
3 - Moncrief (Frequent Route)
Transit Development Plan Major Update | Route Recommendation Profiles
635
3 - Moncrief (Frequent Route)
Transit Development Plan Major Update | Route Recommendation Profiles
636
4 - Kings (Frequent Route)
Transit Development Plan Major Update | Route Recommendation Profiles
637
4 - Kings (Frequent Route)
Transit Development Plan Major Update | Route Recommendation Profiles
638
8 - Beach/St. John's Square (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
639
8 - Beach/St. John's Square (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
640
10 - Atlantic (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
641
10 - Atlantic (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
642
11 - A Philip Randolph (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
643
11 - A Philip Randolph (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
644
12 - Myrtle/Lem Turner (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
645
12 - Myrtle/Lem Turner (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
646
13 - Commonwealth/Lane (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
647
13 - Commonwealth/Lane (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
648
14 - Edison (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
649
14 - Edison (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
650
15 - Post/Normandy (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
651
15 - Post/Normandy (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
652
16 - Riverside/Wilson (Frequent Route)
Transit Development Plan Major Update | Route Recommendation Profiles
653
16 - Riverside/Wilson (Frequent Route)
Transit Development Plan Major Update | Route Recommendation Profiles
654
17 - St. Augustine (Frequent Route)
Transit Development Plan Major Update | Route Recommendation Profiles
655
17 - St. Augustine (Frequent Route)
Transit Development Plan Major Update | Route Recommendation Profiles
656
19 - Arlington (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
657
19 - Arlington (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
658
20 - Park/Blanding (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
659
20 - Park/Blanding (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
660
21 - Boulevard/Gateway (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
661
21 - Boulevard/Gateway (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
662
22 - Avenue B (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
663
22 - Avenue B (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
664
23 - Townsend/Southside (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
665
23 - Townsend/Southside (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
666
24 - Mayport (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
667
24 - Mayport (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
668
25 - San Jose (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
669
25 - San Jose (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
670
26 - Oakleaf/Buckman (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
671
26 - Oakleaf/Buckman (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
672
27 - Philips/Avenues (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
673
27 - Philips/Avenues (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
674
28 - Sunbeam/Southside (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
675
28 - Sunbeam/Southside (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
676
29 - Beach (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
677
29 - Beach (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
678
31 - Talleyrand (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
679
31 - Talleyrand (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
680
32 - McDuff (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
681
32 - McDuff (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
682
33 - Spring Park/Philips (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
683
33 - Spring Park/Philips (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
684
50 - University (Frequent Route)
Transit Development Plan Major Update | Route Recommendation Profiles
685
50 - University (Frequent Route)
Transit Development Plan Major Update | Route Recommendation Profiles
686
51 - Edgewood (Frequent Route)
Transit Development Plan Major Update | Route Recommendation Profiles
687
51 - Edgewood (Frequent Route)
Transit Development Plan Major Update | Route Recommendation Profiles
688
53 - Commonwealth/Cassat (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
689
53 - Commonwealth/Cassat (Mainline Route)
Transit Development Plan Major Update | Route Recommendation Profiles
690
54 - Philips/Gran Bay (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
691
54 - Philips/Gran Bay (Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
692
80 - NAS Shuttle (Limited Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
693
80 - NAS Shuttle (Limited Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
694
81 - Dinsmore Shuttle (Limited Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
695
81 - Dinsmore Shuttle (Limited Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
696
82 - Amazon Shuttle (Limited Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
697
82 - Amazon Shuttle (Limited Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
698
85 - Highlands/Busch Dr (Limited Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
699
85 - Highlands/Busch Dr (Limited Connector Route)
Transit Development Plan Major Update | Route Recommendation Profiles
700
102 - First Coast Flyer Green Line (First Coast Flyer)
Transit Development Plan Major Update | Route Recommendation Profiles
701
102 - First Coast Flyer Green Line (First Coast Flyer)
Transit Development Plan Major Update | Route Recommendation Profiles
702
105 - First Coast Flyer Orange Line (First Coast Flyer)
Transit Development Plan Major Update | Route Recommendation Profiles
703
105 - First Coast Flyer Orange Line (First Coast Flyer)
Transit Development Plan Major Update | Route Recommendation Profiles
704
107 - First Coast Flyer Blue Line (First Coast Flyer)
Transit Development Plan Major Update | Route Recommendation Profiles
705
107 - First Coast Flyer Blue Line (First Coast Flyer)
Transit Development Plan Major Update | Route Recommendation Profiles
706
109 - First Coast Flyer Red Line (First Coast Flyer)
Transit Development Plan Major Update | Route Recommendation Profiles
707
109 - First Coast Flyer Red Line (First Coast Flyer)
Transit Development Plan Major Update | Route Recommendation Profiles
708
200 - Mandarin Express (Express Route)
Transit Development Plan Major Update | Route Recommendation Profiles
709
200 - Mandarin Express (Express Route)
Transit Development Plan Major Update | Route Recommendation Profiles
710
202 - Mayport Express (Express Route)
Transit Development Plan Major Update | Route Recommendation Profiles
711
202 - Mayport Express (Express Route)
Transit Development Plan Major Update | Route Recommendation Profiles
712
206 - Airport Express (Express Route)
Transit Development Plan Major Update | Route Recommendation Profiles
713
206 - Airport Express (Express Route)
Transit Development Plan Major Update | Route Recommendation Profiles
714
800 - Nassau Express Select (Express Select Route)
Transit Development Plan Major Update | Route Recommendation Profiles
715
800 - Nassau Express Select (Express Select Route)
Transit Development Plan Major Update | Route Recommendation Profiles
716
801 - St. John's Express Select (Express Select Route)
Transit Development Plan Major Update | Route Recommendation Profiles
717
801 - St. John's Express Select (Express Select Route)
Transit Development Plan Major Update | Route Recommendation Profiles
718
802 - Baker Express Select (Express Select Route)
Transit Development Plan Major Update | Route Recommendation Profiles
719
802 - Baker Express Select (Express Select Route)
Transit Development Plan Major Update | Route Recommendation Profiles
720
803 - Clay Express Select (Express Select Route)
Transit Development Plan Major Update | Route Recommendation Profiles
721
803 - Clay Express Select (Express Select Route)
Transit Development Plan Major Update | Route Recommendation Profiles
722
CCT Red (Clay Community Transportation Route)
Transit Development Plan Major Update | Route Recommendation Profiles
723
CCT Red (Clay Community Transportation Route)
Transit Development Plan Major Update | Route Recommendation Profiles
724
CCT Blue (Clay Community Transportation Route)
Transit Development Plan Major Update | Route Recommendation Profiles
725
CCT Blue (Clay Community Transportation Route)
Transit Development Plan Major Update | Route Recommendation Profiles
726
CCT Magenta (Clay Community Transportation Route)
Transit Development Plan Major Update | Route Recommendation Profiles
727
CCT Magenta (Clay Community Transportation Route)
Transit Development Plan Major Update | Route Recommendation Profiles
Description of Change
No changes proposed for the Southeast ReadiRide zone.
728
Southeast Zone (ReadiRide)
Transit Development Plan Major Update | Route Recommendation Profiles
Description of Change
No changes proposed for the Beaches ReadiRide zone.
729
Beaches Zone (ReadiRide)
Transit Development Plan Major Update | Route Recommendation Profiles
Description of Change
No changes proposed for the Highlands ReadiRide zone.
730
Highlands Zone (ReadiRide)
Transit Development Plan Major Update | Route Recommendation Profiles
Description of Change
No changes proposed for the Northside ReadiRide zone.
731
Northside Zone (ReadiRide)
Transit Development Plan Major Update | Route Recommendation Profiles
Description of Change
No changes proposed for the Ortega ReadiRide zone.
732
Ortega Zone (ReadiRide)
Transit Development Plan Major Update | Route Recommendation Profiles
Description of Change
This is a new ReadiRide zone between the Westside Industrial Park and
Lem Turner Road north and west of Soutel Drive.
Proposed ReadiRide zone would provide coverage to areas with fixed
route service proposed for elimination and provide connections to First
Coast Flyer Green and JTA’s Soutel Transit Hub.
733
Northwest Zone (ReadiRide)
Transit Development Plan Major Update | Route Recommendation Profiles
Description of Change
New ReadiRide zone bounded by Beach Boulevard to the north, Kernan
Boulevard to the west, and J Turner Butler Boulevard to the south,
extending east to the intracoastal waterway.
Proposed ReadiRide zone would provide coverage to areas with little fixed-
route service and connectivity to First Coast Flyer Red.
734
Eastside - South Zone (ReadiRide)
Transit Development Plan Major Update | Route Recommendation Profiles
Description of Change
New ReadiRide zone generally bounded by Old Middleburg Road to the
west, Collins Road to the north, the Roosevelt Boulevard/Park Avenue
interchange to the east, and the Clay County border to the south.
Proposed ReadiRide zone would provide coverage to areas with little
existing fixed route service and provide connections to First Coast Flyer
Orange when open.
735
Argyle Forest Zone (ReadiRide)
Transit Development Plan Major Update | Route Recommendation Profiles
Description of Change
New ReadiRide zone generally bounded by Atlantic Boulevard to the north,
I-295 and Huffman Boulevard to the west, Kernan Boulevard to the east,
and Beaches Boulevard to the south.
Proposed ReadiRide zone would provide coverage to areas with little
existing fixed route service and provide connections to First Coast Flyer
Red.
736
Sandalwood Zone (ReadiRide)
Transit Development Plan Major Update | Route Recommendation Profiles
Description of Change
New ReadiRide zone bounded by Atlantic Boulevard to the north, Beaches
Boulevard to the South, Kernan Boulevard to the west, and San Pablo
Road to the east, with service in the residential neighborhoods of Atlantic
Highlands and Holiday Harbors as well.
Proposed ReadiRide zone would provide coverage to areas with little
existing fixed route service and provide connections to First Coast Flyer
Red.
737
Golden Glades - The Woods Zone (ReadiRide)
Transit Development Plan Major Update | Route Recommendation Profiles
Description of Change
New ReadiRide zone generally bounded by I-295 to the east, the Ortega
River to the west, Gregory Drive to the north, and Morse Avenue to the
south.
Proposed ReadiRide zone would provide coverage to areas with little
existing fixed route service.
738
Jacksonville Heights Zone (ReadiRide)
Transit Development Plan Major Update | Route Recommendation Profiles
Description of Change
No changes proposed to the Arlington ReadiRide zone.
739
Arlington Zone (ReadiRide)
Transit Development Plan Major Update | Route Recommendation Profiles
Description of Change
No changes proposed to the Mandarin ReadiRide zone.
740
Mandarin Zone (ReadiRide)
Transit Development Plan Major Update | Route Recommendation Profiles
Description of Change
No changes proposed to the Southside ReadiRide zone.
741
Southside Zone (ReadiRide)
Transit Development Plan Major Update | Route Recommendation Profiles
Description of Change
New ReadiRide zone covering the Middleburg and Asbury Lake
communities.
Proposed ReadiRide zone would provide coverage to areas that previously
had CCT Red service and new areas without existing transit service.
742
Middleburg Zone (ReadiRide)
Transit Development Plan Major Update | Route Recommendation Profiles
Description of Change
New ReadiRide zone covering portions of the Orange Park and Fleming
Island communities.
Proposed ReadiRide zone would provide coverage to areas that previously
had CCT Red and Blue service and new areas without existing transit
service.
743
Fleming Island Zone (ReadiRide)
Transit Development Plan Major Update | Route Recommendation Profiles
Description of Change
New ReadiRide zone covering portions of the Oakleaf Plantation
community and commercial development along Challenger Drive.
Proposed ReadiRide zone would provide coverage to areas that did not
have existing transit service and would provide a connection to the CCT
Red route on Blanding Boulevard.
744
Oakleaf Plantation Zone (ReadiRide)
Transit Development Plan Major Update | TDP Financial Planning Tool
The TDP Financial Planning Tool is an Excel spreadsheet submitted separately to JTA.
745
JTA 2019 TDP Financial Planning Tool
About
Based on FDOT TDP Financial Planning Tool and JTA 2018 completed financial plan.
How It Works
- Years are JTA Fiscal Years (October-September).
- Cells outside the Print Area, hidden rows, other tabs listed as internal, and cell comments will be removed
prior to final transmission to JTA. These cells are for lookups and crosschecks primarily. Assumptions and
data sources will also be documented in the final report.
- Some service plan recommendations are implemented as net changes to a route (e.g., a short-run for
Route 17 as one recommendation on top of a Route 17 realignment recommendation) rather than as
replacement routes (e.g., a new Route 17 with both a realignment and a short turn). These net changes are
described with "Short Turn" or realignment in their name. This preserves flexibility to accommodate client
requests.
- Some service plan recommendations are not implemented but have a placeholder in the spreadsheet.
These include a Route 15 frequency increase- in the current phasing plan, the frequency increase is
implemented alongside the extension of select trips to Cecil Airport. This preserves flexibility to
accommodate client requests.
- Because ReadiRide and Paratransit services are expected to see growing passenger use over time and
costs are reflective of demand, the operating cost formulas in "Operating Cost Element" are customized to
reflect anticipated passenger growth alongside operating cost growth. For ADA service, a line-item for net
growth in ridership is used. For ReadiRide service, operating cost formulas are revised to reflect both cost
inflation and population growth to ensure that cost increases are only applicable to zones in operation in a
given year.
- Contact Wylie Timmerman for any additional details on tabs from Assumptions to Operating Cost Element.
- Contact Andrew Zalewski for capital costs and revenues and operating revenues.
Help/Questions
You may direct questions to:
Jessica Alvarez
Project Manager
Foursquare Integrated Transportation Planning
jalvarez@foursquareitp.com
746
Transit Development Plan Major Update | Assumptions
Table E-1
Capital and Operating Assumptions
Cost For
Assumption Notes/Source
2018
Fixed-Route Operating Cost per Revenue Hour $118.36 FY18 actual expenditures and revenue hours
Paratransit Operating Cost per Revenue Hour (Duval) $35.50 2019 Contract Cost
Paratransit Operating Cost per Revenue Hour (Clay) $35.03 2019 Contract Cost
Skyway Operating Cost per Revenue Hour $441.59 FY18 actual expenditures and revenue hours
ReadiRide Operating Cost per Revenue Mile $2.50 2019 Contract Cost
Express Select Operating Cost per Revenue Hour $42.00 2019 Contract Cost
Ferry Operating Cost per Revenue Hour $581.64 FY18 actual expenditures and revenue hours
Clay Community Transportation Cost per Revenue Hour $36.09 2019 Contract Cost
Gameday Xpress Cost per Revenue Hour $215.55 FY18 actual expenditures and revenue hours
Duval County Population Growth 0.92% Average annual growth rate for 2015-2020, Florida BEBR
Clay County Population Growth 2.38% Average annual growth rate for 2015-2020, Florida BEBR
Operating Costs Inflation Rate 3.00% 20-year cashflow analysis
BiAnnual Fare Increase Assumption 5.00%
Revenue per Passenger $1.32 Fare revenue divided by 2019 ridership
Capital Cost Inflation Rate 3.00% FDOT Construction Cost Index
747
Transit Development Plan Major Update | Project & Service Plan
748
Transit Development Plan Major Update | Project & Service Plan
Planned Services
FCF Orange Implement Southwest BRT Service in late 2020 10 - 15 30 30 129 64 58 1797 871 735 255 52 58 39,545 546,240 $4,680,507
Eliminate service to Amtrak and move short turn to
Route #3 15 - 30 30 - 60 30 - 60 124 61 53 1630 873 710 255 52 58 37,871 502,298 $4,482,396
Soutel Hub.
Realign route to serve Amtrak and end service at the
Route #4 15 - 30 30 30 62 26 22 745 307 249 255 52 58 18,268 220,239 $2,162,242
Soutel Transit Hub.
Convert Route 5 to Underlying Service to Southwest
Route #20 60 60 60 46 44 40 661 581 534 255 52 58 16,386 229,639 $1,939,499
BRT in late 2020
Route #8 Eliminate service to UNF, adjust frequency 30 30 30 55 56 50 713 692 593 255 52 58 19,947 252,292 $2,360,950
Route #11 Extend route to serve Gateway Plaza. 30 60 60 57 29 34 565 312 292 255 52 58 18,098 177,330 $2,142,091
Route #12 Extend route to serve Soutel Transit Hub. 30 60 60 53 26 20 625 328 277 255 52 58 15,892 192,562 $1,881,036
Route #16 Short-Turn Increase frequency on short-turn (net increase) 15 - 30 30 - 60 30 - 60 30 14 12 358 173 148 255 52 58 9,072 108,716 $1,073,803
Route #17 Short-Turn Increase frequency on short-turn (net increase) 15 - 30 30 - 60 30 - 60 28 14 11 381 194 152 255 52 58 8,444 116,117 $999,461
Route #17 Realignment Realign route to serve Old Kings Road South 30 60 60 73 36 31 1007 512 444 255 52 58 22,422 309,118 $2,653,922
Route #19 Extend route to serve Kona Avenue 30 45 45 89 60 50 1182 867 709 255 52 58 28,629 387,716 $3,388,489
Route #21 Realign route and increase span 60 60 60 17 14 14 167 159 138 255 52 58 5,959 58,808 $705,285
Route #22 Realign to Soutel Hub 60 60 60 26 26 23 333 303 272 255 52 58 9,406 116,398 $1,113,323
Route #23 Realign route 60 60 60 62 58 50 959 895 766 255 52 58 21,644 335,482 $2,561,754
Route #24 Extend route 60 60 60 19 24 16 320 299 235 255 52 58 6,984 110,734 $826,576
Route #25 Realign Route 60 60 60 27 28 25 358 358 326 255 52 58 9,813 128,931 $1,161,457
749
Transit Development Plan Major Update | Project & Service Plan
Route #27 Increase Span of Service 60 60 60 34 32 28 485 454 401 255 52 58 11,850 170,653 $1,402,512
Route #28 Extend to FSCJ South, realign 30 60 60 60 61 50 667 667 547 255 52 58 21,463 236,342 $2,540,380
Route #31 Extend to Edward Waters 60 60 -- 18 14 0 124 124 0 255 52 58 5,457 38,191 $645,935
Route #32 Realign to Paxon School 60 60 -- 14 18 0 156 156 0 255 52 58 4,460 47,861 $527,901
Route #33 Extend to Southpoint/Belfort Road 60 60 -- 15 19 0 335 286 0 255 52 58 4,844 100,358 $573,329
Route #50 Eliminate 50B, increase frequency 15 30 30 87 53 39 1189 647 525 255 52 58 27,089 367,235 $3,206,266
Route #51 Increase frequency on short-turn (net increase) 15 - 30 30 - 60 30 - 60 30 15 12 393 204 167 255 52 58 9,059 120,547 $1,072,184
Route #53 Extend hourly to Cecil area, replacing Route 30 30 - 60 60 60 92 53 35 1320 831 533 255 52 58 28,327 410,731 $3,352,761
Route #80 Realign to 103rd Street 60 60 -- 9 0 0 180 0 0 255 52 58 2,187 45,849 $258,809
Route #82 Extend span, extend alignment (net increase) 10 10 10 3 3 3 62 62 62 255 52 58 949 22,740 $112,324
Route #85 Realign to FSCJ North 45 45 -- 14 16 0 164 164 0 255 52 58 4,462 50,195 $528,074
Route #200 Increase span and frequency 60 -- -- 25 0 0 438 0 0 255 52 58 6,269 111,563 $742,021
Route #202 Extend to downtown, increase span and frequency 60 -- -- 28 25 0 461 458 0 255 52 58 8,375 141,223 $991,216
Route #206 New fixed route service 30 -- -- 27 0 0 474 0 0 255 52 58 6,762 120,743 $800,395
750
Transit Development Plan Major Update | Project & Service Plan
Skyway Enhancements to the service pending analysis NA NA NA N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A.
ADA Paratransit Service (Clay County) Additional Costs of Paratransit Service in Clay County NA NA NA 192 88 64 3,357 1,533 1,113 255 52 0 53,654 935,800 $1,879,713
751
Transit Development Plan Major Update | Implementation Plan
Annual
Implementation
Service Type/Mode Description End Year Operating 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
Year
Cost
2018
Maintain Existing Fixed Route
Route #1 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $4,349,838 Yes No No No No No No No No No No
Route #3 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $3,924,754 Yes No No No No No No No No No No
Route #4 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $1,928,913 Yes No No No No No No No No No No
Route #5 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $4,743,646 Yes No No No No No No No No No No
Route #8 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $5,124,625 Yes No No No No No No No No No No
Route #10 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $2,897,551 Yes No No No No No No No No No No
Route #11 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $1,018,480 Yes No No No No No No No No No No
Route #12 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $1,732,855 Yes No No No No No No No No No No
Route #13 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $2,610,304 Yes No No No No No No No No No No
Route #14 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $1,624,643 Yes No No No No No No No No No No
Route #15 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $2,231,161 Yes No No No No No No No No No No
Route #16 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $2,154,156 Yes No No No No No No No No No No
Route #17 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $2,323,038 Yes No No No No No No No No No No
Route #18 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $2,279,665 Yes No No No No No No No No No No
Route #19 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $2,791,390 Yes No No No No No No No No No No
Route #21 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $643,947 Yes No No No No No No No No No No
Route #22 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $1,141,637 Yes No No No No No No No No No No
Route #23 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $2,461,018 Yes No No No No No No No No No No
Route #24 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $568,377 Yes No No No No No No No No No No
Route #25 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $1,307,454 Yes No No No No No No No No No No
Route #26 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $1,075,042 Yes No No No No No No No No No No
Route #27 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $1,248,461 Yes No No No No No No No No No No
Route #28 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $1,391,839 Yes No No No No No No No No No No
Route #30 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $492,871 Yes No No No No No No No No No No
Route #31 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $353,938 Yes No No No No No No No No No No
Route #32 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $629,782 Yes No No No No No No No No No No
Route #33 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $493,374 Yes No No No No No No No No No No
Route #50 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $3,791,651 Yes No No No No No No No No No No
Route #51 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $2,138,568 Yes No No No No No No No No No No
Route #53 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $2,575,948 Yes No No No No No No No No No No
Route #80 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $73,945 Yes No No No No No No No No No No
Route #81 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $141,864 Yes No No No No No No No No No No
Route #82 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $224,588 Yes No No No No No No No No No No
Route #83 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $165,605 Yes No No No No No No No No No No
Route #84 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $176,025 Yes No No No No No No No No No No
Route #85 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $476,867 Yes No No No No No No No No No No
Route #86 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $153,622 Yes No No No No No No No No No No
Route #200 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $130,788 Yes No No No No No No No No No No
Route #201 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $265,097 Yes No No No No No No No No No No
Route #202 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $341,924 Yes No No No No No No No No No No
Route #205 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $61,873 Yes No No No No No No No No No No
BLUE Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $4,713,371 Yes No No No No No No No No No No
GREEN Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $3,653,045 Yes No No No No No No No No No No
RED Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $6,247,413 Yes No No No No No No No No No No
752
Transit Development Plan Major Update | Implementation Plan
Annual
Implementation
Service Type/Mode Description End Year Operating 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
Year
Cost
2018
Existing
Maintain Other Fixed Route
Existing Services
ADA Paratransit Service (Duval County) Maintain Existing ADA Paratransit Service 2019 $8,419,720 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Skyway Maintain Existing Fixed Guideway Service 2019 $7,094,143 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Gameday Xpress Maintain Existing Fixed Route Service 2019 $402,536 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
St Johns Ferry Maintain Existing Ferry Service 2019 $2,896,858 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
CCT Red Maintain Existing Service 2019 2022 $127,590 Yes Yes Yes Yes No No No No No No No
CCT Blue Maintain Existing Service 2019 2022 $188,485 Yes Yes Yes Yes No No No No No No No
Nassau Express Maintain Existing Fixed Route Service (w/ Rosa Parks) 2019 2019 $89,964 Yes No No No No No No No No No No
ReadiRide Southeast Zone Maintain Existing ReadiRide Zone 2019 $36,748 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
ReadiRide Beaches Zone Maintain Existing ReadiRide Zone 2019 $45,542 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
ReadiRide Highlands Zone Maintain Existing ReadiRide Zone 2019 $51,424 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
ReadiRide Northside Zone Maintain Existing ReadiRide Zone 2019 $7,457 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
ReadiRide Ortega Zone Maintain Existing ReadiRide Zone 2019 $42,654 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
ReadiRide Mandarin Zone Maintain Existing ReadiRide Zone 2019 $76,038 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
ReadiRide Southside Zone Maintain Existing ReadiRide Zone 2019 $62,297 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
ReadiRide Arlington Zone Maintain Existing ReadiRide Zone 2019 $56,462 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
753
Transit Development Plan Major Update | Implementation Plan
Annual
Implementation
Service Type/Mode Description End Year Operating 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
Year
Cost
2018
Maintain
Route #53Existing Fixed Route Extend hourly to Cecil area, replacing Route 30 2021 $3,352,761 No No Yes Yes Yes Yes Yes Yes Yes Yes Yes
Route #80 Realign to 103rd Street 2021 $258,809 No No Yes Yes Yes Yes Yes Yes Yes Yes Yes
Route #82 Extend span, extend alignment (net increase) 2024 $112,324 No No No No No Yes Yes Yes Yes Yes Yes
Route #54 Extend and provide all-day service, replacing existing 84 2024 $789,182 No No No No No Yes Yes Yes Yes Yes Yes
Route #85 Realign to FSCJ North 2024 $528,074 No No No No No Yes Yes Yes Yes Yes Yes
Route #200 Increase span and frequency 2025 $742,021 No No No No No No Yes Yes Yes Yes Yes
Route #202 Extend to downtown, increase span and frequency 2022 $991,216 No No No Yes Yes Yes Yes Yes Yes Yes Yes
Realign to serve Art Museum Drive, replacing existing
Route #29 2023 $1,863,564 No No No No Yes Yes Yes Yes Yes Yes Yes
205
Route #206 New fixed route service 2024 $800,395 No No No No No Yes Yes Yes Yes Yes Yes
CCT Red Modify service 2023 $274,511 No No No No Yes Yes Yes Yes Yes Yes Yes
CCT Blue Modify service 2023 $357,638 No No No No Yes Yes Yes Yes Yes Yes Yes
ReadiRide Northwest Zone Implement New ReadiRide Zone 2020 $46,688 No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
ReadiRide Eastside - South Zone Implement New ReadiRide Zone 2023 $61,230 No No No No Yes Yes Yes Yes Yes Yes Yes
ReadiRide Argyle Forest Zone Implement New ReadiRide Zone 2023 $45,216 No No No No Yes Yes Yes Yes Yes Yes Yes
ReadiRide Sandalwood Zone Implement New ReadiRide Zone 2023 $27,158 No No No No Yes Yes Yes Yes Yes Yes Yes
ReadiRide Golden Glades - The Woods Zone Implement New ReadiRide Zone 2023 $45,640 No No No No Yes Yes Yes Yes Yes Yes Yes
ReadiRide Jacksonville Heights Zone Implement New ReadiRide Zone 2021 $29,330 No No Yes Yes Yes Yes Yes Yes Yes Yes Yes
ReadiRide Middleburg Zone Implement New ReadiRide Zone 2023 $53,419 No No No No Yes Yes Yes Yes Yes Yes Yes
ReadiRide Fleming Island Zone Implement New ReadiRide Zone 2023 $60,508 No No No No Yes Yes Yes Yes Yes Yes Yes
ReadiRide Oakleaf Plantation Zone Implement New ReadiRide Zone 2023 $34,060 No No No No Yes Yes Yes Yes Yes Yes Yes
St. Johns Express Select Implement New Fixed Route Service 2020 $59,976 No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Clay Express Select Implement New Fixed Route Service 2021 $139,230 No No Yes Yes Yes Yes Yes Yes Yes Yes Yes
Baker Express Select Implement New Fixed Route Service 2020 $94,248 No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Route #1 Maintain Existing Fixed Route Service (w/ JRTC) 2020 $4,799,655 No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Route #3 Maintain Existing Fixed Route Service (w/ JRTC) $4,453,353 No No No No No No No No No No No
Route #4 Maintain Existing Fixed Route Service (w/ JRTC) $2,071,434 No No No No No No No No No No No
Route #5 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2020 $4,283,054 No Yes No No No No No No No No No
Route #8 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2022 $5,032,850 No Yes Yes Yes No No No No No No No
Route #10 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2021 $3,079,968 No Yes Yes No No No No No No No No
Route #11 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2021 $1,101,574 No Yes Yes No No No No No No No No
Route #12 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2021 $1,579,849 No Yes Yes No No No No No No No No
Route #13 Maintain Existing Fixed Route Service (w/ JRTC) 2020 $2,605,583 No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Route #14 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2028 $1,330,552 No Yes Yes Yes Yes Yes Yes Yes Yes Yes No
Route #15 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2028 $1,943,509 No Yes Yes Yes Yes Yes Yes Yes Yes Yes No
Route #16 Maintain Existing Fixed Route Service (w/ JRTC) 2020 $2,098,664 No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Route #17 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2024 $2,273,695 No Yes Yes Yes Yes Yes No No No No No
Route #18 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2021 $2,347,351 No Yes Yes No No No No No No No No
Route #19 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2021 $3,011,741 No Yes Yes No No No No No No No No
Route #21 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2021 $730,370 No Yes Yes No No No No No No No No
Route #22 Maintain Existing Fixed Route Service (w/ JRTC) $1,204,175 No No No No No No No No No No No
Route #23 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2021 $2,461,018 No Yes Yes No No No No No No No No
Route #24 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2022 $568,377 No Yes Yes Yes No No No No No No No
Route #25 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2022 $1,274,148 No Yes Yes Yes No No No No No No No
Route #26 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2026 $1,075,042 No Yes Yes Yes Yes Yes Yes Yes No No No
Route #27 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2022 $1,248,461 No Yes Yes Yes No No No No No No No
Route #28 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2022 $1,391,839 No Yes Yes Yes No No No No No No No
754
Transit Development Plan Major Update | Implementation Plan
Annual
Implementation
Service Type/Mode Description End Year Operating 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
Year
Cost
2018
Maintain
Route #30Existing Fixed Route Maintain Existing Fixed Route Service (w/ JRTC) 2020 2020 $492,871 No Yes No No No No No No No No No
Route #31 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2021 $383,831 No Yes Yes No No No No No No No No
Route #32 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2021 $599,335 No Yes Yes No No No No No No No No
Route #33 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2022 $508,315 No Yes Yes Yes No No No No No No No
Route #50 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2024 $3,791,651 No Yes Yes Yes Yes Yes No No No No No
Route #51 Maintain Existing Fixed Route Service (w/ JRTC) 2020 $2,138,568 No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Route #53 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2020 $2,571,574 No Yes No No No No No No No No No
Route #80 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2020 $71,305 No Yes No No No No No No No No No
Route #81 Maintain Existing Fixed Route Service (w/ JRTC) 2020 $141,864 No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Route #82 Maintain Existing Fixed Route Service (w/ JRTC) 2020 $224,588 No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Route #83 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2020 $165,605 No Yes No No No No No No No No No
Route #84 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2023 $176,025 No Yes Yes Yes Yes No No No No No No
Route #85 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2023 $476,867 No Yes Yes Yes Yes No No No No No No
Route #86 Maintain Existing Fixed Route Service (w/ JRTC) $169,624 No No No No No No No No No No No
Route #200 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2024 $141,464 No Yes Yes Yes Yes Yes No No No No No
Route #201 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2020 $278,486 No Yes No No No No No No No No No
Route #202 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2021 $341,924 No Yes Yes No No No No No No No No
Route #205 Maintain Existing Fixed Route Service (w/ JRTC) 2020 2022 $67,497 No Yes Yes Yes No No No No No No No
BLUE Maintain Existing Fixed Route Service (w/ JRTC) 2020 $4,557,982 No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
GREEN Maintain Existing Fixed Route Service (w/ JRTC) 2020 $3,871,869 No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
RED Maintain Existing Fixed Route Service (w/ JRTC) 2020 $6,614,432 No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Nassau Express Maintain Existing Fixed Route Service (w/ JRTC) 2020 $77,112 No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
CCT Magenta Maintain Existing Fixed Route Service (w/ JRTC) 2020 $62,828 No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Route #28 Frequency Increase Increase Weekday Frequency on Extended Alignment 2025 $1,612,461 No No No No No No Yes Yes Yes Yes Yes
St. Johns Express Select Additional Trips Introduce midday service and extend peak hours 2024 $59,976 No No No No No Yes Yes Yes Yes Yes Yes
755
Transit Development Plan Major Update | Operating Cost Element
Annual Operating
Description 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Total
Service Type/Mode Cost
2018$
Maintain Existing Fixed Route $78,874,954 $81,241,202 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #1 Maintain Existing Fixed Route Service (w/ Rosa Parks) $4,349,838 $4,480,334 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #3 Maintain Existing Fixed Route Service (w/ Rosa Parks) $3,924,754 $4,042,497 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #4 Maintain Existing Fixed Route Service (w/ Rosa Parks) $1,928,913 $1,986,780 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #5 Maintain Existing Fixed Route Service (w/ Rosa Parks) $4,743,646 $4,885,955 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #8 Maintain Existing Fixed Route Service (w/ Rosa Parks) $5,124,625 $5,278,364 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #10 Maintain Existing Fixed Route Service (w/ Rosa Parks) $2,897,551 $2,984,478 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #11 Maintain Existing Fixed Route Service (w/ Rosa Parks) $1,018,480 $1,049,034 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #12 Maintain Existing Fixed Route Service (w/ Rosa Parks) $1,732,855 $1,784,841 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #13 Maintain Existing Fixed Route Service (w/ Rosa Parks) $2,610,304 $2,688,613 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #14 Maintain Existing Fixed Route Service (w/ Rosa Parks) $1,624,643 $1,673,382 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #15 Maintain Existing Fixed Route Service (w/ Rosa Parks) $2,231,161 $2,298,096 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #16 Maintain Existing Fixed Route Service (w/ Rosa Parks) $2,154,156 $2,218,781 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #17 Maintain Existing Fixed Route Service (w/ Rosa Parks) $2,323,038 $2,392,729 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #18 Maintain Existing Fixed Route Service (w/ Rosa Parks) $2,279,665 $2,348,055 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #19 Maintain Existing Fixed Route Service (w/ Rosa Parks) $2,791,390 $2,875,132 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #21 Maintain Existing Fixed Route Service (w/ Rosa Parks) $643,947 $663,266 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #22 Maintain Existing Fixed Route Service (w/ Rosa Parks) $1,141,637 $1,175,887 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #23 Maintain Existing Fixed Route Service (w/ Rosa Parks) $2,461,018 $2,534,849 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #24 Maintain Existing Fixed Route Service (w/ Rosa Parks) $568,377 $585,428 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #25 Maintain Existing Fixed Route Service (w/ Rosa Parks) $1,307,454 $1,346,677 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #26 Maintain Existing Fixed Route Service (w/ Rosa Parks) $1,075,042 $1,107,293 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #27 Maintain Existing Fixed Route Service (w/ Rosa Parks) $1,248,461 $1,285,915 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #28 Maintain Existing Fixed Route Service (w/ Rosa Parks) $1,391,839 $1,433,594 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #30 Maintain Existing Fixed Route Service (w/ Rosa Parks) $492,871 $507,657 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #31 Maintain Existing Fixed Route Service (w/ Rosa Parks) $353,938 $364,556 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #32 Maintain Existing Fixed Route Service (w/ Rosa Parks) $629,782 $648,675 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #33 Maintain Existing Fixed Route Service (w/ Rosa Parks) $493,374 $508,175 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #50 Maintain Existing Fixed Route Service (w/ Rosa Parks) $3,791,651 $3,905,400 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #51 Maintain Existing Fixed Route Service (w/ Rosa Parks) $2,138,568 $2,202,725 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #53 Maintain Existing Fixed Route Service (w/ Rosa Parks) $2,575,948 $2,653,226 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #80 Maintain Existing Fixed Route Service (w/ Rosa Parks) $73,945 $76,164 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #81 Maintain Existing Fixed Route Service (w/ Rosa Parks) $141,864 $146,120 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #82 Maintain Existing Fixed Route Service (w/ Rosa Parks) $224,588 $231,326 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #83 Maintain Existing Fixed Route Service (w/ Rosa Parks) $165,605 $170,574 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #84 Maintain Existing Fixed Route Service (w/ Rosa Parks) $176,025 $181,305 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #85 Maintain Existing Fixed Route Service (w/ Rosa Parks) $476,867 $491,173 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #86 Maintain Existing Fixed Route Service (w/ Rosa Parks) $153,622 $158,230 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #200 Maintain Existing Fixed Route Service (w/ Rosa Parks) $130,788 $134,711 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #201 Maintain Existing Fixed Route Service (w/ Rosa Parks) $265,097 $273,050 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #202 Maintain Existing Fixed Route Service (w/ Rosa Parks) $341,924 $352,182 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #205 Maintain Existing Fixed Route Service (w/ Rosa Parks) $61,873 $63,729 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
BLUE Maintain Existing Fixed Route Service (w/ Rosa Parks) $4,713,371 $4,854,773 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
GREEN Maintain Existing Fixed Route Service (w/ Rosa Parks) $3,653,045 $3,762,637 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
RED Maintain Existing Fixed Route Service (w/ Rosa Parks) $6,247,413 $6,434,835 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Maintain Other Existing Services $19,597,917 $20,265,878 $20,861,596 $21,573,914 $22,311,018 $22,707,369 $23,485,719 $24,291,256 $25,124,948 $25,987,797 $26,880,841 $27,805,156 $237,631,970
ADA Paratransit Service (Duval County) Maintain Existing ADA Paratransit Service $8,419,720 $8,752,334 $9,098,089 $9,457,502 $9,831,114 $10,219,485 $10,623,198 $11,042,859 $11,479,099 $11,932,573 $12,403,960 $12,893,969 $108,981,848
Skyway Maintain Existing Fixed Guideway Service $7,094,143 $7,306,968 $7,526,177 $7,751,962 $7,984,521 $8,224,056 $8,470,778 $8,724,902 $8,986,649 $9,256,248 $9,533,935 $9,819,954 $83,766,195
Gameday Xpress Maintain Existing Fixed Route Service $402,536 $414,612 $427,050 $439,862 $453,058 $466,650 $480,649 $495,069 $509,921 $525,218 $540,975 $557,204 $4,753,063
St Johns Ferry Maintain Existing Ferry Service $2,896,858 $2,983,764 $3,073,277 $3,165,475 $3,260,439 $3,358,252 $3,459,000 $3,562,770 $3,669,653 $3,779,743 $3,893,135 $4,009,929 $34,205,508
CCT Red Maintain Existing Service $127,590 $131,418 $135,360 $139,421 $143,603 $0 $0 $0 $0 $0 $0 $0 $549,802
CCT Blue Maintain Existing Service $188,485 $194,140 $199,964 $205,963 $212,141 $0 $0 $0 $0 $0 $0 $0 $812,207
Nassau Express Maintain Existing Fixed Route Service (w/ Rosa Parks) $89,964 $92,663 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $92,663
ReadiRide Southeast Zone Maintain Existing ReadiRide Zone $36,748 $37,851 $38,986 $40,156 $41,360 $42,601 $43,879 $45,196 $46,551 $47,948 $49,386 $50,868 $433,914
ReadiRide Beaches Zone Maintain Existing ReadiRide Zone $45,542 $46,908 $48,315 $49,765 $51,258 $52,795 $54,379 $56,011 $57,691 $59,422 $61,204 $63,040 $537,748
ReadiRide Highlands Zone Maintain Existing ReadiRide Zone $51,424 $52,966 $54,555 $56,192 $57,878 $59,614 $61,402 $63,244 $65,142 $67,096 $69,109 $71,182 $607,198
ReadiRide Northside Zone Maintain Existing ReadiRide Zone $7,457 $7,681 $7,911 $8,149 $8,393 $8,645 $8,904 $9,171 $9,447 $9,730 $10,022 $10,323 $88,054
ReadiRide Ortega Zone Maintain Existing ReadiRide Zone $42,654 $43,934 $45,252 $46,609 $48,008 $49,448 $50,931 $52,459 $54,033 $55,654 $57,323 $59,043 $503,650
ReadiRide Mandarin Zone Maintain Existing ReadiRide Zone $76,038 $78,320 $80,669 $83,089 $85,582 $88,149 $90,794 $93,518 $96,323 $99,213 $102,189 $105,255 $897,846
ReadiRide Southside Zone Maintain Existing ReadiRide Zone $62,297 $64,166 $66,091 $68,073 $70,115 $72,219 $74,385 $76,617 $78,916 $81,283 $83,722 $86,233 $735,586
ReadiRide Arlington Zone Maintain Existing ReadiRide Zone $56,462 $58,155 $59,900 $61,697 $63,548 $65,454 $67,418 $69,441 $71,524 $73,670 $75,880 $78,156 $666,687
756
Transit Development Plan Major Update | Operating Cost Element
Annual Operating
Description 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Total
Service Type/Mode Cost
2018$
New and Changed Services $152,701,241 $0 $84,822,173 $90,140,725 $94,584,443 $99,304,981 $104,246,544 $109,851,408 $114,515,659 $120,119,405 $125,075,472 $131,881,119 $984,926,213
FCF Orange Implement Southwest BRT Service in late 2020 $4,680,507 $0 $0 $5,114,516 $5,267,951 $5,425,990 $5,588,770 $5,756,433 $5,929,126 $6,107,000 $6,290,210 $6,478,916 $51,958,911
Eliminate service to Amtrak and move short turn to
Route #3 $4,482,396 $0 $4,755,374 $4,898,036 $5,044,977 $5,196,326 $5,352,216 $5,512,782 $5,678,166 $5,848,511 $6,023,966 $6,204,685 $54,515,037
Soutel Hub.
Realign route to serve Amtrak and end service at the
Route #4 $2,162,242 $0 $2,293,922 $2,362,740 $2,433,622 $2,506,631 $2,581,830 $2,659,285 $2,739,063 $2,821,235 $2,905,872 $2,993,049 $26,297,250
Soutel Transit Hub.
Convert Route 5 to Underlying Service to Southwest
Route #20 $1,939,499 $0 $0 $2,119,343 $2,182,923 $2,248,411 $2,315,863 $2,385,339 $2,456,899 $2,530,606 $2,606,525 $2,684,720 $21,530,630
BRT in late 2020
Route #8 Eliminate service to UNF, adjust frequency $2,360,950 $0 $0 $0 $0 $2,736,988 $2,819,098 $2,903,671 $2,990,781 $3,080,504 $3,172,920 $3,268,107 $20,972,069
Realign route onto Atlantic Boulevard, increase
Route #10 $4,338,054 $0 $0 $0 $4,882,518 $5,028,993 $5,179,863 $5,335,259 $5,495,317 $5,660,176 $5,829,981 $6,004,881 $43,416,988
frequency and span of service.
Route #11 Extend route to serve Gateway Plaza. $2,142,091 $0 $0 $0 $2,410,943 $2,483,271 $2,557,769 $2,634,502 $2,713,537 $2,794,943 $2,878,792 $2,965,156 $21,438,914
Route #12 Extend route to serve Soutel Transit Hub. $1,881,036 $0 $0 $0 $2,117,122 $2,180,636 $2,246,055 $2,313,437 $2,382,840 $2,454,325 $2,527,955 $2,603,793 $18,826,164
Extend route to FSCJ Kent Campus and eliminate
Route #14 $1,592,641 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,204,587 $2,204,587
service along Normandy Boulevard.
Route #15 Increase Frequency of Service $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Extend trips to Amazon with increased frequency of
Route #15 $3,880,207 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,371,114 $5,371,114
service
Route #16 Short-Turn Increase frequency on short-turn (net increase) $1,073,803 $0 $0 $0 $0 $0 $0 $0 $1,360,262 $1,401,070 $1,443,102 $1,486,395 $5,690,827
Route #17 Short-Turn Increase frequency on short-turn (net increase) $999,461 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,343,192 $1,383,487 $1,343,192
Route #17 Realignment Realign route to serve Old Kings Road South $2,653,922 $0 $0 $0 $0 $0 $0 $3,263,989 $3,361,908 $3,462,766 $3,566,649 $3,673,648 $13,655,312
Route #19 Extend route to serve Kona Avenue $3,388,489 $0 $0 $0 $3,813,774 $3,928,187 $4,046,033 $4,167,414 $4,292,436 $4,421,209 $4,553,845 $4,690,461 $29,222,898
Route #21 Realign route and increase span $705,285 $0 $0 $0 $793,805 $817,619 $842,148 $867,412 $893,434 $920,237 $947,845 $976,280 $6,082,500
Route #22 Realign to Soutel Hub $1,113,323 $0 $1,181,124 $1,216,558 $1,253,054 $1,290,646 $1,329,365 $1,369,246 $1,410,324 $1,452,633 $1,496,212 $1,541,099 $11,999,163
Route #23 Realign route $2,561,754 $0 $0 $0 $2,883,276 $2,969,775 $3,058,868 $3,150,634 $3,245,153 $3,342,507 $3,442,783 $3,546,066 $22,092,996
Route #24 Extend route $826,576 $0 $0 $0 $0 $958,228 $986,975 $1,016,585 $1,047,082 $1,078,495 $1,110,849 $1,144,175 $6,198,215
Route #25 Realign Route $1,161,457 $0 $0 $0 $0 $1,346,447 $1,386,841 $1,428,446 $1,471,299 $1,515,438 $1,560,901 $1,607,728 $8,709,372
Route #26 Extend route to connect with FCF Blue $1,657,872 $0 $0 $0 $0 $0 $0 $0 $0 $2,163,146 $2,228,041 $2,294,882 $4,391,187
Route #27 Increase Span of Service $1,402,512 $0 $0 $0 $0 $1,625,896 $1,674,673 $1,724,913 $1,776,660 $1,829,960 $1,884,859 $1,941,405 $10,516,960
Route #28 Extend to FSCJ South, realign $2,540,380 $0 $0 $0 $0 $2,944,996 $3,033,346 $3,124,346 $3,218,077 $3,314,619 $3,414,058 $3,516,479 $19,049,442
Route #31 Extend to Edward Waters $645,935 $0 $0 $0 $727,005 $748,815 $771,280 $794,418 $818,251 $842,798 $868,082 $894,125 $5,570,650
Route #32 Realign to Paxon School $527,901 $0 $0 $0 $594,157 $611,982 $630,341 $649,251 $668,729 $688,791 $709,454 $730,738 $4,552,705
Route #33 Extend to Southpoint/Belfort Road $573,329 $0 $0 $0 $0 $664,646 $684,585 $705,123 $726,276 $748,065 $770,507 $793,622 $4,299,201
Route #50 Eliminate 50B, increase frequency $3,206,266 $0 $0 $0 $0 $0 $0 $3,943,303 $4,061,602 $4,183,450 $4,308,954 $4,438,223 $16,497,310
Route #51 Increase frequency on short-turn (net increase) $1,072,184 $0 $0 $0 $0 $0 $0 $0 $0 $1,398,957 $1,440,926 $1,484,153 $2,839,882
Route #53 Extend hourly to Cecil area, replacing Route 30 $3,352,761 $0 $0 $3,663,653 $3,773,563 $3,886,769 $4,003,372 $4,123,474 $4,247,178 $4,374,593 $4,505,831 $4,641,006 $32,578,433
Route #80 Realign to 103rd Street $258,809 $0 $0 $282,808 $291,292 $300,030 $309,031 $318,302 $327,851 $337,687 $347,818 $358,252 $2,514,819
Route #82 Extend span, extend alignment (net increase) $112,324 $0 $0 $0 $0 $0 $134,120 $138,144 $142,288 $146,557 $150,954 $155,482 $712,063
Route #54 Extend and provide all-day service, replacing existing 84 $789,182 $0 $0 $0 $0 $0 $942,324 $970,594 $999,712 $1,029,703 $1,060,594 $1,092,412 $5,002,928
Route #85 Realign to FSCJ North $528,074 $0 $0 $0 $0 $0 $630,548 $649,465 $668,949 $689,017 $709,688 $730,978 $3,347,666
Route #200 Increase span and frequency $742,021 $0 $0 $0 $0 $0 $0 $912,592 $939,969 $968,169 $997,214 $1,027,130 $3,817,943
Route #202 Extend to downtown, increase span and frequency $991,216 $0 $0 $0 $1,115,623 $1,149,091 $1,183,564 $1,219,071 $1,255,643 $1,293,312 $1,332,112 $1,372,075 $8,548,417
Realign to serve Art Museum Drive, replacing existing
Route #29 $1,863,564 $0 $0 $0 $0 $2,160,381 $2,225,193 $2,291,949 $2,360,707 $2,431,528 $2,504,474 $2,579,608 $13,974,233
205
Route #206 New fixed route service $800,395 $0 $0 $0 $0 $0 $955,714 $984,385 $1,013,917 $1,044,334 $1,075,665 $1,107,934 $5,074,015
CCT Red Modify service $274,511 $0 $0 $0 $0 $318,234 $327,781 $337,614 $347,743 $358,175 $368,920 $379,988 $2,058,468
CCT Blue Modify service $357,638 $0 $0 $0 $0 $414,601 $427,039 $439,850 $453,045 $466,637 $480,636 $495,055 $2,681,807
ReadiRide Northwest Zone Implement New ReadiRide Zone $46,688 $0 $50,449 $52,442 $54,514 $56,667 $58,906 $61,233 $63,652 $66,167 $68,780 $71,498 $532,811
ReadiRide Eastside - South Zone Implement New ReadiRide Zone $61,230 $0 $0 $0 $0 $74,319 $77,255 $80,306 $83,479 $86,777 $90,205 $93,768 $492,340
ReadiRide Argyle Forest Zone Implement New ReadiRide Zone $45,216 $0 $0 $0 $0 $54,881 $57,050 $59,303 $61,646 $64,081 $66,613 $69,244 $363,574
ReadiRide Sandalwood Zone Implement New ReadiRide Zone $27,158 $0 $0 $0 $0 $32,963 $34,265 $35,618 $37,025 $38,488 $40,009 $41,589 $218,368
ReadiRide Golden Glades - The Woods Zone Implement New ReadiRide Zone $45,640 $0 $0 $0 $0 $55,396 $57,585 $59,860 $62,224 $64,682 $67,238 $69,894 $366,985
ReadiRide Jacksonville Heights Zone Implement New ReadiRide Zone $29,330 $0 $0 $32,945 $34,247 $35,600 $37,006 $38,468 $39,988 $41,567 $43,209 $44,916 $303,030
ReadiRide Middleburg Zone Implement New ReadiRide Zone $53,419 $0 $0 $0 $0 $69,662 $73,461 $77,467 $81,691 $86,146 $90,844 $95,798 $479,270
ReadiRide Fleming Island Zone Implement New ReadiRide Zone $60,508 $0 $0 $0 $0 $78,907 $83,210 $87,748 $92,533 $97,579 $102,900 $108,511 $542,876
ReadiRide Oakleaf Plantation Zone Implement New ReadiRide Zone $34,060 $0 $0 $0 $0 $44,416 $46,838 $49,393 $52,086 $54,927 $57,922 $61,081 $305,582
St. Johns Express Select Implement New Fixed Route Service $59,976 $0 $63,629 $65,537 $67,504 $69,529 $71,614 $73,763 $75,976 $78,255 $80,603 $83,021 $646,409
Clay Express Select Implement New Fixed Route Service $139,230 $0 $0 $152,140 $156,705 $161,406 $166,248 $171,235 $176,372 $181,664 $187,113 $192,727 $1,352,883
Baker Express Select Implement New Fixed Route Service $94,248 $0 $99,988 $102,987 $106,077 $109,259 $112,537 $115,913 $119,391 $122,972 $126,661 $130,461 $1,015,786
Route #1 Maintain Existing Fixed Route Service (w/ JRTC) $4,799,655 $0 $5,091,954 $5,244,713 $5,402,054 $5,564,116 $5,731,040 $5,902,971 $6,080,060 $6,262,462 $6,450,336 $6,643,846 $51,729,705
Route #3 Maintain Existing Fixed Route Service (w/ JRTC) $4,453,353 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #4 Maintain Existing Fixed Route Service (w/ JRTC) $2,071,434 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #5 Maintain Existing Fixed Route Service (w/ JRTC) $4,283,054 $0 $4,543,893 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,543,893
Route #8 Maintain Existing Fixed Route Service (w/ JRTC) $5,032,850 $0 $5,339,351 $5,499,531 $5,664,517 $0 $0 $0 $0 $0 $0 $0 $16,503,400
Route #10 Maintain Existing Fixed Route Service (w/ JRTC) $3,079,968 $0 $3,267,538 $3,365,564 $0 $0 $0 $0 $0 $0 $0 $0 $6,633,103
Route #11 Maintain Existing Fixed Route Service (w/ JRTC) $1,101,574 $0 $1,168,660 $1,203,720 $0 $0 $0 $0 $0 $0 $0 $0 $2,372,379
Route #12 Maintain Existing Fixed Route Service (w/ JRTC) $1,579,849 $0 $1,676,062 $1,726,344 $0 $0 $0 $0 $0 $0 $0 $0 $3,402,407
Route #13 Maintain Existing Fixed Route Service (w/ JRTC) $2,605,583 $0 $2,764,263 $2,847,191 $2,932,607 $3,020,585 $3,111,202 $3,204,538 $3,300,675 $3,399,695 $3,501,686 $3,606,736 $28,082,441
Route #14 Maintain Existing Fixed Route Service (w/ JRTC) $1,330,552 $0 $1,411,583 $1,453,930 $1,497,548 $1,542,475 $1,588,749 $1,636,411 $1,685,504 $1,736,069 $1,788,151 $0 $14,340,420
757
Transit Development Plan Major Update | Operating Cost Element
Annual Operating
Description 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Total
Service Type/Mode Cost
2018$
Route #15 Maintain Existing Fixed Route Service (w/ JRTC) $1,943,509 $0 $2,061,868 $2,123,724 $2,187,436 $2,253,059 $2,320,651 $2,390,271 $2,461,979 $2,535,838 $2,611,913 $0 $20,946,740
Route #16 Maintain Existing Fixed Route Service (w/ JRTC) $2,098,664 $0 $2,226,473 $2,293,267 $2,362,065 $2,432,927 $2,505,915 $2,581,092 $2,658,525 $2,738,281 $2,820,429 $2,905,042 $22,618,973
Route #17 Maintain Existing Fixed Route Service (w/ JRTC) $2,273,695 $0 $2,412,163 $2,484,527 $2,559,063 $2,635,835 $2,714,910 $0 $0 $0 $0 $0 $12,806,499
Route #18 Maintain Existing Fixed Route Service (w/ JRTC) $2,347,351 $0 $2,490,304 $2,565,013 $0 $0 $0 $0 $0 $0 $0 $0 $5,055,318
Route #19 Maintain Existing Fixed Route Service (w/ JRTC) $3,011,741 $0 $3,195,156 $3,291,010 $0 $0 $0 $0 $0 $0 $0 $0 $6,486,166
Route #21 Maintain Existing Fixed Route Service (w/ JRTC) $730,370 $0 $774,850 $798,095 $0 $0 $0 $0 $0 $0 $0 $0 $1,572,945
Route #22 Maintain Existing Fixed Route Service (w/ JRTC) $1,204,175 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #23 Maintain Existing Fixed Route Service (w/ JRTC) $2,461,018 $0 $2,610,894 $2,689,221 $0 $0 $0 $0 $0 $0 $0 $0 $5,300,115
Route #24 Maintain Existing Fixed Route Service (w/ JRTC) $568,377 $0 $602,991 $621,080 $639,713 $0 $0 $0 $0 $0 $0 $0 $1,863,784
Route #25 Maintain Existing Fixed Route Service (w/ JRTC) $1,274,148 $0 $1,351,744 $1,392,296 $1,434,065 $0 $0 $0 $0 $0 $0 $0 $4,178,105
Route #26 Maintain Existing Fixed Route Service (w/ JRTC) $1,075,042 $0 $1,140,512 $1,174,728 $1,209,969 $1,246,269 $1,283,657 $1,322,166 $1,361,831 $0 $0 $0 $8,739,132
Route #27 Maintain Existing Fixed Route Service (w/ JRTC) $1,248,461 $0 $1,324,493 $1,364,227 $1,405,154 $0 $0 $0 $0 $0 $0 $0 $4,093,874
Route #28 Maintain Existing Fixed Route Service (w/ JRTC) $1,391,839 $0 $1,476,602 $1,520,900 $1,566,527 $0 $0 $0 $0 $0 $0 $0 $4,564,028
Route #30 Maintain Existing Fixed Route Service (w/ JRTC) $492,871 $0 $522,887 $0 $0 $0 $0 $0 $0 $0 $0 $0 $522,887
Route #31 Maintain Existing Fixed Route Service (w/ JRTC) $383,831 $0 $407,207 $419,423 $0 $0 $0 $0 $0 $0 $0 $0 $826,629
Route #32 Maintain Existing Fixed Route Service (w/ JRTC) $599,335 $0 $635,834 $654,909 $0 $0 $0 $0 $0 $0 $0 $0 $1,290,744
Route #33 Maintain Existing Fixed Route Service (w/ JRTC) $508,315 $0 $539,272 $555,450 $572,113 $0 $0 $0 $0 $0 $0 $0 $1,666,835
Route #50 Maintain Existing Fixed Route Service (w/ JRTC) $3,791,651 $0 $4,022,562 $4,143,239 $4,267,536 $4,395,562 $4,527,429 $0 $0 $0 $0 $0 $21,356,330
Route #51 Maintain Existing Fixed Route Service (w/ JRTC) $2,138,568 $0 $2,268,807 $2,336,871 $2,406,977 $2,479,186 $2,553,562 $2,630,169 $2,709,074 $2,790,346 $2,874,056 $2,960,278 $23,049,048
Route #53 Maintain Existing Fixed Route Service (w/ JRTC) $2,571,574 $0 $2,728,183 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,728,183
Route #80 Maintain Existing Fixed Route Service (w/ JRTC) $71,305 $0 $75,647 $0 $0 $0 $0 $0 $0 $0 $0 $0 $75,647
Route #81 Maintain Existing Fixed Route Service (w/ JRTC) $141,864 $0 $150,504 $155,019 $159,670 $164,460 $169,393 $174,475 $179,709 $185,101 $190,654 $196,373 $1,528,985
Route #82 Maintain Existing Fixed Route Service (w/ JRTC) $224,588 $0 $238,266 $245,413 $252,776 $260,359 $268,170 $276,215 $284,501 $293,037 $301,828 $310,882 $2,420,565
Route #83 Maintain Existing Fixed Route Service (w/ JRTC) $165,605 $0 $175,691 $0 $0 $0 $0 $0 $0 $0 $0 $0 $175,691
Route #84 Maintain Existing Fixed Route Service (w/ JRTC) $176,025 $0 $186,745 $192,347 $198,117 $204,061 $0 $0 $0 $0 $0 $0 $781,270
Route #85 Maintain Existing Fixed Route Service (w/ JRTC) $476,867 $0 $505,908 $521,085 $536,718 $552,820 $0 $0 $0 $0 $0 $0 $2,116,531
Route #86 Maintain Existing Fixed Route Service (w/ JRTC) $169,624 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Route #200 Maintain Existing Fixed Route Service (w/ JRTC) $141,464 $0 $150,080 $154,582 $159,219 $163,996 $168,916 $0 $0 $0 $0 $0 $796,793
Route #201 Maintain Existing Fixed Route Service (w/ JRTC) $278,486 $0 $295,445 $0 $0 $0 $0 $0 $0 $0 $0 $0 $295,445
Route #202 Maintain Existing Fixed Route Service (w/ JRTC) $341,924 $0 $362,747 $373,630 $0 $0 $0 $0 $0 $0 $0 $0 $736,377
Route #205 Maintain Existing Fixed Route Service (w/ JRTC) $67,497 $0 $71,608 $73,756 $75,969 $0 $0 $0 $0 $0 $0 $0 $221,333
BLUE Maintain Existing Fixed Route Service (w/ JRTC) $4,557,982 $0 $4,835,563 $4,980,630 $5,130,049 $5,283,950 $5,442,469 $5,605,743 $5,773,915 $5,947,133 $6,125,547 $6,309,313 $49,124,999
GREEN Maintain Existing Fixed Route Service (w/ JRTC) $3,871,869 $0 $4,107,666 $4,230,896 $4,357,823 $4,488,558 $4,623,214 $4,761,911 $4,904,768 $5,051,911 $5,203,468 $5,359,572 $41,730,215
RED Maintain Existing Fixed Route Service (w/ JRTC) $6,614,432 $0 $7,017,250 $7,227,768 $7,444,601 $7,667,939 $7,897,977 $8,134,917 $8,378,964 $8,630,333 $8,889,243 $9,155,920 $71,288,992
Nassau Express Maintain Existing Fixed Route Service (w/ JRTC) $77,112 $0 $81,808 $84,262 $86,790 $89,394 $92,076 $94,838 $97,683 $100,614 $103,632 $106,741 $831,097
CCT Magenta Maintain Existing Fixed Route Service (w/ JRTC) $62,828 $0 $66,655 $68,654 $70,714 $72,835 $75,020 $77,271 $79,589 $81,977 $84,436 $86,969 $677,151
Route #28 Frequency Increase Increase Weekday Frequency on Extended Alignment $1,612,461 $0 $0 $0 $0 $0 $0 $1,983,123 $2,042,617 $2,103,895 $2,167,012 $2,232,023 $8,296,647
St. Johns Express Select Additional Trips Introduce midday service and extend peak hours $59,976 $0 $0 $0 $0 $0 $71,614 $73,763 $75,976 $78,255 $80,603 $83,021 $380,211
Other Service Improvements $1,879,713 $1,982,220 $2,090,316 $2,204,306 $2,324,513 $2,451,276 $2,584,951 $2,725,915 $2,874,567 $3,031,325 $3,196,632 $3,370,953 $26,854,754
Skyway Enhancements to the service pending analysis
ADA Paratransit Service (Clay County) Additional Costs of Paratransit Service in Clay County $1,879,713 $1,982,220 $2,090,316 $2,204,306 $2,324,513 $2,451,276 $2,584,951 $2,725,915 $2,874,567 $3,031,325 $3,196,632 $3,370,953 $25,466,021
TDP Proposal
Projected Annual Operating Costs - Existing Service $98,472,871 $101,507,080 $20,861,596 $21,573,914 $22,311,018 $22,707,369 $23,485,719 $24,291,256 $25,124,948 $25,987,797 $26,880,841 $27,805,156 $314,731,537
Projected Annual Operating Costs - Additional New Service $154,580,955 $1,982,220 $86,912,488 $92,345,031 $96,908,956 $101,756,257 $106,831,495 $112,577,323 $117,390,226 $123,150,731 $128,272,104 $135,252,073 $968,126,832
Projected Annual Operating Costs $253,053,826 $103,489,300 $107,774,084 $113,918,946 $119,219,975 $124,463,626 $130,317,214 $136,868,579 $142,515,174 $149,138,527 $155,152,945 $163,057,229 $1,282,858,369
758
Transit Development Plan Major Update | Ridership by Year
Description TBEST Ridership Output Days of Service 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
Annual
Service Type/Mode (Observed 1 2 3 4 5 6 7 8 9 10 11
Weekday Saturday Sunday Weekday Saturday Sunday Ridership
Ridership)
Route #1 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2,616 1,408 866 255 52 58 790,524 790,524 790,524 0 0 0 0 0 0 0 0 0 0
Route #3 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2,696 1,243 821 255 52 58 799,734 799,734 799,734 0 0 0 0 0 0 0 0 0 0
Route #4 Maintain Existing Fixed Route Service (w/ Rosa Parks) 1,165 481 299 255 52 58 339,429 339,429 339,429 0 0 0 0 0 0 0 0 0 0
Route #5 Maintain Existing Fixed Route Service (w/ Rosa Parks) 2,430 1,317 753 255 52 58 731,808 731,808 731,808 0 0 0 0 0 0 0 0 0 0
Route #8 Maintain Existing Fixed Route Service (w/ Rosa Parks) 1,972 928 694 255 52 58 591,368 591,368 591,368 0 0 0 0 0 0 0 0 0 0
Route #10 Maintain Existing Fixed Route Service (w/ Rosa Parks) 1,513 1,073 738 255 52 58 484,415 484,415 484,415 0 0 0 0 0 0 0 0 0 0
Route #11 Maintain Existing Fixed Route Service (w/ Rosa Parks) 674 298 227 255 52 58 200,532 200,532 200,532 0 0 0 0 0 0 0 0 0 0
Route #12 Maintain Existing Fixed Route Service (w/ Rosa Parks) 876 410 269 255 52 58 260,302 260,302 260,302 0 0 0 0 0 0 0 0 0 0
Route #13 Maintain Existing Fixed Route Service (w/ Rosa Parks) 1,444 687 434 255 52 58 429,116 429,116 429,116 0 0 0 0 0 0 0 0 0 0
Route #14 Maintain Existing Fixed Route Service (w/ Rosa Parks) 796 438 278 255 52 58 241,880 241,880 241,880 0 0 0 0 0 0 0 0 0 0
Route #15 Maintain Existing Fixed Route Service (w/ Rosa Parks) 1,020 598 334 255 52 58 310,568 310,568 310,568 0 0 0 0 0 0 0 0 0 0
Route #16 Maintain Existing Fixed Route Service (w/ Rosa Parks) 930 415 246 255 52 58 272,998 272,998 272,998 0 0 0 0 0 0 0 0 0 0
Route #17 Maintain Existing Fixed Route Service (w/ Rosa Parks) 1,119 540 334 255 52 58 332,797 332,797 332,797 0 0 0 0 0 0 0 0 0 0
Route #18 Maintain Existing Fixed Route Service (w/ Rosa Parks) 1,043 528 359 255 52 58 314,243 314,243 314,243 0 0 0 0 0 0 0 0 0 0
Route #19 Maintain Existing Fixed Route Service (w/ Rosa Parks) 1,804 957 655 255 52 58 547,774 547,774 547,774 0 0 0 0 0 0 0 0 0 0
Route #21 Maintain Existing Fixed Route Service (w/ Rosa Parks) 329 195 145 255 52 58 102,445 102,445 102,445 0 0 0 0 0 0 0 0 0 0
Route #22 Maintain Existing Fixed Route Service (w/ Rosa Parks) 551 393 274 255 52 58 176,833 176,833 176,833 0 0 0 0 0 0 0 0 0 0
Route #23 Maintain Existing Fixed Route Service (w/ Rosa Parks) 701 405 278 255 52 58 215,939 215,939 215,939 0 0 0 0 0 0 0 0 0 0
Route #24 Maintain Existing Fixed Route Service (w/ Rosa Parks) 218 163 88 255 52 58 69,170 69,170 69,170 0 0 0 0 0 0 0 0 0 0
Route #25 Maintain Existing Fixed Route Service (w/ Rosa Parks) 438 226 192 255 52 58 134,578 134,578 134,578 0 0 0 0 0 0 0 0 0 0
Route #26 Maintain Existing Fixed Route Service (w/ Rosa Parks) 67 32 20 255 52 58 19,909 19,909 19,909 0 0 0 0 0 0 0 0 0 0
Route #27 Maintain Existing Fixed Route Service (w/ Rosa Parks) 399 165 97 255 52 58 115,951 115,951 115,951 0 0 0 0 0 0 0 0 0 0
Route #28 Maintain Existing Fixed Route Service (w/ Rosa Parks) 171 92 54 255 52 58 51,521 51,521 51,521 0 0 0 0 0 0 0 0 0 0
Route #30 Maintain Existing Fixed Route Service (w/ Rosa Parks) 142 71 0 255 52 58 39,902 39,902 39,902 0 0 0 0 0 0 0 0 0 0
Route #31 Maintain Existing Fixed Route Service (w/ Rosa Parks) 62 30 0 255 52 58 17,370 17,370 17,370 0 0 0 0 0 0 0 0 0 0
Route #32 Maintain Existing Fixed Route Service (w/ Rosa Parks) 124 49 0 255 52 58 34,168 34,168 34,168 0 0 0 0 0 0 0 0 0 0
Route #33 Maintain Existing Fixed Route Service (w/ Rosa Parks) 248 87 0 255 52 58 67,764 67,764 67,764 0 0 0 0 0 0 0 0 0 0
Route #50 Maintain Existing Fixed Route Service (w/ Rosa Parks) 1,477 656 429 255 52 58 435,629 435,629 435,629 0 0 0 0 0 0 0 0 0 0
Route #51 Maintain Existing Fixed Route Service (w/ Rosa Parks) 767 334 177 255 52 58 223,219 223,219 223,219 0 0 0 0 0 0 0 0 0 0
Route #53 Maintain Existing Fixed Route Service (w/ Rosa Parks) 1,200 570 450 255 52 58 361,740 361,740 361,740 0 0 0 0 0 0 0 0 0 0
Route #80 Maintain Existing Fixed Route Service (w/ Rosa Parks) 11 0 0 255 52 58 2,805 2,805 2,805 0 0 0 0 0 0 0 0 0 0
Route #81 Maintain Existing Fixed Route Service (w/ Rosa Parks) 107 48 19 255 52 58 30,883 30,883 30,883 0 0 0 0 0 0 0 0 0 0
Route #82 Maintain Existing Fixed Route Service (w/ Rosa Parks) 94 60 47 255 52 58 29,816 29,816 29,816 0 0 0 0 0 0 0 0 0 0
Route #83 Maintain Existing Fixed Route Service (w/ Rosa Parks) 18 1 1 255 52 58 4,700 4,700 4,700 0 0 0 0 0 0 0 0 0 0
Route #84 Maintain Existing Fixed Route Service (w/ Rosa Parks) 40 27 0 255 52 58 11,604 11,604 11,604 0 0 0 0 0 0 0 0 0 0
Route #85 Maintain Existing Fixed Route Service (w/ Rosa Parks) 151 60 0 255 52 58 41,625 41,625 41,625 0 0 0 0 0 0 0 0 0 0
Route #86 Maintain Existing Fixed Route Service (w/ Rosa Parks) 32 18 0 255 52 58 9,096 9,096 9,096 0 0 0 0 0 0 0 0 0 0
Route #200 Maintain Existing Fixed Route Service (w/ Rosa Parks) 34 0 0 255 52 58 8,670 8,670 8,670 0 0 0 0 0 0 0 0 0 0
Route #201 Maintain Existing Fixed Route Service (w/ Rosa Parks) 36 0 0 255 52 58 9,180 9,180 9,180 0 0 0 0 0 0 0 0 0 0
Route #202 Maintain Existing Fixed Route Service (w/ Rosa Parks) 50 15 0 255 52 58 13,530 13,530 13,530 0 0 0 0 0 0 0 0 0 0
Route #205 Maintain Existing Fixed Route Service (w/ Rosa Parks) 17 0 0 255 52 58 4,335 4,335 4,335 0 0 0 0 0 0 0 0 0 0
BLUE Maintain Existing Fixed Route Service (w/ Rosa Parks) 1,589 977 632 255 52 58 492,655 492,655 492,655 0 0 0 0 0 0 0 0 0 0
GREEN Maintain Existing Fixed Route Service (w/ Rosa Parks) 2,017 1,060 652 255 52 58 607,271 607,271 607,271 0 0 0 0 0 0 0 0 0 0
RED Maintain Existing Fixed Route Service (w/ Rosa Parks) 1,190 917 462 255 52 58 377,930 377,930 377,930 0 0 0 0 0 0 0 0 0 0
Maintain Other Existing Services 1,743,483 1,782,243 1,754,260 1,759,750 1,765,308 1,750,536 1,756,234 1,762,004 1,767,845 1,773,760 1,779,749 1,785,813
ADA Paratransit Service (Duval County)
Maintain Existing ADA Paratransit Service Annual Ridership only 255 52 58 373,522 378,514 383,573 388,699 393,894 399,158 404,492 409,898 415,376 420,928 426,553 432,254
Skyway Maintain Existing Fixed Guideway Service 3,294 0 0 255 0 0 839,970 839,970 839,970 839,970 839,970 839,970 839,970 839,970 839,970 839,970 839,970 839,970 839,970
Gameday Xpress Maintain Existing Fixed Route Service 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
St Johns Ferry Maintain Existing Ferry Service 1,213 1,752 1,185 259 53 53 469,828 469,828 469,828 469,828 469,828 469,828 469,828 469,828 469,828 469,828 469,828 469,828 469,828
CCT Red Maintain Existing Service 20 0 0 255 0 0 5,100 5,100 5,100 5,100 5,100 5,100 0 0 0 0 0 0 0
CCT Blue Maintain Existing Service 60 0 0 255 0 0 15,300 15,300 15,300 15,300 15,300 15,300 0 0 0 0 0 0 0
Nassau Express Maintain Existing Fixed Route Service (w/ Rosa Parks) 131 0 0 255 0 0 33,405 0 33,405 0 0 0 0 0 0 0 0 0 0
ReadiRide Southeast Zone Maintain Existing ReadiRide Zone 11 5 0 255 52 0 3,122 3,151 3,180 3,209 3,237 3,266 3,295 3,324 3,353 3,381 3,410 3,439 3,468
ReadiRide Beaches Zone Maintain Existing ReadiRide Zone 29 14 0 255 52 0 8,047 8,121 8,196 8,270 8,344 8,418 8,493 8,567 8,641 8,715 8,790 8,864 8,938
ReadiRide Highlands Zone Maintain Existing ReadiRide Zone 13 6 0 255 52 0 3,571 3,604 3,637 3,670 3,703 3,736 3,769 3,802 3,835 3,868 3,901 3,934 3,967
ReadiRide Northside Zone Maintain Existing ReadiRide Zone 9 4 0 255 52 0 2,530 2,553 2,576 2,600 2,623 2,646 2,670 2,693 2,716 2,740 2,763 2,786 2,810
ReadiRide Ortega Zone Maintain Existing ReadiRide Zone 14 7 0 255 52 0 3,975 4,012 4,048 4,085 4,122 4,158 4,195 4,232 4,269 4,305 4,342 4,379 4,415
ReadiRide Mandarin Zone Maintain Existing ReadiRide Zone 25 12 0 255 52 0 7,086 7,152 7,217 7,282 7,348 7,413 7,479 7,544 7,609 7,675 7,740 7,806 7,871
ReadiRide Southside Zone Maintain Existing ReadiRide Zone 21 10 0 255 52 0 5,806 5,859 5,913 5,966 6,020 6,074 6,127 6,181 6,234 6,288 6,341 6,395 6,449
ReadiRide Arlington Zone Maintain Existing ReadiRide Zone 19 9 0 255 52 0 5,262 5,310 5,359 5,408 5,456 5,505 5,553 5,602 5,650 5,699 5,747 5,796 5,845
759
Transit Development Plan Major Update | Ridership by Year
New and Changed Services 0 0 10,343,636 10,877,052 11,175,951 12,110,628 12,816,294 12,842,011 13,024,264 13,186,114 13,320,865 13,375,187
FCF Orange Implement Southwest BRT Service in late 2020 2,383 1,256 593 255 52 58 707,371 0 0 0 707,371 707,371 707,371 707,371 707,371 707,371 707,371 707,371 707,371
Route #1 0 5,663 3,240 3,309 255 52 58 1,804,467 0 0 0 0 0 0 0 0 0 0 0 0
Route #3 Eliminate service to Amtrak and move short turn to Soutel Hub. 2,498 1,302 1,128 255 52 58 770,118 0 0 770,118 770,118 770,118 770,118 770,118 770,118 770,118 770,118 770,118 770,118
Route #4 Realign route to serve Amtrak and end service at the Soutel Transit Hub. 1,336 463 288 255 52 58 381,460 0 0 381,460 381,460 381,460 381,460 381,460 381,460 381,460 381,460 381,460 381,460
Route #20 Convert Route 5 to Underlying Service to Southwest BRT in late 2020 522 516 253 255 52 58 174,616 0 0 0 174,616 174,616 174,616 174,616 174,616 174,616 174,616 174,616 174,616
Route #8 Eliminate service to UNF, adjust frequency 677 404 394 255 52 58 216,495 0 0 0 0 0 216,495 216,495 216,495 216,495 216,495 216,495 216,495
Route #10 Realign route onto Atlantic Boulevard, increase frequency and span of service. 2,467 974 1,275 255 52 58 753,683 0 0 0 0 753,683 753,683 753,683 753,683 753,683 753,683 753,683 753,683
Route #11 Extend route to serve Gateway Plaza. 1,365 802 512 255 52 58 419,475 0 0 0 0 419,475 419,475 419,475 419,475 419,475 419,475 419,475 419,475
Route #12 Extend route to serve Soutel Transit Hub. 941 452 283 255 52 58 279,873 0 0 0 0 279,873 279,873 279,873 279,873 279,873 279,873 279,873 279,873
Route #14 Extend route to FSCJ Kent Campus and eliminate service along Normandy Boulevard. 334 238 124 255 52 58 104,738 0 0 0 0 0 0 0 0 0 0 0 104,738
Route #15 Extend trips to Amazon with increased frequency of service 704 478 216 255 52 58 216,904 0 0 0 0 0 0 0 0 0 0 0 216,904
Route #16 Short-Turn Increase frequency on short-turn (net increase) 615 280 178 255 52 58 181,709 0 0 0 0 0 0 0 0 181,709 181,709 181,709 181,709
Route #17 Short-Turn Increase frequency on short-turn (net increase) 472 157 98 255 52 58 134,208 0 0 0 0 0 0 0 0 0 0 134,208 134,208
Route #17 Realignment Realign route to serve Old Kings Road South 1,293 702 445 255 52 58 392,029 0 0 0 0 0 0 0 392,029 392,029 392,029 392,029 392,029
Route #19 Extend route to serve Kona Avenue 2,201 1,356 835 255 52 58 680,197 0 0 0 0 680,197 680,197 680,197 680,197 680,197 680,197 680,197 680,197
Route #21 Realign route and increase span 328 230 161 255 52 58 104,938 0 0 0 0 104,938 104,938 104,938 104,938 104,938 104,938 104,938 104,938
Route #22 Realign to Soutel Hub 548 353 268 255 52 58 173,640 0 0 173,640 173,640 173,640 173,640 173,640 173,640 173,640 173,640 173,640 173,640
Route #23 Realign route 633 385 265 255 52 58 196,805 0 0 0 0 196,805 196,805 196,805 196,805 196,805 196,805 196,805 196,805
Route #24 Extend route 746 403 258 255 52 58 226,150 0 0 0 0 0 226,150 226,150 226,150 226,150 226,150 226,150 226,150
Route #25 Realign Route 246 167 132 255 52 58 79,070 0 0 0 0 0 79,070 79,070 79,070 79,070 79,070 79,070 79,070
Route #26 Extend route to connect with FCF Blue 83 42 25 255 52 58 24,799 0 0 0 0 0 0 0 0 0 24,799 24,799 24,799
Route #27 Increase Span of Service 440 202 126 255 52 58 130,012 0 0 0 0 0 130,012 130,012 130,012 130,012 130,012 130,012 130,012
Route #28 Extend to FSCJ South, realign 160 112 66 255 52 58 50,452 0 0 0 0 0 50,452 50,452 50,452 50,452 50,452 50,452 50,452
Route #31 Extend to Edward Waters 136 108 0 255 52 58 40,296 0 0 0 0 40,296 40,296 40,296 40,296 40,296 40,296 40,296 40,296
Route #32 Realign to Paxon School 61 30 0 255 52 58 17,115 0 0 0 0 17,115 17,115 17,115 17,115 17,115 17,115 17,115 17,115
Route #33 Extend to Southpoint/Belfort Road 207 150 0 255 52 58 60,585 0 0 0 0 0 60,585 60,585 60,585 60,585 60,585 60,585 60,585
Route #50 Eliminate 50B, increase frequency 918 381 264 255 52 58 269,214 0 0 0 0 0 0 0 269,214 269,214 269,214 269,214 269,214
Route #51 Increase frequency on short-turn (net increase) 551 190 104 255 52 58 156,417 0 0 0 0 0 0 0 0 0 156,417 156,417 156,417
Route #53 Extend hourly to Cecil area, replacing Route 30 1,399 443 342 255 52 58 399,617 0 0 0 399,617 399,617 399,617 399,617 399,617 399,617 399,617 399,617 399,617
Route #80 Realign to 103rd Street 62 0 0 255 52 58 15,810 0 0 0 15,810 15,810 15,810 15,810 15,810 15,810 15,810 15,810 15,810
Route #82 Extend span, extend alignment (net increase) 836 246 184 255 52 58 236,644 0 0 0 0 0 0 236,644 236,644 236,644 236,644 236,644 236,644
Route #54 Extend and provide all-day service, replacing existing 84 804 183 0 255 52 58 214,536 0 0 0 0 0 0 214,536 214,536 214,536 214,536 214,536 214,536
Route #85 Realign to FSCJ North 352 101 0 255 52 58 95,012 0 0 0 0 0 0 95,012 95,012 95,012 95,012 95,012 95,012
Route #200 Increase span and frequency 191 0 0 255 52 58 48,705 0 0 0 0 0 0 0 48,705 48,705 48,705 48,705 48,705
Route #202 Extend to downtown, increase span and frequency 222 67 0 255 52 58 60,094 0 0 0 0 60,094 60,094 60,094 60,094 60,094 60,094 60,094 60,094
Route #29 Realign to serve Art Museum Drive, replacing existing 205 2,128 854 1,523 255 52 58 675,382 0 0 0 0 0 675,382 675,382 675,382 675,382 675,382 675,382 675,382
Route #206 New fixed route service 835 0 0 255 52 58 212,925 0 0 0 0 0 0 212,925 212,925 212,925 212,925 212,925 212,925
CCT Red Modify service 535 0 0 255 52 58 136,425 0 0 0 0 0 136,425 136,425 136,425 136,425 136,425 136,425 136,425
CCT Blue Modify service 961 0 0 255 52 58 245,055 0 0 0 0 0 245,055 245,055 245,055 245,055 245,055 245,055 245,055
ReadiRide Northwest Zone Implement New ReadiRide Zone 16 8 0 255 52 0 4,351 0 0 4,471 4,512 4,552 4,592 4,632 4,672 4,712 4,752 4,793 4,833
ReadiRide Eastside - South Zone Implement New ReadiRide Zone 20 10 0 255 52 0 5,706 0 0 0 0 0 6,022 6,075 6,128 6,180 6,233 6,285 6,338
ReadiRide Argyle Forest Zone Implement New ReadiRide Zone 15 7 0 255 52 0 4,214 0 0 0 0 0 4,447 4,486 4,525 4,564 4,603 4,642 4,680
ReadiRide Sandalwood Zone Implement New ReadiRide Zone 9 4 0 255 52 0 2,531 0 0 0 0 0 2,671 2,694 2,718 2,741 2,764 2,788 2,811
ReadiRide Golden Glades - The WoodsImplement
Zone New ReadiRide Zone 15 7 0 255 52 0 4,253 0 0 0 0 0 4,489 4,528 4,567 4,607 4,646 4,685 4,724
ReadiRide Jacksonville Heights Zone Implement New ReadiRide Zone 10 5 0 255 52 0 2,733 0 0 0 2,834 2,860 2,885 2,910 2,935 2,960 2,986 3,011 3,036
ReadiRide Middleburg Zone Implement New ReadiRide Zone 17 9 0 255 52 0 4,907 0 0 0 0 0 5,609 5,726 5,842 5,959 6,076 6,193 6,310
ReadiRide Fleming Island Zone Implement New ReadiRide Zone 20 10 0 255 52 0 5,559 0 0 0 0 0 6,353 6,485 6,618 6,750 6,883 7,015 7,147
ReadiRide Oakleaf Plantation Zone Implement New ReadiRide Zone 11 5 0 255 52 0 3,129 0 0 0 0 0 3,576 3,651 3,725 3,800 3,874 3,949 4,023
St. Johns Express Select Implement New Fixed Route Service 2 0 0 255 0 0 510 0 0 510 510 510 510 510 510 510 510 510 510
Clay Express Select Implement New Fixed Route Service 7 0 0 255 0 0 1,785 0 0 0 1,785 1,785 1,785 1,785 1,785 1,785 1,785 1,785 1,785
Baker Express Select Implement New Fixed Route Service 36 0 0 255 0 0 9,180 0 0 9,180 9,180 9,180 9,180 9,180 9,180 9,180 9,180 9,180 9,180
760
Transit Development Plan Major Update | Ridership by Year
Route #1 Maintain Existing Fixed Route Service (w/ JRTC) 4,856 2,301 1,961 255 52 58 1,471,670 0 0 1,471,670 1,471,670 1,471,670 1,471,670 1,471,670 1,471,670 1,471,670 1,471,670 1,471,670 1,471,670
Route #3 Maintain Existing Fixed Route Service (w/ JRTC) 3,971 1,779 1,377 255 52 58 1,184,979 0 0 0 0 0 0 0 0 0 0 0 0
Route #4 Maintain Existing Fixed Route Service (w/ JRTC) 1,285 497 300 255 52 58 370,919 0 0 0 0 0 0 0 0 0 0 0 0
Route #5 Maintain Existing Fixed Route Service (w/ JRTC) 1,306 861 390 255 52 58 400,422 0 0 400,422 0 0 0 0 0 0 0 0 0
Route #8 Maintain Existing Fixed Route Service (w/ JRTC) 1,672 842 613 255 52 58 505,698 0 0 505,698 505,698 505,698 0 0 0 0 0 0 0
Route #10 Maintain Existing Fixed Route Service (w/ JRTC) 1,911 1,166 804 255 52 58 594,569 0 0 594,569 594,569 0 0 0 0 0 0 0 0
Route #11 Maintain Existing Fixed Route Service (w/ JRTC) 589 290 179 255 52 58 175,657 0 0 175,657 175,657 0 0 0 0 0 0 0 0
Route #12 Maintain Existing Fixed Route Service (w/ JRTC) 773 359 234 255 52 58 229,355 0 0 229,355 229,355 0 0 0 0 0 0 0 0
Route #13 Maintain Existing Fixed Route Service (w/ JRTC) 1,171 614 369 255 52 58 351,935 0 0 351,935 351,935 351,935 351,935 351,935 351,935 351,935 351,935 351,935 351,935
Route #14 Maintain Existing Fixed Route Service (w/ JRTC) 388 254 126 255 52 58 119,456 0 0 119,456 119,456 119,456 119,456 119,456 119,456 119,456 119,456 119,456 0
Route #15 Maintain Existing Fixed Route Service (w/ JRTC) 478 346 147 255 52 58 148,408 0 0 148,408 148,408 148,408 148,408 148,408 148,408 148,408 148,408 148,408 0
Route #16 Maintain Existing Fixed Route Service (w/ JRTC) 796 378 215 255 52 58 235,106 0 0 235,106 235,106 235,106 235,106 235,106 235,106 235,106 235,106 235,106 235,106
Route #17 Maintain Existing Fixed Route Service (w/ JRTC) 925 491 290 255 52 58 278,227 0 0 278,227 278,227 278,227 278,227 278,227 0 0 0 0 0
Route #18 Maintain Existing Fixed Route Service (w/ JRTC) 990 534 309 255 52 58 298,140 0 0 298,140 298,140 0 0 0 0 0 0 0 0
Route #19 Maintain Existing Fixed Route Service (w/ JRTC) 1,903 1,027 670 255 52 58 577,529 0 0 577,529 577,529 0 0 0 0 0 0 0 0
Route #21 Maintain Existing Fixed Route Service (w/ JRTC) 346 207 144 255 52 58 107,346 0 0 107,346 107,346 0 0 0 0 0 0 0 0
Route #22 Maintain Existing Fixed Route Service (w/ JRTC) 588 403 276 255 52 58 186,904 0 0 0 0 0 0 0 0 0 0 0 0
Route #23 Maintain Existing Fixed Route Service (w/ JRTC) 702 405 277 255 52 58 216,136 0 0 216,136 216,136 0 0 0 0 0 0 0 0
Route #24 Maintain Existing Fixed Route Service (w/ JRTC) 218 163 88 255 52 58 69,170 0 0 69,170 69,170 69,170 0 0 0 0 0 0 0
Route #25 Maintain Existing Fixed Route Service (w/ JRTC) 355 200 163 255 52 58 110,379 0 0 110,379 110,379 110,379 0 0 0 0 0 0 0
Route #26 Maintain Existing Fixed Route Service (w/ JRTC) 67 32 20 255 52 58 19,909 0 0 19,909 19,909 19,909 19,909 19,909 19,909 19,909 0 0 0
Route #27 Maintain Existing Fixed Route Service (w/ JRTC) 395 164 96 255 52 58 114,821 0 0 114,821 114,821 114,821 0 0 0 0 0 0 0
Route #28 Maintain Existing Fixed Route Service (w/ JRTC) 171 92 54 255 52 58 51,521 0 0 51,521 51,521 51,521 0 0 0 0 0 0 0
Route #30 Maintain Existing Fixed Route Service (w/ JRTC) 140 71 0 255 52 0 39,392 0 0 39,392 0 0 0 0 0 0 0 0 0
Route #31 Maintain Existing Fixed Route Service (w/ JRTC) 51 29 0 255 52 0 14,513 0 0 14,513 14,513 0 0 0 0 0 0 0 0
Route #32 Maintain Existing Fixed Route Service (w/ JRTC) 97 41 0 255 52 0 26,867 0 0 26,867 26,867 0 0 0 0 0 0 0 0
Route #33 Maintain Existing Fixed Route Service (w/ JRTC) 225 89 0 255 52 0 62,003 0 0 62,003 62,003 62,003 0 0 0 0 0 0 0
Route #50 Maintain Existing Fixed Route Service (w/ JRTC) 1,487 658 427 255 52 58 438,167 0 0 438,167 438,167 438,167 438,167 438,167 0 0 0 0 0
Route #51 Maintain Existing Fixed Route Service (w/ JRTC) 781 336 177 255 52 58 226,893 0 0 226,893 226,893 226,893 226,893 226,893 226,893 226,893 226,893 226,893 226,893
Route #53 Maintain Existing Fixed Route Service (w/ JRTC) 1,023 522 390 255 52 58 310,629 0 0 310,629 0 0 0 0 0 0 0 0 0
Route #80 Maintain Existing Fixed Route Service (w/ JRTC) 10 0 0 255 0 0 2,550 0 0 2,550 0 0 0 0 0 0 0 0 0
Route #81 Maintain Existing Fixed Route Service (w/ JRTC) 111 48 19 255 52 58 31,903 0 0 31,903 31,903 31,903 31,903 31,903 31,903 31,903 31,903 31,903 31,903
Route #82 Maintain Existing Fixed Route Service (w/ JRTC) 94 60 47 255 52 58 29,816 0 0 29,816 29,816 29,816 29,816 29,816 29,816 29,816 29,816 29,816 29,816
Route #83 Maintain Existing Fixed Route Service (w/ JRTC) 20 1 1 255 52 58 5,210 0 0 5,210 0 0 0 0 0 0 0 0 0
Route #84 Maintain Existing Fixed Route Service (w/ JRTC) 40 27 0 255 52 58 11,604 0 0 11,604 11,604 11,604 11,604 0 0 0 0 0 0
Route #85 Maintain Existing Fixed Route Service (w/ JRTC) 154 60 0 255 52 58 42,390 0 0 42,390 42,390 42,390 42,390 0 0 0 0 0 0
Route #86 Maintain Existing Fixed Route Service (w/ JRTC) 35 19 0 255 52 58 9,913 0 0 0 0 0 0 0 0 0 0 0 0
Route #200 Maintain Existing Fixed Route Service (w/ JRTC) 37 0 0 255 0 0 9,435 0 0 9,435 9,435 9,435 9,435 9,435 0 0 0 0 0
Route #201 Maintain Existing Fixed Route Service (w/ JRTC) 41 0 0 255 0 0 10,455 0 0 10,455 0 0 0 0 0 0 0 0 0
Route #202 Maintain Existing Fixed Route Service (w/ JRTC) 50 15 0 255 52 0 13,530 0 0 13,530 13,530 0 0 0 0 0 0 0 0
Route #205 Maintain Existing Fixed Route Service (w/ JRTC) 18 0 0 255 0 0 4,590 0 0 4,590 4,590 4,590 0 0 0 0 0 0 0
BLUE Maintain Existing Fixed Route Service (w/ JRTC) 843 615 352 255 52 58 267,361 0 0 267,361 267,361 267,361 267,361 267,361 267,361 267,361 267,361 267,361 267,361
GREEN Maintain Existing Fixed Route Service (w/ JRTC) 2,492 1,232 760 255 52 58 743,604 0 0 743,604 743,604 743,604 743,604 743,604 743,604 743,604 743,604 743,604 743,604
RED Maintain Existing Fixed Route Service (w/ JRTC) 2,050 1,240 702 255 52 58 627,946 0 0 627,946 627,946 627,946 627,946 627,946 627,946 627,946 627,946 627,946 627,946
Nassau Express Maintain Existing Fixed Route Service (w/ JRTC) 38 0 0 255 0 0 9,690 0 0 9,690 9,690 9,690 9,690 9,690 9,690 9,690 9,690 9,690 9,690
CCT Magenta Maintain Existing Fixed Route Service (w/ JRTC) 1 0 0 255 0 0 255 0 0 255 255 255 255 255 255 255 255 255 255
Route #28 Frequency Increase Increase Weekday Frequency on Extended Alignment 161 0 0 255 0 0 41,055 0 0 0 0 0 0 0 41,055 41,055 41,055 41,055 41,055
St. Johns Express Select Additional Trips
Introduce midday service and extend peak hours 2 0 0 255 0 0 510 0 0 0 0 0 0 510 510 510 510 510 510
TDP Proposal 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
Projected Annual Ridership - Existing Service 12,101,209 12,139,969 1,754,260 1,759,750 1,765,308 1,750,536 1,756,234 1,762,004 1,767,845 1,773,760 1,779,749 1,785,813
Projected Annual Ridership - Additional New Service 0 0 10,343,636 10,877,052 11,175,951 12,110,628 12,816,294 12,842,011 13,024,264 13,186,114 13,320,865 13,375,187
Projected Annual Ridership 12,101,209 12,139,969 12,097,897 12,636,802 12,941,260 13,861,164 14,572,528 14,604,015 14,792,109 14,959,874 15,100,614 15,161,000
Absolute Change -42,072 538,905 304,458 919,904 711,364 31,487 188,094 167,765 140,740 60,386
% Change 0% 4% 2% 7% 5% 0% 1% 1% 1% 0%
Absolute Change of 2019 (42,072) 496,833 801,291 1,721,195 2,432,559 2,464,046 2,652,140 2,819,905 2,960,645 3,021,031
761
Transit Development Plan Major Update | New Capital Cost Element
Capital Cost Element ($ thousands) FY2020 FY2021 FY2022 FY2023 FY2024 FY2025 FY2026 FY2027 FY2028 FY2029 Total
Bus Capital (Maintenance of Current Service) $ 9,377 $ 11,890 $ 11,041 $ 15,667 $ 5,126 $ 12,629 $ 12,128 $ 22,834 $ 21,910 $ 18,701 $ 141,302
Fixed Route Service $ 6,962 $ 8,160 $ 9,106 $ 11,543 $ - $ 9,950 $ 7,883 $ 18,676 $ 19,236 $ 12,922 $ 104,439
Clay County Express $ 1,084 $ 625 $ 1,088 $ 746 $ 346 $ 1,148 $ 602 $ 757 $ 1,124 $ 134 $ 7,654
CTC Paratransit $ 1,129 $ 2,907 $ 691 $ 1,140 $ 4,090 $ 1,309 $ 3,474 $ 694 $ 1,322 $ 4,741 $ 21,497
Service Vehicle Replacement $ 202 $ 197 $ 156 $ 2,237 $ 691 $ 222 $ 168 $ 2,707 $ 227 $ 904 $ 7,712
Bus Capital (Service Improvement) $ - $ 10,192 $ - $ 370 $ - $ - $ - $ 2,385 $ 1,628 $ 5,000 $ 19,574
New Revenue Vehicle Purchase $ 10,192 $ 370 $ 2,385 $ 1,628 $ 5,000 $ 19,574
Bus Operations
IT Infrastructure and Update $ 516.80 $ 516.80 $ 516.80 $ 516.80 $ 516.80 $ 516.80 $ 516.80 $ 516.80 $ 516.80 $ 516.80 $ 5,168
Farebox Infrastructure $ 50 $ 50 $ 100
Bus Stop Construction $ 2,000 $ 2,000 $ 2,000 $ 2,000 $ 2,000 $ 2,000 $ 2,000 $ 2,000 $ 2,000 $ 2,000 $ 20,000
Bus Shelters and Other Amenities $ 500 $ 500 $ 500 $ 500 $ 500 $ 500 $ 500 $ 500 $ 500 $ 500 $ 5,000
U2C / Skyway $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Ferry Capital
TOTAL $ 12,444 $ 25,149 $ 14,058 $ 19,053 $ 8,143 $ 15,646 $ 15,144 $ 28,235 $ 26,555 $ 26,717 $ 191,144
Investment ($ thousands) 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Ten-Year Total
Vehicles
Fixed Route Bus $6,962 $8,160 $9,106 $11,543 $0 $9,950 $7,883 $18,676 $19,236 $12,922 $104,439
Clay County Express $1,084 $625 $1,088 $746 $346 $1,148 $602 $757 $1,124 $134 $7,654
CTC Paratransit $1,129 $2,907 $691 $1,140 $4,090 $1,309 $3,474 $694 $1,322 $4,741 $21,497
Non-Revenue Fleet Replacement $202 $197 $156 $2,237 $691 $222 $168 $2,707 $227 $904 $7,712
$0
Technology and Operations $0
IT Infrastructure $517 $517 $517 $517 $517 $517 $517 $517 $517 $517 $5,168
Fareboxes $50 $50 $0 $0 $0 $0 $0 $0 $0 $0 $100
$0
Facilities $0
Bus Stops $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $20,000
Bus Shelter and Passenger Amenities $500 $500 $500 $500 $500 $500 $500 $500 $500 $500 $5,000
Facility Improvements $0
$0
Fixed Guideway $0
U2C / Skyway Replacement $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
BRT Southwest Corridor $0
Ferry Improvements $0
$0
Service Expansion $0
Additional Fixed-Route Buses $0 $10,192 $0 $370 $0 $0 $0 $2,385 $1,628 $5,000 $19,574
$0
Other $0
Mobility Works Road Projects $0
Miscellaneous $0
Total $12,444 $25,149 $14,058 $19,053 $8,143 $15,646 $15,144 $28,235 $26,555 $26,717 $191,144
762
Transit Development Plan Major Update | Revenue Element
Page 1 of 6
2019 2020
Source % Escalation Assumption Notes Operating Planning Capital TOTAL Operating Planning Capital TOTAL
EXPENSES
Unallocated Expenses 0% Assumed base cost escalation $ 30,174,629 $ 1,280,000 $ 31,454,629 $ 30,174,629 $ 1,305,600 $ 31,480,229
REVENUE
FTA 5307 2% Year on year growth in FTA formula funds $ 1,280,000 $ 6,872,151 $ 8,152,151 $ - $ 1,305,600 $ 7,009,594 $ 8,315,194
FTA 5337 2% Year on year growth in FTA formula funds $ 840,032 $ 840,032 $ - $ - $ 856,833 $ 856,833
FTA 5339 3% Year on year growth in FTA formula funds $ 1,807,624 $ 1,807,624 $ - $ - $ 1,852,815 $ 1,852,815
5307 SU NFTPO 2% Year on year growth in FTA formula funds $ 1,000,000 $ 1,000,000 $ - $ - $ 1,020,000 $ 1,020,000
5307 FHWA Transfer for Ferry 2% Year on year growth in FTA formula funds $ 318,158 $ 318,158 $ - $ - $ 324,521 $ 324,521
FTA 5310 2% Year on year growth in FTA formula funds $ 334,892 $ 954,700 $ 1,289,592 $ 341,590 $ - $ 973,794 $ 1,315,384
FTA 5307 PM 2% Year on year growth in FTA formula funds $ 5,303,401 $ 5,303,401 $ 5,409,469 $ - $ - $ 5,409,469
FTA 5311 0% Year on year growth in FTA formula funds $ 1,104,392 $ - $ - $ 1,104,392
LowNo and Emissions Grant 0% Future amount based on JTA guidance $ 1,300,000 $ 1,300,000 $ - $ - $ - $ -
State Block Grant 0% Assume fixed amount every year $ 4,075,751 $ 4,075,751 $ 4,075,751 $ - $ - $ 4,075,751
State Trip and Equipment Grant 0% Assume fixed amount every year $ 1,596,992 $ 1,596,992 $ 1,596,992 $ - $ - $ 1,596,992
SUB-TOTAL State and Federal $ 11,872,033 $ 1,280,000 $ 49,613,892 $ 62,765,925 $ 14,490,389 $ 1,305,600 $ 12,037,556 $ 27,833,545
Operating Surplus Based on prior year capital surplus and operating surplus $ 2,810,432 $ 2,810,432
Gas Tax 1.00% Average VMT growth nationwide $ 19,075,373 $ 19,075,373 $ 19,266,127 $ - $ 22,076,559
Sales Tax 4.25% Feedback from JTA $ 67,918,684 $ 67,918,684 $ 70,805,228 $ - $ - $ 70,805,228
Total Revenues 30% $ 134,010,930 $ 1,280,000 $ 64,696,392 $ 199,987,322 $ 140,817,457 $ 1,305,600 $ 14,847,989 $ 156,971,046
EXPENSES
REVENUE
Farebox Revenue see assumption tab $ - $ - $ - $ (58,312) $ - $ (58,312)
Total Costs $ 133,663,929 $ 1,280,000 $ 64,696,392 $ 199,640,321 $ 137,948,713 $ 1,305,600 $ 12,443,791 $ 151,698,104
Total Revenues $ 134,010,930 $ 1,280,000 $ 64,696,392 $ 199,987,322 $ 140,759,145 $ 1,305,600 $ 14,847,989 $ 156,912,734
763
Transit Development Plan Major Update | Revenue Element
Page 2 of 6
2021 2022
Source % Escalation Assumption Notes Operating Planning Capital TOTAL Operating Planning Capital TOTAL
EXPENSES
Unallocated Expenses 0% Assumed base cost escalation $ 30,174,629 $ 1,331,712 $ 31,506,341 $ 30,174,629 $ 1,358,346 $ 31,532,975
REVENUE
FTA 5307 2% Year on year growth in FTA formula funds $ - $ 1,331,712 $ 7,149,786 $ 8,481,498 $ - $ 1,358,346 $ 7,292,782 $ 8,651,128
FTA 5337 2% Year on year growth in FTA formula funds $ - $ - $ 873,969 $ 873,969 $ - $ - $ 891,449 $ 891,449
FTA 5339 3% Year on year growth in FTA formula funds $ - $ - $ 1,899,135 $ 1,899,135 $ - $ - $ 1,946,613 $ 1,946,613
5307 SU NFTPO 2% Year on year growth in FTA formula funds $ - $ - $ 1,040,400 $ 1,040,400 $ - $ - $ 1,061,208 $ 1,061,208
5307 FHWA Transfer for Ferry 2% Year on year growth in FTA formula funds $ - $ - $ 331,012 $ 331,012 $ - $ - $ 337,632 $ 337,632
FTA 5310 2% Year on year growth in FTA formula funds $ 348,422 $ - $ 993,270 $ 1,341,692 $ 355,390 $ - $ 1,013,135 $ 1,368,525
FTA 5307 PM 2% Year on year growth in FTA formula funds $ 5,517,658 $ - $ - $ 5,517,658 $ 5,628,012 $ - $ - $ 5,628,012
FTA 5311 0% Year on year growth in FTA formula funds $ 1,080,712 $ - $ - $ 1,080,712 $ 1,119,748 $ - $ - $ 1,119,748
State Block Grant 0% Assume fixed amount every year $ 4,075,751 $ - $ - $ 4,075,751 $ 4,075,751 $ - $ - $ 4,075,751
State Trip and Equipment Grant 0% Assume fixed amount every year $ 1,596,992 $ - $ - $ 1,596,992 $ 1,596,992 $ - $ - $ 1,596,992
Other Federal/State Assistance Grants 2% $ 583,661 $ - $ 8,843,662 $ 9,427,323 $ 595,335 $ - $ 103,000 $ 698,335
SUB-TOTAL State and Federal $ 15,100,504 $ 1,331,712 $ 21,131,233 $ 37,563,450 $ 15,272,625 $ 1,358,346 $ 12,645,819 $ 29,276,790
Operating Surplus Based on prior year capital surplus and operating surplus $ 1,664,023 $ 1,664,023 $ 1,506,605 $ 1,506,605
Gas Tax 1.00% Average VMT growth nationwide $ 19,458,788 $ - $ 21,122,811 $ 19,653,376 $ - $ 21,159,981
Sales Tax 4.25% Feedback from JTA $ 73,814,450 $ - $ - $ 73,814,450 $ 76,951,564 $ - $ - $ 76,951,564
SUB-TOTAL Local and Other $ 114,340,246 $ - $ 1,664,023 $ 116,004,268 $ 118,093,288 $ - $ 1,506,605 $ 119,599,893
Total Revenues 30% $ 145,068,987 $ 1,331,712 $ 22,795,256 $ 169,195,955 $ 149,735,090 $ 1,358,346 $ 14,152,424 $ 165,245,860
EXPENSES
REVENUE
Farebox Revenue see assumption tab $ 688,610 $ - $ 688,610 $ 1,166,118 $ 1,166,118
Total Costs $ 144,093,575 $ 1,331,712 $ 25,148,709 $ 170,573,996 $ 149,394,604 $ 1,358,346 $ 14,057,694 $ 164,810,644
Total Revenues $ 145,757,597 $ 1,331,712 $ 22,795,256 $ 169,884,565 $ 150,901,208 $ 1,358,346 $ 14,152,424 $ 166,411,978
764
Transit Development Plan Major Update | Revenue Element
Page 3 of 6
2023 2024
Source % Escalation Assumption Notes Operating Planning Capital TOTAL Operating Planning Capital TOTAL
EXPENSES
Unallocated Expenses 0% Assumed base cost escalation $ 30,174,629 $ 1,385,513 $ 31,560,142 $ 30,174,629 $ 1,413,223 $ 31,587,852
REVENUE
FTA 5307 2% Year on year growth in FTA formula funds $ - $ 1,385,513 $ 7,438,637 $ 8,824,150 $ - $ 1,413,223 $ 7,587,410 $ 9,000,633
FTA 5337 2% Year on year growth in FTA formula funds $ - $ - $ 909,278 $ 909,278 $ - $ - $ 927,463 $ 927,463
FTA 5339 3% Year on year growth in FTA formula funds $ - $ - $ 1,995,279 $ 1,995,279 $ - $ - $ 2,045,161 $ 2,045,161
5307 SU NFTPO 2% Year on year growth in FTA formula funds $ - $ - $ 1,082,432 $ 1,082,432 $ - $ - $ 1,104,081 $ 1,104,081
5307 FHWA Transfer for Ferry 2% Year on year growth in FTA formula funds $ - $ - $ 344,384 $ 344,384 $ - $ - $ 351,272 $ 351,272
FTA 5310 2% Year on year growth in FTA formula funds $ 362,498 $ - $ 1,033,398 $ 1,395,896 $ 369,748 $ - $ 1,054,066 $ 1,423,814
FTA 5307 PM 2% Year on year growth in FTA formula funds $ 5,740,572 $ - $ - $ 5,740,572 $ 5,855,383 $ - $ - $ 5,855,383
FTA 5311 0% Year on year growth in FTA formula funds $ 1,160,736 $ - $ - $ 1,160,736 $ 1,203,774 $ - $ - $ 1,203,774
LowNo and Emissions Grant 0% Future amount based on JTA guidance $ - $ - $ 840,000 $ 840,000 $ - $ - $ -
State Block Grant 0% Assume fixed amount every year $ 4,075,751 $ - $ - $ 4,075,751 $ 4,075,751 $ - $ - $ 4,075,751
State Trip and Equipment Grant 0% Assume fixed amount every year $ 1,596,992 $ - $ - $ 1,596,992 $ 1,596,992 $ - $ - $ 1,596,992
Other Federal/State Assistance Grants 2% $ 607,241 $ - $ 3,535,745 $ 4,142,986 $ 619,386 $ - $ 3,606,460 $ 4,225,846
SUB-TOTAL State and Federal $ 15,475,311 $ 1,385,513 $ 17,179,153 $ 34,039,977 $ 16,718,340 $ 1,413,223 $ 16,675,912 $ 34,807,476
Operating Surplus Based on prior year capital surplus and operating surplus $ 1,728,638 $ 1,728,638 $ - $ 3,154,359 $ 3,154,359
Gas Tax 1.00% Average VMT growth nationwide $ 19,849,910 $ - $ 21,578,548 $ 20,048,409 $ - $ 23,202,768
Sales Tax 4.25% Feedback from JTA $ 80,222,006 $ - $ - $ 80,222,006 $ 83,631,441 $ - $ - $ 83,631,441
SUB-TOTAL Local and Other $ 121,990,030 $ - $ 1,728,638 $ 123,718,669 $ 126,036,327 $ - $ 3,154,359 $ 129,190,686
Total Revenues 30% $ 153,862,039 $ 1,385,513 $ 18,907,791 $ 174,155,343 $ 159,929,093 $ 1,413,223 $ 19,830,271 $ 181,172,588
EXPENSES
REVENUE
Farebox Revenue see assumption tab $ 2,504,855 $ 2,504,855 $ 3,717,109 $ 3,717,109
Total Costs $ 154,638,255 $ 1,385,513 $ 19,053,249 $ 175,077,017 $ 160,491,843 $ 1,413,223 $ 8,143,169 $ 170,048,235
Total Revenues $ 156,366,893 $ 1,385,513 $ 18,907,791 $ 176,660,198 $ 163,646,202 $ 1,413,223 $ 19,830,271 $ 184,889,696
765
Transit Development Plan Major Update | Revenue Element
Page 4 of 6
2025 2026
Source % Escalation Assumption Notes Operating Planning Capital TOTAL Operating Planning Capital TOTAL
EXPENSES
Unallocated Expenses 0% Assumed base cost escalation $ 30,174,629 $ 1,441,488 $ 31,616,117 $ 30,174,629 $ 1,470,318 $ 31,644,947
REVENUE
FTA 5307 2% Year on year growth in FTA formula funds $ - $ 1,441,488 $ 7,739,158 $ 9,180,646 $ - $ 1,470,318 $ 7,893,941 $ 9,364,259
FTA 5337 2% Year on year growth in FTA formula funds $ - $ - $ 946,012 $ 946,012 $ - $ - $ 964,933 $ 964,933
FTA 5339 3% Year on year growth in FTA formula funds $ - $ - $ 2,096,290 $ 2,096,290 $ - $ - $ 2,148,697 $ 2,148,697
5307 SU NFTPO 2% Year on year growth in FTA formula funds $ - $ - $ 1,126,162 $ 1,126,162 $ - $ - $ 1,148,686 $ 1,148,686
5307 FHWA Transfer for Ferry 2% Year on year growth in FTA formula funds $ - $ - $ 358,298 $ 358,298 $ - $ - $ 365,464 $ 365,464
FTA 5310 2% Year on year growth in FTA formula funds $ 377,143 $ - $ 1,075,147 $ 1,452,290 $ 384,686 $ - $ 1,096,650 $ 1,481,336
FTA 5307 PM 2% Year on year growth in FTA formula funds $ 5,972,491 $ - $ - $ 5,972,491 $ 6,091,941 $ - $ - $ 6,091,941
FTA 5311 0% Year on year growth in FTA formula funds $ 1,203,774 $ - $ - $ 1,203,774 $ 1,203,774 $ - $ - $ 1,203,774
State Block Grant 0% Assume fixed amount every year $ 4,075,751 $ - $ - $ 4,075,751 $ 4,075,751 $ - $ - $ 4,075,751
State Trip and Equipment Grant 0% Assume fixed amount every year $ 1,596,992 $ - $ - $ 1,596,992 $ 1,596,992 $ - $ - $ 1,596,992
SUB-TOTAL State and Federal $ 16,855,230 $ 1,441,488 $ 14,341,068 $ 32,637,786 $ 16,994,859 $ 1,470,318 $ 13,618,370 $ 32,083,547
Operating Surplus Based on prior year capital surplus and operating surplus $ 1,018,580 $ 1,018,580 $ 1,181,967 $ 1,181,967
Gas Tax 1.00% Average VMT growth nationwide $ 20,248,893 $ - $ 21,267,472 $ 20,451,382 $ - $ 21,633,349
Sales Tax 4.25% Feedback from JTA $ 87,185,777 $ - $ - $ 87,185,777 $ 90,891,173 $ - $ - $ 90,891,173
SUB-TOTAL Local and Other $ 130,238,277 $ - $ 1,018,580 $ 131,256,856 $ 134,602,233 $ - $ 1,181,967 $ 135,784,201
Total Revenues 30% $ 164,296,566 $ 1,441,488 $ 15,359,647 $ 181,097,701 $ 169,616,496 $ 1,470,318 $ 14,800,338 $ 185,887,151
EXPENSES
REVENUE
Farebox Revenue see assumption tab $ 3,765,222 $ 3,765,222 $ 4,255,274 $ 4,255,274
Total Costs $ 167,043,208 $ 1,441,488 $ 15,645,827 $ 184,130,523 $ 172,689,803 $ 1,470,318 $ 15,144,305 $ 189,304,425
Total Revenues $ 168,061,788 $ 1,441,488 $ 15,359,647 $ 184,862,923 $ 173,871,770 $ 1,470,318 $ 14,800,338 $ 190,142,425
766
Transit Development Plan Major Update | Revenue Element
Page 5 of 6
2027 2028
Source % Escalation Assumption Notes Operating Planning Capital TOTAL Operating Planning Capital TOTAL
EXPENSES
Unallocated Expenses 0% Assumed base cost escalation $ 29,706,378 $ 1,499,724 $ 31,206,102 $ 29,706,378 $ 1,529,718 $ 31,236,096
REVENUE
FTA 5307 2% Year on year growth in FTA formula funds $ - $ 1,499,724 $ 8,051,820 $ 9,551,544 $ - $ 1,529,718 $ 8,212,857 $ 9,742,575
FTA 5337 2% Year on year growth in FTA formula funds $ - $ - $ 984,231 $ 984,231 $ - $ - $ 1,003,916 $ 1,003,916
FTA 5339 3% Year on year growth in FTA formula funds $ - $ - $ 2,202,414 $ 2,202,414 $ - $ - $ 2,257,475 $ 2,257,475
5307 SU NFTPO 2% Year on year growth in FTA formula funds $ - $ - $ 1,171,659 $ 1,171,659 $ - $ - $ 1,195,093 $ 1,195,093
5307 FHWA Transfer for Ferry 2% Year on year growth in FTA formula funds $ - $ - $ 372,773 $ 372,773 $ - $ - $ 380,228 $ 380,228
FTA 5310 2% Year on year growth in FTA formula funds $ 392,379 $ - $ 1,118,583 $ 1,510,963 $ 400,227 $ - $ 1,140,955 $ 1,541,182
FTA 5307 PM 2% Year on year growth in FTA formula funds $ 6,213,780 $ - $ - $ 6,213,780 $ 6,338,055 $ - $ - $ 6,338,055
FTA 5311 0% Year on year growth in FTA formula funds $ 1,203,774 $ - $ - $ 1,203,774 $ 1,203,774 $ - $ - $ 1,203,774
LowNo and Emissions Grant 0% Future amount based on JTA guidance $ - $ - $ 800,000 $ 800,000 $ - $ - $ -
State Block Grant 0% Assume fixed amount every year $ 4,075,751 $ - $ - $ 4,075,751 $ 4,075,751 $ - $ - $ 4,075,751
State Trip and Equipment Grant 0% Assume fixed amount every year $ 1,596,992 $ - $ - $ 1,596,992 $ 1,596,992 $ - $ - $ 1,596,992
Other Federal/State Assistance Grants 2% $ 657,297 $ - $ 2,475,707 $ 3,133,004 $ 670,443 $ - $ 12,204,144 $ 12,874,587
SUB-TOTAL State and Federal $ 17,137,279 $ 1,499,724 $ 17,177,188 $ 35,814,191 $ 17,282,548 $ 1,529,718 $ 26,394,667 $ 45,206,934
Operating Surplus Based on prior year capital surplus and operating surplus $ 831 $ 831 $ 159,995 $ 159,995
Gas Tax 1.00% Average VMT growth nationwide $ 20,655,896 $ - $ 20,656,727 $ 20,862,455 $ - $ 21,022,449
Sales Tax 4.25% Feedback from JTA $ 94,754,048 $ - $ - $ 94,754,048 $ 98,781,095 $ - $ - $ 98,781,095
SUB-TOTAL Local and Other $ 139,134,816 $ - $ 831 $ 139,135,647 $ 143,842,919 $ - $ 159,995 $ 144,002,914
Total Revenues 30% $ 174,321,288 $ 1,499,724 $ 17,178,019 $ 192,999,031 $ 180,031,543 $ 1,529,718 $ 26,554,662 $ 208,115,923
EXPENSES
REVENUE
Farebox Revenue see assumption tab $ 4,524,448 $ 4,524,448 $ 4,987,775 $ 4,987,775
Total Costs $ 178,844,905 $ 1,499,724 $ 28,234,991 $ 208,579,619 $ 184,859,322 $ 1,529,718 $ 26,554,662 $ 212,943,703
Total Revenues $ 178,845,736 $ 1,499,724 $ 17,178,019 $ 197,523,479 $ 185,019,317 $ 1,529,718 $ 26,554,662 $ 213,103,698
767
Transit Development Plan Major Update | Revenue Element
Page 6 of 6
2029 10-Year Total
Source % Escalation Assumption Notes Operating Planning Capital TOTAL Operating Planning Capital TOTAL
EXPENSES
Unallocated Expenses 0% Assumed base cost escalation $ 27,133,871 $ 1,560,313 $ 28,694,183 $ 297,769,029 $ 14,295,956 $ - $ 312,064,984
REVENUE
FTA 5307 2% Year on year growth in FTA formula funds $ - $ 1,560,313 $ 8,377,114 $ 9,937,427 $ - $ 14,295,956 $ 76,753,099 $ 91,049,055
FTA 5337 2% Year on year growth in FTA formula funds $ - $ - $ 1,023,994 $ 1,023,994 $ - $ - $ 9,382,078 $ 9,382,078
FTA 5339 3% Year on year growth in FTA formula funds $ - $ - $ 2,313,912 $ 2,313,912 $ - $ - $ 20,757,789 $ 20,757,789
5307 SU NFTPO 2% Year on year growth in FTA formula funds $ - $ - $ 1,218,994 $ 1,218,994 $ - $ - $ 11,168,715 $ 11,168,715
5307 FHWA Transfer for Ferry 2% Year on year growth in FTA formula funds $ - $ - $ 387,833 $ 387,833 $ - $ - $ 3,553,416 $ 3,553,416
FTA 5310 2% Year on year growth in FTA formula funds $ 408,231 $ - $ 1,163,774 $ 1,572,005 $ 3,740,313 $ - $ 10,662,773 $ 14,403,086
FTA 5307 PM 2% Year on year growth in FTA formula funds $ 6,464,816 $ - $ - $ 6,464,816 $ 59,232,177 $ - $ - $ 59,232,177
FTA 5311 0% Year on year growth in FTA formula funds $ 1,203,774 $ - $ - $ 1,203,774 $ 11,688,232 $ - $ -
LowNo and Emissions Grant 0% Future amount based on JTA guidance $ - $ - $ - $ - $ - $ - $ 1,640,000 $ 1,640,000
State Block Grant 0% Assume fixed amount every year $ 4,075,751 $ - $ - $ 4,075,751 $ 40,757,510 $ - $ - $ 40,757,510
State Trip and Equipment Grant 0% Assume fixed amount every year $ 1,596,992 $ - $ - $ 1,596,992 $ 15,969,920 $ - $ - $ 15,969,920
Other Federal/State Assistance Grants 2% $ 683,852 $ - $ 12,231,040 $ 12,914,892 $ 6,265,616 $ - $ 43,999,757 $ 50,265,373
SUB-TOTAL State and Federal $ 17,430,723 $ 1,560,313 $ 26,716,661 $ 45,707,697 $ 162,757,809 $ 14,295,956 $ 177,917,628 $ 354,971,393
Operating Surplus Based on prior year capital surplus and operating surplus $ - $ - $ - $ 13,225,430 $ 13,225,430
Gas Tax 1.00% Average VMT growth nationwide $ 21,071,079 $ - $ 21,071,079 $ 201,566,313 $ - $ - $ 201,566,313
Sales Tax 4.25% Feedback from JTA $ 102,979,291 $ - $ - $ 102,979,291 $ 860,016,074 $ - $ - $ 860,016,074
Total Revenues 30% $ 185,101,518 $ 1,560,313 $ 26,716,661 $ 213,378,492 $ 1,622,780,077 $ 14,295,956 $ 191,143,058 $ 1,828,219,090
EXPENSES
REVENUE
Farebox Revenue see assumption tab $ 5,089,506 $ 5,089,506 $ 30,640,604 $ - $ - $ 30,640,604
Total Costs $ 190,191,099 $ 1,560,313 $ 26,717,105 $ 218,468,517 $ 1,640,195,326 $ 14,295,956 $ 191,143,502 $ 1,845,634,784
Total Revenues $ 190,191,024 $ 1,560,313 $ 26,716,661 $ 218,467,998 $ 1,653,420,681 $ 14,295,956 $ 191,143,058 $ 1,858,859,694
768