Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Gyasuddin CV

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

JOB APPLICATION

------------------------------Senior Quantity Surveyor (CIVIL) -------------------------------

MOHAMMAD GYASUDDIN AHSAN ARFI Mob: - +966 536279937


+91 7503449339
E-Mail: - gyasuddin.2020ksa@gmail.com
WhatsApp: - +91 750349339

Date: …/….. /….

Attn.H.R. Manager,

Subject: Application for the Post of “Senior Quantity Surveyor (CIVIL)”.

Respected Sir,

Kindly consider my curriculum vitae enclosed for the above-mentioned position in your
esteemed organization.
Presently, I am working as a “Senior Quantity Surveyor (CIVIL)” at Badan Agricultural &
Cont. Co. Ltd. During these periods I have equipped myself with the fields of Quantity
Surveyor and Contract Department. The job includes preparing Interim Payment
Application (IPCs) and approval from the Consultant/Client. Personally, I am a young
Graduate Civil Engineer having more than 13 years of professional experience in the
reputed Companies in India and Saudi Arabia. I pleased to offer my candidature for the
post of “Senior Quantity Surveyor” in your esteemed organization.

Although I am enjoying my present job, I intend to looking out for new opportunities in the
same field to explore more myself.

Thanking you for your time and consideration.

Sincerely yours,

MOHAMMAD GYASUDDIN AHSAN ARFI

(GYASUDDIN)

MOHAMMAD GYASUDDIN AHSAN ARFI


MOHAMMAD GYASUDDIN AHSAN
SENIOR QUANTITY SURVEYOR (SQS)

M: +966 536279937 E: gyasuddin.2020ksa@gmail.com

L: Riyadh, Kingdom of Saudi Arabia

PROFESSIONAL HISTORY PROFESSIONAL PROFILE

January 2020 – Present An enthusiastic senior quantity surveyor is with more than13 years’
Badan Agricultural & Cont. Co. experience having worked in Saudi Arabia and India. Competent in
Ltd Senior Contractor, client and consultancy practices including both pre- and post-
Quantity Surveyor contract aspects of quantity surveying.

Experience includes Mixed-use development project (including hotel,


June2014 – Dec 2019 serviced apartments, town houses, Library, etc.), Landscaping, High Rise
Eldeco Infrastructure and Building, Commercial Complex and Institutional Building etc.
Properties Ltd. A passionate, result driven and self- motivated professional. Able to
Senior Quantity Surveyor communicate effectively at all levels, understanding key drivers and assist
to deliver success at all stages of the project.
August 2012 – April 2014
Nostri Architect WORK EXPERIENCE
Quantity Surveyor
Badan Agricultural & Cont. Co. Ltd January 2020 – Present
PROJECTS:
January2010 – July2012 ➢ DD-2021-056 Wadi Hanifah, Phase-1, DGDA, Riyadh
ATS Infrastructure Ltd ➢ DD-2021-055 Wadi Hanifah, Phase-1, DGDA, Riyadh
Site Engineer
Produce detailed reports on project progress, prepare & negotiate project
final account Commercial management of various work (Landscaping)
packages through an in-depth understanding of contractual and legal
processes. Ensure that the Employer’s. Position is always protected by
PROFESSIONAL SKILLS
developing and implementing robust commercial management protocols.
Variations Supervise and submit the performance of the Cost Managers from various
projects. I am responsible for the commercial negotiation and certification
Value Engineering
of various Contractor claims for prolongation of resources, cost, and time
Cost Report impact of disruptions.
Budget.
Contract Administration RESPONSIBILITIES:
Financial Reporting and Analysis
➢ Review of the Tender documents for major activities i.e., Civil,
Tender Evaluation Landscaping, MEP Services, Firefighting…etc.
Preparing Cost Estimates ➢ Prepare Interim Payment Certificate (IPC) and submit through Aconex
and also follow up with Consultant and Client.
Reviewing Contractual
➢ Study rejected documents on Aconex and coordinate with Site Team
Evaluation of Variations for their revisions and update in the log.
BOQ Preparations ➢ Preparation of Material Tracking Sheet.
➢ Preparation of Material Consumption sheet and its reconciliations.
Agreement of Final Accounts ➢ Preparation of daily Site Report for Client and to submit in Aconex.
Assessment of Interim valuations ➢ Tracking of daily Progress received from site.
➢ Checking of Interim & Final Invoices of Sub-Contractors
➢ Material Reconciliation, Recovery of mobilization Advance, Secured
PROFESSIONAL MEMBERSHIP Advance etc.
Saudi Council of Engineers ➢ Preparation of Material Submittal for approval and prepare of the
Membership No: 868207 quantity of materials as required & also raising purchase request.

CURRICULUM VITAE 1
ACADEMIC QUALIFICATION ➢ Study Design/ Plans/ Revisions & corresponding regarding cost
estimation and submit to management for review.
BTECH CIVIL ENGINEERING ➢ Review of the fuel, steel, Cement…etc. consumption reports, Transfer
(PUNJAB TECHNICAL of material report, Quality test reports.
➢ Preparation of Variation analysis and review of Claims in compliance
UNIVERSITY@ 2010) with contractual aspects.
➢ Perform cost analysis and draw up reports on changes to works and
contractor’s claims.
PERSONAL INFORMATION ➢ Assist the Project Manager to prepare and approve contractor’s final
accounts.
Date of Birth – 12 Jan 1988 ➢ Finalize the final Account of projects.
➢ Preparing Variation Order due to design changes, as per Engineers
Nationality – Indian Instruction and as per RFI’s
Passport Number – R7509888 ➢ Provide assistance to Project Manager on subcontractor’s contractual
Marital Status - Married issues.

LANGUAGES
Eldeco Infr. & Properties Ltd –New Delhi Aug 2012 – April 2014
English, Urdu & Hindi
Properties owned and managed by Eldeco Infrastructure and Properties Ltd are
located in prime areas of India.
COMPUTER APPLICATION
PROJECTS:
MS Office ➢ Magnolia Park, Aamantran and swagatam (sec-119, Noida, U.P)
Aconex ➢ Eldeco Country (Sonepath, Haryana)
Farvision ➢ Eldeco Jalandhar (Jalandhar, Punjab)
Canddy ➢ Mystic Green (Greater Noida).
Cost X
RESPONSIBILITIES:
Sketchup
Autocad ➢ Responsible for keeping the design team informed regarding budget.
Civil 3D ➢ Preparation of Interim Valuations with substantial documents.
➢ Provide assistance to Project Manager on subcontractor’s contractual
issues.
ADDRESS ➢ Evaluate variations and handle contractual correspondences.
➢ Arranging progress meetings and providing updates to the Client with
projection of costs as required.
1. Local Address ➢ Liaise with sub-contractors to advise on the requirements of Contract.
➢ Preparation of Variation analysis and review of Claims in compliance
ANMATI, AL-MALAZ, RIYADH- with contractual aspects.
12629 (SAUDI ARABIA) ➢ Perform cost analysis and draw up reports on changes to works and
contractor’s claims.
2. Local Address ➢ Assist the Project Manager to prepare and approve contractor’s final
accounts.
FRIENDS COLONY, CHAKNOOR
ROAD, DHARAMPUR, ➢ Finalize the final Account of projects.
SAMASTIPUR, BIHAR (INDIA) ➢ Resolving disputes between contracting parties
PIN- 848101 ➢ Preparing various quantity surveying documents including a budgetary
estimate from sketch, proposal, concept design drawings to Evaluate
Feasible Studies.
➢ Attend meetings and provide updates, justification to Engineer as
required.
➢ Review and respond to contractor's requests for Commercial
clarification / information.
➢ Analysis of the breakdown percentages according to specification &
BOQ items.
➢ Inspect site for collation of information for monthly statement which
includes but not limited to recommendation on interim payments,
statement of claims from contractor, anticipated claims from contractor
and assessment of costs of works and expected final cost.

CURRICULUM VITAE 2
➢ Interpret contracts, and ensure the client chooses the right contract for
them and then secures the best outcome from that contract.
➢ Perform cost analysis and draw up reports on changes to works and
contractor’s claims.

Nostri Architect – New Delhi Aug 2012 – August 2012 – April 2014
I was engaged with pre-contract roles for below mentioned projects.

PROJECTS:-

Client: Rites LTD. Projects:-


➢ Detail Estimates of Nalanda Classroom Complex, IIT Kharagpur (West
Bengal)
➢ Detail estimate of Delhi Police Office and Staff Quarters (New Delhi).

Client: Wave Infrastructure LTD. Projects:-


➢ Wave City Center, Sec-32, Noida
➢ Wave One, Sec-18, Noida
➢ Wave Vertue, Sec-18, Noida Pre-Contract

Pre-Contract Duties were:

➢ Production of Bills of Quantities and specifications.


➢ Preparation of Preliminary Estimate and Detail Estimate.
➢ Preparation of rates of analysis for Non-Scheduled using market
current rate & Pro-rata method
➢ Quotations Enquiries from Markets
➢ Preparing Tender Documentation.
➢ Examining tenders received and reporting thereon.
➢ Facilitate Value engineering exercises.
➢ Benchmarking of key cost drivers, rate analysis, etc.

Post-Contract Duties were:

➢ Take off and prepare BOQ’s in accordance with standard


methods of measurements.
➢ Quantify and value the works on site in accordance with
construction drawings and specifications and agreed rates.
➢ Understanding of contract terms and conditions.
➢ Reconciliation of quantities due to changes in design, scope of work
and on-site revisions with the consultant’s advice notice /
instruction.
➢ Evaluation of Sub-Contractors’ payment application, issuing
payment certificates.

➢ Evaluation of Supplier & Sub-cont. Payment applications & invoices


➢ Final Account negotiations and closing final accounts.
➢ Preparing Variation Order due to design changes, as per Engineer
Instruction and RFI’s.
➢ Arrange workshops and agree the quantities and rates with a
consultant for variations.
➢ Preparation of Purchase Requisition as per work order for Vendor.
➢ Insure the required construction materials at site and issue to material
purchase requisition.
➢ Updating Drawings in Auto Cad for additional Proposed work at Site.

CURRICULUM VITAE 3
ATS Infrastructure Ltd, Chandigarh Jan 2010 – July 2012

PROJECTS:
➢ ATS Golf Meadows (Muhali, Chandigarh)

RESPONSIBILITIES:
➢ Joint measurement with project consultant.
➢ Coordination between sub-contractor and client.
➢ Taking off quantities for the progress of the works executed.
➢ Estimating
➢ Materials Ordering and Management
➢ Preparation of Tender documents
➢ Attending the Bid meetings
➢ Arranging site Visit
➢ Supervision and coordination of the works.
➢ Preparation of Bills of Quantities.
➢ Preparation of proposed Design Change Estimate
according to issued Engineer’s Instruction.
➢ Participate in the preparation of final accounts with all the
supporting documentation.

TRAINING AND PROJECTS

ATS INFRASTRUCTURE LIMITED. (Mohali, Punjab).

May 2009 to august 2009 with ATS INFRASTRUCTURE LTD., work with 5-
Star Hotel and plotting of 80 acres land by Digital Theodolite.

COLLEGE PROJECTS:

➢ Survey Camp at Solan (H.P.) for 2 Months (Summer training)


➢ Survey Camp at Solan (H.P.) for 2 Months (Summer training)
➢ Survey Camp at Solan (H.P.) for 2 Months (Summer training)

DECLARATION:

I hereby declared that all the above information’s are correct according to my knowledge.

DATE : __/__/____
PLACE : Ar Reyadh Mohammad Gyasuddin Ahsan Arfi

CURRICULUM VITAE 4

You might also like