A 0 5 B 5 7 C 7 22 D 22 24 E 24 25 F 25 26 G 26 70 H 70 72
5 2 15 2 1 1 44 2
2.90% 1.16%
1 Mobilization/Demobilization 4.06% ₱79,497.60 A/H 7 ############### ######
₱56,784.00 ₱22,713.60
2.25%
2 Temporary Facilities 2.25% ₱44,141.24 B 2 ######
₱44,141.24
0.56% 0.56% 0.08%
3 Occupational Safety & Health Program 1.20% ₱23,473.67 C 15 #############################################
₱10,954.38 ₱10,954.38 ₱1,564.91
0.26%
4 Signages 0.26% ₱5,001.61 D 2 ######
₱5,001.61
2.58%
5 Subgrade Preparation 2.58% ₱50,655.44 E 1 ###
₱50,655.44
21.51%
6 Aggregate Base Course 21.51% ₱421,646.91 F 1 ###
₱421,646.91
8.52% 25.55% 4.26% 29.81%
7 Portland Cement Concrete Pavement 68.14% ₱1,335,583.53 G 44 ######################## C U R I N G P E R I O D ########################
₱166,947.94 ₱500,843.82 ₱83,473.97 ₱584,317.79
Total Project Cost & Percentage 100.00% ₱1,960,000.00
PHYSICAL 5.15% 0.56% 0.56% 32.95% 25.55% 0.00% 0.00% 0.00% 4.26% 29.81% 1.16%
WEEKLY PROGRESS
FINANCIAL ₱100,925.24 ₱10,954.38 ₱10,954.38 ₱645,816.81 ₱500,843.82 ₱0.00 ₱0.00 ₱0.00 ₱83,473.97 ₱584,317.79 ₱22,713.60
PHYSICAL 5.15% 5.71% 6.27% 39.22% 64.77% 64.77% 64.77% 64.77% 69.03% 98.84% 100.00%
COMMULATIVE PROGRESS
FINANCIAL ₱100,925.24 ₱111,879.62 ₱122,834.00 ₱768,650.81 ₱1,269,494.64 ₱1,269,494.64 ₱1,269,494.64 ₱1,269,494.64 ₱1,352,968.61 ₱1,937,286.40 ₱1,960,000.00
1 Mobilization/Demobilization 7
Driver 1 1 1 1 1 1 1
2 Temporary Facilities 2
Foreman 1 1
Skilled Worker 2 2
Laborer 7 7
3 Occupational Safety & Health Program 15
First Aider 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4 Signages 2
Skilled Worker 1 1
5 Subgrade Preparation 1
Foreman 1
Skilled Worker 2
6 Aggregate Base Course 1
Foreman 1
Skilled Worker 2
7 Portland Cement Concrete Pavement 44 C U R I N G P E R I O D
Foreman 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Skilled Worker 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Laborer 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
Laborer (Curing Works) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total Project Cost & Percentage
1 Mobilization/Demobilization 7
Dumptruck 1 1 1 1 1 1 1
2 Temporary Facilities 2
3 Occupational Safety & Health Program 15
4 Signages 2
5 Subgrade Preparation 1
Road Grader 1
Vibratory Road Roller 1
Water Truck 1
6 Aggregate Base Course 1
Road Grader 1
Vibratory Road Roller 1
Water Truck 0.5
Bar Cutter 1 1 1
Concrete Saw Blade 1 0.5
For
GM/PM/SM Within 1 week
Implementation
For
PM/SM Quarterly
Implementation
For
PM/SM Monthly
Implementation
For
Operator/ Driver Daily
Implementation
LOGO CONTRACTOR
Bid. No. :
Concreting of Dalaupon FMR Barangay Dalaupon, Tayasan, Negros
Contract Title:
Oriental
CONSTRUCTION METHOD
I.INTRODUCTION
The contract works to be done consist of furnishing of materials, equipment and labor for the
project stated above.
II.BRIEF DESCRIPTION OF THE CONTRACT WORKS
Upon receipt of the Notice to Proceed, a pre-construction meeting with the procuring entity in
order to discuss the details of the projects and make necessary suggestion regarding the project.
Provide the construction safety warnings in the project, fabricate and install the billboards in
the project site. Contractor’s safety officer conducts meeting to all workers before the project
commence to promote safety awareness.
Inform the engineer in-charge to schedule the ocular inspection for the project based on the
approved program of works and start and construction activities.
All scope of work, materials and other works to be done on the site should be approved by the
project/resident engineer assigned for strict compliance of the approved Plans and Specifications
of the contract.
When the project finally completed and with all the defects and deficiencies corrected, final
inspection will be done prior to turnover.
Before moving out, all debris from construction site and vicinity must be cleared and disposed
PROPRIETOR