PERT-CPM

A 0 5 B 5 7 C 7 22 D 22 24 E 24 25 F 25 26 G 26 70 H 70 72
5 2 15 2 1 1 44 2

Concreting of Dalaupon FMR Barangay Dalaupon, Tayasan, Negros Oriental


PREPARED BY:
Chart Title
BAR CHART, S-CURVE, & CASH FLOW
No. Scope of works W.T Amount Duration W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11
(%) (PHP) (DAYS) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77

2.90% 1.16%
1 Mobilization/Demobilization 4.06% ₱79,497.60 A/H 7 ############### ######
₱56,784.00 ₱22,713.60
2.25%
2 Temporary Facilities 2.25% ₱44,141.24 B 2 ######
₱44,141.24
0.56% 0.56% 0.08%
3 Occupational Safety & Health Program 1.20% ₱23,473.67 C 15 #############################################
₱10,954.38 ₱10,954.38 ₱1,564.91
0.26%
4 Signages 0.26% ₱5,001.61 D 2 ######
₱5,001.61
2.58%
5 Subgrade Preparation 2.58% ₱50,655.44 E 1 ###
₱50,655.44
21.51%
6 Aggregate Base Course 21.51% ₱421,646.91 F 1 ###
₱421,646.91
8.52% 25.55% 4.26% 29.81%
7 Portland Cement Concrete Pavement 68.14% ₱1,335,583.53 G 44 ######################## C U R I N G P E R I O D ########################
₱166,947.94 ₱500,843.82 ₱83,473.97 ₱584,317.79
Total Project Cost & Percentage 100.00% ₱1,960,000.00

PHYSICAL 5.15% 0.56% 0.56% 32.95% 25.55% 0.00% 0.00% 0.00% 4.26% 29.81% 1.16%
WEEKLY PROGRESS
FINANCIAL ₱100,925.24 ₱10,954.38 ₱10,954.38 ₱645,816.81 ₱500,843.82 ₱0.00 ₱0.00 ₱0.00 ₱83,473.97 ₱584,317.79 ₱22,713.60
PHYSICAL 5.15% 5.71% 6.27% 39.22% 64.77% 64.77% 64.77% 64.77% 69.03% 98.84% 100.00%
COMMULATIVE PROGRESS
FINANCIAL ₱100,925.24 ₱111,879.62 ₱122,834.00 ₱768,650.81 ₱1,269,494.64 ₱1,269,494.64 ₱1,269,494.64 ₱1,269,494.64 ₱1,352,968.61 ₱1,937,286.40 ₱1,960,000.00

Concreting of Dalaupon FMR Barangay Dalaupon, Tayasan, Negros Oriental


MAN POWER SCHEDULE
No. Scope of works Duration W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11
(DAYS) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77

1 Mobilization/Demobilization 7
Driver 1 1 1 1 1 1 1
2 Temporary Facilities 2
Foreman 1 1
Skilled Worker 2 2
Laborer 7 7
3 Occupational Safety & Health Program 15
First Aider 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4 Signages 2
Skilled Worker 1 1
5 Subgrade Preparation 1
Foreman 1
Skilled Worker 2
6 Aggregate Base Course 1
Foreman 1
Skilled Worker 2
7 Portland Cement Concrete Pavement 44 C U R I N G P E R I O D
Foreman 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Skilled Worker 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Laborer 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
Laborer (Curing Works) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total Project Cost & Percentage

Concreting of Dalaupon FMR Barangay Dalaupon, Tayasan, Negros Oriental


EQUIPMENT SCHEDULE
No. Scope of works Duration W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11
(DAYS) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77

1 Mobilization/Demobilization 7
Dumptruck 1 1 1 1 1 1 1
2 Temporary Facilities 2
3 Occupational Safety & Health Program 15
4 Signages 2
5 Subgrade Preparation 1
Road Grader 1
Vibratory Road Roller 1
Water Truck 1
6 Aggregate Base Course 1
Road Grader 1
Vibratory Road Roller 1
Water Truck 0.5

7 Portland Cement Concrete Pavement 44 C U R I N G P E R I O D


One Bagger Concrete Mixer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Concrete Vibrator 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Water Truck 1 0.5

Bar Cutter 1 1 1
Concrete Saw Blade 1 0.5

Total Project Cost & Percentage

Concreting of Dalaupon FMR Barangay Dalaupon, Tayasan, Negros Oriental


COSH PLAN
Concreting of Dalaupon FMR Barangay Dalaupon, Tayasan, Negros Ori
Name:
CONCERN (PROBLEM) ACTION PLAN
1. OHS policy not yet establish Develop OHS policy and approval
Roll-out [dissemination] and displays
2. Safety Officer in-charged no DOLE Comply to DOLE training requirements for
accreditation Safety Officer
Submit CV and credentials to DOLE for
evaluation
3. OHS committee not yet develop Establish OHS Committee
Conduct OHS meeting and record minutes of
meeting
Submit to DOLE for compliance

Develop emergency preparedness procedure


4. Emergency preparedness procedure not yet
develop [for fire, earthquake, typhoon, flood,
lightning, spills, etc.] and approval

Conduct training to all ERT members


Carry-out drills as per the procedure

5. Workplace and equipment/tools/devices


Develop inspection procedure and approval
Inspection not yet develop

Carry-out quarterly inspection


[tagging/sticker system] to all
equipment/vehicles/tools/devices

Carry-out weekly workplace inspection

Carry-out pre-inspection of equipment


/vehicle
H PLAN
ay Dalaupon, Tayasan, Negros Oriental
Location: Date:
RESPONSIBLE TARGET TIME STATUS
GM/PM/SM Within 1 week In Progress
GM/PM/SM Within 2 weeks and onward In Progress

GM/PM/SM Within 1 week In Progress

GM/PM/SM Within 1 week In Progress

GM/PM/SM Within 1 week In Progress

GM/PM/SM Weekly In Progress

GM/PM/SM Monthly In Progress

GM/PM/SM Within 1 week In Progress

GM/PM/SM Within 1 week In Progress


PM/SM Monthly In Progress

For
GM/PM/SM Within 1 week
Implementation

For
PM/SM Quarterly
Implementation

For
PM/SM Monthly
Implementation
For
Operator/ Driver Daily
Implementation
LOGO CONTRACTOR

Bid. No. :
Concreting of Dalaupon FMR Barangay Dalaupon, Tayasan, Negros
Contract Title:
Oriental

CONSTRUCTION METHOD

I.INTRODUCTION
The contract works to be done consist of furnishing of materials, equipment and labor for the
project stated above.
II.BRIEF DESCRIPTION OF THE CONTRACT WORKS

The scope of work includes equipment mobilization and demobilization, construction of


temporary facilities, have an occupational safety and health program, provide signages, subgrade
preparation, aggregate base course, and portland concrete cement pavamenet.

III.CONSTRUCTION METHOD AND PROCEDURES

Upon receipt of the Notice to Proceed, a pre-construction meeting with the procuring entity in
order to discuss the details of the projects and make necessary suggestion regarding the project.

Provide the construction safety warnings in the project, fabricate and install the billboards in
the project site. Contractor’s safety officer conducts meeting to all workers before the project
commence to promote safety awareness.

Inform the engineer in-charge to schedule the ocular inspection for the project based on the
approved program of works and start and construction activities.

All scope of work, materials and other works to be done on the site should be approved by the
project/resident engineer assigned for strict compliance of the approved Plans and Specifications
of the contract.

When the project finally completed and with all the defects and deficiencies corrected, final
inspection will be done prior to turnover.

Before moving out, all debris from construction site and vicinity must be cleared and disposed

PROPRIETOR