Kop 77-1 01-27 Ec El Electrical RV - JL
Kop 77-1 01-27 Ec El Electrical RV - JL
Kop 77-1 01-27 Ec El Electrical RV - JL
TOILET
FOR C.C CASN UNDERSEA TOILET
KABINET COMMANDER
COMMANDER'S CABINET
CASN
SUB-SEA UNDER WATER CABINET AREA 1
GENERAL TOILET AREA CABINET SUB UNIIT CASN GENERAL TOILET
(GENT) (GENT) 2
MAIN LOBBY
WARE
HOUSE WARE
GENERAL ADMINISTRATION UNDERSEA HOUSE
VICE CABINET CASN GENERAL ADMINISTRATION
UNDERSEA VICE
GENERAL TOILET COMANDER CASN GENERAL TOILET
COMMANDER CABINET
(WOMAN) (WOMAN) 1
TERRACE 2
TERRACE 3
CORRIDOR CORRIDOR
RECEPTIONIST
FLEET COMMANDER'S
CABINET
BORDESS BORDESS
TERRACE 1
APPROVED BY
CONSULTING SERVICES FOR DETAILED VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA LIGHTING & RECEPTACLE WIRING
DILI MUNICIPALITY
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DIAGRAM 1-2 FLOOR OFFICE DRAWING NO.
XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE
EC.01.01.01
HERA AMARO CAMOES MAU-LOCO
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
TOILET
FOR C.C CASN TOILET
KABINET COMMANDER
COMMANDER'S CABINET
WARE
HOUSE WARE
HOUSE
APPROVED BY
CONSULTING SERVICES FOR DETAILED VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
DILI MUNICIPALITY JUDUL GAMBAR
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DRAWING NO.
XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HERA AMARO CAMOES MAU-LOCO HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE EC.01.02.02
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
MINISTÉRIO DAS OBRAS PÚBLICAS SHEET NO.
DESIGN CONSULTANT OWNER
PROJECT DRAWING VICE MINISTÉRIO DAS OBRAS PÚBLICAS
CLIENT/PROJECT OWNER PREPARED BY
TITLE TITLE DIRECÇÃO GERAL DE HABITAÇÃO E URBANISMO
Ministério das
Obras Públicas
DRAWING BY VERIFIED BY APPROVED BY MINISTRY OF DEFENCE
Direcção Nasional de Edificações (DNE)
APPROVED BY
CONSULTING SERVICES FOR DETAILED LIGHTING & RECEPTACLE VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
DILI MUNICIPALITY WIRING DIAGRAM
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DRAWING NO.
1-2 FLOOR WORK SHOP XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HERA AMARO CAMOES MAU-LOCO HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE EC.01.03.03
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
TKO LAMP SLIM TKI LAMP TUBE TKI LAMP TUBE TKI LAMP TUBE TKI LAMP TUBE DOWN LIGHT LED BARET LAMP LED DOWN LIGHT LED KONTAK KONTAK EF KONTAK
LED LED LED 2X16W LED 2X16W 12W-DAY LIGHT 10W-DAY LIGHT + 9W-DAY LIGHT
EXIT LAMP
300W- -100W - AC 500W- CONNECTED LOAD
LED 1X16W-DAY
2X16W+COVER 2X16W+COVER +REFLECTOR +REFLECTOR NICCAD
LED 1x10W
1P 1P 1P LOAD
KODE LIGHT
-DAY LIGHT +NICCAD -DAY LIGHT +NICCAD
(W) ØRN ØSN ØTN
EXIT 1P AC
(W) (W) (W)
DARI SDP-P.K
LIGHTING
WIRING
1-2 FLOOR
DIAGRAM
&WORK
RECEPTACLE
SHOP
from SDP-P.K
LIGHTING
WIRING
1-2 FLOOR
DIAGRAM
&WORK
RECEPTACLE
SHOP
LIGHTING
WIRING
1-2 FLOOR
DIAGRAM
&WORK
RECEPTACLE
SHOP
LIGHTING
WIRING
1-2 FLOOR
DIAGRAM
&WARE
RECEPTACLE
HOUSE
APPROVED BY
CONSULTING SERVICES FOR DETAILED
LIGHTING & RECEPTACLE VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DILI MUNICIPALITY WIRING DIAGRAM DRAWING NO.
1-2nd FLOOR WARE HOUSE XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HERA HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE
EC.01.04.04
AMARO CAMOES MAU-LOCO
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : da Defesa
Date: Date:
P.LK - WH (Lamp-Socket Panel)
TKO LAMP SLIM TKO LAMP SLIM TKI LAMP TUBE TKI LAMP TUBE DOWN LIGHT LED DOWN LIGHT LED BARET LAMP LED HIGHT BAY LAMP KONTAK KONTAK KONTAK
LED 2X16W LED 2X16W 11W-DAY LIGHT 9W-DAY LIGHT 10W-DAY LIGHT + LED 50W-DAY
EXIT LAMP
200W- 1000W- CF -200W - CONNECTED LOAD
LED 1X16W-DAY LED 1X16W+
+REFLECTOR +REFLECTOR NICCAD LIGHT
LED 1x10W
1P 3P 1P LOAD
KODE LIGHT NICCAD
-DAY LIGHT +NICCAD
(W) ØRN ØSN ØTN
EXIT 1P 3P
(W) (W) (W)
from LVMDP
APPROVED BY
CONSULTING SERVICES FOR DETAILED
LIGHTING & RECEPTACLE VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DILI MUNICIPALITY WIRING DIAGRAM 1-2nd DRAWING NO.
FLOOR WARE HOUSE XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA
EC.01.05.05
HERA AMARO CAMOES MAU-LOCO HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : da Defesa
Date: Date:
SDP - WS (Workshop Panel.)
TKO LAMP SLIM TKO LAMP SLIM TKI LAMP TUBE TKI LAMP TUBE DOWN LIGHT LED DOWN LIGHT LED BARET LAMP LED HIGHT BAY LAMP KONTAK KONTAK KONTAK
LED 2X16W LED 2X16W 11W-DAY LIGHT 9W-DAY LIGHT 10W-DAY LIGHT + LED 50W-DAY
EXIT LAMP
200W- 1000W- CF -200W - CONNECTED LOAD
LED 1X16W-DAY LED 1X16W+
+REFLECTOR +REFLECTOR NICCAD LIGHT
LED 1x10W
1P 3P 1P LOAD
KODE LIGHT NICCAD
-DAY LIGHT +NICCAD
(W) ØRN ØSN ØTN
EXIT 1P 3P
(W) (W) (W)
DARI LVMDP
APPROVED BY
CONSULTING SERVICES FOR DETAILED
LIGHTING & RECEPTACLE VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DILI MUNICIPALITY WIRING DIAGRAM 1-2 DRAWING NO.
XXXX Ir. Budi Susetyo, MT Ir. Suhardi
FLOOR WORK SHOP Team Leader Director of consultant,
AA Engineer Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HERA HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE
EC.01.06.06
AMARO CAMOES MAU-LOCO
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : da Defesa
Date: Date:
NICAB BATERRY WIRING WIRING PEMASANGAN NICAB BATERRAY
DOWNLIGHT LED 9 WATT+ NICCAD TUBE LED 2 X 16 WATT (+1 NICCAD)
DISCRIPTION OF CONNECTED
LOAD LOAD (W)
SPARE
SUB TOTAL :
Div.FACTOR 1,2
MAX.Div.DEMAND LOAD
(PF 0,9) (kVA) 27.078
DARI LVMDP
APPROVED BY
CONSULTING SERVICES FOR DETAILED SDP.1 & NICCAD VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DILI MUNICIPALITY BATTERYWIRING DRAWING NO.
XXXX Ir. Budi Susetyo, MT Ir. Suhardi
DIAGRAM OFFICE AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE
EC.01.07.07
HERA AMARO CAMOES MAU-LOCO
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
PKG ( AMF ) PUTR BLOK C
BEBAN (Watt)
NO NAMA PANEL
PLN GENSET
FIRE/GENSET
ss POWER
GENSET METER
DKWH COSØ OLR EFR
150 KVA
1
G
DE
DGPT
TO PLTS
SOLAR CELL
2
(OPTIONAL)
APPROVED BY
CONSULTING SERVICES FOR DETAILED VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
DILI MUNICIPALITY
ELECTRICAL SINGLE
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DRAWING NO.
LINE DIAGRAM XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HERA AMARO CAMOES MAU-LOCO HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE EC.01.08.08
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
P.PFT-FILTER TANK
CONNECTED LOAD
LOAD
NO DESCRIPTION
(Watt) ØRN ØSN ØTN
(W) (W) (W)
FROM SDP.PP
P.PT-TRANSFER
CONNECTED LOAD
LOAD
NO DESCRIPTION
(Watt) ØRN ØSN ØTN
(W) (W) (W)
FROM SDP.PP
APPROVED BY
CONSULTING SERVICES FOR DETAILED TRANSFER PUMP- VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
DILI MUNICIPALITY FILTER PUMP PANEL
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DRAWING NO.
WIRING XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE
EC.01.09.09
HERA AMARO CAMOES MAU-LOCO
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
PC.AK- WASTE WATER POMP
CONNECTED LOAD
LOAD
NO DESCRIPTION (Watt) ØRN ØSN ØTN
(W) (W) (W)
FROM SDP.PP
SDP-PUMP
BEBAN (Watt)
R S T Group
A A A
ss
V R S T
2A
APPROVED BY
CONSULTING SERVICES FOR DETAILED VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA WASTE WATER PUMP-
DILI MUNICIPALITY
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg
SDP PUMP PANEL WIRING DRAWING NO.
XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HERA HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE EC.01.10.10
AMARO CAMOES MAU-LOCO
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
P.PB-BOSSTER
CONNECTED LOAD
LOAD
NO DESCRIPTION
(Watt) ØRN ØSN ØTN
(W) (W) (W)
FROM SDP.PP
SPARE - SPARE -
SPARE - SPARE -
SPARE - SPARE -
SPARE SPARE
SPARE SPARE
FROM LVMDP
FROM LVMDP
SUB TOTAL : SUB TOTAL :
APPROVED BY
CONSULTING SERVICES FOR DETAILED BOOSTER PUMP & VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DILI MUNICIPALITY SDP SLIDING DOCK DRAWING NO.
WIRING DIAGRAM XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HERA HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE EC.01.11.11
AMARO CAMOES MAU-LOCO
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
P.PJU- PARKING AREA
LOAD (Watt)
Group
500
TOTAL
APPROVED BY
CONSULTING SERVICES FOR DETAILED
OUT DOOR & PARKING VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
DILI MUNICIPALITY AREA WIRING DIAGRAM
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DRAWING NO.
XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HERA HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE EC.01.12.12
AMARO CAMOES MAU-LOCO
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
MINISTÉRIO DAS OBRAS PÚBLICAS SHEET NO.
DESIGN CONSULTANT OWNER
PROJECT DRAWING VICE MINISTÉRIO DAS OBRAS PÚBLICAS
CLIENT/PROJECT OWNER PREPARED BY
TITLE TITLE DIRECÇÃO GERAL DE HABITAÇÃO E URBANISMO
Ministério das
Obras Públicas
DRAWING BY VERIFIED BY APPROVED BY MINISTRY OF DEFENCE
Direcção Nasional de Edificações (DNE)
1500mm
15°
EXIT EXIT EXIT
SDP
400
300
APPROVED BY
CONSULTING SERVICES FOR DETAILED
LIGHTING FIXTURE - VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DILI MUNICIPALITY OUT DOOR & PANEL DRAWING NO.
XXXX Ir. Budi Susetyo, MT Ir. Suhardi
DETAIL INSTALATION Team Leader Director of consultant,
AA Engineer Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HERA HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE EC.01.14.14
AMARO CAMOES MAU-LOCO
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
Ø.32 mm
LIGHTNING
PROTECTION PLAT Ø 5 mm
(RADIUS PROTECTION 60M)
FIBERGLASS
Obtrucle Light (LED)
4W, 220V, 50Hz DI LAS
SKRUP Ø 1 1/2 mm
FIBERGLASS Photo Elektrik Switch BILA PAKAI BAUT Ø 5 mm
10
40
60
Pipa PVC AW Ø.32
10
Klem Pipa
40
Baut Klem Coaxial 2C-35 mm2
BRICK
60
50
Pipa Pelindung Coaxial 2C-35mm2
50
60
ENTRANCE
ROTATING NUT Wall
SPANNER
Besi Pengangkat
Clamp
60
Klem
10 Ground level (GL)
NYA 1C-70mm2 Hook Support
ground level (GL)
10
Ke Lightening Counter & Ground Chain Welded
Pasangan Bata Tanah Dipadatkan
BC/Coaxial connection
NYM 3C-2,5 mm2 brick
to Cooper Rod
concrete roof ...
Ke Power Lantai
Drainage
Maxs. resistance 1 ohm Drainage
Kerikil
gravel
UP TO WATER
Skal a NTS
APPROVED BY
CONSULTING SERVICES FOR DETAILED VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA LIGHTNING PROTECTION
DILI MUNICIPALITY
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg
DETAIL INSTALATION DRAWING NO.
XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE
EC.01.15.15
HERA AMARO CAMOES MAU-LOCO
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
Beton Cor
lifting tool
Ground level (GL)
Besi Pengangkat
60
50
Balancing resistor Klem Balancing resistor
potential MASTER
BEDROOM potential
Ground level (GL)
10
40
MASTER
BEDROOM/OFFICE
BATHROOM 60
BC & Cooper Rod
WALK IN CLOSET concrete brick
connection
ENSUITE 2
Kerikil
10 40 10
10
CU Rod Ø.20mm - 12 m
grounding resistance < 2 0hm
40
60
10
40
APPROVED BY
CONSULTING SERVICES FOR DETAILED VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
DILI MUNICIPALITY SUPPORTING GROUNDING
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg
DETAIL INSTALATION DRAWING NO.
XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA
EC.01.17.17
HERA AMARO CAMOES MAU-LOCO HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
575.00
R. GAS GENSET
VIEW B - B
skala 1 : 100
575.00 575.00
VIEW A - A
skala 1 : 100
APPROVED BY
CONSULTING SERVICES FOR DETAILED VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
DILI MUNICIPALITY
POWER HOUSE
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DRAWING NO.
VIEW SIDE XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HERA AMARO CAMOES MAU-LOCO HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE EC.01.18.18
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
DETAIL TANKI HARIAN
TANKI BBM BULANAN KAP : 15.000 Lt TAMPAK DEPAN
NTS
NTS
NTS
NTS
COAPLING PENGISI
APPROVED BY
CONSULTING SERVICES FOR DETAILED
GENSET FUEL PUMP VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DILI MUNICIPALITY SCHEMATIC INSTALATION DRAWING NO.
XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HERA AMARO CAMOES MAU-LOCO HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE EC.01.19.19
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
DINDING
DINDING
POTONGAN C DETAIL LAPISAN PEREDAM SUARA (SOUND PROOF) POTONGAN C DETAIL LAPISAN PEREDAM SUARA (SOUND PROOF)
NTS NTS NTS NTS
DINDING BASE
FRAME GENSET
M 12
50
RUBBER VIBRATION = 2 CM
SPINDLE PIN
ROCK WOOL
VARIABLE
DIBUNGKUS GLASS CLATH
DENSITY=80 kg/cm2 GENSET SUPPORT
ANKER BOLT M 16
SPINDLE PIN
PAPAN PAPAN
PAKU KELING
165
POTONGAN C DETAIL LAPISAN PEREDAM SUARA (SOUND PROOF)
NTS NTS
APPROVED BY
CONSULTING SERVICES FOR DETAILED VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
DILI MUNICIPALITY
GENSET SILENCER
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DRAWING NO.
DETAIL INSTALATION XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HERA AMARO CAMOES MAU-LOCO HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE EC.01.20.20
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
NYA 2C-35mm2
NYA 1C-70mm2
APPROVED BY
CONSULTING SERVICES FOR DETAILED LIGHTNING AREA (C) VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
DILI MUNICIPALITY RADIUS PROTECTION
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DRAWING NO.
125 METER
LIGHTNING
LAYOUT TOP
PROTECTION
& SIDE VIEW
APPROVED BY
CONSULTING SERVICES FOR DETAILED LIGHTNING PROTECTION VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA LAYOUT OFFICE
DILI MUNICIPALITY
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DRAWING NO.
LIGHTNING
LAYOUT TOP
PROTECTION
& SIDE VIEW
RUANG RUANG
APPROVED BY
CONSULTING SERVICES FOR DETAILED LIGHTNING PROTECTION VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
DILI MUNICIPALITY LAY OUT OFFICE
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DRAWING NO.
XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HERA HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE EL.02.03.23
AMARO CAMOES MAU-LOCO
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
NORTH VIEW FASADE
0M 1M 2M 3M 4M 5M 10M
APPROVED BY
CONSULTING SERVICES FOR DETAILED
LIGHTNING PROTECTION VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
DILI MUNICIPALITY WARE HOUSE
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DRAWING NO.
XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HERA HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE EL.02.04.24
AMARO CAMOES MAU-LOCO
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
RUANG
RUANG
APPROVED BY
CONSULTING SERVICES FOR DETAILED
LIGHTNING PROTECTION VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DILI MUNICIPALITY WORKSHOP DRAWING NO.
XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HERA HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE EL.02.05.25
AMARO CAMOES MAU-LOCO
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
RUANG
RUANG RUANG
APPROVED BY
CONSULTING SERVICES FOR DETAILED VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
DILI MUNICIPALITY
LIGHTNING PROTECTION
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg
WORKSHOP DRAWING NO.
XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HERA HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE EL.02.06.26
AMARO CAMOES MAU-LOCO
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa
Besi Pengangkat
10
Ø.32 mm
BC connection
PLAT Ø 5 mm
to Cooper Rod BRICK WALL
CU Rod Ø.20mm - 10 m
grounding resistance </=2 0hm
Pipa Pelindung N2XSY 2C-35mm2
Lewat Dinding Samping
Beton Cor
A Klem
A Muka Tanah (GL)
Dinding Gedung
Besi Pengangkat
Pemasangan Bata
60
50
Klem
60
10 Muka Tanah (GL)
10 40 10
Tanah Dipadatkan
Pasangan Bata
40
10
60
Drainase
S k a l a N TS
Kerikil
40
60
CU Rod Ø.20mm - 6 m CONTROL BOX DETAIL
tahanan tanah 1 0hm
S k al a N TS
10
DETAIL BAK KONTROL ELEKTRODA
S k a l a N TS
40
APPROVED BY
CONSULTING SERVICES FOR DETAILED LIGHTNING EQUIPMENT VERIFIED BY: APPROVED BY:
ENGINEERING DESIGN FOR NAVY PORT HERA
DILI MUNICIPALITY DETAIL INTSALATION
.\11. DED NAVY PORT TIMOR LESTE\logo intimulya.jpg DRAWING NO.
XXXX Ir. Budi Susetyo, MT Ir. Suhardi
AA Engineer Team Leader Director of consultant,
Crescêncio Amaral Lopes, Arch
LOCATION : Lino Pereira, Arch
DEMOCRATIC REPUBLIC OF TIMOR-LESTE PT. INTIMULYA MULTIKENCANA HERA HEAD OF DEPARTMENT OF PROJECT DIRECTRESS OF DNE EL.02.07.27
AMARO CAMOES MAU-LOCO
MINISTRY OF DEFENCE Director National de Avrovision Amento Ministerio
SCALE : DATE : DATE : DATE : Date: Date:
da Defesa