10.32-Monorail Beam
10.32-Monorail Beam
10.32-Monorail Beam
This report complies with the Lifting Equipment Engineers Association Technical requirements
Date of Through Examination: 24 June 2023 Date of Report: 26 June 2023 Report number: IVS.MC.6.28286.IR48
Name and Address of the owner: Address of premises at which the examination was made:
OQ Natural Gas Liquid Extraction Fahud-NGLE
Fahud PO Box 241,PC 118
Sultanate of Oman.
Description and identification of the equipment: OEM Reference or SWL Load Test Details:
Description : Monorail Beam Reference
Tag No : LB590002
Size : 500mm(H) X 200mm(W) X 10/16mm (T) AG/TPI/2450/22 4.5 Tonne Visual Inspection
Height of lift-8000 mm,
Location : P-59001B
Is this the first examination after put Was the examination carried out:
in to use or assembly at a new site
YES √ NO Within an interval of 3 months? YES NO
or location?
Within an interval of 6 months? YES NO
If the answer to the above question In accordance with an examination
YES √ NO YES √ NO
scheme or 12 months?
is YES has the equipment been
After the occurrence of exceptional
installed correctly? YES NO
circumstances?
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect::
(If none state NONE) None
Is the above a defect which is of immediate danger to persons YES NO √
Ref standard : BS 2853:2011
BV Inspection Procedure : BV/IVS/LE/WI-04 Rev :3, Jan 2020
Is the above a defect which is not yet but could become a Measuring Equipment’s Used:
danger to persons: SL Description Serial Number Cal. Validity
(If YES state the date by when) : Not Applicable 1 Vernier Caliper K 19111945 12-09 2023
2 Measuring Tape BU-MT-4320 02-08-2023
3
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
Recommended to Stencil the SWL both side of the beam
Particulars of any tests carried out as part of the examination: (If none state NONE)
Thorough Visual Carried Out
Note: Certificate applicable to monorail beam only and not to any trolley or lifting appliance that may be lifted
IS THIS EQUIPMENT FIT FOR ITS INTENDED USE? YES √ NO
Name & Qualifications of person performing Company authentication: Latest date by which next thorough
the Inspection: examination must be carried out:
Sijoy KM
Digital Authentication
23 June 2024
Thamilazhagan Ganesan
Inspection Engineer
Date of issue : 26 June 2023