BACKUP VOLUME COULD MILLING

Item Pekerjaan Could Milling


Lebar Lebar Jarak Luas Tebal
No. LOKASI
(m) rata2(m) (m) (m2) (m)
10.30
1 10.30 25.00 257.5 0.04
10.30
10.30
2 10.65 25.00 266.3 0.04
11.00
11.00
3 11.25 25.00 281.3 0.04
11.50
11.50
4 11.50 27.80 319.7 0.04
11.50
11.50
5 10.75 25.00 268.8 0.04
10.00
10.00
6 9.30 25.00 232.5 0.04
8.60
8.60
7 8.60 25.00 215.0 0.04
8.60
Volume
(m3)

10.3

10.7

11.3

12.8

10.8

9.3

8.6

73.6
BACKUP VOLUME COULD MILLING

Item Pekerjaan Could Milling


Lebar Lebar Jarak Luas Tebal
No. LOKASI
(m) rata2(m) (m) (m2) (m)
10.30
1 10.30 25.00 257.5 0.04
10.30
10.30
2 10.65 25.00 266.3 0.04
11.00
11.00
3 11.25 25.00 281.3 0.04
11.50
11.50
4 11.50 27.80 319.7 0.04
11.50
11.50
5 10.75 25.00 268.8 0.04
10.00
10.00
6 9.30 25.00 232.5 0.04
8.60
8.60
7 8.60 25.00 215.0 0.04
8.60
BJ Volume
(ton) (ton)

2.30 23.7

2.30 24.5

2.30 25.9

2.30 29.4

2.30 24.7

2.30 21.4

2.30 19.8

169.4
NO URAIAN PEKERJAAN
PARAPET
3 3.87m

1.40m

TROTOAR
4

TIANG SANDARAN
5
0.16m

1.15m

0.10m

0.15

JUMLAH SUBTOTAL

JUMLAH TOTAL
RJAAN PANJANG

VOLUME 1 : 0.4 X
` VOLUME 2 : 3.87 X
VOLUME 3 : 0.4 X
1.40m

0.00m VOLUME 1 : 0.2 X


VOLUME 2 : 0.1 X

VOLUME 1 : 0.16 +
0.62m

1.15m

VOLUME 2 : 3.14 X

0.10m

BTOTAL

OTAL
PERHITUNGAN VOLUME

1.4 X 2 = 1.12
1.4 X 2 = 10.836
3.87 = 1.548

4.0 BUAH

29.8 X 2.0 = 11.9


29.8 X 2.0 = 3.6

2.0 BUAH

0.15 X 2.00 X 1.15 = 0.713

30.00 BUAH

0.075 X 27.80 = 6.55


4.00 BUAH

PEKERJAAN BETON

PEKERJAAN BETON
VOLUME SATUAN KET.

43.344 m2 BETON
PLAT
INJAK

23.840 m2 BETON
PENUNJANG
PASANGAN

21.390 m2 BETON

26.1876 m2

88.574 m2
NO URAIAN PEKERJAAN
PASANGAN MORTAL KANAN
1 0.30m 1.50m

1.20m

0.30m

0.60m 1.00m

0.30m 1.50m

2.00m

0.30m

0.60m 1.00m

2 0.30m 0.80m

II

0.40m 0.60m

0.30m 1.50m

1.20m

III

0.30m
0.60m 1.00m

0.30m 1.50m

2.00m
III

0.30m

0.60m 1.00m

3 0.30m 1.50m

0.70m
III

0.30m

0.50m 1.00m

0.30m 1.50m

1.50m
III

0.30m

0.50m 1.00m

JUMLAH SUBTOTAL

JUMLAH TOTAL
RJAAN PANJANG

0.30m VOLUME 1 : 0.30m


3.00m

0.70m VOLUME 2 0.30m

0.30m VOLUME 3 0.30m


0.50m

0.30m 5.00m VOLUME 1 : 0.30m

1.50m

VOLUME 2 0.30m

0.30m VOLUME 3 0.30m


0.50m

0.30m 9.00m VOLUME 1 : 0.30m

I 0.80m VOLUME 2 0.30m

0.30m
0.40m

0.30m 3.00m VOLUME 1 : 0.30m

0.70m VOLUME 2 0.30m


I

II 0.30m VOLUME 3 0.30m


0.50m

0.30m 3.00m VOLUME 1 : 0.30m

1.50m VOLUME 2 0.30m


I

II
0.30m VOLUME 3 0.30m
0.50m

0.30m 5.00m VOLUME 1 : 0.30m

1.20m VOLUME 2 0.30m


I

II
0.30m VOLUME 3 0.30m
0.60m

0.30m 5.00m VOLUME 1 : 0.30m

2.00m VOLUME 2 0.30m


I

II
0.30m VOLUME 3 0.30m
0.60m

BTOTAL

TOTAL
PERHITUNGAN VOLUME

+ 0.50m X 0.70m = 0.28 m2


2

x 2.10m = 0.63 m2

+ 0.60m X 1.20m = 0.54 m2


2 1.45 m2 X 3.00m

+ 0.50m X 1.50m = 0.6 m2


2

x 2.10m = 0.63 m2

+ 0.60m X 2.00m = 0.9 m2


2 2.13 m2 X 5.00m

+ 0.40m X 0.80m X 2 = 0.56 m2


2

x 1.40m = 0.42 m2
0.98 m2 X 9.00m

+ 0.50m X 0.70m = 0.28 m2


2

x 2.10m = 0.63 m2

+ 0.60m X 1.20m = 0.54 m2


2 1.45 m2 X 3.00m

+ 0.50m X 1.50m = 0.6 m2


2

x 2.10m = 0.63 m2

+ 0.60m X 2.00m = 0.9 m2


2 2.13 m2 X 3.00m

+ 0.60m X 1.20m = 0.54 m2


2

x 2.10m = 0.63 m2

+ 0.50m X 0.70m = 0.28 m2


2 1.45 m2 X 5.00m

+ 0.60m X 2.00m = 0.9 m2


2

x 2.10m = 0.63 m2

+ 0.50m X 1.50m = 0.6 m2


2 2.13 m2 X 5.00m

PEKERJAAN BETON

PEKERJAAN BETON
VOLUME SATUAN KET.

4.350 m3 PASANAGAN
BATU
MORTAR

10.650 m3 PASANAGAN
BATU
MORTAR

8.820 m3 PASANAGAN
BATU
MORTAR

4.350 m3 PASANAGAN
BATU
MORTAR
6.390 m3 PASANAGAN
BATU
MORTAR

7.250 m3 PASANAGAN
BATU
MORTAR

10.650 m3 PASANAGAN
BATU
MORTAR

52.460 m3
NO. URAIAN PEKERJAAN
1 PROFIL K 0.30m

I
3.00m

1.00m II

1.00m
2 PROFIL K 0.30m

I
3.00m

1.00m II

1.00m
3 PROFIL K 0.30m

I
2.00m

0.60m II

0.60m
JUMLAH SUBTOTAL
JUMLAH SUBTOTAL
PANJANG PERHITUNGAN VOLUME

I. 0.30 + 1.00 x 3.00 = 1.950 m2


2
20.50m

II. 1.00 x 1.00 = 1.000 m2


= 2.950 m2

I. 0.30 + 1.00 x 3.00 = 1.950 m2


2
10.00m

II. 1.00 x 1.00 = 1.000 m2


= 2.950 m2

I. 0.30 + 0.60 x 2.00 = 0.900 m2


2
8.00m

II. 0.60 x 0.60 = 0.360 m2


= 1.260 m2

PEKERJAAN PASANGAN BATU


PEKERJAAN PASANGAN BATU
OLUME VOLUME SATUAN KETERANGAN

PAS.
BATU
x 20.50m 60.48 m³ BIASA

PAS.
BATU
x 10.00m 29.50 m³ BIASA

PAS.
BATU
x 8.00m 10.08 m³ BIASA

NGAN BATU 100.06 m³


NGAN BATU 100.06 m³

-18.47
NO. URAIAN PEKERJAAN
1 PROFIL K 0.30m

I
3.00m

1.00m II

1.00m
2 PROFIL K 0.30m

I
3.00m

1.00m II

1.00m
3 PROFIL K 0.30m

I
2.00m

0.60m II

0.60m
JUMLAH SUBTOTAL
JUMLAH SUBTOTAL
PANJANG PERHITUNGAN VOLUME

I. 0.30 + 1.00 x 3.00 = 1.950 m2


2
20.50m

II. 1.00 x 1.00 = 1.000 m2


= 2.950 m2

I. 0.30 + 1.00 x 3.00 = 1.950 m2


2
10.00m

II. 1.00 x 1.00 = 1.000 m2


= 2.950 m2

I. 0.30 + 0.60 x 2.00 = 0.900 m2


2
8.00m

II. 0.60 x 0.60 = 0.360 m2


= 1.260 m2

PEKERJAAN PASANGAN BATU


PEKERJAAN PASANGAN BATU
OLUME VOLUME SATUAN KETERANGAN

PAS.
BATU
x 20.50m 60.48 m³ BIASA

PAS.
BATU
x 10.00m 29.50 m³ BIASA

PAS.
BATU
x 8.00m 10.08 m³ BIASA

NGAN BATU 100.06 m³


NGAN BATU 100.06 m³

-18.47
NO. URAIAN PEKERJAAN
1 PROFIL K 0.30m

I
3.00m

1.00m II

1.00m
2 PROFIL K 0.30m

I
3.00m

1.00m II

1.00m
3 PROFIL K 0.30m

I
2.00m

0.60m II

0.60m
JUMLAH SUBTOTAL
JUMLAH SUBTOTAL
PANJANG PERHITUNGAN VOLUME

I. 0.30 + 1.00 x 3.00 = 1.950 m2


2
20.50m

II. 1.00 x 1.00 = 1.000 m2


= 2.950 m2

I. 0.30 + 1.00 x 3.00 = 1.950 m2


2
10.00m

II. 1.00 x 1.00 = 1.000 m2


= 2.950 m2

I. 0.30 + 0.60 x 2.00 = 0.900 m2


2
8.00m

II. 0.60 x 0.60 = 0.360 m2


= 1.260 m2

PEKERJAAN PASANGAN BATU


PEKERJAAN PASANGAN BATU
OLUME VOLUME SATUAN KETERANGAN

PAS.
BATU
x 20.50m 60.48 m³ BIASA

PAS.
BATU
x 10.00m 29.50 m³ BIASA

PAS.
BATU
x 8.00m 10.08 m³ BIASA

NGAN BATU 100.06 m³


NGAN BATU 100.06 m³

-18.47
NO. URAIAN PEKERJAAN
1 PLAT INJAK TIPE 1 0.30m
4.00m

4.20m
4.00m

2 PLAT INJAK TIPE 2


4.00m

2.70m
4.00m

JUMLAH SUBTOTAL
PANJANG PERHITUNGAN VOLUME

VOLUME 1 : 4.20m X 0.20m = 0.84 m2

4.00m

0.20m

VOLUME 1 : 2.70m X 0.20m = 0.54 m2

4.00m

0.20m

PEKERJAAN PASANGAN BATU


N VOLUME VOLUME SATUAN KETERANGAN

X 2 BUAH

BETON

6.72 m³

X 2 BUAH

BETON

4.32 m³

SANGAN BATU 11.04 m³

-107.48
NO. URAIAN PEKERJAAN
1 PLAT DUDUKAN
0.85m 0.25m 0.25m

0.20m

0.20m
0.99m
0.10m

0.69m

0.25m

JUMLAH SUBTOTAL
PANJANG PERHITUNGAN VOLUME

VOLUME 1 : 0.25m X 0.99m = 0.25 m2

VOLUME 2 : 0.25m + 0.30m X 0.25m = 0.28 m2


2

1.70m VOLUME 3 : 0.85m X 0.25m = 0.21 m2


0.74 m2

PEKERJAAN PASANGAN BATU


OLUME VOLUME SATUAN KETERANGAN

X 2 BUAH

BETON

2.50 m³

GAN BATU 2.50 m³


NO. URAIAN PEKERJAAN
1 PLAT INJAK TIPE 1 0.30m

0.40m

0.90m 0.40m

0.20m

0.20m

0.95m

1.70m

JUMLAH SUBTOTAL
PANJANG PERHITUNGAN VOLUME

VOLUME 1 : 0.20m X 0.40m = 0.08 m2

11.00m VOLUME 2 : 0.20m X 0.90m = 0.18 m2

VOLUME 3 : 0.40m X 0.95m X 2 = 0.76 m2


1.02 m2

PEKERJAAN PASANGAN BATU


VOLUME VOLUME SATUAN KETERANGAN

BETON

11.22 m³

ANGAN BATU 11.22 m³