Notam
Notam
Notam
Home
PIB
Aerodrome PIB
Aerodrome PIB PREVIEW MAP
Point PIB Validity (UTC): 24 Jul 2023 10:05 - 24 Jul 2023 16:00
Service type: FULL
Briefing Handbook
PIB includes: NOTAM SNOWTAM METEO
Aerodrome Information
LPCS (CASCAIS)
OPERATIONS THAT REQUIRE THE USE OF THE TERMINAL BUILDING
+ BTW 1900 AND 2259 ARE ONLY AVBL WITH PPR TILL 1900 AND IF NO OTHER
A1582/23
SCHEDULE RESTRICTIONS IS IN FORCE.
FROM: 24th Apr 2023 15:44 TO: 6th Sep 2023 22:59
FROM: 14th Jun 2023 07:00 TO: 30th Jan 2024 19:00 EST
TRIGGER NOTAM - PERM AIRAC AIP AMDT 003/23 WEF 13 JUL 2023.
+ SUPPLEMENTARY VAC, NEW VISUAL REFERENCES.
A2305/23
FROM: 13th Jul 2023 00:00 TO: 26th Jul 2023 23:59
WIP 15M WEST OF STRIP RWY 17/35 NEAR INTERSECTION WITH TAXILANE
+ M. MEN AND EQPT UNDER AIRPORT OPERATIONS SUPERVISION.
A3010/23
FROM: 19th Jul 2023 13:37 TO: 29th Jul 2023 23:59 EST
TWY F CLOSED BETWEEN TWY S AND TWY P DUE TO WIP. MEN AND EQPT
+ UNDER AIRPORT OPERATIONS SUPERVISION. VFR TRAFFIC DELAYS AND
A3071/23
RESTRICTIONS ARE EXPECTED. PRE-FLIGHT ENGINE RUN-UP SHALL BE
MADE ON APRON B ON ENGINE RUN-UP AREA.
FROM: 21st Jul 2023 17:38 TO: 29th Jul 2023 23:59 EST
END OF PIB
All Trigger NOTAM are valid only for two weeks. For the publication of ECAC States, please consult
also the PAMS application.