BE FORM 7 - SCHOOL ACCOMPLISHMENT REPORT Donations

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 6

BE FORM 7

Republic of the Philippines


Department of Education
REGION IV-A CALABARZON
CITY SCHOOLS DIVISION OF BIÑAN CITY
NAME OF SCHOOL

BRIGADA ESKWELA
SY. 2023-2024

SCHOOL ACCOMPLISHMENT REPORT

DIVISION: REGION:
SCHOOL: SCHOOL ID:
SCHOOL ADDRESS:

(Please check appropriate box)


Level: Type of School:
Elementary Central School
 High School Non- Central School (Complete)
Multi-grade
Primary School (Complete)
Integrated

SCHOOL HEAD: CONTACT NO.:


PTA PRESIDENT: CONTACT NO.:

A. SCOPE OR REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
What was done?
Others
Repaired Repainted Replaced
(Brief Description)
1. Roofs
2. Ceilings
3. Wall
4. Windows and Doors
5. Chairs/Desks, Tables and
A. SCOPE OR REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
What was done?
Others
Repaired Repainted Replaced
(Brief Description)
Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds/Landscaping
9. School signs
10. Alternative gates/ backdoor
gates
11. Electric fans
12. Lightings

B. DONATIONS/MATERIALS RESOURCES GENERATED (Use separate sheets, if needed)


Type of Donations Sources Estimated Cost
Construction materials Private school 20,000.00
Paint Parents 3,200.00
Paint & cleaning materials Barangay officials 8,000.00
Paint and cleaning materials Teachers 5,885.00
Paint & cleaning materials Teachers 10.365.00
Paint and paint brush Private individuals 3,500.00
Food & snacks Teachers 8,200.00
Paint & mineral water Provincial government officials 4,200.00
Tarpaulin & signages Teacher 800.00
Plants Teacher 900.00
Electric fan Parent 870.00
Paint Private individual 1,800.00
Reference Books CSA 75,000.00
Office/school supplies Ubiquity Global Services 10,000.00
Paint and brushes Teacher 1,700.00
B. DONATIONS/MATERIALS RESOURCES GENERATED (Use separate sheets, if needed)
Type of Donations Sources Estimated Cost

TOTAL 154,420.00

C. VOLUNTEERS SERVICE
Name of individuals/ Number of Volunteers
Type of Volunteer
organization Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 TOTAL

TOTAL

D. ESTIMATED COST OF VOLUNTEER SERVICES RENDERED


Total Number of Hours
Type of Service Total Number of Volunteers Total Estimated Costs
Rendered
Carpentry
Masonry
D. ESTIMATED COST OF VOLUNTEER SERVICES RENDERED
Total Number of Hours
Type of Service Total Number of Volunteers Total Estimated Costs
Rendered
Gardening/ Landscaping
Painting
Welding
Electrical/ Electronics
Plumbing
Ordinary Labor
TOTAL

E. MAINTENANCE OF CLEAN SCHOOLS


Update/ Actions taken/
Indicator Plan of Action Photo Documentation
Challenges Encountered
EXAMPLE:
OPLAN ALIS: All teachers are
tasked to remove all IEC materials 50% of the rooms are now free
posted on the walls of their from unnecessary artwork/ At least 5 photos of rooms that are
School Grounds, Classrooms and
classrooms. decoration. now ready for Opening of classes
walls are clean and free from
The other half are still in
unnecessary artwork, decorations,
MAINTENANCE CHECK: repainting/ repairing because 5 photos of rooms that need to be
tarpaulin and posters at all times.
Monitoring team shall check all some are still being utilized for the repainted/ re-organized.
rooms on August 25, 2023 to National learning Camp
ensure readiness of school for the
August 29 Opening of Classes
Oversized signages with
commercial advertisements, words
of sponsorship and/or
endorsements or announcements
of any kind of nature shall be
taken down in compliance with
DO 37 s. 2010 titled Prohibition
on use and/or Display of School
Signages showing Commercial
E. MAINTENANCE OF CLEAN SCHOOLS
Update/ Actions taken/
Indicator Plan of Action Photo Documentation
Challenges Encountered
Advertisements, Sponsorship
and/or Endorsements.

Classroom walls shall remain bare


and devoid of posters, decorations
or other posted materials.

Classrooms should not be used to


stockpile materials and should be
clear of other unused items or
items for disposal.

F. SIGNIFICANT EVENTS / EXPERIENCES


What is/are important
contribution to the operation to
What happened? Who were involved? When?
the school or to existing needs
of the school?
F. LESSONS LEARNED

G. SUGGESTIONS TO STRENGTHEN BRIGADA ESKWELA PROJECT