07 RecordKeeping
07 RecordKeeping
07 RecordKeeping
7. RECORDKEEPING REQUIREMENTS
GENERAL
7) All injuries on the project shall classified first aid, recordable, restricted and days away from
work injuries and injury incidence rates in accordance with OSHA Record-keeping Guidelines
and ANSI Standard Z16.4-1997. Incidence rates will be based on 200,000 man-hours worked.
MEDICAL RECORDS
1) The Safety Manager is responsible for insuring that the appropriate safety-related reports
concerning occupational injury/illnesses are properly executed and maintained.
H:\000_General\Share\501 - Construction\SITE SAFETY PROCEDURES\07-Recordkeeping.doc GENERAL SITE CONDITIONS AND SAFETY PROCEDURES
Yanbu National Petrochemical Company Site Safety Procedures Manual
Yanbu Petrochemical Complex U & O Project July, 2005
Fluor Arabia Limited Contract A2IT Page 2 of 3
3) The Physician is responsible for maintaining accurate records of medical treatment and
providing the Safety Manager with a copy of the same. The following is a listing of these
records.
4) Drug testing will be in accordance with Saudi regulations and to consist of Substance
Abuse Prevention and Chemical Screening Program. The above regulation and policy will
apply to all expatriate personnel whether full time or part time being assigned to the project.
1) Doctor's Return to Work Notice is to be completed by the Physician and kept on file. The
Doctor's Release must be completed by the physician before the individual can be allowed
to return to work.
3) Employee Report of Injury This will be completed immediately after the industrial
injury/illness by the Employee or Safety Manager.
4) Doctor’s Medical Report to Employer is completed by the treating physician. A copy will be
made and forwarded to the Safety Manager.
5) Monthly Injury Analysis (OSHA 200 Log) is used to report on-the-job injuries by month. This
will be provided by the Safety Manager.
6) Weekly and Monthly Safety Reports complied by the Safety Manager, reviewed by
Construction Manager and submitted to Owner Safety Manager. Construction shall keep a
copy on file.
7) Weekly Area Safety Assessments, Area Discrepancy Logbooks, Safety Audit Reports,
Supervisor Safety Logbook, Safety Action Plans, Safe Work Plans, Permits, Inspection
Reports, Third Party Certification and all other safety procedural forms, shall be
maintained. Construction Management and Safety Management shall review them regularly
H:\000_General\Share\501 - Construction\SITE SAFETY PROCEDURES\07-Recordkeeping.doc GENERAL SITE CONDITIONS AND SAFETY PROCEDURES
Yanbu National Petrochemical Company Site Safety Procedures Manual
Yanbu Petrochemical Complex U & O Project July, 2005
Fluor Arabia Limited Contract A2IT Page 3 of 3
to assist in managing safety and improving safety on the project by taking the necessary
corrective/improvement actions.
ATTACHMENTS:
H:\000_General\Share\501 - Construction\SITE SAFETY PROCEDURES\07-Recordkeeping.doc GENERAL SITE CONDITIONS AND SAFETY PROCEDURES