TP4-SD-PH4-ME-IR-3083 TO 3874 Rev-3-L34-35-36-37
TP4-SD-PH4-ME-IR-3083 TO 3874 Rev-3-L34-35-36-37
TP4-SD-PH4-ME-IR-3083 TO 3874 Rev-3-L34-35-36-37
GL= V-L36-0
2 1
EQUAL TEE X:50 .50
3
X:503305.514 Y:24 303.629
1589
Y:2415892.845 7.28
22° B 7
X:50 END 1 2 3 4 5 6
3 3 0
ENTRY
/EXIT
5
99
Reefs Setback
116
Y:24
186
98
84
100
73
115
MARINA SERVICE AREA
85
71
72
83
97
96
1589 .021
100m
SERVICE BLDG. DOCK AREA
70
94
95
86
68
69
185
DOCK AREA
SLIPWAY
DOCK AREA
78
79
Marina
67
90
Zone
-4.9
80
178
m
105 114
89
174
106
93
DOCK AREA
104
77
81
82
AREA
103
107
113
179
DOCK
184
CUSTOM BLDG. 189
108
76
112
111
109
FLOATING DOCK
110
75
74
FUEL
5.15
DOCK
88
102
91
177
101
87
183
6
117
118
92
138
59
176
58
57
119
60
188
182
Area 61
Beach 56 120
Reefs
Setback
121 125
126
137 122 123
124
100m
Natural Filling
62
Level
64
7 8 9 10 11 12
shallow
for
Protec 139
63
175
tion
127
55
164
43
54
47
Beach
53
187
52
136
Area
44
181
45° BEND
141
174
135 134
51
42
128
133
48 132
142
66
131
50
180
41
49
130
129
140
143
173
45
40
65
38
144
146
37
26
165
35
36
X:503305.982
172
39
145
46
170
Reefs
Natural
Level
shallow
Setback
100m
161
147
153
2
3
27
160
34
171
154
152
159
8
151
33
28
155
156
7
Filling 157 158 169
6
25
Beach
area 30
32
31
29
Area
h
Beac
Y:2415890.646 IR-G
149
148
168
9
22 24 162 163
10
150
167
19
23
166
12 16 21
18
13
11
14
15
17
20
13 14 15 16 17 18
GL= V-L35-0
2 1
X:50 .50
3
Y:24 310.762
1589
3.81
4
IR-DCT-L32-01
GL=3.20
X:503453.841
EV
Y:2415957.100
A
RO
UT
E
IR-
X:5 WO-L
Y:2 0327 35-0 IR-DC-L35-01
415 0.28 1 IR- GL=3.05
805 7
.88 GL WO-L X:503379.649
2 X:5 =2.50 35-0 Y:2415884.60
1 8
Y:2 0327
415 2.54
806 8
UTE
.25
0
RO
EVA
IR-AV-L35-01
GL=3.50
X:503429.875 45° BEND
173 Y:2415874.92
9 X:503453.540
Y:2415881.49
0
45° BEND
X:503440.661
45° BEND
173 Y:2415872.801
X:503292.225
Y:2415751.997
IR-DGV-L30-02
4 GL=3.224
-3 45° BEND
X:503521.289
RD X:503477.342
Y:2415873.662
Y:2415875.82
9
45° BEND
X:503513.291
IR-DCT-L35-01 Y:2415868.496
X:503347.294
PVCU
21 96 01
110mm CAP
721.960.114
IR-DCT-L35-01
GL=2.90 Y:2415737.243 45° BEND
X:503345.905 X:503515.106
Y:2415729.407 END CAP
X:503350.960
172 Y:2415868.94
2 721.960.114
110mm
21 96 01CAP
PVCU
-D .7 8. .06
G :50 15
RD-18
GL=3.29
C- 0 907 4
X :24
721.960.114
CAP
PVCU110mm
01
96
21
X:503517.560
L3
Y
0-
Y:2415862.688
01
IR-DGV-L35-01
TEE ( LINE-36)
IR-WO-L35-01
IR-DCT-L35-01
IR-DC-L35-01
IR-AV-L35-01
45° BEND
45° BEND
45° BEND
45° BEND
45° BEND
END CAP
5
SW HC Ø200
IL: 1.594
2
PW 225 Ø
I.L = 0.289 SW HC Ø200
IL: 0.583 RED SEA VILLAGE DEVELOPMENT
0
SW Ø300
IL: -0.379 PW 225 Ø
I.L = -0.304
TP4 - INFRA STRUCTURE WORKS
ROADS AND UTILITIES
DATUM -2.00
DIAMETER (mm) 225 Ø HDPE SDR 11 225 Ø HDPE SDR 11 160 Ø HDPE SDR 11 160 Ø HDPE SDR 11 160 Ø HDPE SDR 11 160 Ø HDPE SDR 11 160 Ø HDPE SDR 11
ARABIAN CONSULTING ENGINEERING CENTRE
SLOP 0.313 1.027 1.643 0.364 0.067 1.161 0.000 0.000 0.000 0.000 0.000 0.000 1.409 0.000
3.25
3.25
3.55
3.50
3.40
3.20
3.10
3.00
2.55
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.95
2.96
2.96
GROUND LEVEL (m)
1.45
1.45
1.14
2.01
2.00
1.95
1.83
1.60
1.22
1.20
0.95
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
1.45
INVERT LEVEL (m)
1.50
1.50
2.05
1.87
1.80
1.56
1.56
1.56
1.56
1.56
1.24
1.24
1.60
1.66
1.80
1.60
1.56
1.56
1.56
1.56
1.56
1.50
DEPTH
Thabat Construction Company Ltd. Saudi Arabia
1.40
1.01
1.02
1.37
1.43
1.57
1.40
1.40
1.40
1.40
1.40
1.34
1.34
1.34
1.82
1.64
1.57
1.37
1.33
1.37
1.40
0+402.51
0+403.26
0+563.07
0+246.68
0+265.92
0+504.51
0+620.08
0+623.88
0+250
0+300
0+328
0+350
0+380
0+400
0+422
0+450
0+500
0+550
0+600
0+419
0+473
CHAINAGE (m)