JAPAN INTERNATIONAL COOPERATION AGENCY (JICA)

OBJECTION PROCEDURES
BASED ON THE GUIDELINES FOR ENVIRONMENTAL AND SOCIAL
CONSIDERATIONS
(Translation of Japanese Version)

April 2010

1
CONTENTS
1. Policy
2. Objectives of the Procedures
3. Basic Principles
4. Tasks of the Examiners
5. Powers and Duties of the Examiners
6. Projects Covered by the Procedures
7. Qualifications of the Requesters
8. Period within which to Submit a Request
9. Contents of a Request
10. Process of the Procedures
11. Report to the President
12. Opinions of the Operational Departments
13. Responses to Examiners’ Report and Recommendations
14. Disclosure of Information
15. Secretariat
16. Review of the Procedures and Interim Provisions
APPENDICES
1. Sample Request
2. Sample Notice of Acceptance
3. Sample Notice to Commence the Procedures
4. Sample Notice of Decision not to Commence the Procedures
5. Sample Notice of Decision to Suspend the Commencement of the Procedures
6. Sample Results of Examination
7. Sample Notice to the Requesters of the Examiners’ Report
8. Sample Form of the Examiners’ Report
9. Sample Form of the Examiners’ Annual Report of Activities
10. Procedures Flowchart

2
1. Policy
To ensure compliance with the Japan International Cooperation Agency (hereinafter
referred to as “JICA”) Guidelines for Environmental and Social Considerations (hereinafter
referred to as the “Guidelines”), JICA hereby establishes Examiners for the Guidelines
(hereinafter referred to as the “Examiners”) who are under the direct control of the
President and are independent of departments responsible for individual projects and
environmental analysis (hereinafter referred to as the “Operational Departments”), and
JICA sets forth the following Objection Procedures based on the Guidelines (hereinafter
referred to as the “Procedures”).
2. Objectives of the Procedures
(1) To investigate whether JICA has complied with the Guidelines and report the results to
the President; this will ensure JICA’s compliance with the Guidelines.
(2) To encourage dialogues between the parties concerned, with their consent. Specifically,
these are dialogues between parties that have submitted objections (hereinafter referred
to as the “Requesters”) and entities that carry out projects (hereinafter referred to as the
“Project Proponents”), which are held in order to assist in the prompt resolution of
disputes concerning specific environmental and/or social problems caused by projects
for which JICA provides assistance, which have arisen due to JICA’s non-compliance
with the Guidelines.
3. Basic Principles
(1) Independence
The Examiners will be appointed as an organ working under the direct control of the
President and will be independent of the Operational Departments.
(2) Neutrality
The Examiners must hear the opinions of all parties impartially and from a neutral
standpoint, without taking the part of the Operational Departments, the Project
Proponents, or the Requesters.
(3) Efficiency
The Examiners must efficiently process the submitted objections.
(4) Promptness
The Examiners must promptly process the Procedures and must, in principle, complete
their activities by submitting a report within two (2) months after the commencement of
the Procedures.

3
(5) Transparency
While considering the purpose of encouraging dialogue between the parties concerned
and the treatment of information about the host countries and other parties, the activities
of the Examiners must, in principle, be open to the public and must contribute to the
furtherance of JICA’s accountability.
4. Tasks of the Examiners
(1) JICA assigns two or three Examiners who are independent of the Operational
Departments.
(2) The President appoints Examiners who meet the following requirements based on the
opinions of a selection committee:
1) Have no interest in relations with JICA’s environmental and social considerations
business; and
2) Are fluent in Japanese and English.
3) It is desirable that Examiners have knowledge of environmental and social
considerations, international cooperation, and law.
(3) The aforementioned selection committee consists of members that JICA selects through
a fair and appropriate process from the realms of academia, the business community, the
government of Japan, the governments of developing countries, NGOs, etc.
(4) The Examiners’ term of duty is three years, and selection for a second term is permitted.
JICA will not employ Examiners during the three years directly following the end of
their assignment. If one of the Examiners resigns, the term of replacement is the
remainder of the former Examiner’s term.
(5) One of the Examiners takes charge of each request submitted, and he/she will prepare an
investigation report after taking into account the other Examiners’ views.
5. Powers and Duties of the Examiners
(1) In order to attain the above-mentioned purposes, the Examiners shall have the following
powers:
1) To have free access to the information necessary for their activities, including, but not
limited to, documents and records possessed by JICA;
2) To be able to interview JICA’s personnel and to ask that they submit relevant
documents;

4
3) To be able to ask relevant departments of JICA to make arrangements to interview
third parties, including persons concerned other than JICA’s personnel, and to request
the submission of relevant documents.
(2) In order to faithfully perform their duties, the Examiners shall have the following
obligations:
1) To faithfully perform their tasks with regard to the requests submitted;
2) To take due care of the human rights and business interests of the Requesters and
other parties concerned and of the handling of information about host countries, and
not to behave in such a manner as to unduly injure the Requesters and/or other parties
concerned;
3) Not to use information to which the Examiners have had access in performing their
tasks for any purposes other than these tasks; and
4) To comply with the Procedures.
6. Projects Covered by the Procedures
Requests to raise objections (hereinafter referred to as the “Requests”) may be submitted
with respect to the projects of (1) Loan Aid, (2) Grant Aid (excluding projects executed
through international organizations), (3) Preliminary Studies of Grant Aid undertaken by
the Ministry of Foreign Affairs (hereinafter referred to as “MOFA”), (4) Technical
Cooperation for Development Planning, and (5) Technical Cooperation Projects covered by
the Guidelines, in which substantial damage has actually been incurred or is likely to be
incurred in the future due to JICA’s non-compliance with the Guidelines.
7. Qualifications of the Requesters
(1) A Request must be submitted by two or more residents of a country who have suffered
actual damage or who are likely to suffer damage in the future as a result of JICA’s
non-compliance with the Guidelines regarding a project for which JICA provides
cooperation.
(2) If it is unavoidable in view of the particular circumstances of the region in question, etc.,
a Request may be submitted by an agent, provided that, in such cases, the names of the
principals (Requesters) must be identified and the agent must be duly authorized by the
Requesters.
8. Period within which to Submit a Request
A Request may be submitted during the period prescribed below.
(1) Loan Aid, Grant Aid (excluding projects executed through international

5
organizations) and Technical Cooperation Projects
A Request pointing out any instance of JICA’s non-compliance with the Guidelines may
be submitted between the time at which JICA discloses the results of a project’s
categorization and the time at which the project is completed. After the completion of
the project, a Request pointing out JICA’s non-compliance with the monitoring
provisions of the Guidelines may be submitted during the time in which JICA is
monitoring the matter, pursuant to the Guidelines.
(2) Preliminary Studies of Grant Aid undertaken by MOFA
A Request pointing out any instance of JICA’s non-compliance with the Guidelines may
be submitted between the time at which JICA discloses the results of a project’s
categorization and one month after the final report is disclosed on JICA’s website.
(3) Technical Cooperation for Development Planning
A Request pointing out any instance of JICA’s non-compliance with the Guidelines may
be submitted between the time at which JICA discloses a project agreement document
and one month after the final report is disclosed on JICA’s website.
9. Contents of a Request
A Request must state the following information in Japanese, English, or the official
language of the relevant country. If the Request is written in the official language of the
relevant country, it is necessary for the Examiners to translate the Request into Japanese or
English before commencing the Procedures; therefore, it may take some time before the
acceptance of the Request is announced.
(1) Names of the Requesters
(2) Addresses or places of contact of the Requesters
A Request must be submitted in the Requesters’ real names and contact addresses must
be specified. However, the Requesters’ information shall not be disclosed to outside
persons, unless otherwise required by law. If the Requesters desire not to disclose their
names to the Project Proponents, they may express this desire in the Request.
(3) Project with respect to which the Request is submitted
* Country name
* Project name
* Project site
* Project outline
The name of the project does not have to be stated precisely; however, the Requesters

6
are required to provide related information so that the project can be identified. In cases
in which the name of the project cannot be stated precisely, the time needed to confirm
information from the Requesters may delay the acceptance of a request.
(4) Description of actual damage incurred or likely to be incurred by the Requesters as a
result of JICA’s non-compliance with the Guidelines
(5) Relevant provisions of the Guidelines considered by the Requesters to have been
violated by JICA and the facts constituting such non-compliance as alleged by the
Requesters
(6) Causal nexus between JICA’s non-compliance with the Guidelines and the damage
(7) Resolution desired by the Requesters
(8) Facts concerning the Requesters’ consultations with the Project Proponents
In order to encourage dispute resolution through the parties’ own efforts, the Requesters
are asked to endeavor to engage in dialogues with the Project Proponents prior to the
submission of a Request. For this reason, it is necessary to state in the Request the dates
and times of such dialogues, the names of persons with whom the Requesters engaged
in dialogues, the contents of the responses of the other parties, and other detailed facts
concerning the Requesters’ endeavors to engage in dialogues with the Project
Proponents. If, however, there were unavoidable reasons for which the Requesters could
not endeavor to engage in dialogues with the Project Proponents, such reasons should be
stated.
(9) Facts concerning the Requesters’ consultations with JICA
The Requesters are asked to communicate with the Operational Departments prior to the
submission of a Request. For this reason, it is necessary to state in the Request the dates
and times of such communication, the names of the persons with whom the Requesters
communicated, the contents of the Operational Departments’ responses, and other
detailed facts concerning the Requesters’ communication with the Operational
Departments. The Requesters may also state the reasons for which the Operational
Departments’ responses were considered to be insufficient.
If JICA’s public relations department receives an inquiry from an outside person, it must
promptly introduce to that person the relevant Operational Departments that are
handling the project in question, so that dialogues with the Operational Departments can
be conducted expeditiously and adequately. The Operational Departments must conduct
a screening and an environmental review pursuant to the provisions of the Guidelines,
recognizing the importance of information furnished by stakeholders.
(10) If a Request is to be submitted by an agent, the Requesters must explain the necessity
to submit the Request through an agent and attach evidence that the agent

7
has been duly authorized by the Requesters.
10. Process of the Procedures
(1) Submission of a Request
The Requesters submit a written Request (refer to attachment) to the Examiners by post,
e-mail or delivery by hand.
(2) Acceptance of a Request and Notifications to the Requesters and the Project Proponents
The Examiners shall, so long as the names and the places of contact are stated in the
Request, notify the Requesters, the Project Proponents, and the Operational
Departments of the acceptance of the Request using the sample form attached hereto,
within five (5) business days after the receipt of the Request. If the Requesters desire not
to disclose their names to the Project Proponents, no information about the Requesters
shall be disclosed to the Project Proponents.
(3) Preliminary Investigation
1) The Examiners shall check the Request to confirm whether or not all of the required
matters are fully set forth within it. If the descriptions are insufficient or otherwise
inadequate, the Examiners may ask the Requesters to rectify the deficiencies.
2) As necessary, the Examiners may interview the persons concerned with respect to
whether or not the Requesters are qualified to submit a Request.
3) The Examiners shall, with the intention of preventing abuse, check the Request to
confirm that it was submitted in good faith and adequately in conformity with the
purpose of the Procedures.
4) Unless there are special circumstances that prevent the Examiners from doing so, a
preliminary investigation will, in principle, be completed approximately one (1)
month after the acceptance of a Request, and a decision will be made as to whether or
not to commence the Procedures.
(4) Decision to Commence the Procedures
1) If, according to the examination form attached hereto, the Examiners deem that the
Request satisfies the requirements to commence the Procedures and that the
descriptions in the Request are fairly reasonable, they shall make the decision to
commence the Procedures, and shall inform the President, the Requester, the Project
Proponents, and the Operational Departments of the decision in writing.
2) If a decision not to commence the Procedures is made, the Examiners shall inform

8
the President, the Requester, the Project Proponents, and the Operational Departments
of the decision and the reasons for the decision in writing. Even if a decision is made
not to commence the Procedures, the Examiners may transfer the Request to the
Operational Departments, if they deem it useful for the examination and monitoring
of the project. The President and the Requesters shall both be notified of this transfer.
3) The Examiners may suspend the decision to commence the Procedures if a dispute
concerning the project is pending in other resolution proceedings and the Examiners
deem that the issues involved in these dispute resolution proceedings and those
involved in the Procedures are substantially similar and that it is not necessary to
commence the Procedures according to the objectives of the Procedures. If it is
decided to suspend commencement of the Procedures, the President, the Requesters, a
host country, etc., and the Operational Departments shall be notified in writing. If the
intention of the Requesters to continue the Procedures is confirmed after the grounds
for suspension have ceased to exist, the Examiners may decide to commence the
Procedures.
4) In view of the legal principle of double jeopardy, if a Request was submitted in the
past concerning the same damage, a decision not to commence the Procedures may be
made, provided that this shall not apply to a new Request based on a new fact not
known at the time of the prior Request.
5) The Requesters may submit their opinion in writing to the Examiners if a decision not
to commence the Procedures is made. The Examiners must faithfully consider the
opinion submitted by the Requesters and shall convey that opinion to the Operational
Departments, as necessary.
(5) Investigation of the Facts of Compliance with the Guidelines
1) In order to investigate the facts of JICA’s compliance with the Guidelines, the
Examiners may meet with the Requesters and directly interview the Requesters about
the matters with respect to which the Request has been submitted.
2) The Examiners shall interview relevant persons in the Operational Departments and
ascertain the facts concerning (i) environmental and social considerations conducted
during or before decision-making and (ii) monitoring. The Examiners may inspect any
and all materials used by the Operational Departments when conducting this
confirmation of environmental and social considerations and monitoring.
3) When necessary, the Examiners may interview residents who have the same view as
that of the Requesters, residents who have different views from that of the

9
Requesters, Project Proponents, specialists, and other persons concerned, provided that
if the Examiners intend to interview the host country and related parties, the
Examiners will make initial arrangements to conduct interviews through the
Operational Departments.
(6) Encouragement of Dialogues in an Attempt to Resolve Disputes
1) In order to resolve disputes, the Examiners may not only mediate for the purpose of
encouraging dialogues among the Requesters, other residents who have been
adversely affected, and the host country and related parties, but may also conduct
individual interviews.
2) The Examiners must listen to the opinions of the persons concerned in a
well-balanced manner, and must be careful, when conducting individual interviews,
not to diminish people’s trust in the Examiners’ neutrality.
(7) Matters Handled Cautiously in Implementing Investigation and Activities to Encourage
Dialogues
The Examiners may temporarily suspend their investigation and activities to encourage
dialogues if a dispute concerning the project becomes pending in other dispute
resolution proceedings, and if the issue in those proceedings and the issue in these
Procedures are substantially similar and it is not necessary to commence the Procedures
according to the objectives of the Procedures. The President, the Requesters, the Project
Proponents, and the Operational Departments will be notified if such a suspension
occurs. If the intention of the Requesters to resume the Procedures is confirmed once the
grounds for suspension cease to exist, the Procedures shall be resumed.
11. Report to the President
(1) Within two (2) months after the commencement of the Procedures, the Examiners shall
prepare a report, using the sample form attached hereto, which sets forth the results of
the investigation of the facts of compliance with the Guidelines, the progress of
dialogues, and the agreement between the parties concerned if a settlement is reached.
The Examiners must submit this report to the President.
(2) If the Examiners determine that JICA has not complied with the Guidelines, the
Examiners may recommend to the President possible measures to correct such
non-compliance, as necessary.
(3) If the Examiners are unable to ascertain the facts as to whether or not JICA has
complied with the Guidelines, or if the parties have agreed to dispense with the
investigation by the Examiners of the facts of JICA’s compliance or non-compliance,

10
the Examiners shall report to the President the progress of the dialogues and of the said
agreement between the parties concerned.
(4) If the Examiners believe that more time is required for investigation or for the
encouragement of dialogues, the Examiners may report to the President the particulars
of further required activities and the reasons why such activities are indispensable.
Upon receipt of such a report, if the President decides that there is a suitable degree of
unavoidable reasons to extend the period, the President may extend the period for up to
two (2) months.
(5) The Examiners’ report shall immediately be sent to the parties concerned. The parties
concerned may then submit to the Examiners their opinions on the contents of the report.
The Examiners shall pay due respect to such opinions, and if they deem that the
opinions contain matters useful for the monitoring of the project in question, they may
transfer the opinions to the Operational Departments.
12. Opinions of the Operational Departments
Within one (1) month after the submission of the Examiners’ report to the President, the
Operational Departments shall submit their opinions in writing to the President. The
Departments shall set forth their opinions on the Examiners’ report, and, if the Examiners
concluded in the report that JICA has not complied with the Guidelines, the Operational
Departments shall set forth measures to be taken to ensure JICA’s compliance with the
Guidelines, as necessary.
13. Responses to Examiners’ Report and Recommendations
(1) Any instructions issued by the President in consideration of the Examiners’ report, the
opinions of the Operational Departments, and the opinions of the parties concerned shall
be implemented by the Operational Departments.
(2) The Examiners shall be informed of the status of the Operational Departments’
implementation of the instructions issued by the President. When necessary, the
Examiners will interview the Requesters and other relevant persons in order to gather
and report related information to the President in the annual report of activities. If the
Examiners deem it necessary, they may report to the President, at any time, the status of
the Operational Departments’ implementation of the instructions issued by the President.
In addition, on the basis of the investigation results of individual cases in which it was
concluded that JICA did not comply with the Guidelines, the Examiners may state, in
the annual report, their opinion of the measures to be taken to ensure JICA’s future
compliance with the Guidelines and other matters.

11
14. Disclosure of Information
(1) Information on the Procedures shall be disclosed in accordance with the following:
1) The Examiners, after the acceptance of the Request, shall publicize the summary
(country name, project site, project name, outline of the damage and JICA’s alleged
non-compliance with Guidelines) on JICA’s website.
2) The Examiners, after the commencement of the Procedures, shall publicize the
Request in whole or in part on JICA’s website, with confirmation that it does not
contain any information whose disclosure is not required by the Procedures and/or by
statute.
3) The Examiners’ report, the opinions of the parties concerned, and the opinions of the
Operational Departments shall be sent to the parties concerned and promptly
publicized on JICA’s website, with confirmation that they do not contain any
information whose disclosure is not required by the Procedures and/or by statute.
(2) Since the Examiners’ report and the opinions of the Operational Departments must, in
principle, be publicized, they must not contain any information whose disclosure is not
required by statute. If, in order to make the report meaningful, it is indispensable to state
in the report any information whose disclosure is not required by statute, the prior
consent of the parties concerned must be obtained.
(3) Other documents that the Examiners have prepared in the performance of their duties
shall be publicized pursuant to the provisions of applicable laws.
(4) The Examiners shall prepare an annual report of activities using the sample form
attached hereto and shall publicize it on JICA’s website. Since the annual report of
activities is a document that is prepared in order to be publicized, it must not contain
any information whose disclosure is not required by statute.
(5) The Examiners shall publicize their contact address on JICA’s website, and endeavor to
have their presence and activities widely known to the public by preparing and
publishing pamphlets and posting information on JICA’s website, etc., in collaboration
with JICA’s Public Relations Department.
(6) The working language used in the disclosure documents on JICA’s website shall be
English, while Japanese and/or the official language of the Requesters shall be used as
necessary.
15. Secretariat
A secretariat shall be organized to process work in relation to the Examiners. The

12
secretariat consists of several JICA personnel. The Examiners can utilize external
specialists as needed.
16. Review of the Procedures and Interim Provisions
(1) The Procedures shall be reviewed, in principle, concurrently with the review of the
Guidelines. This review shall be conducted in consideration of the opinions given and
the evaluations made by the users and the Examiners that have accumulated up to the
time of the review.
(2) The Procedures shall become effective in July 2010 and shall apply in the case of
projects to which the Guidelines apply.
Note: If there is any ambiguity in the English version and/or any inconsistencies with the
Japanese version, the Japanese version shall prevail.

13
APPENDIX 1
Sample Request
Date:
To: The Examiners for the Guidelines
Japan International Cooperation Agency (JICA)
Names of the Requesters:
Contact information of the Requesters:
Address:
TEL:
FAX:
E-mail:
【If the Requesters are making use of an agent】
Name of the agent:
Contact information of the agent:
Address:
TEL:
FAX:
E-mail:
We desire that our names should be kept confidential from the Project Proponents.
Yes ・ No (Circle one)
1. Project with respect to which the objections are submitted
* Country name:
* Project name:
* Project site:
* Project outline:
2. Substantial damage actually incurred or likely to
be incurred by the Requesters as a result of JICA’s non-compliance with the

14
Guidelines:
3. Relevant provisions of the Guidelines considered violated by JICA and facts constituting
JICA’s non-compliance, as alleged by the Requesters:
4. Causal nexus between JICA’s non-compliance with the Guidelines and the substantial
damage:
5. Resolution desired by the Requesters:
6. Facts concerning the Requesters’ consultations with the Project Proponents:
7. Facts concerning the Requesters’ consultations with JICA’s Operational Departments:
8. If a Request is to be submitted by an agent, the Requesters must explain the necessity for
submitting the Request through an agent and attach evidence that the agent has been duly
authorized by the Requesters.
The Requesters hereby covenant that all the matters described herein are true and correct.
[END]

15
APPENDIX 2
Sample Notice of Acceptance
Date:
To: (Names of the Requesters)
The Examiners for the Guidelines
Japan International Cooperation Agency (JICA)

We hereby inform you that your request to raise objections dated DD Month, YYYY was
accepted on DD Month, YYYY.

After completing the preliminary investigations, we will decide, in principle within one
month, whether or not to commence the Procedures or suspend the commencement, and we
will notify you in due course of our decision.

We may wish to interview you during the preliminary investigations, in which case we will
contact you to make necessary arrangements.

If, after the preliminary investigations, it is decided that the Procedures shall be commenced,
we will investigate the facts of JICA’s compliance or non-compliance with the Guidelines
and encourage dialogues between the parties, pursuant to the Objection Procedures based on
the Guidelines for Environmental and Social Considerations. For these purposes, we may
wish to interview you, in which case we will contact you to make necessary arrangements.

An outline of your request (country name, project site, project name, claimed damage, and
relevant provisions of the Guidelines that have been violated) and the progress of the
Procedures will be publicized on JICA’s website.

For details of the Procedures, please visit http://www.jica.go.jp/environment/guideline or


send us an inquiry.
[END]

16
APPENDIX 3
Sample Notice to Commence the Procedures
Date:
To: (Names of the Requesters)
The Examiners for the Guidelines
Japan International Cooperation Agency (JICA)

We hereby inform you of our decision to commence the Procedures with respect to your
request to submit objections dated DD Month, YYYY (accepted on DD Month, YYYY) as
described below. For details, please refer to the enclosed Results of Examination.

For approximately the next two months, we will investigate the details of JICA’s
compliance or non-compliance with the Guidelines and encourage dialogues between the
parties, pursuant to the Objection Procedures based on the Guidelines for Environmental
and Social Considerations. For these purposes, we may wish to interview you, in which case
we will contact you to make necessary arrangements.

Your request will be publicized on JICA’s website. After completion of the relevant
procedures, the reports prepared by the Examiners for the Guidelines, opinions prepared by
JICA’s Operational Departments, and opinions prepared by parties concerned will also be
publicized on JICA’s website. Information that is not required to be publicized by the
Objection Procedures and/or statute will remain undisclosed.

For details of the Procedures, please visit http://www.jica.go.jp/environment/guideline or


send us an inquiry.
[END]

17
APPENDIX 4
Sample Notice of Decision not to Commence the Procedures
Date:
To: (Names of the Requesters)
The Examiners for the Guidelines
Japan International Cooperation Agency (JICA)

We hereby inform you of our decision not to commence the Procedures with respect to your
request to submit objections dated DD Month, YYYY (accepted on DD Month, YYYY).
For details, please refer to the enclosed Results of Examination.

[Reasons for the decision not to commence the Procedures will be stated. Furthermore, the
examination and monitoring procedures undertaken by JICA’s Operational Departments
will be described.]

Thank you very much for your attention.


[END]

18
APPENDIX 5
Sample Notice of Decision
to Suspend the Commencement of the Procedures
Date:
To: (Names of the Requesters)
The Examiners for the Guidelines
Japan International Cooperation Agency (JICA)

We hereby inform you of our decision to suspend the commencement of the Procedures
with respect to your request to submit objections dated DD Month, YYYY (accepted on DD
Month, YYYY). For details, please refer to the enclosed Results of Examination.

[Reasons for the decision to suspend the commencement of the Procedures will be stated.]

If, after the grounds for suspension have ceased to exist, the intention of the Requesters to
continue the Procedures is confirmed, we may decide to commence the Procedures.
Thank you very much for your attention.
[END]

19
APPENDIX 6
Sample Results of Examination
(This document is only a sample; in the case of an actual examination, more suitable
descriptions will be made based on the nature of each Request.)

1. Formal requirements of the Request


All items are written in Japanese, English, or the official language of the country in which the
Requesters reside.
There are items with insufficient descriptions.

2. Requirements to commence the Procedures


(1) Requirements regarding the Requesters
The Request has been submitted by two or more residents of the country in which the project is
implemented.
The Request does not satisfy the above requirements.
It cannot be confirmed that the Request has been submitted by the Requester.

(2) Project with respect to which the objections are submitted


After identifying the project from the Request, it has been confirmed that JICA provides funding
for this project.
After identifying the project from the Request, it has been confirmed that JICA does not provide
assistance for this project.
The project cannot be identified from the Request.

(3) Period
1) Loan Aid, Grant Aid (excluding projects executed through international
organizations), and Technical Cooperation Projects
The Request was submitted between the time at which JICA indicated its categorization of
the project and the time at which the project was completed.
The Request was submitted after the completion of the project and during the time in which
JICA was monitoring the matter, and JICA’s non-compliance with the Guidelines
concerning JICA’s monitoring was pointed out.
The Request was submitted after the completion of the project, but JICA’s non-compliance
with the Guidelines concerning JICA’s monitoring was not pointed out.

20
2) Preliminary Studies of Grant Aid undertaken by MOFA
The Request was submitted between the time at which JICA indicated its categorization of the
project and one month after the final report was disclosed on JICA’s website.

3) Technical Cooperation for Development Planning


The Request was submitted between the time at which JICA disclosed the agreement document
of the project and one month after the final report was disclosed on JICA’s website.

(4) Actual damage incurred or likely to be incurred by the Requesters as a result of


JICA’s non-compliance with the Guidelines
Actual damage incurred or likely to be incurred is described.
Actual damage incurred or likely to be incurred is not described.

(5) Relevant provisions of the Guidelines considered to have been violated by JICA and
the facts constituting JICA’s non-compliance alleged by the Requesters
Provisions not complied with and facts of non-compliance are reasonably described.
Provisions not complied with and facts of non-compliance are not reasonably described.

(6) Causal nexus between JICA’s non-compliance with the Guidelines and the
substantial damage
Description of causal nexus is considered reasonable.
Description of causal nexus is not considered reasonable.

(7) Facts concerning the Requesters’ consultations with the Project Proponents
The Requesters have endeavored to have dialogues with the Project Proponents.
There is an unavoidable reason preventing the Requesters from having dialogues with the
Project Proponents.
As the Requesters have not fully endeavored to have dialogues with the Project Proponents, the
Requesters should first propose to have such dialogues.

(8) Facts concerning the Requesters’ consultations with JICA


The Requesters have communicated with JICA’s Operational Departments.
As the Requesters have not fully endeavored to communicate with JICA’s Operational
Departments, the Requesters should first attempt such communication.

21
(9) Prevention of abuse
There is no concern that the Request was submitted for abusive purposes.
There is a concern that the Request was submitted for abusive purposes; therefore, it is
inappropriate to commence the procedures.
(Examples)
1) The Request was submitted for the purpose of unduly obtaining compensation.
2) The Request was submitted solely for the purpose of delaying the implementation of the
project.
3) The Procedures were utilized for the purpose of damaging the credit or reputation of the host
country, etc.
4) The Request was submitted for political purposes unrelated to the project.

There is a serious false description in the Request.

[END]

22
APPENDIX 7
Sample Notice to the Requesters of the Examiners’ Report
Date:
To: (Names of the Requesters)
The Examiners for the Guidelines
Japan International Cooperation Agency (JICA)

We hereby inform you that we have submitted a report to the President of JICA with
respect to your request to raise objections dated DD Month, YYYY (accepted on DD
Month, YYYY).

Opinions on the said report may be submitted pursuant to the Objection Procedures
based on the Guidelines for Environmental and Social Considerations.

The Examiners’ report is presented below. The report itself, opinions of the parties
concerned, and opinions of the Operational Departments will be publicized in due
course. Information that is not required to be publicized by the Objection Procedures
and/or statute will remain undisclosed.
[END]

23
APPENDIX 8
Sample Form of the Examiners’ Report

1. Summary of request accepted


(1) Name of country
(2) Name of city in which the project is located
(3) Name of project
(4) Alleged damage
(5) Alleged non-compliance with the Guidelines

2. Results of preliminary investigations (results of examination are attached)

3. Results of investigations of relevant facts and encouragement of dialogues


(1) Record of interviews with personnel of JICA’s Operational Departments for the
purpose of investigating JICA’s compliance/non-compliance with the Guidelines
* Dates and times of interviews
* Content of interviews
(2) Results of investigations of the facts concerning JICA’s compliance/non-compliance
with the Guidelines
* Damage actually incurred
* Facts concerning compliance/non-compliance with the Guidelines
* Causal nexus between the damage actually incurred and the facts concerning
compliance/non-compliance with the Guidelines
* Final results
* Possible measures to correct the non-compliance in the particular case (if the
Guidelines are not complied with)
(3) Agreement between the parties on the encouragement of dialogues and the record of
dialogues held between the parties
* Date and time of dialogues
* Content of dialogues
(4) Content of agreement reached between the parties, if any
(5) Necessity for further mediation

4. List of materials on which the Examiners’ judgment was based