R19 - Survey Lab Manual
R19 - Survey Lab Manual
R19 - Survey Lab Manual
MANUAL
DEPARTMENT OF CIVIL ENGINEERING
2020-2021
i
CERTIFICATE
This is to certify that this manual is a bonafide record of practical work in the
during the academic year 2020-21. The book is prepared by Dr. M. Harihanandh,
ii
INDEX
S. No CONTENT PAGE No
PREFACE i
ACKNOWLEDGEMENT ii
SAFETY PRECAUTIONS iv
LIST OF EXPERIMENTS x
iii
PREFACE
This book entitled “SURVEYING LAB Manual” is intended for the use of third semester (i.e, II
Year –I Semester) B.Tech (Civil) students of Marri Laxman Reddy Institute of Technology and
Management, Dundigal, Hyderabad. The main objective of the SURVEYING LAB Manual is to
teach the student to impart the practical knowledge in the field to set out any Civil Engineering
work, especially in advanced surveying. This book lays foundation of certain basic concepts and
skills that can be repeatedly employed by the students in their future endeavours. The main aim
of this book is to develop the habit of scientific reasoning and providing answers to all the doubts
that arise during the course of conducting experiments. The book was written as per the new
syllabus framed for MLRITM (Autonomous Institution) recommended by the BOS Committee
members in a simple language. These experiments will help the students to expertise in the
advanced surveying. Hence, we hope this book serve for better understanding by the student
By,
Dr. M.Harihanandh
Associate Professor,
Department of Civil Engineering
iv
ACKNOWLEDGEMENT
It was really a good experience, working at SURVEYING Lab. First, I would like to thank
Mr. T. Jayakrishna, Assistant Professor, Mr. N. Krishnarao, Assistant Professor and
Mr. A. Sudhakar, Assistant Professor, Department of Civil Engineering, Marri Laxman Reddy
Institute of Technology and Management for giving the technical support in preparing the
document.
I express my sincere thanks to Mr.K.Murali, Head of the Department, Civil Engineering, Marri
Laxman Reddy Institute of Technology and Management, for his concern towards me and gave
the opportunity to prepare Surveying laboratory manual.
I am deeply indebted and gratefully acknowledge the constant support and valuable patronage of
Dr.Balarengadurai Chinnaiah, Dean Academics, Marri Laxman Reddy Institute of Technology
and Management. I am unboundedly grateful to him for timely corrections and scholarly
guidance.
At last, but not the least I would like to thanks the entire Civil Department faculties those who
had inspired and helped me to achieve my goal.
By,
Dr. M.Harihanandh
Associate Professor,
Department of Civil Engineering
v
GENERAL INSTRUCTIONS
1. Students are instructed to come to SURVEYING laboratory on time. Late comers are not
entertained in the lab.
2. Students should be punctual to the lab. If not, conducted experiments will not be repeated.
3. Students are expected to come prepared at home with the experiments which are going to
performed.
4. Students are instructed to display their identity cards and apron before entering into the lab.
6. The surveying equipment’s used in SURVEYING lab should be handled with care and
responsibility.
7. Any damage to the equipment’s during the lab session is student’s responsibility and penalty
or fine will be collected from the student.
8. Students should update the records and lab observation books session wise. Before leaving
the lab, the student should get his lab observation book signed by the faculty.
9. Students should submit the lab records 2/3 days in advance to the concerned faculty members
in the staffroom for their correction and return.
10. Students should not move around the lab during the lab session.
11. If any emergency arises, the student should take the permission from faculty member
concerned in written format.
12. The faculty members may suspend any student from the lab session on disciplinary grounds.
iii
SAFETY PRECAUTIONS
5. When the experiment is completed, students should disconnect the setup made by them,
and should return all the components/instruments taken for the purpose.
iv
INSTITUTION VISION AND MISSION
VISION
To establish as an ideal academic institutions in the service of the nation, the world and the
humanity by graduating talented engineers to be ethically strong, globally competent by
conducting high quality research, developing breakthrough technologies, and disseminating and
preserving technical knowledge.
MISSION
To fulfil the promised vision through the following strategic characteristics and aspirations:
v
DEPARTMENT VISION, MISSION , PROGRAMME EDUCATIONAL OBJECTIVES
VISION
The Civil Engineering department strives to impart quality education by extracting the
innovative skills of students and to face the challenges in latest technological advancements and
to serve the society.
MISSION
The Programme Educational Objectives (PEOs) that are formulated for the civil engineering
programme are listed below;‖
PSO 1 - UNDERSTANDING: Graduates will have ability to describe, analyse and solve
problems using mathematical, scientific, and engineering knowledge .
PSO 2 - ANALYTICAL SKILLS: Graduates will have an ability to plan, execute, maintain,
manage, and rehabilitate civil engineering systems and processes.
PSO 3 - EXECUTIVE SKILLS: Graduates will have an ability to interact and work effectively
in multi disciplinary teams.
vi
PROGRAMME OUT COMES
1. Engineering knowledge: Apply the knowledge of mathematics, science, engineering
fundamentals, and an engineering specialization to the solution of complex engineering
problems.
2. Problem analysis: Identify, formulate, review research literature, and analyze complex
engineering problems reaching substantiated conclusions using first principles of
mathematics, natural sciences, and engineering sciences.
3. Design/development of solutions: Design solutions for complex engineering problems
and design system components or processes that meet the specified needs with
appropriate consideration for the public health and safety, and the cultural, societal, and
environmental considerations.
4. Conduct investigations of complex problems: Use research-based knowledge and
research methods including design of experiments, analysis and interpretation of data,
and synthesis of the information to provide valid conclusions.
5. Modern tool usage: Create, select, and apply appropriate techniques, resources, and
modern engineering and IT tools including prediction and modeling to complex
engineering activities with an understanding of the limitations.
6. The engineer and society: Apply reasoning informed by the contextual knowledge to
assess societal, health, safety, legal and cultural issues and the consequent responsibilities
relevant to the professional engineering practice.
7. Environment and sustainability: Understand the impact of the professional engineering
solutions in societal and environmental contexts, and demonstrate the knowledge of, and
need for sustainable development.
8. Ethics: Apply ethical principles and commit to professional ethics and responsibilities
and norms of the engineering practice.
9. Individual and team work: Function effectively as an individual, and as a member or
leader in diverse teams, and in multidisciplinary settings.
10. Communication: Communicate effectively on complex engineering activities with the
engineering community and with society at large, such as, being able to comprehend and
write effective reports and design documentation, make effective presentations, and give
and receive clear instructions.
11. Project management and finance: Demonstrate knowledge and understanding of the
engineering and management principles and apply these to one’s own work, as a member
and leader in a team, to manage projects and in multidisciplinary environments.
12. Life-long learning: Recognize the need for, and have the preparation and ability to
engage in independent and life-long learning in the broadest context of technological
change.
vii
COURSE STRUCTURE, OBJECTIVES & OUTCOMES
COURSE STRUCTURE
SURVEYING lab will have a continuous evaluation during 2nd year 1st semester for 30
sessiosnal marks and 70 end semester examination marks.
Out of the 30 marks for internal evaluation, day-to-day work in the laboratory shall be evaluated
for 20 marks and internal practical examination shall be evaluated for 10 marks conducted by the
laboratory teacher concerned.
The end semester examination shall be conducted with an external examiner and internal
examiner. The external examiner shall be appointed by the principal / Chief Controller of
examinations
COURSE OBJECTIVE
The objective of this lab is to teach the student the practical knowledge in the field to set out any
Civil Engineering work such as,
To impart the practical knowledge in the field- measuring distances, directions, angles
To determining R.L.’s areas and volumes
To set out Curves
To stake out points
To traverse the area
To draw Plans and Maps
COURSE OUTCOME
CE216.3 Apply the solution for two point and three point problems in the field.
8
LIST OF EXPERIMENTS
1. Surveying of an area by chain, and compass survey (closed traverse) & plotting.
2. Determine of distance between two inaccessible points with compass
3. Radiation method, intersection methods by plane table survey.
4. Levelling – Longitudinal and cross-section and plotting
5. Measurement of Horizontal and vertical angle by theodolite
6. Trigonometric leveling using theodolite
7. Height and distances using principles of tachometric surveying
8. Determination of height, remote elevation, distance between inaccessible points using total
station
9. Determination of Area using total station and drawing map
10. Traversing using total station for drawing contour map
11. Stake out using total station
12. Setting out Curve using total station
9
Ex. No: 1
Date:
Aim: To survey an open field by chain survey in order to calculate the area of the given field.
Instruments: Chain, Tape, Ranging Rods, Arrows, cross Staff.
Chain Chains of 20 m and 30 m are used to lay and measure main survey lines and long
distant offsets. These chains are divided into 100 links. The length of each link is 20 cm and 30
cm for 20 m and 30mchains respectively.
Tape: Tape of 30 m length is used. The tape is used to take perpendicular offsets for smaller
lengths.
Ranging rods: Steel tubular ranging rods 2 m or 3 m long are used. These are used for marking
a point in such a way that the position of the point can be clearly and exactly seen from some
distance away.
Arrows: 40 cm long steel arrows are used to mark the end of each chain during the chaining
process.
Cross-staff: This instrument is used for setting right angles or perpendicular offsets of objects
from main chain line.
Code of Signals: The code of signals shown in Table 1 should be followed by the surveyors
while ranging a survey line using chain, to direct or convey message to the other surveyors or
assistants in order to bring all the intermediate points in alignment with the end points in a chain
line.
10
Table 1: Code of Signal
Signal given by the Surveyor Meaning of the signal to the Assistant
1. Rapid sweep with right hand (Fig.a) Move considerably in that direction (to your
left).
2. Slow sweep with right hand. Move slowly to your left.
5. Rapid sweep with left hand (Fig.) Move considerabl y i n that di rect i on
(to your right).
6. Slow sweep with left hand. Move slowly to your right.
7. Left arm extended (Fig.). Continue to move your right.
8. Left arm up and moved to the left. Plumb the rod to your right.
9. Both hands above head and Ranging is correct.
brought down (Fig.).
10. Both arms extended forward Fix the ranging rod.
horizontally and the hands brought down
quickly.
Ranging a line:
It is the process of establishing a number of intermediate points on a survey line joining
two stations in the field, so that all the points on the line are in alignment and the length
between stations may be measured accurately.
Procedure:
Two ranging rods are erected vertically at the end stations by two surveyors who are
11
standing behind ranging rods.
One of the surveyors from one of the end stations directs the assistant to hold the ranging rod
vertically to establish an intermediate point and move the rod either to the left or right until
the ranging rod is in alignment with the end stations.
Finally, when the ranging is correct, the assistant is directed to fix the ranging rod at that
point. All the directions from surveyor should be as per the Code of Signals given in Table 1.
Taking offsets:
The perpendicular distance measured right or left of the chain line to locate the details like
corners, boundaries, culverts, etc is known as offset. Offsets can be taken by two ways:
1. By Tape and 2. By Cross-Staff.
By Tape:
The leader holds the zero end of the tape at the point where the offset is to be taken and the
follower swings off the tape in an arc across the chain line to left and right. The minimum
reading of tape on the chain line gives the position of the foot of the perpendicular from the
required point.
By Cross-Staff:
The Cross-Staff is held vertically on the chain line approximately near the point where the
offset is likely to fall. The Cross-Staff is turned until the signal at one end of the chain line is
viewed through one pair of slits. The surveyor then takes a round and views through the other
pair of silts. If the point to which the offset is to be taken is seen, the point below the instrument
is the required foot of the offset. On the other hand, if the point is not seen, the surveyor moves
along the chain line, without twisting the Cross-Staff, till the point appears.
Procedure for surveying the given open field (Closed Traverse):
Note: This procedure is general procedure only. This procedure varies with the experiment
given to students. Therefore students are required to write the procedure according to the
experiment given to them.
ABCDEF is the required closed traverse open field to be surveyed for calculating the
area as shown in Fig 1. From the station A the length of all the opposite corners such
as AC, AD and AE are measured with a chain and the longest distance is considered for
lying off the main chain line. In this case AD is the longest and a chain line running from
A to D is laid.
12
Offsets to corner points B, C, E and F are now laid from the chain line AD either by
tape or cross- staff and their foot of offsets are G, I, J, H respectively.
All the offset lengths GB, HF, IC and JE are measured either by chain or tape
depending on the length of offsets. The distances between all the points AG, GH, HI,
IJ and JD are also measured along the chain line.
13
Result:
The total Area of the given Open Field by Chain Survey = ........................... Sqm.
14
Aim: To survey an area (Closed Traverse) by Compass Survey and to plot the area.
Instruments: Chain, Tape, Ranging Rods, Arrows, Prismatic Compass, Tripod.
Whole Circle Bearing (WCB): The bearing of line that is always measured clockwise from
the north point of the reference meridian towards the line right round the circle is known as
0 0
Whole Circle Bearing (WCB). WCB will have values between 0 and 360 . Q1, Q2, Q3, etc in
Fig 1 represent WCBs.
15
Calculation of Included Angles from Fore Bearing and Back Bearing:
Included angle is an angle between two lines. Included angles may be exterior or interior.
Included angle between two lines is obtained by the following formula,
Included Angle = Fore Bearing of Next Line – Back Bearing of Previous Line
In Fig 3 the included angle between line AB and line BC is,
= FB of line BC – BB of line AB
If the calculated included angle comes out as a negative value, 3600 is added to it. Since
traversing in this case is done in clockwise direction, the included angles will be exterior only.
Taking Fore Bearing and back bearing of a line with Prismatic Compass:
While taking Fore Bearing of a line, the compass is kept over the starting point of line while
running from clockwise direction in the traverse. The line of sight is kept along N – S direction
0
such that the bearing under the prism should read 0 . Now the compass is turned in clockwise
direction only until the line of sight coincides with the ranging rod placed at the end point of
line.
While taking Back Bearing of a line, the compass is shifted to the end point of line and
same procedure is followed as it is followed while taking Fore Bearing.
Procedure:
Note: This procedure is general procedure only. This procedure, figures and table vary with the
16
experiment given to students. Therefore students are required to write the procedure and draw
figures and table according to the experiment given to them.
The Fore Bearing and Back Bearing of all lines of closed traverse (Fig 4) are measured by
a Prismatic Compass.
The distances of all lines of closed traverse are measured with a chain. All the values are
tabulated as below.
Observations and Tabulations:
0
Sum of included angle = (2n + 4) x 90
Where,
n = Number of sides of closed traverse.
17
Result:
Distances,
AB =
BC =
CD =
DE =
EA =
Included Angles:
Angle A =
Angle B =
Angle C =
Angle D =
Angle E =
18
Viva Questions:
1. Define surveying.
2. How you can classify the surveying based on field?
3. What the common accessories used for surveying?
4. How you can erect perpendiculars using chain/tape from main chain line/
5. How you make parallel line for the chain line using chain/tape?
6. At what interval the tags and tallies are fixed in the chain?
7. What is the fundamental difference between surveying and leveling?
8. What is the fundamental difference between plane surveying and geodetic surveying?
9. What do you mean by terms “topographical map” and cadastral map?
10. What are the main principles of surveying?
11. How is a chain folded and unfolded?
12. In a chaining operation, who is the leader and who is the follower?
13. While chaining a line, if you have to measure through a steep sloping ground, what method
should you apply?
14. Two stations are not intervisible due to intervening high ground. How will you range the
line?
15. How many ranging rods are required to range a line?
16. What is the length of one link in a 20m chain?
17. What do you mean by triangulation?
18. Why is the triangle preferred to the quadrilateral?
19. What is reconnaissance survey?
20. What is base line of survey?
21. How is the north line of the chain survey map fixed?
22. Suppose you are asked to conduct a chain survey in a crowded town what would you say?
23. What should be the maximum length of the offset?
24. How will you set up a perpendicular with the help of only a chain and tape?
25. Who are the leader and follower when a line is being chained?
26. Why does the field book open lengthwise?
27. What is chaining?
28. Instruments used in Chain Surveying?
19
29. How many links are in 30m Metric Chain? Length of each link?
30. Reciprocal Ranging?
31. What is the height of pegs?
32. The rapid sway of right hand by the surveyor indicates?
33. The rapid sway of left hand by the surveyor indicates?
34. If the both arms are extended, and suddenly dropped down by the surveyor means, what
should that indicates?
35. Principle of Chain Surveying?
36. What is well-conditioned triangle?
37. What is Reconnaissance Survey?
38. What is Field Book?
39. What is it necessary to provide tallies in a chain?
40. What do you mean by the term ideal triangle?
41. Objective and Uses of Surveying?
42. Methods of Surveying?
a. Triangulation
b. Traversing
20
Ex.No: 2
Date:
Aim: To determine distance between two inaccessible points using Prismatic Compass.
Instruments: Chain, Tape, Ranging Rods, Arrows, Prismatic Compass, Tripod.
Prismatic Compass: It is a compass where the graduated ring is attached with the needle and
does not rotate with line of sight. As the name implies a prism is provided at the Eye Vane
end so that the readings on graduated ring are read through the prism. Graduations are
engraved inverted since the graduated ring is read through the prism.
0
The minimum angle between two adjacent graduations is 30 .
The advantage of this compass is that both sighting and reading can be done simultaneously.
21
coincides with the cross hair should be taken. The break pin which is provided below the
object vane should be pressed down while taking reading to avoid oscillations of
graduated ring.
Measuring Angle between Two lines: Let ABCD be a traverse of which the angle at A and
B to be measured. The compass is set up at point A and focus the point C, note down the
value of angle in the graduated ring, then the point D is sighted and the reading on
graduated ring is noted down. The difference of those two reading gives the angle at A which
is an angle between line AC and line AD. Similarly the angle from point B, towards point C
and D has been noted.
Procedure for measuring inaccessible distance between two points:
Let C and D be the two inaccessible points whose distance to be measured. A point A and
B is est ablished for the known distance (d), and that line AB is parall el to line
CD approximatel y.
Let, f i n d t h e d i s t a nc e o f s i d e A D (P ) an d A C ( Q ) u si n g si n e r u l e f r om t h e
t r i a n gl e s A B D a n d A C D .
After finding the distance, P and Q, from the triangle ACD and using cosine rule, calculate the
inaccessible distance between the points C&D.
Fig. 1
22
23
Calculations:
Note: All calculations should be shown here. Result:
The distance between the two inaccessible points A & B, = m
Instructions to students:
Your are required draw a rough sketch of Fig 1, with all measurements and angles should be
drawn to a suitable scale.
Result:
24
Viva Questions:
1. There are two stations A and B. Which of the following statements is correct :
i. the fore bearing of AB is AB
ii. the back bearing of AB is BA
iii. the fore and back bearings of AB differ by 180°
iv. all the above.
2. Back bearing of a line is equal to
i. Fore bearing ± 90°
ii. Fore bearing ± 180°
iii. Fore bearing ± 360°
iv. Fore bearing ± 270°
3. If whole circle bearing of a line is 120°, its reduced bearing is
i. S 20° E ii. S 60° E iii. N 120° E iv. N 60° E
4. Reduced bearing of a line is an angle between
i. north line and given line measured clockwise
ii. north line and given line measured anticlockwise
iii. east or west and the given line
iv. given line and the part of the meridian whether N end or S end, lying
adjacent to it.
5. The magnetic meridian at any point, is the direction indicated by a freely suspended
i. magnetic needle
ii. and properly balanced magnetic needle
iii. properly balanced and uninfluenced by local attractive force
iv. magnetic needle over an iron pivot
6. The zero of the graduated circle of a prismatic compass is located at
i. north end ii. east end iii. south end iv. west end
7. The bearing of AB is 190° and that of CB is 260° 30'. The included angle ABC, is
i. 80° 30' ii. 99° 30' iii. 70° 30' iv. none of these
8. The horizontal angle between true meridian and magnetic meridian, is known
i. bearing
ii. magnetic declination
25
iii. dip
iv. convergence.
9. Magnetic bearing of a survey line at any place
i. remains constant
ii. changes systematically
iii. varies differently in different months of the year
iv. is always greater than true bearing
10. Grid lines are parallel to
i. magnetic meridian of the central point of the grid
ii. line representing the central true meridian of the grid
iii. geographical equator
iv. none of these.
11. Magnetic declination at any place
i. remains constant
ii. does not remain constant
iii. fluctuates
iv. changes abruptly.
12. The reduced bearing of a line is N 87° W. Its whole circle bearing is
i. 87° ii. 273° iii. 93° iv. 3°
13. The vertical angle between longitudinal axis of a freely suspended magnetic needle
and a horizontal line at its pivot, is known
i. Declination ii. Azimuth iii. Dip iv. Bearing.
14. True meridian of different places
i. converge from the south pole to the north pole
ii. converge from the north pole to the south pole
iii. converge from the equator to the poles
iv. run parallel to each other.
15. The main principle of surveying is to work
i. from part to the whole
ii. from whole to the part
iii. from higher level to the lower level
26
iv. from lower level to higher level.
16. A bearing of a line is also known as
i. magnetic bearing
ii. true bearing
iii. azimuth
iv. reduced bearing
17. True meridians are generally preferred to magnetic meridians because
i. these converge to a point
ii. these change due to change in time
iii. these remain constant.
iv. None of these.
18. The bearings of the lines AB and BC are 146° 30' and 68° 30'. The included angle
ABC is
i. 102° ii. 78° iii. 45° iv. none of these.
19. In quadrantal bearing system, back bearing of a line may be obtained from its forward
bearing, by
i. adding 180°, if the given bearing is less than 180°
ii. subtracting 180°, if the given bearing, is more than 180°
iii. changing the cardinal points, i.e. substituting N for S and E for W and
vice-versa
iv. none of these.
20. What is Magnetic Meridian?
21. Define true bearing.
22. Define true meridian.
23. What is Magnetic Bearing?
24. What is magnetic meridian?
25. What is Whole Circle Bearing (WCB)?
26. What is Quadrantal Bearing (QB)?
27. What is Fore Bearing?
28. What is Back Bearing?
29. What is Magnetic Declination?
27
30. What is Dip of the magnetic needle?
31. What is Local Attraction?
32. How locally attractions are found?
33. What are the methods available to remove the local attraction?
34. What is compass traversing?
35. What is Close Traverse?
36. What is Open Traverse?
37. What is closing error?
38. Write down the check on Closed Traverse
Clockwise traverse =
Anti-clock wise traverse =
39. How to adjust the closing error?
40. Write down the methods available to adjust closing error? And write which method is
easiest?
28
Ex.No: 3
Date:
Aim:
To plot a given area by Radiation and Intersection methods of Plane Table Survey.
Instruments:
Chain, Tape, Ranging Rods, Arrows, Plane Table with Tripod and its accessories, Two
Drawing Sheets, Drawing Clips, Pencil, Eraser and Pins.
Plane Table Surveying:
It is the branch of surveying in which both field work and plotting are done simultaneously.
The advantage of Plane Table Surveying is that as the field is in our view, omitting of any
measurement is not possible and exact shapes of the areas can be drawn.
Drawing Board:
The Drawing Board is made of well-seasoned wood. The Drawing Board is mounted on a
tripod by means of a screw and wing nut.
Alidade:
It is a brass ruler of about 50 – 60 cm in length. Two vanes, ‘object vane’ and ‘sight vane’
are hinged at its two ends. A scale is attached to the fudicial edge of alidade. This is used for
sighting the object through object and sight vanes and to draw lines to a suitable scale along the
judicial or ruling edge.
Trough Compass:
Usually it is 15 cm long and is provided to plot the magnetic meridian (N – S direction) to
facilitate orientation of the plane table in the magnetic meridian.
Spirit Level:
The essential condition in plane table surveying is that the board should be level. This is
usually accomplished with a circular spirit level.
Plumbing Fork:
It is a hairpin-shaped brass frame having two arms of equal length. One end of the frame is
pointed and is kept over the drawing sheet touching the plotted position of the instrument
station. The other end of the frame carries a plumb bob. The position of the plane table is
29
adjusted until the plumb bob hangs over the station occupied by the instrument.
Indian Clinometer:
Since a large number of points of observation are required to plot contours in plane table
survey, the direct or spirit levelling proves to be very slow and thus an Indian pattern
Clinometer is employed to measure the levels of the ground.
Drawing Sheet:
The drawing sheet used should be of the best quality to withstand rubbing and scrubbing.
Because of humidity, unequal expansion and contraction of the sheet may alter the scale and
distort the map. It should never be rolled or folded and should be carried flat. The sheet
should be well stretched and held firmly on the board to prevent any displacement of the
sheet by the friction of the alidade.
A plane table and its accessories are shown in the figure below.
Temporary Adjustments:
SurfaceoftheboardshouldbeperpendiculartotheverticalaxisoftheInstrument:
30
This can be achieved by placing a spirit level over the plane table and moving the legs to make
the bubble central. The table is then turned through 1800. The spirit level is now placed at
900 to its previous position and the bubble is again made central. The procedure is repeated
and if the bubble remains central, the adjustment is correct.
To check this, draw a line along the ruling or fudicial edge, reverse the alidade and place it
against the ends of the line. Again draw a line which should coincide with the previous line. If
the two lines do not coincide, the edge is rubbed with sand paper and is corrected.
ThetwoVanesshouldbeperpendiculartotheBaseofAlidade:
Set the alidade on the corner edge of a building or on a suspended plumb bob. Set the
alidade vanes along any of the above two. The plumb line and vane should coincide. If they do
not coincide adjust from the hinges till the vane coincides with the plumb line.
31
plumbing fork.
Now the alidade is rotated along point ‘a’ until the ranging rod at ground station B is
sighted through object vane and eye vane. The distance AB on the ground is measured and
converted to a suitable scale. A point ‘b’ is marked along the alidade with the distance that
is equal to the converted distance of AB. Now ‘ab’ is the required distance of line AB on the
drawing sheet.
Radiation Method:
In this method the instrument is setup at a station and rays are drawn to various stations which
are to be plotted. The distances are cut to a suitable scale after actual measurements.
Procedure:
Note: This procedure is general procedure only and varies with the given experiment.
Students are required to write the procedure and draw figures according to the experiment
given to them.
A station O is selected such that all other stations A, B, C and D are accessible and visible from
O (Fig 2). N – S direction is plotted. The plane table is setup at O. The alidade is placed at
‘o’ and rays are drawn from ‘o’ to the stations A, B, C, D and the distances oa, ob, oc and od
are cut to the chosen scale. Joint a, b, c and d.
32
Result:
The area of the given field using radiation method = ............................................. Sqm
Intersection Method:
In this method two stations are so selected that all the other stations to be plotted are visible
from these. The line joining these two stations is called Base Line. The length of this line is
measured very accurately. Rays are drawn from these stations to the stations to be plotted. The
intersection of the rays from the two stations gives the position of the station to be plotted on the
drawing sheet.
Procedure:
Note: This procedure is general procedure only and varies with the given experiment.
Students are required to write the procedure and draw figures according to the experiment
given to them.
Let A and B be the two accessible stations (Fig 3), such that A and B can be suitably plotted.
C is the station to be plotted by intersection. The plane table is placed at A. N – S direction is
plotted. The ground station A is transferred as ‘a’ onto the drawing sheet. With the alidade
centered at ‘a’, station B is sighted. A ray aB is drawn and is cut as ‘ab’ to a suitable scale.
With the alidade at ‘a’, C is also sighted and a ray aC is drawn. The table is now shifted to B
and is setup. The alidade is placed at ‘b’ and C is sighted. A ray bC is drawn. The intersection
of the two rays gives the position of C as ‘c’ on the plane table
33
Instructions to Students:
There are no calculations and result in this experiment, but you are required to attach the
two drawing sheets (the ones you have drawn on the field) to the lab record after the last
page of this experiment.
34
Viva Questions:
1. The distance between steps for measuring down hill to obtain better accuracy
A) decreases with decrease of slope B) increases with increase of slope
C) decreases with increase of slope D) decreases with decrease of weight of the chain
35
8. If a linear traverse follows a sharp curve round a large lake where it is difficult to have
long legs, the accuracy of the traverse may be improved by
i. taking short legs
ii. making repeated observations of angular and linear measurements
iii. making a subsidiary traverse to determine the length of a long leg
iv. all the above
9. Rankine's deflection angle in minutes is obtained by multiplying the length of the chord
by
A) degree of the curve B) square of the degree of the curve
C) inverse of the degree of the curve D) none of these.
10. The chord of a curve less than peg interval, is known as
A) small chord B) sub-chord C) normal chord D) short chord
11. Mistakes which may produce a very serious effect upon the final results arise due to
A) in attention B) in experience C) carelessness D) all of these
13. The area of any irregular figure of the plotted map is measured with
A) pentagraph B) sextant C) clinometers D) planimeter
14. The imaginary line passing through the intersection of cross hairs and the optical centre
of the objective, is known as
A) line of sight B) line of collimation C) axis of the telescope D) none of these
36
17. If the long chord and tangent length of a circular curve of radius R are equal the angle of
deflection, is
A) 30° B) 60° C) 90° D) 120°
18. In a theodolite
i. the telescope axis is perpendicular to transit axis
ii. the axis of rotation is perpendicular to transit axis
iii. the telescope axis, the transit axis and the rotation axis pass through the
centre of theodolite
iv. all the above
19. The method generally preferred to for contouring an undulating area, is
A) chain surveying B) Plane table surveying
C) tacheometrical surveying D) compass surveying
20. Stadia tachometry was discovered by James Watt in the year
A) 1670 B) 1770 C) 1870 D) 1900
21. The angle of intersection of a curve is the angle between
i. back tangent and forward tangent
ii. prolongation of back tangent and forward tangent
iii. forward tangent and long chord
iv. back tangent and long chord.
22. State the circumstance where plane table is suitable?
23. Name the accessories of plane table?
24. What is orientation; State the two methods of orientation?
25. State four demerits of plane table survey?
26. What is closed traversing
27. What are the types of traversing?
28. What is prism
29. What is centering
30. What is meant by compass
31. What is leveling
32. How to find inaccessible distance.
33. List out the methods of plane table surveying.
37
34. Why we have to use plane table surveying?
35. List the accessories used in pane table surveying.
36. What are the advantages of three point problem of plane table surveying?
37. List out the methods available in three point problem.
38. List the advantages and disadvantages of two point problem.
39. Compare the radiation and intersection methods.
40. Define traversing method in plane table surveying.
41. Compare the methods of two point and three point problem.
38
Ex.No:4
Date:
LEVELLING – LONGITUDINAL AND CROSS-SECTION AND PLOTTING
DUMPY LEVEL
39
Foot Screws: By turning the foot screws, the tribrach can be raised or lowered to bring the
bubble to the center of its run. Temporary adjustments are to be made at each setup of the
instrument.
Temporary Adjustments of Dumpy Level:
Temporary adjustments are to be made at each setup of the instrument. The following are the
temporary adjustments to be made.
1. Setting up of the level
2. Leveling up
3. Elimination of parallax.
Setting Up of the Level
a) Release the clamp screw of the instrument
b) Hold the instrument in the right hand and fix it on the tripod by turning round only the
lower part with the left hand.
c) Screw the instrument firmly.
d) Bring all the foot screws to the center of its run.
e) Spread the tripod legs well apart.
f) Fix any two legs firmly into the ground by pressing them with the hand.
g) Move the third leg to the right or left until the main bubble is approximately in the
center.
h) Then move the third leg in or out until the bubbles of the cross-level is approximately
in the center.
i) Fix the third leg firmly when the bubbles are approximately in the centers of
their run.
Levelling Up:
a) Place the telescope parallel to a pair of foot screws.
b) Bring the bubble to the center of its run by turning the foot screws equally either both
inwards and both outwards.
c) Turn the telescope through 90º so that it lies over the third foot screw.
d) Turn this third foot screw so that the bubble corners to the center of its run.
e) Bring the telescope back to the original position without reversing the eye-piece and
object glass.
40
f) Repeat the above operations until the bubble remains in the center of its run in both the
positions.
g) Turn the telescope through 180º and check whether the bubble remains central.
Elimination of Parallax:
a) Remove the lid from the object glass.
b) Hold a sheet of white paper in front of the object glass.
c) Move the eyepiece in or out until the cross hairs are distinctly visible.
d) Direct the telescope towards the staff.
e) Turn the focusing screw until a clear and sharp image in formed in the plane of the
cross hairs.
Procedure:
Longitudinal Sectioning:
1. Establish Benchmark near the starting points.
2. Fix the profile line AB and BC on the ground by fixing ranging rods at A,B,C, etc..
3. Measure the magnetic bearings of h the lines AB and BC using a compass.
4. Align the line and mark number of points at equal intervals on the proposed intervals.
(Points are 20m or 30m intervals).
5. Set up the leveling instrument on the side of the alignment on firm ground at some
suitable place P, so as to cover a large number of points in the lines.
6. Take back sight on benchmark, to determine the height of instrument.
7. Hold the leveling staff at successive station A, 1,2,3,4,etc..
8. Other procedure followed by differential leveling.
9. Finally close the work by taking a Fore sight on the Benchmark-2 from the last
instrument setup.
10. Enter the staff readings in the field book, reduced the levels and check in each page as
usual.
Cross Sectioning:
1. Mark the cross section points on the proposed centerline alignment.
2. Set out perpendicular at three points on both sides on the center line using a chain or
tape or cross staff or optical square.
3. Mark the cross representative points along the erected perpendicular lines depending
41
upon the nature of the ground, fix the arrows on these points. (Usually at interval of 2m,
3m, or 5m).
4. Left side marking L1, L2, L3, etc.. To the right side markings R1, R2, R3 etc to the
center line.
5. Take staff readings on each cross-section on marked points from the instrument
station.
6. Enter the staff reading at records.
7. Write full description of each cross section regarding the chain ages, number of the
cross section, distance of points on the cross section from the center line.
8. Calculate the reduced levels and with usual check.
Tabulation:
Reduced level of first point = ..................... m
Angle
Staff Back Inter Fore Height of Reduced
Remarks (Using
Station Sight Sight Sight Instrument Level
Compass)
BM
L1
L2
L3
C - 0m
R1
R2
R3
L1
L2
L3
C - 20m
R1
R2
R3
42
L1
L2
L3
C - 40m
R1
R2
R3
L1
L2
L3
C - 60m
R1
R2
R3
L1
L2
L3
C - 80m
R1
R2
R3
L1
L2
L3
C - 100m
R1
R2
R3
43
Result:
The longitudinal and Cross sectional levelling are calculated and plotted.
Viva Questions:
1. How many chief types of levels are used in levelling?
2. A levelling staff is used to establish:
3. Dumpy level was originally designed by:
4. How many categories of levelling staff are there?
5. Which of the below is used to make line of sight horizontally in a level?
6. A digital level reads a
7. Which of the below cannot be used to measure vertical heights?
8. How many types of self-reading staff are available?
9. Which of the below is not common in all levelling equipments?
10. Level vials can be of ____________ types.
11. Abney level is a type of hand level.
12. For accurate leveling __________ is attached inside telescope in an automatic level.
13. How many methods are used in levelling?
14. How many types of levelling are there?
15. In _________ levelling, the first and last point are at a far distance.
16. Stadia levelling is a modified form of:
17. Contours can be found in a __________ map.
18. Contour Maps are mandatory in civil engineering projects like
19. How many methods of contouring are present?
20. Indirect methods uses how many methods?
21. The commonly used squares in method of square is:
22. Which of the below methods is used for interpolating contour points between 2
points?
23. The contour interval is the same for all purposes.
24. The curves used for drawing lines between points in a contour line is:
25. Which shaped lines indicate presence of a ridge?
26. The line which separates the catchment basin from the rest of the area is:
44
27. How many types of EDM instruments are there based on wavelength?
28. Which of the below is used up to a range of 100km?
29. Plane table (PT) surveying is a __________ method.
30. What is used for levelling a plane table?
31. List the components of vernier theodolite.
32. Define transit.
33. What is swinging the telescope?
34. Define telescope normal.
35. Define telescope inverted.
36. Define the term line of sight.
37. What is centering.
38. What is face left observation?
39. Define face right observation?
40. The other name of plunging is
45
Ex.No:5
Date:
MEASUREMENT OF HORIZONTAL AND VERTICAL ANGLE BY THEODOLITE
46
7. Unclamp the lower clamp and swing the telescope and bisect station ‘P’ accurately
by using the lower clamp and lower tangent screw.
8. Read both the verniers check the vernier reading it should be the same (unchanged)
as that obtained in step 6.
9. Release the upper plate by using upper clamp and bisect station ‘R’ accurately by
using upper tangent screw. The vernier will read twice the PQR
10. Repeat the procedures for required number of times say three times and find out the
value of PQR.
11. Change face and make three more repetitions as described above. Find the average
angle with face right by dividing the final reading by three or whatever the number of
repetitions.
12. The average Horizontal angle is then obtained by taking the average of the two
angles obtained with face left and face right.
47
Result:
The angle is measured by the method of repetition and the obtained Horizontal angle is PQR =
..........................................
48
MEASUREMENT OF VERTICAL ANGLE
Aim: To measure the vertical angle subtended by the line of sight of a given rod with reference
to the horizontal axis at a selected station.
Equipment: Transit Theodolite, Tripod Stand, Plumb Bob, Ranging Rod and Pegs.
Principle:
The vertical angle is the angle made by an inclined line of sight with horizontal line of sight.
Vertical angles are measured by using telescope clamping and telescope tangent screws.
Procedure:
1) Let AOB is to be measured (Fig.2):
1. Setup the instrument doing the exact adjustments (centering, leveling and focusing the
eyepiece)
2. The centering is done with reference to altitude bubble.
3. Keep the instrument in the left position make the vernier ‘C’ read zero with the help of
vertical circle clamp & tangent screws.
4. Bring the altitude bubble to zero when the telescope is horizontal.
5. Direct the telescope to the object and bisect it accurately by means of the vertical circle
clamp and tangent screw.
6. Read both the vernier ‘C’ and ‘D’ and take the average, this gives the value of vertical
angle.
7. Change the face and repeat the procedure.
8. The required vertical angle is the average of face left and face right.
2) Let AOC is to be measured (Fig.2):
1. The instrument is already setup on the station at ‘O’.
2. Direct the telescope to the top of the rod and bisect it accurately by means of the vertical.
3. Read the both verniers ‘C’ and ‘D’ and take the average which gives the value of vertical
angle ‘α’.
4. Then the telescope is bisected to the bottom of the rod. Then read the both verniers ‘C’
and ‘D’ readings the average gives the value of vertical angle ‘β’.
5. The summation of α & β gives the AOC.
6. The face is changed and same procedure should be repeated then find AOC.
49
7. The average of this two gives the AOC.
50
Viva Questions:
1. Define: Theodolite surveying. What are the uses of a theodolite?
2. Why a type of theodolite is called a transit theodolite?
3. List the essential parts of a theodolite.
4. Differentiate between the Vernier theodolite and Micrometer theodolite.
5. List the essential qualities of a theodolite telescope. The essential parts of the
telescope:
6. What are the temporary adjustments of the theodolite?
7. List out the permanent adjustments of Theodolite.
8. List out the fundamental lines of Theodolite
9. What is an anallatic lens? What is the use of an anallatic lens?
10. Name the two methods of measuring horizontal angles using a thedolite. When each
method is advantageously used?
11. State what errors are eliminated by repetition method.
12. What are the methods used to plot the traverse?
13. Define closing error.
14. Define: Balancing. What are the methods used to balancing the traverse?
15. Explain the Bowditch's rule in balancing the traverse.
16. What is Gale's table? What is its use?
17. Define: Omitted measurements.
18. What is closed traverse? What are the two checks applicable in this case?
19. Define: Trigonometrical leveling or Heights and Distances.
20. What are the methods used to find the elevations of the points in the case of
inaccessible points?
21. What is Single plane method?
22. What is Double plane method?
23. The error due to eccentricity of inner and outer axes can be eliminated by
24. In the double application of principle of reversion, the apparent error is?
25. Which of the following errors can be eliminated by taking mean of both face
observations?
26. Which of the following errors cannot be eliminated by taking both face observations?
51
27. If altitude bubble is provided both on index frame as well as on telescope of a
theodolite, then the instrument is levelled with reference to
28. The following sights are taken on a "turning point"
29. The rise and fall method of levelling provides a complete check on ……………….
30. In an internal focussing type of telescope, the lens provided is?
31. For measuring horizontal angle, which vernier scale we have to look up?
32. For measuring vertical angle, which vernier scale we have to look up?
33. What is the least count of our vernier theodolite?
34. What is the least count of our leveling staff?
35. What is the necessasity of measuring horizontal and vertical angle using theodolite?
36. List the components of vernier theodolite.
37. Define transit.
38. What is swinging the telescope?
39. Define telescope normal.
40. Define telescope inverted.
41. Define the term line of sight.
42. What is centering.
43. What is face left observation?
44. Define face right observation?
45. The other name of plunging ……………….
52
Ex.No:6
Date:
TRIGONOMETRIC LEVELING USING THEODOLITE
Let,
P= instrument station
Q= Point to be observed
A= Center of the instrument
D= Horizontal distance between P and Q
h’ = Height of the instrument at P
Q’= Projection of Q on horizontal plane
S= Reading on staff kept on B.M, with line of sight on horizontal
α = Angle of elevation from A to Q
53
1. Setup the Theodolite at P and level if accurately w.r.t. the altitude bubble. See that the vertical
circle reads 000’0” when the line of sight is horizontal.
2. Direct the telescope towards Q and bisect it accurately clamp both the plates. Read the vertical
angle ‘α’.
3. Plunge the telescope and sight to the same point ‘Q’ and take the vertical angle ‘α’ calculate
the avg. of the vertical angles measured in both faces.
4. With the vertical vernier set to zero reading and the altitude bubble in the center of its run take
the reading on the leveling staff kept at A.B.M. Let it be ‘S’.
Observations and Calculations:
Vertical Angle, α =
Staff Reading, S (m) =
Horizontal Distance, D (m) =
From Triangle AQQ’: h = D tan α
Result:
Reduced Level of the given Point w.r.to BM =
54
(B) BASE INACCESSIBLE (SINGLE PLANE METHOD)
Aim: To find the elevation of the top of a building using the principle of trigonometrical leveling
with the instrument stations having their vertical axes in the same plane as the object.
Equipment: Transit Vernier Theodolite, Tripod Stand, Plumb Bob, Tape, Leveling Staff and
Pegs.
Procedure: It is required to find the elevation (R.L.) of the top of a building ‘Q’ from the
instrument stations P & R as shown in Fig.2 (a)
55
1. Setup the Theodolite at P and level it accurately with respect to the altitude bubble. See that
the vertical circle reads 000’0” when the line of sight is horizontal.
2. Direct the telescope towards Q and bisect it accurately clamp both the plates. Read the vertical
angle α1.
3. Transit the telescope so that the line of sight is reversed. Mark the instrument station R on the
ground along the line of sight. Measure the dist. b/w P&R accurately. Let it be ‘b’ repeat the
steps (2) & (3) for both face observations. The mean values should be adopted in the
calculations.
4. With the vertical vernier set to zero reading and the altitude bubble in the center of its run take
the reading on the leveling staff kept at A.B.M. Let it be ‘S’ if both the instrument axis are at
same level and ‘S1’ if they are at different levels.
5. Shift the instrument to R and set up the Theodolite there. Measure the vertical angle ‘α 2’ to Q
with both face observations.
6. In case of instrument axis at different levels repeat the step (4) and let the reading at R be ‘S2’.
Observations and Calculations:
Vertical Angles,
α1= α2=
Staff Readings
S (m) =
S1 (m) =
S2 (m) =
Horizontal dist. b/w P & R = b =
In case of instrument axis at same level:
From triangle AQQ’
h = D tan α 1
From triangle BQQ’
h = (b + D) tan α 2
D = (b tan α 2) / (tan α 1 - tan α 2)
Reduced Level of point Q (m) = R.L. of B.M. + S + h
In case of instrument axis at different levels:
h1-h2 = S2~S1 = S
56
D = (S + b tan α 2 ) / (tan α 1 - tan α 2)
h1 = D tan α 1
h2 = (b + D) tan α 2
Reduced Level of point Q = R.L. of B.M. + S1 + h1
Reduced Level of point Q = RL of B.M. + S2 + h2
Result:
Reduced Level of given point Q (m) =
57
Viva Questions:
1. How many methods are used in levelling?
2. How many types of levelling are there?
3. Trigonometric levelling is also called
4. In _________ levelling, the first and last point are at a far distance.
5. Stadia levelling is a modified form of:
6. The last reading taken from the instrument is called:
7. Reciprocal levelling is used when,
8. In a hilly terrain, staff reading is more at:
9. Which is the arithmetic check for height of instrument method?
10. Which instrument is used in trigonometric levelling?
11. In levelling, error due to earth’s curvature is to be corrected using:
12. Level vials can be of ____________ types.
13. How many types of bench mark are there?
14. A stone that marks boundary is called:
15. _________ errors are small unavoidable fluctuation.
16. Plan is a small-scale representation of a large area.
17. Which of the below is not a means of linear surveying methods?
18. The term Gore is used to indicate:
19. An acre is equal to how many square feet.
20. In triangulation method, the whole area is divided into:
21. A stone that marks boundary is called:
22. The commonly used squares in method of square is:
23. Which of the below methods is used for interpolating contour points between 2
points?
24. The contour interval is the same for all purposes.
25. The curves used for drawing lines between points in a contour line is:
26. Which shaped lines indicate presence of a ridge?
27. Plan is a small-scale representation of a large area.
28. How many meridians are used in surveying?
29. Which of the below is not an instrument used to set right angles?
58
30. In how many ways can ranging be carried out?
31. How many types of cross staff are available?
32. List the components of vernier theodolite.
33. Define transit.
34. What is swinging the telescope?
35. Define telescope normal.
36. Define telescope inverted.
37. Define the term line of sight.
38. What is centering.
39. What is face left observation?
40. Define face right observation?
59
Ex.No:7
Date:
HEIGHT AND DISTANCES USING PRINCIPLES OF TACHOMETRIC SURVEYING
Equipment:
Theory:
The Tachometer is an instrument which is generally used to determine the horizontal as well as
vertical distance . it can also be used to determine the elevation of various points which cannot
be determine by ordinary leveling. When one of the sight is horizontal and staff held vertical
then the RLs of staff station can be determined as we determine in ordinary leveling .But if the
staff station is below or above the line of collimation then the elevation or depression of such
point can be determined by calculating vertical distances from instrument axis to the central hair
reading and taking the angle of elevation or depression made by line of sight to the instrument
made by line of sight to the instrument axis.
Procedure:
1. Set up the instrument in such a way that all the point should be visible from the
instrument station.
2. Carryout the temporary adjustment and set vernier zero reading making line of sight
horizontal.
3. Take the first staff reading on Benchmark and determine height of instrument.
4. Then sight the telescope towards the staff station whose R.Ls are to be calculated.
Measure the angle on vernier if line of sight is inclined upward or downward and also
note the three crosshair readings.
5. Determine the R.Ls of various points by calculating the vertical distance
60
61
Observation and Calculations:
Where,
Result:
62
Viva Questions:
1. Define tacheometry.
2. The other name for tacheometry are ………………………….
3. Which type of theodolite is necessary for doing the tacheometric surveying?
4. The transit theodolite is to be fitted with ……………… Diaphragm
5. List out the essential characteristics of tacheometer.
6. What are the types of holding available in tacheometry and name that?
7. Write the advantage and disadvantages of vertical and normal holding.
8. What is subtense bar?
9. Under which circumstances the subtense bar can be used?
10. Contours can be found in a __________ map.
11. How many methods of contouring are present?
12. Indirect methods uses how many methods?
13. Contour Maps are mandatory in civil engineering projects like road works, dams, canals
14. The commonly used squares in method of square is:
15. Which of the below methods is used for interpolating contour points between 2 points?
16. The contour interval is the same for all purposes.
17. The curves used for drawing lines between points in a contour line is:
18. Which shaped lines indicate presence of a ridge?
19. The line which separates the catchment basin from the rest of the area is:
20. How many chief types of levels are used in levelling?
21. A levelling staff is used to establish:
22. Dumpy level was originally designed by:
23. How many categories of levelling staff are there?
24. Which of the below is used to make line of sight horizontally in a level?
25. A digital level reads a:
26. Which of the below cannot be used to measure vertical heights?
27. How many types of self-reading staff are available?
28. Which of the below is not common in all levelling equipments?
29. Level vials can be of ____________ types.
30. Abney level is a type of hand level.
63
31. Which instrument is used in trigonometric levelling?
32. How many types of variations in declination are there?
33. Which of the below is not a temporary adjustment of prismatic compass?
34. ___________ line is the line drawn through points of same declination.
35. How many meridians are used in surveying? List the components of vernier theodolite.
36. Define transit.
37. What is swinging the telescope?
38. Define telescope normal.
39. Define telescope inverted.
40. Define the term line of sight.
41. What is centering.
42. What is face left observation?
43. Define face right observation?
64
INTRODUCTION ON TOTAL STATION
Total Station:
The total station is an electronic theodolite (transit) integrated with an electronic distance
measurement (EDM) to read slope distances from the instrument to a particular point, and an on-
board computer to collect data and perform advanced coordinate based calculations.
Function:
Angle measurement
Most total station instruments measure angles by means of electro-optical scanning of extremely
precise digital bar-codes etched on rotating glass cylinders or discs within the instrument. The
best quality total stations are capable of measuring angles to 0.5 arc-second. Inexpensive
"construction grade" total stations can generally measure angles to 5 or 10 arc-seconds.
Distance measurement
Measurement of distance is accomplished with a modulated infrared carrier signal, generated by
a small solid-state emitter within the instrument's optical path, and reflected by a prism reflector
or the object under survey. The modulation pattern in the returning signal is read and interpreted
by the computer in the total station. The distance is determined by emitting and receiving
multiple frequencies, and determining the integer number of wavelengths to the target for
each frequency. Most total stations use purpose-built glass corner cube prism reflectors for the
EDM signal. A typical total station can measure distances with an accuracy of about 1.5
millimetres (0.0049 feet) + 2 parts per million over a distance of up to 1,500 meters (4,900 feet).
Reflector less total stations can measure distances to any object that is reasonably light in colour,
up to a few hundred meters.
Coordinate measurement:
The coordinates of an unknown point relative to a known coordinate can be determined using the
total station as long as a direct line of sight can be established between the two points. Angles
and distances are measured from the total station to points under survey, and the coordinates (X,
Y, and Z or easting, northing and elevation) of surveyed points relative to the total station
position are calculated using trigonometry and triangulation. To determine an absolute location a
Total Station requires line of sight observations and can be set up over a known point or with line
of sight to 2 or more points with known location, called Resection (Free Stationing).
For this reason, some total stations also have a Global Navigation Satellite System receiver and
do not require a direct line of sight to determine coordinates. However, GNSS measurements
may require longer occupation periods and offer relatively poor accuracy in the vertical axis.
Data processing Some models include internal electronic data storage to record distance,
horizontal angle, and vertical angle measured, while other models are equipped to write these
measurements to an external data collector, such as a hand-held computer.
When data is downloaded from a total station onto a computer, application software can be used
to compute results and generate a map of the surveyed area. The newest generation of total
65
stations can also show the map on the touch-screen of the instrument immediately after
measuring the points.
Precautions To Be Taken While Handling Total Station:
1. Never point the instrument at the sun without a filter.
2. Never store the instrument in extreme temperatures and avoid sudden changes of
temperature.
3. When not using the instrument, place it in the case to avoid shock, dust, and humidity.
4. If there is a great difference in temperature between the work site and the instrument
storage location leave the instrument in the case until it adjusts to the temperature of the
surrounding environment.
5. Please remove the battery for separate storage if the instrument is to be in storage for an
extended time. The battery should be charged once a month during storage.
6. The instrument should be placed in its carrying case during transportation. It is
recommended that the original packing case be used for cushioning during extended
transportation.
7. Be sure to secure the instrument with one hand when mounting or removing from the
tripod.
8. Clean exposed optical parts with degreased cotton or lens tissue only.
9. Clean the instrument's surface with a woollen cloth when finished with use. Dry it
immediately if it gets wet.
10. Check the battery, functions, and indications of the instrument as well as its initial setting
and correction parameters before operating.
11. Unless you are a maintenance specialist do not attempt to disassemble the instrument for
any reason. Unauthorized disassembly of the instrument can result in a void warranty.
12. The total stations emit a laser during operation. DO NOT stare into the beam or laser
source when instrument is operation.
Nomenclature:
66
Unpacking and Storage of The Instrument:
Unpacking of the instrument: Place the case lightly with the cover upward, unlock the case and
take out the instrument.
Storage of the instrument: Replace the cover on the telescope lens, place the instrument into
the case with the vertical clamp screw and circular vial upward (objective lens toward the
tribrach), tighten the vertical clamp screw, close and lock the case.
Instrument Set Up: Mount the instrument onto the tripod and secure firmly. Level and
centre the instrument precisely to ensure the best performance. Use the tripod with a 5/8” tripod
screw.
Operation Reference: Levelling and Centring the Instrument
1. Setting up the tripod: First extend the extension legs to suitable length and tighten the
screws, firmly plant the tripod in the ground over the point of beginning.
2. Attaching the instrument to the tripod: Secure the instrument carefully on the tripod
and slide the instrument by loosening the tripod mounting screw. If the optical plumb site
is positioned over the centre of the point tighten the mounting screw.
3. Roughly levelling the instrument by using the circular vial: Turn the levelling screw
A and B to move the bubble in the circular vial, in which case the bubble is located on a
line perpendicular to a line running through the centres of the two levelling screw being
adjusted. Turn the levelling screw C to move the bubble to the centre of the circular vial.
Recheck the position of the instrument over the point and adjust if needed.
4. Levelling by using the plate vial: Rotate the instrument horizontally by loosening the
Horizontal Clamp Screw and place the plate vial parallel with the line connecting
67
levelling screws A and B, then bring the bubble to the centre of the plate vial by turning
the levelling screws A and B. Rotate the instrument 90° (100g) around its vertical axis
and turn the remaining levelling screw or levelling C to centre the bubble once more.
Repeat the procedures for each 90° (100g) rotation of the instrument and check whether
the bubble is correctly centred in all directions.
5. Centring by using the optical plummet (or plummet or laser): Adjust the eyepiece of
the optical plummet telescope to your eyesight. Slide the instrument by loosening the
tripod screw; place the point on the centre mark of the optical plummet. Sliding the
instrument carefully as to not rotate the axis will allow you to get 7 the least dislocation
of the bubble. (Place star-key after power on, then press F4(LASER)key, press
F1(ON)key to turn on the laser plummet. Slide the instrument by loosening the tripod
screw; Place laser facular on the occupied pointing, Sliding the instrument carefully as to
not rotate the axis will allow you to get the least dislocation of the bubble. The last, press
ESC key, and laser plummet turn off automatically.)
6. Complete levelling the instrument: Level the instrument precisely as in Step 4. Rotate
the instrument and check to see that the bubble is in the centre of the plate level
regardless of the telescope direction then tighten the tripod screw firmly.
Battery removal and insertion: Insert the battery into the battery slot and push the battery until
it clicks. Press the right and left buttons of the battery compartment to remove the battery.
Battery information: ------------- Indicates that battery is fully charged
------------- Indicates that the battery can only be used for about 1 hour. Recharge the battery or
prepare a recharged battery for use.
------------- Recharge the battery or prepare a recharged battery for use
Note: The working time of the battery is determined by environment
conditions, recharging time, and other factors.
Battery recharging: Battery should be recharged only with the charger supplied with the
instrument. Remove the on-board battery from instrument as instructed and connect to the
battery charger.
Battery removal caution: Before you take the battery out of the instrument, make sure that
the power is turned off. Otherwise the instrument can be damaged.
Recharging Caution:
The charger has built-in circuitry for protection from overcharging. However, do not
leave the charger plugged into the power outlet after recharging is completed.
Be sure to recharge the battery at a temperature of 0℃~45℃, recharging may be
abnormal beyond the specified temperature range.
68
When the indicator lamp does not light after connecting the battery and charger the
battery or the charger may be damaged.
Storage Caution:
The rechargeable battery can be repeatedly recharged 300-500 times. Complete discharge
of the battery may shorten its service life.
In order to get the maximum service life be sure to recharge the battery at least once a
month.
Operation Key:
69
Power key On / Off key press and hold key
F1 – F4 Soft key (Function Responds to the message displayed key)
0-9 Number key Input numbers
- Minus key Input minus sign, displays electronic bubble
. Point key On / Off laser pointing function
DISPLAY CONTENT
V Vertical angle
Vertical angle as a percentage (Gradient
V%
display)
HR Horizontal angle (right)
HL Horizontal angle (left)
HD Horizontal distance
VD Elevation difference
SD Slope distance
N North coordinate
E East coordinate
Z Z or elevation coordinate
* EDM working
m/ft Switches units between meters and feet
m Meter unit
S/A Sets temperature, air pressure, prism constant
PSM Prism constant (unit: mm)
PPM Atmospheric correction
70
Ex.No:8
Date:
DETERMINATION OF HEIGHT, REMOTE ELEVATION, DISTANCE BETWEEN
INACCESSIBLE POINTS USING TOTAL STATION
Aim:
To find the elevation of a remote point using total station.
Equipment:
Total station, Prism, Tripod, Tape, Compass, Pegs and arrows
Precautions:
a) Temporary adjustment for total station
b) Levelling and centring
c) Focusing adjustment
Procedure:
1. Fix the total station over a station point and level it. Press the power button to switch on
the instrument.
2. Select MODE B→ S function→ file management → Create a job (enter a name) →
Accept. And press ESC to go to the starting page
3. Place the compass and orient the telescope towards magnetic north and then set zero by
double clicking on 0 set (F3).
4. Go to S Func – Prog (F1) - REM comment. Focus and bisect the bottom of the given
object and set starting point (i.e 0m). Then focus the top of the given object,
automatically the height of the object will appear in the screen.
71
Diagram:
Result:
The remote elevation of the given object = …………………………m
72
Aim:
To find the Distance, gradient, difference, height between two inaccessible points using Total
Station.
Equipment:
Precautions:
Temporary adjustment for total station
Levelling and centring
Focusing adjustment
Procedure:
7. Here enter the point number or name, instrument height and prism code.
8. Select two inaccessible points “P” and “Q” between which the distance is to be measured.
Calculate the coordinates of point P and Q and save those values.
Gradient of line PQ =
73
DIAGRAM:
Calculation:
Result:
74
Viva Questions:
75
30. What kinds of coordinates are available in total station?
31. Where we can use polar coordinates?
32. List the comments used in total station.
33. What is the use of cogo comment?
34. What is the use of REM comment?
35. What is MLM?
36. List the capabilities of a total station.
37. What are the field procedures for a total station in topographic surveys?
38. Value of prism correction = …………………….
39. What are the modes of observation available in total station?
40. Define stakeout.
76
Ex.No:9
Date:
DETERMINATION OF AREA USING TOTAL STATION AND DRAWING MAP
Aim:
Equipment:
Precautions:
77
9. Repeat the steps to the rest of the stations and close the traverse
10. Now go to S function→ view/edit→ graphical view.
11. It will show the graphical view of the traverse.
12. Select S function→ calculation→ 2D surface→ All→ accept
13. This will give the area of the closed traverse.
Diagram:
Calculation:
Select S function → Calculation→ 2D surface →All → accept – (Will display the area of
the field which we taken the readings in the screen)
Result:
78
Viva Questions:
79
31. What are the modes of observation available in total station?
32. Define stakeout.
33. What is resection?
34. What is the purpose of resection?
35. What is the advantage of resection?
36. How to measure of the height of instrument?
37. How the sensitiveness of a bubble tube is designated?
38. How the benchmark is established?
39. As a surveyor, what are your primary job tasks?
40. What are the methods of surveying?
41. What are the general principles of surveying?
80
Ex.No:10
Date:
TRAVERSING USING TOTAL STATION FOR DRAWING CONTOUR MAP
Aim:
Prepare the contour plan of given area (One full size drawing sheet) using total station.
Equipment:
Precautions:
The elevation and depression and the undulations of the surface of the ground are shown as map
by interaction of level surface with by means of contour line. A contour may be defined as the
line of intersection of a level surface with the surface of the ground.
1. Fix the total station over a station and level it. Press the power button to switch on the
instrument.
2. Select MODE B→ S function→ file management → Create a job (enter a name) →
Accept. And press ESC to go to the starting page.
3. Then go to S Function → Measure → Station (Enter the coordinates of station point)
- Place the compass and orient the telescope towards magnetic north and then set
zero by double clicking on 0 set (F3) - Rectangular co-ordinate - Here enter the point
number or name, instrument height and prism code (Measure the coordinates of
points of given field)
4. Keep the reflecting prism on the first point and turn the total station to the prism, focus
it and bisect it exactly using a horizontal and vertical clamp.
5. Then select MEAS and the display panel will show the point specification
6. Now select edit and re-enter the point number or name point code and enter the prism
81
height that we have set.
7. Then press MEAS/SAVE (F3) so that the measurement to the first point will
automatically be saved and the display panel will show the second point.
8. Adopt Cross section method for establishing the major grid around the study area.
9. Project suitably spaced cross sections on either side of the centre line of the area.
Choose several points at reasonable distances on either side.
10. Keep the reflecting prism on the first point and turn the total station to the prism, focus
it and bisect it exactly using a horizontal and vertical clamp.
11. Then select MEAS and the display panel will show the point specification
12. Now select edit and re-enter the point number or name point code and enter the prism
height that we have set.
13. Then press MEAS/SAVE (F3) so that the measurement to the first point will
automatically be saved and the display panel will show the second point.
14. Then turn the total station to second point and do the same procedure. Repeat the steps
to the rest of the stations and get all point details.
15. Plot cross section lines to scale and enter spot levels.
16. The points on the chosen contours are interpolated assuming uniform slope between
adjacent points and join them by a smooth line.
Diagram:
82
Calculations:
83
Select S Function → calculation → 2D surface → All → accept.
Result:
The contour of a given field has been plotted.
Viva Questions:
1. What is contouring?
2. What are the advantages of contouring?
3. Represent contour for a hill with a neat sketch.
4. What are the characteristics of contour?
5. What are the uses of contouring?
6. What is traversing?
7. What are the temporary adjustments of total station?
8. What is the instrument used for ranging?
9. What is levelling?
10. What are the precautions to be taken while determining the area?
11. What is closed traverse?
12. What is Total Station?
13. What are the major components of Total Station?
14. What are the uses of Total Station?
15. What is the Least of Count of Total Station?
16. What are temporary adjustments of Total Station?
17. Nowadays targets are not necessary for doing surveying. Is it true?
18. What is remote height?
19. What is elevation?
20. What is depression?
21. How to find out the high of the tower by using total station?
22. What is resection?
23. What is the purpose of resection?
24. What is the advantage of resection?
25. How to measure of the height of instrument?
26. How the sensitiveness of a bubble tube is designated?
84
27. How the benchmark is established?
28. As a surveyor, what are your primary job tasks?
29. What are the methods of surveying?
30. What are the general principles of surveying?
31. Where we can use polar coordinates?
32. List the comments used in total station.
33. What is the use of cogo comment?
34. What is the use of REM comment?
35. What is MLM?
36. List the capabilities of a total station.
37. What are the field procedures for a total station in topographic surveys?
38. Value of prism correction = …………………….
39. What are the modes of observation available in total station?
40. How you can do contouring using total station?
85
Ex.No:11
Date:
STAKE OUT USING TOTAL STATION
Aim:
Equipment:
Precautions:
Place the total station in the spot from which you want to stake out points after you have
finished entering the coordinates for the area into the total station's internal memory.
1. Set up the instrument at a known point and set the horizontal circle (Consider this point
as station point) using S Func – Stake – Station (After entering the station point
coordinates, press Enter, and press BSP (Back Sight Point), enter the coordinates of one
reference point. Since, the instrument has to be oriented with existing North of previous
records)
2. Go to Stakeout and enter the coordinates of the point to be staked out. (The program
automatically calculates direction and distance to the point – the two parameters needed
for staking out.)
3. Turn the total station until the horizontal circle (Horizontal Angle) reads zero.
86
4. Position the reflector at this point (Point P).
5. Measure the distance. (The difference in the distance D to the point P will be displayed
automatically.)
6. The coordinates of the points to be staked out can be transferred beforehand from your
computer to the total station. Under these circumstances, you only need to select the
point number. If two points are known, you can also use the resection method to set up
and orient your instrument.
Diagram:
Result:
The missed out point has been re-established in the field and their Coordinates are,
N=
E=
Z=
87
Viva Questions:
88
28. What are temporary adjustments of Total Station?
29. Nowadays targets are not necessary for doing surveying. Is it true?
30. How to measure of the height of instrument?
31. How the sensitiveness of a bubble tube is designated?
32. How the benchmark is established?
33. As a surveyor, what are your primary job tasks?
34. What are the methods of surveying?
35. What are the general principles of surveying?
36. What is the aim of this experiment?
37. What are the tools used for this experiment?
38. How does fix the total station in the field?
39. How do change point in the field using total station?
40. What is setout?
89
Ex.No:12
Date:
SETTING OUT CURVE USING TOTAL STATION
Aim:
Equipment:
Precautions:
Simple Curve: A simple curve is a circular arc in the horizontal plane that has a central
angle of less than 180 degrees (PI radians). A simple curve starts at the PC (Point of Curvature),
has a CC (Circle Centre) and a PI (Point of Intersection for the tangents to the curve), and ends at
the PT (Point of Tangency, the ending point of the curve).
1. From the Power Topo Lite screen, press [F2] [CALC] to view CALCULATION screen.
90
2. Select 1. COGO and press [ENT] to view the COGO screen.
4. Start point input (Input the PN, Coordinates and PC of the Start point.)
5. Select 1. SP and press [ENT] to view SP screen.
6. [LIST] key All stored points can be displayed as follows by pressing [F2] [LIST]. Press
[F2] [LIST] to view POINT SELECTION FROM THE LIST screen.
91
8. Input your desired Point Name by pressing keys, and press [ENT] to open the X
coordinate input screen.
9. Input your desired value by pressing each keys and press [ENT] to go Y coordinate.
10. Press [ENT] to open the Y coordinate input screen and input.
11. Press [ENT] to open the Z coordinate input screen and input.
12. Press [ENT] to open the PC input screen and input.
13. End point coordinates input (Input the PN, Coordinates and PC of the End point.)
14. After PC input, EP screen is viewed.
15. Input the PN, X, Y, Z Coordinates and PC name of the End point.
16. Press [ENT] to view the RESULT OF INVERSE screen.
17. Another End Point Coordinates input the PN, X, Y, Z Coordinates and PC name of
another End point, and another inverse result can be performed.
92
18. A point Coordinates is calculated from a known point Coordinates and the Distance and
Horizontal angle of the Second point.
19. Input: Coordinates of a known point, Distance and Horizontal angle of the Second point
Output: Coordinates of the Second point
20. From the Power Topo Lite screen, press [F2] [CALC] to view the CALCULATION
screen.
21. Select 1.COGO and press [ENT] to view the COGO screen.
Diagram:
Calculation:
93
From the Power Topo Lite screen, press [F2] [CALC] to view the CALCULATION
screen.
Result:
Viva Questions:
94
24. What are the methods of surveying?
25. What are the general principles of surveying?
26. What are the general principles of surveying?
27. What is the aim of this experiment?
28. What is EDM?
29. What is the use of polar co-ordinate?
30. How do you perform change point using total station?
31. Where we can use polar coordinates?
32. List the comments used in total station.
33. What is the use of cogo comment?
34. What is the use of REM comment?
35. What is MLM?
36. List the capabilities of a total station.
37. What are the field procedures for a total station in topographic surveys?
38. Value of prism correction is equal to
39. What are the modes of observation available in total station?
40. Define stakeout.
41. What precision have to achieve during leveling using total station?
95
CONTENT BEYOND THE SYLLABUS
Ex.No: 1
Date:
Aim:
To locate the station point occupied by the plane table with the reference of three known points.
Equipments:
Chain/Tape, Ranging Rods, Arrows, Plane Table with Tripod and its accessories, Drawing
Sheets, Drawing Clips, Pencil, Eraser and Pins.
Procedure:
Three Point Problem - Principle:
In this method, three well defined points, having locations already being plotted on the
drawing are involved. These are used to find and subsequently plot the location of the plane table
station.
The method is based on the fact that, in a correctly oriented plane table, resectors through
well defined points get intersected at a point which represents the location of the plane table
station on the drawing. For example, as shown in Figure, if X, Y and Z are well defined objects
present in the field whose plotted positions are x, y and z. Now, if the plane table is oriented
correctly, the three resectors Xx, Yy and Zz get intersected at p which represents the location of
the plane table station, P on the drawing sheet. Thus, through solution of three-point problem,
both orientation and resection of plane table gets accomplished simultaneously.
96
There are several methods for solution of the three point problem: (i) Trial and Error
method, (ii) Mechanical method, (iii) Graphical method, (iv) Analytical method and (v)
Geometrical construction method. Of these, the trial and error method is easy, quick and
accurate. It is commonly used in practice and hence, has been discussed in detail.
In three point problem, if the orientation of the plane table is not proper, the intersection of the
resectors through the three points will not meet at a point but will form a triangle, known
as triangle of error. The size of the triangle of error depends upon the amount of angular error in
the orientation.
The trial and error method of three point problem, also known as Lehman's method minimises
the triangle of error to a point iteratively. The iterative operations consist of drawing of resectors
from known points through their plotted position and the adjustment of orientation of the plane
table.
The estimation of location of the plane table depends on its position relative to the well defined
points considered for this purpose. Depending on their relative positions, three cases may arise:
In case of (iii), the solution of the three-point problem becomes indeterminate or unstable. But
for the cases (i) and (ii), Lehmann's rules are used to estimate the location of plane table.
Lehmann's rules
1. If the position of plane table station is inside the great triangle, its plotted position should be
chosen inside the triangle of error.
2. If the position of plane table station is outside the great triangle, its plotted position should be
chosen outside the triangle of error.
3. The plotted position of the plane table should be so chosen that its distance from the the
resectors is proportional to the distance of plane table station from the field positions of the
considered objects.
4. The plotted position of the plane table should be so chosen that it is to the same side of all the
three rays.
4(a). If the position of plane table station is outside the great circle, its plotted position should be
so chosen that
It lies on the same side of ray to the most distant point as the intersection k of the other
two rays.
The intersection of two rays to the nearer points, is midway between the plotted position
of the station and the ray to the most distant point.
97
4(b). If the position of plane table station is outside the great triangle but inside the great circle,
the plotted position of the station is so chosen that the ray to the middle point lies between
plotted station position and the intersection of the rays to the two extreme points.
i. Select a plane table position inside the great triangle XYZ and set up the table
over P and orient it by judgment so that apparent line xy is approximately parallel
to the imaginary side XY.
ii. Pivoting the alidade on x, y, and z bisect the signals placed at X, Y, and Z in turn
and draw rays. If the orientation of the table is correct, the three rays will meet at
one point which is the desired location of p on the sheet. If not, the rays will form
a triangle of error.
iii. Choose a point p' inside the triangle of error such that its perpendicular distances
from each ray is in proportion to the respective distances of P from the three
ground objects. For selection of location of p', Lehmann's rules (1) and (3) need to
be applied.
iv. Align the alidade along p' x (assuming X to be the farthest station) rotate the table
till flag at X is bisected, and clamp the table.
v. Pivoting the alidade on x, y, and z repeat the process as in step (ii) above. If the
estimation of p as p' is correct, the three rays will intersect at a point otherwise
again a triangle of error will be formed but of smaller size and within the previous
triangle of error. .
vi. Estimate again the location of p' in the new triangle of error applying the rules, (i)
and (iii), and repeat the steps (iv) and (v).
vii. The method is repeated till all the three rays intersect at a point. The point of
intersection is the required location p of the plane-table station P.
Result:
The station point of the plane table has been re-established using plane table surveying
by three point problem.
98
Ex.No: 2
Date:
Aim:
To find the position (latitude, longitude and elevation) of station point using global positioning
system (GPS).
Equipments:
GPS Meter, GPS software, Total Station or Garmin GPS
Precautions:
a) Temporary adjustment for total station
b) Levelling and centring
c) Focusing adjustment
Theory:
A GPS receiver can fix its latitude and longitude by calculating its distance from three or
more Earth-orbiting satellites, whose positions in space and time are known.
99
1. In the absolute positioning mode, the absolute coordinates of the antenna position
(centred over the survey station) are determined using single GPS receiver, by a method
similar to the resection method used in plane tabling.
2. The pseudo ranges (the satellite-antenna range, contaminated by the receiver clock bias)
from minimum four satellites are observed at the given epoch, from which the four
unknown parameters - the 3-D position of the antenna (x, y, z) and the receiver clock
error can be determined.
3. The accuracy of the position obtained from this method depends upon the accuracy of the
time and position messages received from the satellites.
4. With the selective availability operational, the accuracy of absolute positioning in real-
time was limited to about 100 metres, which has now improved to a about 10 to 20
metres, since the SA is switched-off.
5. This can be further improved to few centimetres level by using post-processed satellite
orbit information in the post-processing mode.
6. The accuracy of absolute positioning with GPS is limited mainly due to the high orbit of
the satellites. However, very few applications require absolute position in real time.
7. A wide variety of GPS receivers are commercially available today. Depending upon the
type of application, accuracy requirements and cost factor, the user can select the type of
GPS receiver which best suits his demands.
8. The receivers available cover a wide range from the high-precision Rouge receivers
developed by the Jet Propulsion Laboratories, (JPL), of the National Aeronautics and
Space Administration (NASA), with built-in atomic clock, to the hand-held navigation
receivers used by Army personnel, mountaineers, etc., which can give the position to
few-metres accuracy. Even wrist-watches with built-in GPS receivers are now
commercially available (e.g.: the Casio GPS watch).
9. The surveying type of receivers are single frequency, multi-channel receivers, which are
useful for most surveying applications, including cadastral mapping applications,
providing tertiary survey control, engineering surveys, etc.
100
10. These are more expensive than the navigation type of receivers, and more versatile. The
data from many of these receivers can be directly imported in to most commonly used
GIS software packages / formats.
11. Most of these receivers can also be used in DGPS mode. Examples of surveying receivers
are the PRO-XR model of Trimble Navigation Ltd., the SR 100 model of Leica Ag., etc
Procedure:
5. On the GPS Data Resources page, follow the GNSS Planning Tool link.
The GNSS Planning Online interface will open. You will land on the Settings page.
6. Go ahead and enter at least longitude and latitude information for a location you are
interested in.
You can also use the Pick button to interactively select a location. After you pick a
location from the map, click the Apply button.
7. Change or take note of the other setting in the Settings dialog window.
8. Click the Settings window Apply button. Your settings will be processed. Then you can
click on any of the other buttons along the left side of the interface.
For example, the Satellite Library button gives you access to the satellites in the
various GPS systems that exist. You can choose the satellites you want to use. Clicking
on a satellite entry from one of the system lists will bring up its almanac information.
9. Click the DOPs button. This allows you to see how the various sources of Dilution of
Precision vary throughout the time period that was specified on the Settings page.
Can you determine the best and worst times of day for GPS work?
10. Spend some time investigating what the other buttons allow you to investigate.
11. Trimble's GNSS Planning Online tool is not a teaching tool; you will not find a Help
button that links to explanations of the functionality. The planning tool is aimed at users
already versed in the terminology and technology.
101
Using Garmin GPS meter:
1. Switch on the power button present in the instrument. The instrument has to
receive the signals from 5 satellites for getting accuracy (3m circumference) in
result.
2. Go to Mark Waypoint comment – That gives the latitude, longitude and elevation
of a particular point.
Result:
The latitude, longitude and the elevation of the station point have been found.
Latitude =
Longitude =
Elevation =
102