Hospital Plumbing
Hospital Plumbing
Hospital Plumbing
450 150
150
150
350
400
450
OUTLET
300
CO CO
TO NEAREST
INLET CO CO SEWER LINE
OUTLET
TO NEAREST
S-2 (VERIFY)
S-1
1500
SEWER LINE
DIGESTION CHAMBER LEACHING LEACHING
CHAMBER CHAMBER MH MH MH
2000
1700
1700
600
500 300 300
500
℄ 2% SLOPE A
150
150 mm THK. R. C. WALL WITH CO
AT
16 mm Ø EXTRA BARS
16 mm Ø HOR. BARS AT 250 mm
S-2
+/- 600 mm 150 1000 150 700 150 700 150 O.C. AND 16 mm Ø VERT. BARS
150
150
O.C. 3000 AT +/-300 mm O.C. (TYPICAL)
16 mm Ø BARS AT 259 mm 600
O.C. 150 mm THK. BOTTOM SLAB
CUT-OFF ALTERNATE @ 462 mm (TYPICAL) LEACHING CHAMBER
FROM FACE OF
SUPPORT
DETAIL SECTION A 100 mm THK. COMPACTED 200 mm Ø PVCSP
B C (TYPICAL)
16 mm Ø LONGITUDINAL GRAVEL FILL
INLET INLET
BARS
AT 269 mm O.C.
DETAIL PLAN (TOP SLAB)