CONCRETE CUBE TEST RESULTS

PROJECT TITLE TK618 222 Sludge Filter Structure Renewal PAGE NO:

STRUCTURE CONCRETE CUBE TEST COMPRESSIVE STRENGTH


Concrete Crushing Load Reading
Slump (mm) Date Remarks
(COMPONENT/ELEMENT) Grade Ref.No. Age (days) Weight (g) Density (kg/m³) (kN) (N/mm2) Avarage
Cast Tested
1
774 229333.3 750.00 33.33

Concrete Slab 50mm (GF GL D-H1/1-3) 30 90 2 12/16/2023 12/22/2023 7 33.33 PASS


745 220740.7 750.00 33.33

3
781 231407.4 750.00 33.33

Concrete Slab 50mm (GF GL D-H1/1-2) 30 90 2 12/16/2023 12/22/2023 7

Cube Dimension (cm)


NOTES *Density = Weight (g) / Cube Volume (cm³)
Cube Volume (cm³)
*Compressive Strength = Crushing Load Reading (kN) / Area of Cube (m2)

Tested By : Witness By: Approved By:


SUMMARY OF CONCRETE CUBE COMPRESSION TEST RESULT
TERM OF CONTRACT FOR CIVIL WORKS MAINTENANCE AT SABAH-SARAWAK GAS PIPELINE (SSGP) - 21-Jan-22
PROJECT TITTLE UPDATE ON
Area C

NO. LOCATION / STRUCTURE CONC. SLUMP CAST RESULT OF COMPRESSIVE STRENGTH TEST (N/mm2)
AREA ELEMENT GRADE DATE 7 DAYS TEST REPORT 14 DAYS TEST REPORT 28 DAYS TEST REPORT
TRIAL MIX
CEMENT
1) KP 215.4 GROUT 30 NONE 20-Dec-21 23.30 RFI-113 33.30 RFI-114 35.33 RFI-124
SHEET PILE

REMARK AND COMMENT - IF ANY

RECORDED BY CHECKED BY

Doc. ref.: SSGP/CWM(LLT)-CCT-01