This document is a material approval form for a construction project. It lists 57 items of materials needed, including pipes, valves, sprinklers, and solar panel equipment. It provides specifications and quantities for each item. It also describes documents to be submitted for material review, plans for material inspection and testing, and outlines the approval process which requires sign off from the subcontractor, client, and supervision consultant.
This document is a material approval form for a construction project. It lists 57 items of materials needed, including pipes, valves, sprinklers, and solar panel equipment. It provides specifications and quantities for each item. It also describes documents to be submitted for material review, plans for material inspection and testing, and outlines the approval process which requires sign off from the subcontractor, client, and supervision consultant.
This document is a material approval form for a construction project. It lists 57 items of materials needed, including pipes, valves, sprinklers, and solar panel equipment. It provides specifications and quantities for each item. It also describes documents to be submitted for material review, plans for material inspection and testing, and outlines the approval process which requires sign off from the subcontractor, client, and supervision consultant.
This document is a material approval form for a construction project. It lists 57 items of materials needed, including pipes, valves, sprinklers, and solar panel equipment. It provides specifications and quantities for each item. It also describes documents to be submitted for material review, plans for material inspection and testing, and outlines the approval process which requires sign off from the subcontractor, client, and supervision consultant.
Download as XLSX, PDF, TXT or read online from Scribd
Download as xlsx, pdf, or txt
You are on page 1of 2
FORM PERSETUJUAN MATERIAL
Nomor Kontrak : 74/BA/EBG-KIPP/OPS/SPMK/VII/2023
Nomor Tender SW A0613/-P/1857/RUP/KLARNEG-019-VI-2023 Kegiatan : Pekerjaan Sistem Penyiraman, PLTS dan Pemadam Kebakaran Pekerjaan : Penggalian Pipa
NO DESKRIPSI DAN SPESIFIKASI MATERIAL Jumlah
1 Sprinkler Diameter 15M, SRM, HUNTER brand 200
2 Swing Joint 1/2 PVSwing Joint 1/2 PVC 200
Ball Valve PVC Controller Smart 3 1.5" System with Ball Valve PVC 1.5" 20 Box Valve 10", 4 panel Plasticbox, Box Valve 10", Plastic 20 selenoid, sensor Controller Smart System with panel box, 5 Solvent Cement selenoid, sensor rain, accsessoris rain, accsessoris 1 @1000 gram, 6 Purple glue PVCPrimer Solvent Cement @1000 gram, glue PVC 30 @1000 gram, 7 glue PVC Purple Primer @1000 gram, glue PVC 12 8 3" Pipa PVC AW 2 9 2" Pipa PVC AW 2" Pipa PVC AW 670 10 1.5" Pipa PVC AW 1.5" Pipa PVC AW 700 11 0.5" Pipa PVC AW 0.5" Pipa PVC AW 20 Pipa Casing 12 Sprinkler @25cm Pipa Casing Sprinkler @25cm 200 Sock Drat Dalam 13 PVC 1/2" PVC AW Sock Drat Dalam PVC 1/2" PVC AW 210 Sock Drat Luar 14 PVC 1.5" PVC AW Sock Drat Luar PVC 1.5" PVC AW 210 15 Dop 2" PVC AW 10 16 Dop 1.5" PVC AW Dop 1.5" PVC AW 40 17 Elbow 2" PVC AW Elbow 2" PVC AW 90 Deg 170 18 Elbow 2" PVC AW Elbow 2" PVC AW 45 Deg 170 19 Elbow 1.5" PVC A Elbow 1.5" PVC AW 90 Deg 170 20 Elbow 1.5" PVC A Elbow 1.5" PVC AW 45 Deg 170 21 2x1.5" Tee Reduc 2x1.5" Tee Reducer PVC AW 30 22 1.5" Tee PVC AW 1.5" Tee PVC AW 60 23 1.5x1/2" Tee Reducer PVC AW 210 24 Socket 2" PVC AW 6 25 Socket 1.5" PVC A Socket 1.5" PVC AW 20 26 Seal Tape Seal Tape 170 27 Fitting PVC Fitting PVC 1 28 Pompa CentrifugalPompa Centrifugal End Suction 30m3 @65 2 29 Control Panel 15K Control Panel 15KW 1 30 3" Pipa Suction, Ga3" Pipa Suction, Galvanis 1 31 3" Pipa Disharge, 3" Pipa Disharge, Galvanis 1 32 Fitting, Galvanis 1 33 3" foot Valve PVC 2 34 Pressure Tank, 500 Ltr, Cast Iron, Max 10 bar operation 1 35 3/4" Pressure Swit3/4" Pressure Switch. Max 8 Bar 1 36 3" Gate Valve Disc3" Gate Valve Discharge, Cast Iron 3 37 3" Ball Valve Disch3" Ball Valve Discharge, Cast Iron 2 38 Jasa Pengiriman toJasa Pengiriman to site 1 39 ICASolar ICA450 ICASolar ICA450-72HMG 450Wp Mono 48 40 Inverter Hybrid S Inverter Hybrid SNV-GH10041 (3 Phase) + 2 41 ICAL LIP12200D 1 ICAL LIP12200D 12V/200 Ah 20 42 DC Combainer BoxDC Combainer Box 4 in 2 out 2 43 PV Array Ground Mo PV Array Ground Mounting Solar Panel (Co 1 44 Battery Box Panel Battery Box Panel dan Aksesoris, Iron 1 45 AC Electrical PanelAC Electrical Panel Box, iron 1 46 Rack Battery, Iron Rack Battery, Iron 4 47 Kabel DC PV 1x4mKabel DC PV 1x4mm 1000 48 Kabel AC NYY 4x Kabel AC NYY 4x16mm 100 49 kabel NYA 1x16m kabel NYA 1x16mm 100 50 Kabel NYA 1x6mmKabel NYA 1x6mm 150 51 Aksesoris PendukuAksesoris Pendukung 1 52 Grounding SystemGrounding System 1 53 Aksedoris Kabel Aksedoris Kabel 1 54 MC4 Connector MC4 Connector 40 55 Instalasi penangkalInstalasi penangkal petir radius 1 56 Jasa Instalasi PLTS Jasa Instalasi PLTS 20000 57 Akomodasi dan Tr Akomodasi dan Transportasi Man Power 6 58 Biaya Pengiriman m Biaya Pengiriman meterial on site 7500
RIWAYAT PENGGUNAAN MATERIA
DOKUMEN PENDUKUNG YANG DISERTAKAN: PEKERJAAN SEJENIS: 1. Company Profile 2. Daftar Pengalaman Perusahaan 3. Spesifikasi Material/ Brosur
PEMERIKSAAN MATERIAL (Bila diperlukan)
Tanggal : 08/08/2023 Jenis Pemeriksaan dan Pengujian: Lokasi : Embung A dan Gudang S Kuantitas dan Jenis Material Institusi Penguji : Pihak Brantas dan Kosultan Pengawas
RENCANA PENGGUNAAN MATERIAL
Jenis Pekerjaan: Tanggal Penggunaan : Penggalian Pipa
PENGAJUAN DAN PERSETUJUAN
Diajukan oleh : Diperiksa dan diverivikasi oleh : Disetujui/ditolak oleh Disetujui/ditolak oleh
Sub Kontraktor SDA/PU PT. BRANTAS ABIPRAYA PT. BRANTAS ABIPRAYA
PT. WIDI BERLIAN PUTRI
Nama : Luden Nama : Dimas Ade Hermawan Nama : Revo
Nama : Jetro Simatupang Direksi SDA/PU Direksi PT. BRANTAS ABIPRAYA Konsultan Pengawas Direktur Utama Tanggal : Tanggal : Tanggal : Tanggal :