CUY MED Traffic Study PID 116069 Preliminary Feasibility Study
CUY MED Traffic Study PID 116069 Preliminary Feasibility Study
CUY MED Traffic Study PID 116069 Preliminary Feasibility Study
a
www.euthenics-inc.com
PREPARED BY:
EUTHENICS, INC.
8235 MOHAWK DRIVE
STRONGSVILLE, OHIO 44136
(440) 260-1555
TRANSYSTEMS
1100 SUPERIOR AVE EAST, SUITE 1000
CLEVELAND, OHIO 44114
TABLE OF CONTENTS
I. Introduction and Project History ........................................................................... 4
Safety:.................................................................................................................................................... 18
Page 1
LIST OF TABLES
Table 1 – Estimated Cost of Construction and Right-of-Way in $Millions
LIST OF FIGURES
Figure 1 – Recent Timeline Milestones
Page 2
APPENDICES
Appendix A – Traffic Analysis Points
Appendix F – Utilities
Page 3
I. INTRODUCTION AND PROJECT HISTORY
Introduction
Pursuant to Section 755.20 (A) of Ohio House Bill (HB) 110, on April 4, 2022, The City of Strongsville,
Ohio was authorized by its council to contract with Euthenics, Inc. for professional engineering
services to begin preliminary work (Part 1A) to perform a traffic study to examine how to improve
roads and highways to increase the safety and convenience of the traveling public through the cities
of Strongsville and Brunswick. Part 1B work IS NOT INCLUDED IN THIS CONTRACT because it is not
authorized by the Northeast Ohio Areawide Coordinating Agency (NOACA). Part 1B of the study
includes the Environmental Field Studies, a Public Involvement Plan, Public Involvement,
development of an Alternative Evaluation Report (AER) and development of an Interchange
Justification Study (IJS) on the Preferred Alternative. The Part 1A scope of work was defined at a
meeting with the Ohio Department of Transportation (ODOT) District 12, Northeast Ohio Areawide
Coordinating Agency (NOACA), the City of Strongsville and its Consultant.
Part 1A contains a collection and analysis of traffic data and review of preliminary engineering in
prior studies. A Preliminary Feasibility Study and Preliminary Purpose and Need Statement are
prepared. Preliminary reporting will change over time as more information becomes available during
Part 1B activities. Traffic counts with analysis are included and will be reviewed and approved to
obtain Certified Traffic. Part 1A is commissioned to begin the process of identifying and analyzing
feasible alternatives building upon previous studies. The complete preliminary engineering study
and analysis (Parts 1A and 1B) will eventually identify feasible alternatives and identify a preferred
alternative. Part 1A does not contain Certified Traffic. The Highway Capacity Software (HCS)
modeling system is used to generate future conditions. Part 1A does NOT offer a Preferred
Alternative. This project will follow the Ohio Department of Transportation (ODOT) Project
Development Process (PDP) policy, and the National Environmental Protection Act (NEPA) laws.
Preliminary assessment indicates that this project will follow a Path 3 (new interchange with existing
overpass/underpass) of ODOT’s PDP, but it is too early to make a final determination because full
impacts are unknown. A typical feasibility study (FS) provides the information needed to recommend
a NEPA documentation level, we anticipate a D2 level. As part of the PDP, ODOT Office of Roadway
Engineering is required to review and approve all Feasibility Studies and Alternative Evaluation
Reports involving any interstate interchange.
NOACA prepared several reports in 2017 and 2018 on the I-71 corridor in conjunction with ODOT.
Those studies investigated improving traffic congestion along the highway and identified a partial
interchange at Boston Road and I-71 as the alternative with the highest potential return on
investment. Part 1A builds upon those findings. Opening Year will be 2027 and Design Year is 2047
for this study.
The location of this study runs along the I-71 corridor and is bound at Royalton Road (SR 82) to the
north, Center Road (SR 303) to the south, West 130th Street to the east, and Howe, Pearl (US 42),
and North Carpenter Roads to the west. Boston Road is a County Road that is split between two
Cities, in two Counties, in two ODOT Districts.
Page 4
Figure 1 – Study Area
Project History
I-71 is an interstate highway that connects Cleveland to Columbus and Cincinnati, Ohio and
Louisville, Kentucky. The corridor is important for transportation of freight, goods and services,
and for use by regional travelers and those who live and work in the area. Travel and access along
I-71, through the study area for this project, has been analyzed for decades. NOACA studied the
area in the mid-1980s and in 1998. More recent studies include ODOT’s Existing and Future
Conditions Report, Boston Road/I‐71 Interchange No‐Build Alternatives Study (2008), ODOT’s
Further Evaluation of Safety Improvements and Congestion Mitigation for the SR 82 Corridor near
the I‐71 Interchange (2012), ODOT’s I‐71 at SR 82 EB Interchange Operations Study (2015), NOACA’s
IR‐71 Corridor Study and IR‐71 Corridor Study: Boston Rd. Partial Interchange (2017), NOACA’s IR‐
Page 5
71 Corridor Study: Boston Rd. Partial Interchange Origin‐Destination Analysis (2018), and ODOT’s
Boston Road Interchange Study (2020).
NOACA, the metropolitan planning organization for the study area, began identifying potential
additional interchange access locations along the I-71 corridor in the mid-1980’s. The first point of
access study prepared by NOACA in 1984, indicated that an interchange with Boston Road had a
finding of “sufficient justification” based upon projected traffic volume increases in southwest
Cuyahoga and northern Medina counties. A regional freeway study was performed by NOACA in 1990
and found that I-71/Boston Road was one of the most likely locations for a new interchange with I-
71 in Cuyahoga and Medina Counties. In 1995 and again in 1999, NOACA updated the previous
planning work with the I-71/Boston Road Point of Access Justification Study and refined the study
area to include several interchange configurations. Each and every alternative studied planned for
proposed improvements to Boston Road.
The Boston Road widening project (ODOT PID 4067) was programmed in 1997 and a design
consultant, R. E. Warner & Associates, was hired by the City of Brunswick. Plan development
progressed with Stage 1 and Stage 2 Plans completed and the Environmental Document approved on
November 20, 2001, using federal funds. During the final plan development on July 16, 2002, it was
discovered that there was a potential problem with a private utility’s assets (two (2) 12-inch
petroleum pipelines) located in an easement outside of the public right-of-way that runs primarily
parallel and along the southern right-of-way line of Boston Road. The pipeline was impacted by the
proposed design. Buckeye Pipeline (now Buckeye Partners) was engaged with the help of ODOT
District 3 and on March 30, 2004, Buckeye Pipeline responded that 1.7 miles of their pipeline would
have to be relocated to accommodate the current design at an unexpected cost of more than $2.5
million. This all transpired during a national economic recession beginning in 2000 and the will to
invest in infrastructure was low. In 2005, the Cuyahoga County Engineer (CCE) offered to take
ownership of the Boston Road widening project with the intent of adjusting the original design
geometry to avoid impacts to the pipeline thereby reducing the cost. This shifted the dynamics from
Brunswick and Medina County as the lead agencies to Strongsville and Cuyahoga County, and on April
27, 2006, it was ratified by Cuyahoga County and over a year later on November 26, 2007, passed
consent legislation. After further study and no acceptable solution to the interested parties, the
project was at a standstill. In the public interest of assuring that projects planned and designed
using federal funding move forward to construction, FHWA and ODOT requested a status update in
January 2011. Brunswick committed in its contract with FHWA and ODOT that the Boston Road
widening project would use federal funds for engineering and that Brunswick would build the project
before the 10-year timeframe elapsed or repay the funds. After an appeal, the reimbursement
requirement was forgiven by FHWA. No planning work has been performed to widen Boston Road
since then. This background is important because widening Boston Road is integral to an interchange
with I-71.
Boston Road: In 1997, the City of Brunswick sponsored a project to reconstruct and widen Boston
Road from US 42 to the existing 3 lane pavement section near the intersection of West 130th
Street. One of the reasons for the project was preparation for an interchange. The design provided
one lane in each direction and a two-way left turn lane with a face of curb to face of curb distance
of approximately 36’-6”. A modern curbed pavement with a closed stormwater drainage system in
addition to tree lawns and sidewalks on both sides was proposed and would replace what could be
considered the rural typical section that consisted of non-curbed pavement with roadway ditches
that have steep slopes close to the travel lanes at several locations through the corridor. A new
sanitary sewer and waterline were planned for a portion of the corridor. The existing longitudinal
roadway grade which exceeds 10% at the west end of the project was to be reduced to a grade less
Page 6
of less than 10%. The new road section was designed symmetrically along the existing centerline of
right-of-way. Those plans have been discarded.
I-71 Corridor & Boston Road: The area of interest for this study was previously analyzed by the
NOACA in studies of the I-71 corridor dating back to 1987. NOACA’s IR‐71 Corridor Study, completed
in June 2017, reviewed I-71 from I-80 to US 224 in Cuyahoga and Medina Counties for operational
improvements to reduce congestion and improve safety in the corridor. One alternative
recommended in this study was the addition of a partial interchange at Boston Road and I-71,
alternatives for which were further studied in NOACA’s IR‐71 Corridor Study: Boston Rd. Partial
Interchange in November 2017 and IR‐71 Corridor Study: Boston Rd. Partial Interchange Origin‐
Destination Analysis in January 2018. The Boston Road studies analyzed multiple partial interchange
options at Boston Road and I-71 and the potential resulting improvements.
Low-Cost Congestion Mitigation: Findings from previous studies recommend a new interchange
on I-71 at Boston Road, either as a full or partial interchange. The 2012 ODOT-commissioned safety
study confirmed that all low-cost alternatives have been identified and evaluated before any large-
cost alternatives were pursued. It also found that three of the four mid-level alternatives would
not be feasible with future traffic volumes; the fourth alternative, a two-lane entrance ramp from
SR 82 eastbound to I-71 northbound was further studied in the 2015 Interchange Operation Study
(IOS) and subsequently constructed. The 2017 NOACA studies, as part of a larger I-71 corridor study,
considered reducing congestion and improving safety at the I-71 and SR 82 interchange which
included the study of full and partial interchanges at I-71 and Boston Road. Strongsville completed
a citywide traffic signal safety upgrade project that helped ease congestion on SR 82 and a few of
the intersecting roads. The 2020 ODOT study is the latest in the series of analyses performed in this
area, with a focus on improving congestion and safety around I-71 and SR 82. The primary purpose
of the study was to see if the Federal Highway Administration (FHWA) would allow the partial
interchange alternative to determine a feasible alternative for further evaluation at Boston Road.
Partial interchanges must be approved by FHWA since they may adversely impact their interstate
system. FHWA’s review of this study indicated a partial interchange is a feasible alternative. This
study evaluated several alignments for an interchange at Boston Road and found that an acceptable
level of service (LOS) would be provided at the proposed interchange while also reducing congestion
at the I-71/SR 82 and I-71/SR 303 interchanges. Level of Service (LOS) is a measure of the quality
of motor vehicle traffic service with “A” being free-flow, and “F” stop-and-go with reduced comfort
for the driver. Under ODOT’s Ramp Clear program, ramp improvements were made to the I-71 &
SR 303 interchange to improve free flow of traffic on the interstate and based upon the findings of
previous studies, a Boston Road Interchange is a logical solution. See Figure 2 Timeline Milestones.
Page 7
Figure 2 - Timeline Milestones
The study is unique in that it explores options for an I-71 interchange with Boston Road and affiliated
improvements needed to the adjacent transportation network impacted to improve and redistribute
existing traffic movement within this transportation network.
Page 8
Need Elements
Improve Mobility
The primary need for this project is to improve mobility throughout the road network studied.
Meeting traffic demand in the study area and providing more efficient movement of people and
goods is a common theme across the previous studies performed. Mobility concerns are evident in
the poor access to I-71 from the impacted communities, congestion throughout the corridor, and
the specific crash types observed in the study area.
The existing SR 82 and SR 303 interchanges with I-71 are approximately five miles apart. It takes
approximately 10 minutes to drive (freeflow traffic) to I-71 from the southern limits of Strongsville
and the northern limits of Brunswick, where the predominately residential areas are located. Access
to I-71 is about a four-minute drive (freeflow traffic) from the commercial centers of Strongsville
and Brunswick.
No Build: Highway Capacity Software (HCS) intersection capacity analyses showed that several of
the intersections that were studied will operate at an unacceptable Level of Service (LOS) in the
future in the No Build condition. Approaches at the intersections of SR 82/Howe Road and Drake
Road/Hunt Road operate at LOS E in the PM peak in the 2027 Opening Year scenario. Many of these
approaches worsen in the 2047 Design Year and begin to operate at an unacceptable LOS. In the
2047 Design Year, the intersections of SR 82/Howe Road, US 42/Boston Road, and Drake Road/Hunt
Road will operate at an unacceptable LOS for the No Build condition.
Crash data from the ODOT’s TIMS GCAT database (2019-2021) for the study area (the SR 82 and SR
303 interchanges at I-71, US 42, Howe Road/North Carpenter Road, and W 130th Street from SR 82
to SR 303) shows a higher concentration of crashes occurring around the two I-71 interchanges
compared to the rest of the road networks. Additionally, the predominant crash type observed was
rear end, which is associated with congestion.
Improving mobility by constructing one of the Build alternative interchanges at Boston Road now
being studied will allow for an increased movement of people and goods within the study area by
redistributing traffic on roads that are designed for it. The interstate will not have significant
negative impacts as the result of an interchange. Additionally, as part of this study, improving
mobility through the study area is anticipated to disperse existing and projected traffic volumes
throughout the study area which, in turn, will reduce congestion, improve air quality and lower
crash concentrations.
Proposed transportation improvements within the study area do not depend on any other projects
outside of the logical termini to meet the established purpose and need. Therefore, independent
utility is established for this transportation improvement.
Page 9
III. EXISTING CONDITIONS
Boston Road: Boston Road over I-71 is currently a two-lane major collector roadway with one lane
serving westbound traffic and one serving eastbound traffic. Boston Road is a county road and has
no direct access to I-71. Two interchanges immediately to the north and to the south include I-71/
SR 82 and I-71/ SR 303, respectively.
Interstate-71: Interstate-71 carries three lanes in each of the northbound and southbound direction
through most of the study area. The eastbound SR 82 ramp to I-71 northbound was widened from
one lane to two lanes in 2016 to alleviate congestion on eastbound SR 82 and on Howe Road. In
2019, an auxiliary lane was provided along I-71 southbound between the Ohio Turnpike and SR 82
changing that segment from three lanes to four. The exit ramp to SR 82 westbound was widened
from one lane to two lanes. The project was as a low-cost mitigation project to move traffic that
backed up onto the interstate during peak traffic off of I-71 onto ramps to SR 82 but was not a
capacity improvement project. Both were constructed using ODOT Safety funding. The
consequence of increasing storage on the ramps resulted in the congestion moving downstream onto
the local roadway system.
SR 82: The I-71/SR 82 interchange is approximately 2.5 miles north of Boston Road and serves traffic
from Strongsville, North Royalton, commuters from the south, and other neighboring communities.
The land use to the west of the interchange along SR 82 is a mix of commercial and retail. At SR 82,
a single ramp exists for the movements of SR 82 entrance to I-71 southbound and the I-71 northbound
exit to SR 82. Pairs of ramps facilitate each of the southbound exit and northbound entrance
movements with I-71. One exit ramp is designated for each of the westbound and eastbound
movements onto SR 82 (Figure 6, SR 82 Nodes 1 and 2). Similarly, one entrance ramp is designated
for each of the westbound and eastbound movements from SR 82 (Figure 6, SR 82 Nodes 5 and 6).
Within the study area, SR 82 primarily has seven lanes west of I-71, seven lanes across the overpass
bridge, and has four lanes east of the I-71 interchange. SR 82 is as wide as eight lanes near the Howe
Road intersection. Dual left turn lanes exist at three legs of the SR 82 and Howe Road intersection
and dual right turn lanes exist at one leg (Figure 3, Node 1).
SR 303: The I-71/SR 303 interchange is located approximately 2.5 miles south of Boston Road and
serves the communities of Brunswick, Brunswick Hills, and Hinckley. The land use to the west of the
interchange along SR 303 is a mix of commercial and retail. At SR 303, a single ramp exists for the
movements for the I-71 southbound exit to SR 303, the SR 303 entrance to I-71 southbound, and the
I-71 northbound exit to SR 303. In 2016, the exit slip ramp from I-71 southbound to SR 303 westbound
was widened and extended west to allow traffic to clear the exit ramp in a quicker and safer manner.
A pair of ramps facilitate the northbound entrance movement onto I-71. One ramp services the
traffic for westbound SR 303 (Figure 6, SR 303 Node 5) and one ramp services traffic from eastbound
SR 303 onto I-71 northbound (Figure 6, SR 303 Node 4). SR 303 primarily has five lanes west of I-71
and has four lanes east of I-71. SR 303 is as wide as seven lanes just west of the I-71 interchange.
Page 10
IV. ALTERNATIVES CONSIDERED
Five Alternatives were analyzed in this Preliminary Feasibility Study to determine what impacts a
proposed interchange at Boston Road and I-71 may have on traffic. A total of eight intersections,
signalized and stop controlled, near the proposed interchange at I-71 were modeled. The
interchange approximately 2.5 miles north of Boston Road, SR 82, is located in Strongsville
(Cuyahoga County). Four signalized intersections, including the freeway ramps, along SR 82 were
evaluated. The interchange approximately 2.5 miles to the south of Boston Road, SR 303, is located
in Brunswick (Medina County). Five signalized intersections, including the freeway ramps, along SR
303 were studied. Figures 1, 2, and 3 in Appendix A show the intersections that were analyzed as
part of this report. The analysis points along I-71 include freeway segments, diverge, and merge
areas. Existing freeway segments and ramps are shown in Figures 4 and 5 Appendix A.
The following figures depict the alternatives considered as part of this study.
Page 11
Figure 3 - No Build/Exiting Conditions Exhibit
Page 12
Figure 4 - Alternative 1 Layout Exhibit
Page 13
Figure 5 - Alternative 2 Layout Exhibit
Page 14
Figure 6 - Alternative 3 Layout Exhibit
Page 15
Figure 7 - Alternative 4 Layout Exhibit
Page 16
Figure 8 - Full Interchange Layout Exhibit
Page 17
V. KEY ISSUES
The I-71 and Boston Road corridors, within the Study Area, were assessed for critical issues
related to design criteria, traffic control & safety, utility conflicts, environmental constraints,
and constructability. There will be right-of-way impacts on each Build alternative studied.
Preliminary right-of-way costs have been estimated to assess impacts relative to each
Alternative; however, it is understood that a more refined determination will be developed in
Part 1B. Details of this assessment and issues identified are documented in the Preliminary
Project Initiation Package (PIP), provided in Appendix B.
There are two elements to a holistic solution to traffic redistribution along the I-71 corridor
from SR 82 south to SR 303. The first is consideration of alternatives consisting of configurations
of full and partial interchanges at Boston Road. The second is the impact on Boston Road
including several intersecting roads that will be part of an overall Boston Road widening and
upgrade project. Boston Road should be improved to accept the traffic any interchange will
produce so widening and reconstruction are recommended for each build alternative. NOTE:
Construction cost estimates, right-of-way impacts, environmental impacts, and utility impacts
identified in this report do not include the improvements to Boston Road beyond the limits
shown in the Interchange Layout Exhibits for Alternatives 1, 2, 3, 4, and Full Interchange. Key
Issues are described for each alternative element.
Safety:
Improved safety is directly related to congestion reduction. By reducing congestion throughout
the study area, safety is anticipated to be improved.
Traffic Analysis:
The traffic analysis shows a reduction in delay for the study intersections and a minimal increase
in delay for the freeway facility. Additionally, for the design year three (3) intersections have
a failing level of service (LOS) for the No Build condition but for the build alternatives only one
will fail.
Roadway Design Issues:
Each alternative will require improvements to Boston Road that mitigate an existing deficient
vertical profile, substandard pavement section and ditch grading in the study area.
Maintenance of Traffic:
Maintenance of Traffic during construction for each alternative will require careful planning
and cooperation with stakeholders in the public involvement activities in the future.
Structural Design Issues:
The bridge on Boston Road over I-71 will be impacted by a widened roadway section. It is too
early to estimate the full extent of the work involved but a budget number for each alternative
is included in the Estimated Construction Cost Table 1.
Environmental Analysis:
More research will be required to determine if threatened or endangered species, wetlands or
environmental justice will be impacted when more information is available on work limits and
the footprint of a preferred alternative in future phases of preliminary engineering.
Utility Impacts:
Build condition scenarios will be designed to accommodate existing subsurface utilities present
along Boston Road and the west limited access right of way of I-71. Widening Boston Road will
likely require relocation of aerial power and telecommunication utilities. Widening of Boston
Road for all alternatives studied will require extensive coordination with Buckeye Pipeline that
Page 18
owns the two 12” petroleum pipelines. The pipelines were found to be sub-standard in a study
by the Cuyahoga County Engineer in the early 2000’s. In 2003 Buckeye offered an estimated
cost to relocate 1.7 miles of their pipeline of $2.5 million. The company is not able to provide
an updated cost estimate because the design is not started. The ODOT Office of Estimating
was contacted and provided an escalation factor of 2.2 to bring the relocation cost to $5.5
million dollars in 2023 dollars. See Appendix F for existing utilities present within the I-
71/Boston Road area and the Project Initiation Package in Appendix B.
Construction
$27.4 $36.3 $35.2 $29.0 $44.2
Cost
Right-of-Way $1.2 $6.3 $2.5 $4.9 $6.8
Total of
Construction
$28.6 $42.6 $37.7 $33.9 $51.0
and Right-of-
Way Costs
The results showed that for each alternative the delay was always improved from the No Build
condition for the sum of the intersections along the SR 82 and SR 303 corridors. Although traffic
will be increased at the Boston Road area intersections, the Build conditions include
improvements such as widening to attain an acceptable level of service. When combining the
delays for AM and PM peak hours for the study intersections, the reduction in delay outweighs
any increase in delay for a net benefit to the entire local network. Table 2 shows the total
delay in hours for each alternative.
Page 19
The delay improvements shown below in Table 2 represent the cumulative time in hours
motorists using these intersections will be improved during the AM and PM peak hour for one
day. This does not include travel time along segments or any origin-destination information.
For some alternatives, motorists will experience almost 100 hours of saved delay compared to
the No Build condition for the two peak hours at the study intersections.
HCS freeway facility analysis includes a vehicle hours of delay (VHD) output. VHD is the vehicle
hours of delay on the freeway during the peak period analyzed for the length of the study. This
does not include ramp delays. The northbound and southbound VHD were totaled for 2047 and
the results are provided in Table 3. The table also shows the degradation in delay compared to
a No Build condition due to increased traffic volumes on I-71 between SR 82 and SR 303. It
should be noted that the comparison in Table 3 does not include anticipated improvements to
the local road network for the proposed alternatives.
HCS freeway facility analysis provides a measure of ramp performance as density in the ramp
influence area (DRI) of the freeway segment. DRI is the equivalent passenger cars per mile per
lane (pc/mi/ln) traveling within the ramp merge or diverge influence area during the peak
periods analyzed. The ramp performance for each proposed alternative is demonstrated by the
cumulative change in density at the existing interchange ramps. The resulting overall DRI at the
existing SR 82 and SR 303 interchanges was totaled and the results are presented in Table 4.
Page 20
Table 4: Ramp Influence Area Density Comparison – Design Year
Total Ramp Density (pc/mi/ln)
Condition SR 82 (Royalton SR 303 Density Compared
Total
Road) (Center Road) to No Build
No Build 230.4 171.3 401.7 0
Alt 1 239.6 164.8 404.4 -2.7
Alt 2 242.4 149.0 391.4 10.3
Alt 3 242.4 149.0 391.4 10.3
Alt 4 228.6 171.6 400.2 1.5
Full Build 230.8 169.0 399.8 1.9
The analysis performed for this study determined that all proposed Build conditions would
operate at an acceptable level of service for I-71 corridor as well as the study area intersections
with the exception of the SR 82 and Howe intersection. At this location, operations are similar
or improved for each alternative. Boston Road area intersections were analyzed with the
assumption that they would be improved to meet an acceptable level of service while the
remainder of the study locations would not be changed geometrically.
Freeway delay results show an increase in delay when compared to No Build conditions.
Generally, ramp density and intersection delay improve, to varying degrees, for each
alternative compared to No Build conditions. The benefit of reduction in delay for the
intersections is far more significant than the increase in freeway delay.
The analysis for this study determined that no significant adverse impact on the operation of
the Interstate facility or on the local street system will occur for current or design year as a
result of the studied interchange alternatives. All five alternatives are considered feasible
alternatives based on traffic analysis.
Table 6 shows the total change of freeway and intersection delays compared to the No Build
divided by the estimated cost of construction and right-of-way for each alternative. This shows
the reduction in delay per million dollars of construction in the form of a benefit to cost ratio.
This ratio shows the relative cost to produce improved delay.
Page 21
Table 6: Traffic Delay Benefit to Cost Ratio – Design Year
No Build $0 - - - -
Alt 1 $28.6 71.0 -3.2 67.8 2.37
Alt 2 $42.6 91.1 -4.1 87.0 2.04
Alt 3 $37.7 95.7 -4.0 91.6 2.43
Alt 4 $33.9 61.6 -2.4 59.2 1.75
Full Build $51.0 46.1 -5.1 41.0 0.80
This comparison shows that Alternatives 1 and 3 produce the largest benefit to cost ratio. Costs
associated with improvements to Boston Road beyond the interchange area, intersection
improvements outside of the Boston Road interchange area, and public and private utility
relocation (Buckeye Pipeline) are not included at this feasibility stage.
VII. CONCLUSIONS
Each alternative provides some benefit over the No Build condition, and all are recommended
to move forward for further analysis and development in Part 1B.
Continue with Part 1B of required preliminary development that includes Certified Traffic, an
Environmental Field Study, Public Involvement Plan including coordination by Stakeholder
Meeting and Public Meeting, and an Alternative Evaluation Report (AER), to define a Preferred
Alternative. There will then be an Interchange Justification Study for the Preferred
Alternative. Only then can a scope be developed to move forward with construction plans and
obtain funding for improvements to the network of roads in this study area.
Page 22
APPENDIX A
Instructions
• The Project Initiation Package is intended to focus on critical issues that can be identified with existing information from
secondary sources and/or identified during a site visit.
• Each specialty area of the Project Initiation Package should be completed by individuals who possess sufficient
experience to enable them to correctly identify and evaluate issues arising from the field review.
• In the Location/Comments field provide information concerning potential impacts that is brief but gives enough detail to
allow an understanding of the issue(s).
• The scope of services document should account for any issues identified in the Project Initiation Package that have the
potential to affect scope, schedule, and budget.
• In some instances, resources/subject areas that may need to be consulted for the secondary source review are
identified on this form.
General
Project Description: Conduct a traffic study for the roads and highways in Strongsville and Brunswick. The traffic study will
examine how to improve those highways in ways that increase the mobility and convenience of the traveling public through
those municipal corporations. Planning activities include preliminary Purpose & Need Statement and a feasibility study for
No Build, Full Interchange Alternatives, or Partial Interchange Alternatives.
Project Limits/Study Area/General Location: Study Limits: CUY-I.R. 71 SLM 0.00 to 1.018, MED-I.R. 71 SLM 25.645 to
26.687. Study Area: The study area will include SR 82 (Royalton Road) from Howe Road to West 130th Street; Boston Road
from US 42 (Pearl Road) to West 130th Street; & SR 303 (Center Road) from North Carpenter Road to West 130th Street.
Minor intersections throughout the project area will not be studied.
*** The FHWA Engineer should be invited on projects expected to require approval from Federal Highway
Administration.
CRASH DATA:
Has a Safety Study been completed in the project area within past three years Not aware of one.
Is the project area highlighted on the Safety Integrated Project Maps Yes
Based on a spatial query (using GCAT or TIMS) of the three most recent years of crash data, briefly summarize crash
history including pedestrian and bicycle crashes. Indicate any design features that may be contributing to the observed
crash pattern that may be addressed by the project.
Crash data analysis and evaluation of suitable counter measures is to be completed as part of the next phase of the subject
Project. Preliminary assessment of rear end crashes as the predominant crash type is indicative of congestion-related issues
at both S.R. 82 and S.R. 303 interchanges.
ENVIRONMENTAL ISSUES:
Make a preliminary determination on whether the following resources will be affected by the proposed project. Include
the location and any other pertinent information for resources that may be affected.
Resource/Feature Location/Comments
Parkland, nature preserves and wildlife areas {4(f)/6(f)} No
Threatened and Endangered Species and/or habitat To be determined; wooded area present north of Boston Road,
west of IR71
Scenic River No
Existing wet areas /existing cattails/wetlands To be determined; 2 NWI areas north of Boston, E&W of I.R. 71
Stream/river/waterway/jurisdictional ditch Unnamed tributary to Rocky River East Branch
Historic Resources (buildings, structures, objects) To be determined
Historic Bridge(s) No
National Historic Landmarks No
Archaeological Sites No
Public Facilities No
Cemetery (modern and historic cemeteries) No
Farmland No
Watershed Specific (i.e. Darby or Olentangy) NPDES General Permit
Permit Area
Air Quality non-attainment area or concerns The project site is located within Non-Attainment areas for PM 2.5
and Ozone 8-hour.
Landfill, Superfund, CERCLIS, RCRA, NPL, or industrial To be determined
site(s), and/or evidence of hazardous materials
Sensitive environmental justice areas No
Federal Emergency Management Agency (FEMA) None within in anticipated project area
floodplains
Lake Erie Coastal Management Area No
Sole Source Aquifers No
Wellhead Protection Areas No
Noise abatement issues To be determined (exist noise barrier MED-71-26.67)
Coordination with Conservancy Districts No
Other environmental issues None known at this time
GEOTECHNICAL ISSUES:
Based on the information compiled during this study indicate whether or not the following geotechnical issues are
present or should be further considered during project development. Provide additional comments as needed. Refer to
Section 302.2 of the ODOT Specifications for Geotechnical Explorations for literature search resources.
Design Issues Location/Comments
Is there evidence of soil drainage problems (e.g., wet -
or pumping subgrade, standing water, the presence
of seeps, wetlands, swamps, bogs)?
Will construction be impacted based on the -
groundwater table?
Is there evidence of any embankment or foundation -
problems (e.g., differential settlement, sag,
foundation failures, slope failures, scours, evidence
of channel migrations)?
Is there evidence of any slope instability (soil or -
rock)?
Is there evidence of unsuitable materials (e.g., -
presence of debris or man-made fills or waste pits
containing these materials, indications from old soil
borings)?
Is there evidence of rock strata (e.g., presence of -
exposed bedrock, rock on the old borings)?
Is there evidence of active, reclaimed or abandoned -
surface mines? Evidence of quarries?
Is there information pertaining to the existence of -
underground mines?
Is there Acid Mine Drainage present within the study -
area?
Are there any other geotechnical issues? Specify. Future design project would include Geotech investigation.
PAVEMENT ISSUES:
Indicate if the following pavement issues are present or should be considered during project development. Side road and
service road work should be considered in this assessment. Provide additional comments as needed.
Design Issue Location/Comments
Do dynaflect tests indicate the existing pavement is Not applicable
in poor condition?
Are joint repairs needed? N/A – typically existing asphalt pavement
Are pressure relief joints needed? N/A – existing pavement is full depth asphalt
Does curb need to be replaced due to deteriorated N/A
condition or lack of curb reveal?
Has the site received repeated resurfacings in recent Boston Road is resurfaced on a regular basis.
years?
Does pavement deterioration appear to be caused by No
drainage or geotechnical problems?
Are there any other pavement issues? Specify. No; PCR=67 (Boston (20)) | PCR=83 (IR71 (22))
STRUCTURAL ISSUES:
Indicate if the following structure issues are present or should be considered during project development. Provide
additional comments as needed. The Bridge Inspection reports should be evaluated and attached. Provide a separate
table for each structure.
Structure Number: 1803549 (CUY-71-0.000)
Design Issue Location/Comments
Is it possible for the structure to be replaced with a N/A
prefabricated box culvert or 3-sided box?
Is the deck delaminated? Specify. No
Is non-destructive testing needed to determine the Not applicable
Amount of delamination?
Are there areas to be patched/repaired on the deck? N/A – Anticipate full replacement
Is the bridge a poor candidate for an overlay? Specify N/A – Anticipate full replacement
type of overlay if known.
Does the bridge rail violate current standards? No
Is fatigue analysis required? Not applicable
Should all fatigue prone details be retrofitted or Not applicable
replaced? Specify.
Is there any evidence of substructure movement No
(e.g., settlement, rotation)?
Is elimination of the deck joint possible? What Not applicable
modifications are necessary?
Is it possible for the hinges to be removed to make Not applicable
the members continuous?
Is there any evidence that the bridge does not meet Not applicable
hydraulic capacity?
Are there existing sidewalks on or adjacent to the Yes; walk are on structure, only
bridge?
Is Vandal Protection Fencing required in accordance Existing vandal protection fence
with the BDM?
Will the structure work require any special Part width construction is anticipated. Short term night closure is
maintenance of traffic (e.g., closing of roadway for likely to set new bridge beams.
erection of beams, maintenance of waterway traffic,
location of cut line, etc.)? Specify.
Does the bridge need to accommodate future To be determined
roadway lanes, bicycle lanes, a shared use path,
shoulder, or railroad tracks?
Will temporary shoring be required next to the Likely for MOT.
railroad?
Describe any issues with the bridge deck (curb, No
sidewalk, railing, surface, median, drainage,
expansion joints, etc.).
Describe any issues with the bridge superstructure Not known
(alignment, beams/girders/slab, bearing devices,
etc.).
Describe any issues with the bridge substructure Not known
(abutments, piers, backwalls, wingwalls, scour, etc.).
Describe any issues with the channel (i.e. alignment, Not applicable
erosion, etc.)
Describe any issues with the bridge approaches (i.e. None known
pavement, guardrail, etc.)
Are there any other structure related issues? Specify. None known
HYDRAULIC ISSUES:
Indicate if the following drainage issues are present or should be considered during project development. Side road and
service road work should be considered in this assessment. Any available Culvert Inspection reports should be evaluated
and attached. Provide additional comments as needed.
Design Issue Comments
Does the existing drainage system appear to be Yes
appropriately sized and functioning properly?
Describe deficiencies.
Is there evidence of alignment or flow velocity No
problems (e.g., scour, bank erosions, silting) at
culvert inlets or outlets?
Are there sinkholes or other deterioration in the No
pavement that would indicate separations in the
existing pipes?
Is the exposed curb height in existing gutters No
inadequate to contain flow (include height of
proposed resurfacing)?
Does the project affect a wetland or waterway (e.g., To be determined
stream, river, jurisdictional ditch)?
Will channel relocation be required? To be determined
Will post construction BMPs be required that could To be determined
impact R/W or utilities?
Are existing underdrain outlets functioning properly? Existing underdrains appear to be functioning.
Does the drainage work warrant any special Improvements are not to result in an increase in runoff versus the
maintenance of traffic considerations? existing conditions.
Are there any other hydraulic issues? Describe. 60” culvert under IR71 north of Boston Road (CFN1817065) will
likely need to be replaced or extended.
TSMO CONSIDERATIONS:
Briefly describe the opportunities for managing congestion or traffic issues using TSMO strategies or improvements.
Consider opportunities to upgrade or install systems management and operations infrastructure:
TSMO infrastructure includes communications equipment, travel time signs, signals, changeable message signs, traffic
cameras, traffic signal systems, other remote field devices and data collection equipment, conduit and any supporting fiber
optics. TOAST is the Traffic Operations Assessment System Tool For additional TSMO information see
http://www.dot.state.oh.us/Divisions/Operations/Traffic/miscellaneous/Pages/TSMO.aspx
Design Issue Location/Comments
Does the project area contain a Hot Spot identified in 2022 score = 73.3% (IR71)
TOAST? If so, what is the TOAST ranking?
Does the project area have an operations master No
plan (or has this site been discussed with the District
TSMO Coordinator)?
Would operations benefit from TMC coverage of the No
project area? (RWIS, travel time boards, cameras,
communications)
Are there opportunities for initiating or upgrading No
TSMO infrastructure?
Does this project support any TSMO strategies such To be determined
as (Smartlane, VSL, Coordinated traffic signals, etc.)
Does this project require multi-jurisdictional Yes. Project resides on municipal, county, and ODOT District
coordination, agreements, funding, etc.? boundary.
What existing TSMO infrastructure is in place? Will it Not applicable
need to be moved or maintained in place?
Are there any local TSMO infrastructure No
recommendations in the project area? (ex. Include
emergency or transit traffic signal pre-emption,
dynamic message signs or signal coordination)
What MPO ITS architecture is already in place or None
planned? Consult the MPO ITS architecture plan, if
applicable.
Categories of potential ITS for this study area/project Not applicable
include: Exempt, Low, or High risk? Ref: TEM, 1-
pager for CFR 940.
Could this project expand an existing device or No
communications system?
What type of device communications and equipment Not applicable
exists?
Should this location have communications added or No
upgraded?
Will additional conduit be necessary for future No
infrastructure/communications? (ex. in barrier wall)
Will existing device power or communications drops No
be disrupted?
Does this project require a new traffic signal timing Yes
plan?
Are the current traffic signal(s) being upgraded to a Likely, to be determined
system?
Are there alternative routes available/identified for Yes
incident management?
Is this a Traffic Incident Management Note eligible Yes (multi-year interstate project)
project?
OTHER TSMO Considerations:
UTILITY ISSUES:
Indicate if the following utility issues are present or should be considered during project development. Provide additional
comments as needed.
Design Issue Location/Comments
Do existing utilities need to be relocated? If so, 12” Buckeye Pipeline along south side of Boston Road;
please identify. underground crossing IR71 south of Boston.
Sanitary sewer along north and south sides of Boston Road;
underground crossing IR71 south of Boston.
Existing aerial electric (First Energy) and telcomm along north side
of Boston Road.
Sanitary pump station at SE quad at North Carpenter Road
AT&T underground fiber along west side of IR71
Utility relocation to be determined with the preferred alternative
Would the project benefit from Subsurface Utility Yes, during the PE Phase
Engineering (SUE) Level A?
Are there existing utilities on an existing structure None known
that need to be relocated?
UTILITY ISSUES:
Indicate if the following utility issues are present or should be considered during project development. Provide additional
comments as needed.
Design Issue Location/Comments
Are there any specific utility requirements or Yes, Buckeye Pipeline is within their own easement outside of the
concerns? Specify. public right-of-way. Impacts to their facilities should be avoided, if
possible.
Are there water or sanitary lines that will be To be determined, both water and sanitary are present along
relocated as part of the ODOT contract? Boston Road.
Are there any other utility issues? Specify. Impacts to the existing pump station at the southwest quadrant of
Boston Road and I-71 should be avoided, if possible.
Provide additional comments as needed. For additional Bicycle and Pedestrian data, see the TIMS Active Transportation
Map Viewer: https://gis.dot.state.oh.us/tims/Map/ActiveTransportation and discuss with the District Bike & Ped
Contact.
Design Issue Location/Comments
Are there visible signs of deterioration on sidewalks or No sidewalk present between North Carpenter Road Benbow
missing sidewalks? Road
Is there a minimum 4’ clearance along sidewalks? (i.e. Not applicable
poles that obstruct the sidewalk)
Are there visible signs of deterioration in bike Not applicable
lanes/shoulders or missing bike facilities?
Do crossings for bicyclists and/or pedestrians need to be Yes
improved or installed?
Is on-street parking set back 20 feet from the crosswalk Not applicable
(both marked and unmarked) at an intersection or set back
30 feet of the approach to any flashing beacon, stop sign
or traffic control device? (See TEM 4511.68)
Is there evidence of the need for a midblock crossing? (i.e. None known.
pedestrian crashes, signalized intersection spacing exceeds
600 ft., presence of midblock transit stops or path,
pedestrian generators and destinations). Refer to FHWA
Guide for Improving Pedestrian Safety at Uncontrolled
Intersections
Does the project area have an active transportation plan in No
place (or other multimodal plan such as a bicycle,
pedestrian, school travel plan, or metropolitan
transportation plan). Contact pertinent local public
agencies for more information.
Is there existing bicycle or pedestrian usage along this No
corridor? (For statewide volume data visit ODOT’s Non-
Motorized Database System)
Visible indicators of usage include counts, worn paths,
transit stops, etc.
Provide additional comments as needed. For additional Bicycle and Pedestrian data, see the TIMS Active Transportation
Map Viewer: https://gis.dot.state.oh.us/tims/Map/ActiveTransportation and discuss with the District Bike & Ped
Contact.
Design Issue Location/Comments
Are there visible signs of deterioration on sidewalks or No sidewalk present between North Carpenter Road Benbow
missing sidewalks? Road
Is there a minimum 4’ clearance along sidewalks? (i.e. Not applicable
poles that obstruct the sidewalk)
Are there visible signs of deterioration in bike Not applicable
lanes/shoulders or missing bike facilities?
Do crossings for bicyclists and/or pedestrians need to be Yes
improved or installed?
Is on-street parking set back 20 feet from the crosswalk Not applicable
(both marked and unmarked) at an intersection or set back
30 feet of the approach to any flashing beacon, stop sign
or traffic control device? (See TEM 4511.68)
Is there evidence of the need for a midblock crossing? (i.e. None known.
pedestrian crashes, signalized intersection spacing exceeds
600 ft., presence of midblock transit stops or path,
pedestrian generators and destinations). Refer to FHWA
Guide for Improving Pedestrian Safety at Uncontrolled
Intersections
Does the project area have an active transportation plan in No
place (or other multimodal plan such as a bicycle,
pedestrian, school travel plan, or metropolitan
transportation plan). Contact pertinent local public
agencies for more information.
Is the project located on a designated or proposed bike No
route (local, regional, state, or US)?
What is the Level of Traffic Stress (1-4)? (LTS 1 and 2 are LTS=3 (shared lane)
considered comfortable for the mainstream adult
population.) (See Level of Traffic Stress calculation tool.
This data is pre-calculated for the State & US Bike Route
System).
Does the project area have high Active Transportation Yes;
Demand and high Active Transportation Need (Scores of 3 AT Demand = Low (Cuyahoga)
or 4)? AT Demand = Moderate (Medina)
(Use the Identify Features tool to select project area and AT Need = 3 (High)
view scores for Demand_ Mapping and Need_Mapping.
scores.)
What are the proposed bicycle lane widths? Not applicable
What are the proposed sidewalk and shared use path To be determined based on build condition; 5-ft width w/ 4-ft
widths (and buffer width)? min. buffer anticipated
If bike/ped accommodations require additional ROW not Yes
planned for the project, can a future project provide this?
CONSTRUCTION ISSUES:
Indicate if the following issues are present or should be considered during project development. Provide additional
comments as needed.
Issue Location/Comments
Will any of the construction activity take place over, No
under, or near railroad property?
Could material with long lead times for delivery have Possibly
an impact on the construction schedule and/or
project completion (e.g., strain poles, large box
culverts, steel beams, etc.)?
Are there any concerns related to existing or No
proposed lighting (e.g., light trespass, river
navigation, airway clearance)?
Compare the Begin/End construction dates with the To be determined
Scope of Work. Is the construction schedule
reasonable?
Examine the existing pavement condition and repair IR71 PCR = 84 (2021); no substantial repair anticipated
history. Calculate potential pavement repair Boston Rd PCR=67 (2021); Cuyahoga side of Boston resurfaced in
quantities. 2022. New pavement anticipated.
Note manhole lid elevations versus proposed paving To be determined
thickness. Will manhole lids or valve boxes need
adjusted after paving?
Is there a need for Echelon Paving? No
Examine the rideability of the approach slab to the No issues identified
roadway/bridge joint.
Will the project have impacts to nearby Yes, adjacent residential properties impacted.
residents/businesses? Will site access occur down
steep side slopes or through properties adjacent to
project site?
CONSTRUCTION ISSUES:
Indicate if the following issues are present or should be considered during project development. Provide additional
comments as needed.
Issue Location/Comments
Examine existing guardrail condition, height and Guardrail condition is fair; anticipate replacement as part of
length of need. What is the condition of the slopes project.
behind guardrail? Will additional grading or fill be Slopes appear stable. Need for additional grading or fill for
required for guardrail replacement? guardrail not anticipated.
Is more space or room needed for construction? To be determined.
Is Temporary or Permanent R/W required for utility
relocations, construction of structures, drainage
ditches, etc.?
Is there enough clearance to overhead utility lines for Aerial utility relocations required.
cranes and concrete pump trucks?
Will there be instream work? Not anticipated
Where are the potential staging areas for the Within properties vacated for project.
contractor?
SAFETY PRIORITIES
SAFETY PRIORITIES
House Bill (HB) 110, effective June 30, 2021, intends to increase the safety (reduce congestion)
and convenience of the traveling public through the cities of Strongsville, North Royalton, and
Brunswick by funding a portion of the cost of this study. Highway Safety Improvement Program
(HSIP) Priority Intersections and Segments have been identified along SR 82 near the I-71
interchange and on Pearl Road (US 42) in the City of Strongsville. An additional HSIP Priority
Segment has been identified on SR 303 in the City of Brunswick. County Engineers Association
of Ohio (CEAO) Priority Segments have also been identified in the surrounding area along W
130th Street and N Carpenter Road.
Figure 8 – Nearby HSIP/SIP Priority Locations (Source: ODOT’s Safety Map Viewer)
Crash data from ODOT’s TIMS and GCAT database (2019-2021) for the study area (the Royalton
Road (SR 82) and Center Road (SR 303) interchanges at I-71, along with Pearl Road (US 42),
Howe Road/N. Carpenter Road, and W. 130th Street) shows a higher concentration of crashes
occurring around the two I-71 interchanges compared to the rest of the road networks. The
predominant crash type observed throughout the corridor was rear end, which can be attributed
to congested conditions with stop and go or queued traffic.
Figure 9 – Crash Locations (2019-2021) (Source: ODOT’s GCAT Tool)
APPENDIX D
CRASH ANALYSIS
CRASH ANALYSIS
The previous three years (2019-2021) of crash history were acquired through the ODOT TIMS
and GCAT database within the study area, with focus on the I-71 interchanges with SR 303 and
SR 82, as well as the following north-south corridors from SR 303 to SR 82:
• US 42/Pearl Road
• W 130th
• Howe Road and North Carpenter Road
At the I-71 interchanges, the crash history review was limited to the east-west streets, the exit
and entrance ramps, and the area immediately surrounding the merge and diverge locations.
Overall, nine hundred sixty-one (961) crashes were recorded in these areas during this time
period. Two (2) of the crashes were fatalities, two hundred fifty-one (251) were injury/possible
injury crashes, and the remainder were property damage only (PDO) crashes. Seven (7) crashes
involved pedestrians or cyclists. A heat map of the study area provided in Appendix B shows the
locations with the highest concentrations of crashes within the study area. This is concentrated
heavily around the I-71 interchanges and the major intersections along SR 303 and particularly
along SR 82.
The majority of the recorded crashes were rear-end crashes (454 crashes), followed by angle
crashes (140 crashes) and side-swipe crashes (118 crashes). The remaining crash types did not
individually represent a significant portion of the crashes, but included the following:
There were no specific, localized, crash patterns noted for any one location within these areas,
but the dominant recorded crash types generally indicate general congestion for these
locations, particularly along the east-west corridors of SR 303 and SR 82.
The crash history was examined year to year, and the data show that Pearl Road and W 130th
experienced a spike in crashes in 2020, while the I-71 interchanges and the Howe Road/North
Carpenter Road corridor showed a dip in crashes in 2020. These patterns equalized over the
entire study area to result in a steady decrease over time in the overall number of crashes,
with 350 crashes occurring in 2019, 319 crashes occurring in 2020, and 292 crashes occurring in
2021. The reduction in overall crashes in 2020 is presumed to be at least partly due to the
changes in travel volumes and patterns state-wide during the COVID pandemic.
W
Webster Rd
Fa
Pr ie m
ir
R
Boston Roadd
Alb i on R d
Crash Data (2019-2021) 42
Ab be y R d
±
Rd
CrashA lDensity A lbion
bi o n R d
Pear l Rd
Sparse
80 W
Dense
82
Strongsville
82
Howe Rd
Prospec t R d
tR
d
n et
B en
Drake Rd
Drake Rd
H
un
t
Rd
Bennetts
42
71 Corners
Bosto n Rd
Dr
J u d it a
Babc oc k Rd
k
r ee
mC
P lu
Mine r Dr
W olff Dr
Sherman
Beebetown Brunswick Corners
Cossett Creek
Golf Club
Bell
S Carpenter Rd
ENVIRONMENTAL OVERVIEW
ENVIRONMENTAL OVERVIEW
A desktop review of environmental information available in ODOT’s TIMS online mapping system
showed the potential for streams and wetlands in the project area. Suitable wooded habitat
for bats was also identified on both sides of I-71. All four quadrants of the project area are
residential and are therefore classified as Noise Sensitive Areas; an existing noise wall was
identified on the west side of I-71 south of Boston Road in the TIMS review. There are no parks
or other potential 4f properties identified in the initial desktop review, and no 6f resources
present in the initial review of the Land and Water Conservation Fund’s online mapping tool.
An initial review of the U.S. Census Bureau’s American Community Survey (ACS) 2021 data for
underserved populations in TIMS showed that there may be a higher percentage of LEP
populations in the northwest portion of the project area. A more detailed analysis may need
to be done in a future phase of this project, and targeted outreach should occur throughout
the project process.
A desktop review of ODOT’s Ohio Regulated Properties Search (ORPS) Tool shows a spill reported
in the project area. No other regulated materials are immediately present in the area.
A review of Ohio’s State Historic Preservation Office’s (SHPO) online mapping system showed
that the project area had previously been surveyed for archeological sites and historic
structures with multiple archeological sites being found. There are no National Register listed
or DOE properties or National Historic Landmarks identified in the SHPO mapping.
Current levels of design for the project show right-of-way impacts of up to 54 permanent takes,
including up to 15 total takes. A desktop review of the impacted properties indicates that the
total takes may result in up to 14 relocations.
APPENDIX F
UTILITIES
UTILITIES
Following a review of existing utility plans obtained through Ohio Utility Protection Service
(OUPS) (Ohio 811) coordination, a field review was conducted.
Numerous facilities are present at the Boston Road overpass at I-71. Parallel with Boston Road,
under I-71, are a 10” & 18” sanitary sewers (Medina County Sanitary Engineer), 12” water main
(City of Cleveland Division of Water), and a 6” gas main (Columbia Gas), north of the bridge. A
culvert crosses under Boston Road at each bridge approach. A telecom cable (AT&T) follows
the west I-71 limited access right-of-way. Buckeye Pipelines and AT&T telecom lines are within
private easements outside of the public road right-of-way.
The primary cost driver for utility coordination/relocation is a pair of privately held 12”
petroleum lines that are owned by Buckeye Pipeline located within their own easements. The
cost of relocating them will be part of the project cost but that cost is not included in the
estimated construction cost tables. A review of plans prepared in 2003, indicates that there
may be some mitigation by moving the roadway centerline to avoid the pipelines in some areas.
Aerial electric (Illuminating Company) and telecom (AT&T, Breezeline, Charter, Frontier) are
present along the north side of Boston both east and west of I-71. Existing lighting is present
along Boston Road from Howe Road to Benbow Road and exists primarily at the intersections.
The sanitary sewers present along the south side of Boston Road connect with a lift station and
two sanitary lines along the east side of North Carpenter Road.
An Existing Utilities Exhibit indicating the location of these and other utilities in the project
study area is provided below.
HOWE ROAD
STU
RBR
IDG
E
LA
EN
DUXBURY LANE
N. CARPENTER ROAD
BOSTON ROAD
I-71 (SO
UTHBO
UND)
I-71 (N
ORTHB
OUND)
BENBOW ROAD
TRAIL
LANDINGS
HA
RT
OR F
WAIT D
E FAR TR
MS LA
NE
AIL
BOSTON ROAD
BOSTON ROAD
APPENDIX G
Data Collection
Using pole-mounted cameras, video footage was collected at eight intersections along and near
Boston Road on October 4, 2022, at four intersections along SR 82 on October 12, 2022, and at
five intersections along SR 303 on October 18, 2022. Turn movement data at all seventeen
intersections was manually obtained from the video footage between 7:00 AM and 6:00 PM.
Additional data obtained from ODOT’s Transportation Data Management System (MS2) was also
utilized for this study. Data from two automatic traffic recorders (ATR) were used to obtain
traffic along I-71. ATR 577 is located on I-71 north of SR 82 and ATR 611 is located on I-71
between SR 82 and SR 303. Traffic is recorded daily for these locations. Data for the ATR
locations was reviewed for each of the three video collection dates for the adjacent roadway
systems. Traffic volumes were observed to be greater on October 12th, 2022 than the other
two collection dates. Therefore, this date was used to obtain volumes at the ATR locations to
be conservative. Additionally, one traffic count location from ODOT’s MS2 was utilized for this
study. The count location was on SR 303 east of I-71 (Location ID 17552) and data was collected
in March of 2022.
Peak Hours
The total traffic for each intersection was calculated in one-hour periods, staggered at fifteen
minute intervals between 7:00 AM and 6:00 PM. The 60 minute period with the greatest volume
determined the system peak hours (7:00 AM – 8:00 AM and 4:30 PM – 5:30 PM). Additionally,
these system peak hours were checked by calculating peak hours at each individual
intersection. The mode (most common value) supported an AM peak hour of 7:00 AM – 8:00 AM
and a PM peak hour of 4:30 PM – 5:30 PM, as determined above. It should be noted that the AM
peak hour coincides with the beginning of the data collection period. The increasing trend of
traffic volumes for 15-minute periods within the hour suggested the calculated AM system peak
hour was valid and would not occur earlier than 7:00 AM.
Site specific data for hourly traffic distribution throughout the day was utilized for this study.
ODOT’s Transportation Data Management System (TDMS) MS2 was checked for recent traffic
data in the study area that contained 24 hour counts. A recent traffic count (ID 17552 from
March 2022) was available on SR 303 east of I-71. The previously mentioned ATR locations had
24 hour counts available. Additional counts from the collected videos were manually performed
on Boston Road and SR 82 to obtain hourly volume percentages.
These sources were used to determine typical hourly percentages of total daily traffic for each
study area. These percentages were then applied to the eleven hours of count data for each
intersection to determine ADT for each turn movement. The total vehicles counted during the
study period divided by the sum of hourly percentages corresponding to hours studied equals
the total ADT for any given movement.
ODOT’s seasonal adjustment factor tables were used to convert ADT to AADT. Roadway
classification along with the day and month of traffic data collection were used to determine
the appropriate seasonal adjustment factor.
After AM Peak and PM Peak design hour volumes and AADT’s were determined, the percent
variation of traffic entering and exiting a roadway segment was calculated and evaluated for
accuracy. Balancing and smoothing techniques stated in the Ohio Traffic Forecasting Manual
were used to resolve any discrepancies found. The Higher Volume Distributed method was
used. ODOT approved the existing traffic plates and methods used on February 10th, 2023.
Several resources were used along with the existing traffic volumes to estimate future opening
year (2027) and design year (2047) traffic volumes.
Northeast Ohio Areawide Coordinating Agency (NOACA) provided 2025 and 2045 modeling
information for a No Build scenario as well as three possible build scenarios (Alternatives 3, 4,
and full interchange).
ODOT developed a forecast adjustment tool spreadsheet based on methods from the National
Cooperative Highway Research Program (NCHRP) 255 and NCHRP 765 reports. This spreadsheet
will be later referred to as the NCHRP spreadsheet. The NCHRP spreadsheet utilizes count year
traffic data, K-factors, and base and future travel demand model results to estimate the future
year link volumes and intersection turning movement volumes.
The balanced 2022 existing traffic data as well as the modeling information provided from
NOACA was input into the NCHRP spreadsheets. Turning movement traffic volumes were
produced for 2027 and 2047 for AM, PM, and 24-hour periods.
The 2027 and 2047 No Build volumes were normalized using the same balancing methods
methods as the 2022 existing traffic volumes. The percent variation of traffic entering and
exiting a roadway segment was evaluated. Balancing and smoothing techniques stated in the
Ohio Traffic Forecasting Manual were used to resolve discrepancies. The Higher Volume
Distributed method was used. Any areas with negative growth from 2027 to 2047 were manually
adjusted to have a growth rate of zero.
The traffic plates with these adjustments are referred to as the balanced traffic plates. The
balanced No Build traffic plates are provided in Appendix H.
The 2022 count volumes were processed through the NCHRP spreadsheets using the 2025/2045
NOACA model growth rates to generate 2027/2047 Build Condition volumes. For the Build
Condition, 2025 Opening Year volumes were used as the basis for interpolating the 2027 Opening
Year volumes used in this Study's Model.
For intersections with new links (at the Boston Road interchange), it was necessary to utilize
the model turn movement data entry feature in the PM, AM and 24 HR NCHRP spreadsheet tabs,
as no existing movements were available in the existing condition. The intersections of Boston
Road and the NB and SB ramps, as well as the intersections of Boston Road with Howe and N
Carpenter, solely relied on model turn movement data due to the high level of impact to traffic
patterns anticipated in those locations for all alternatives. For all other locations throughout
the project, model turning movement was entered into the NCHRP spreadsheets, and the
spreadsheets relied on a combination of both the model turning movement data and the count
data for the estimation of the opening and design year turning movement volumes. During the
balancing process, the projected ramp volumes and the mainline volumes entering/exiting the
study area were adjusted up or down according to the relationships reported in the NOACA
model outputs between the No Build and Build alternatives (by percent change from No Build
to Build). This step was taken to ensure that the balanced volumes would represent the changes
in traffic patterns predicted by the NOACA model as accurately as possible.
The model growth rates showed negative values in some instances. In these cases, in the Build
condition, the opening year volumes were not adjusted upward to meet the existing count
volumes, as the initial reduction in traffic volumes may be assumed to be a consequence of
changes in traffic patterns due to the presence of the new interchange. However, any negative
growth between the opening and design years was adjusted upwards to meet the opening year
volumes at a minimum. After adjusting for negative growth rates in the design year,
balancing/smoothing was performed between any Howe Road or Carpenter Road intersections
and adjacent ramp intersections to within 5% tolerance. Complete balancing/smoothing was
performed between interchange ramp intersections and along the IR-71 mainline. No
balancing/smoothing was performed for intersections separated by significant distances as
illustrated by cut lines on the traffic plates because of the number of traffic generators/traffic
sinks between the intersections. This information was sent to ODOT’s Office of Modeling and
Forecasting for review.
The final balanced traffic volumes for the 2027 opening year and 2047 design year build
conditions are provided in Appendix H.
Additionally, truck percentages as well as peak hour factors were calculated from the existing
traffic data. These values are provided in Appendix H.
Turn Lane Length Calculations
The required storage lengths for the turn lanes were calculated based on methods detailed in
ODOT’s Location and Design Manual, Volume 1 using the design year (2047) traffic volumes.
These calculations are used to approximate the roadway layout and potential impacts near the
proposed Boston Road interchange location. The turn lane length calculations are provided in
Appendix N.
APPENDIX H
TRAFFIC PLATES
N
7:00 AM 0 2 0 63 0 2 0 74 0 139
7:15 AM 1 3 0 59 1 6 1 86 2 151
7:30 AM 0 5 0 83 1 2 1 95 1 185
7:45 AM 2 2 0 94 3 0 7 81 4 189
TOTAL: 3 12 0 299 5 10 9 336 7 664
APPROACH
15 304 345
TOTAL
8:00 AM 0 2 0 57 1 2 2 74 0 136
8:15 AM 0 3 0 59 0 1 1 67 0 130
8:30 AM 0 3 0 63 1 2 6 67 1 140
8:45 AM 1 3 0 65 2 2 1 85 6 157
TOTAL: 1 11 0 244 4 7 10 293 7 563
APPROACH
12 248 303
TOTAL
9:00 AM 0 3 0 49 0 3 1 65 2 118
9:15 AM 1 3 0 51 1 0 1 46 0 103
9:30 AM 3 4 0 46 2 1 1 55 3 111
9:45 AM 0 2 0 39 2 1 1 40 1 84
TOTAL: 4 12 0 185 5 5 4 206 6 416
APPROACH
16 190 210
TOTAL
10:00 AM 0 1 0 49 1 4 0 50 4 101
10:15 AM 2 1 1 63 0 2 3 53 0 122
10:30 AM 3 0 0 48 0 3 3 59 1 113
10:45 AM 2 2 1 73 2 4 2 55 3 136
TOTAL: 7 4 2 233 3 13 8 217 8 472
APPROACH
11 236 225
TOTAL
11:00 AM 1 3 0 48 2 0 0 53 2 107
11:15 AM 1 5 0 48 5 1 1 45 1 105
11:30 AM 0 2 0 61 1 0 2 69 3 135
11:45 AM 1 7 0 60 2 4 3 61 2 134
TOTAL: 3 17 0 217 10 5 6 228 8 481
APPROACH
20 227 234
TOTAL
12:00 PM 0 6 0 68 1 3 3 55 1 133
12:15 PM 1 3 0 43 0 1 3 53 1 103
12:30 PM 3 2 0 60 0 0 2 69 1 136
12:45 PM 1 1 0 65 2 2 3 61 3 133
TOTAL: 5 12 0 236 3 6 11 238 6 505
APPROACH
17 239 249
TOTAL
1:00 PM 0 1 0 76 0 4 4 49 1 130
1:15 PM 1 6 0 55 1 3 4 44 1 111
1:30 PM 0 4 0 56 0 0 4 65 1 129
1:45 PM 0 2 1 68 0 2 6 60 4 136
TOTAL: 1 13 1 255 1 9 18 218 7 506
APPROACH
14 256 236
TOTAL
2:00 PM 1 4 0 74 1 4 3 58 2 141
2:15 PM 2 2 0 73 1 2 2 73 0 153
2:30 PM 2 6 0 62 1 1 3 78 2 152
2:45 PM 0 5 0 87 3 3 3 74 2 172
TOTAL: 5 17 0 296 6 10 11 283 6 618
APPROACH
22 302 294
TOTAL
3:00 PM 3 0 0 81 0 0 6 77 1 167
3:15 PM 4 0 0 91 5 2 8 56 0 164
3:30 PM 2 0 0 99 7 2 6 92 0 206
3:45 PM 3 3 0 97 1 1 2 77 3 183
TOTAL: 12 3 0 368 13 5 22 302 4 720
APPROACH
15 381 324
TOTAL
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Strongsville
STREETS: Drake Road and Howe Road COUNT DATE: 10/4/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
9:00 AM 11 31 24 1 3 50 46 4 11 63 5 0 48 39 5 1 336
9:15 AM 11 23 22 1 1 46 43 1 6 62 2 0 61 40 3 1 320
9:30 AM 14 17 22 0 0 33 30 0 5 65 2 2 30 46 3 4 267
9:45 AM 12 33 22 2 3 51 39 7 8 51 2 0 38 33 4 2 296
TOTAL: 48 104 90 4 7 180 158 12 30 241 11 2 177 158 15 8 1219
APPROACH
242 345 282 350
TOTAL
10:00 AM 16 22 24 1 0 39 26 8 2 51 1 0 53 46 9 1 289
10:15 AM 13 34 33 0 1 27 24 2 1 57 1 1 33 34 6 0 264
10:30 AM 22 22 28 0 1 33 27 1 5 60 3 0 32 35 4 0 272
10:45 AM 21 30 39 1 3 37 44 1 9 63 3 2 28 34 3 3 314
TOTAL: 72 108 124 2 5 136 121 12 17 231 8 3 146 149 22 4 1139
APPROACH
304 262 256 317
TOTAL
11:00 AM 19 55 23 4 0 40 32 2 10 50 5 0 33 42 5 4 314
11:15 AM 36 40 19 1 4 40 31 3 5 57 4 0 43 33 5 2 317
11:30 AM 32 48 27 0 0 44 40 3 10 69 3 0 41 30 2 1 346
11:45 AM 22 40 27 0 4 63 43 3 5 63 1 1 26 37 7 6 338
TOTAL: 109 183 96 5 8 187 146 11 30 239 13 1 143 142 19 13 1315
APPROACH
388 341 282 304
TOTAL
12:00 PM 30 41 20 0 3 44 32 3 9 50 4 0 28 37 10 2 308
12:15 PM 24 46 31 1 3 48 33 2 6 56 4 1 47 39 8 5 345
12:30 PM 27 52 25 2 3 52 31 3 15 62 2 0 28 40 5 0 342
12:45 PM 35 41 41 2 3 48 30 1 8 60 3 0 39 63 8 3 379
TOTAL: 116 180 117 5 12 192 126 9 38 228 13 1 142 179 31 10 1374
APPROACH
413 330 279 352
TOTAL
1:00 PM 25 47 30 1 3 40 34 5 3 56 1 0 41 52 7 2 339
1:15 PM 35 60 32 1 2 46 24 5 2 48 1 1 40 46 13 3 349
1:30 PM 33 66 31 0 1 49 36 3 5 56 2 0 36 52 3 1 370
1:45 PM 28 48 29 3 4 38 31 1 10 67 1 0 21 38 1 0 316
TOTAL: 121 221 122 5 10 173 125 14 20 227 5 1 138 188 24 6 1374
APPROACH
464 308 252 350
TOTAL
2:00 PM 31 62 39 1 4 44 33 0 8 58 4 3 38 67 7 1 395
2:15 PM 31 54 37 1 2 44 27 2 7 44 3 3 43 67 7 9 366
2:30 PM 33 56 33 0 3 52 32 3 8 65 2 0 45 79 7 3 415
2:45 PM 25 63 46 1 6 66 24 4 5 53 4 0 34 65 10 1 401
TOTAL: 120 235 155 3 15 206 116 9 28 220 13 6 160 278 31 14 1577
APPROACH
510 337 261 469
TOTAL
3:00 PM 35 69 44 1 5 41 32 4 7 61 3 0 54 51 8 1 410
3:15 PM 44 80 46 0 5 51 30 3 8 56 2 0 37 56 6 1 421
3:30 PM 54 93 53 2 7 63 30 2 6 45 5 0 49 65 10 2 480
3:45 PM 34 92 80 0 3 48 25 2 12 81 0 0 48 53 3 4 479
TOTAL: 167 334 223 3 20 203 117 11 33 243 10 0 188 225 27 8 1790
APPROACH
724 340 286 440
TOTAL
4:00 PM 45 88 59 0 3 73 32 2 12 44 2 2 34 63 11 2 466
4:15 PM 50 95 66 2 8 68 40 2 10 60 6 0 41 56 10 1 510
4:30 PM 41 99 58 0 4 88 42 3 16 67 7 0 62 97 14 2 595
4:45 PM 47 90 57 0 6 80 36 3 10 68 1 3 50 77 9 1 531
TOTAL: 183 372 240 2 21 309 150 10 48 239 16 5 187 293 44 6 2102
APPROACH
795 480 303 524
TOTAL
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Strongsville
STREETS: Drake Road and Hunt Road COUNT DATE: 10/4/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
7:00 AM 1 16 1 43 1 0 47 25 4 133
7:15 AM 2 38 0 47 6 0 42 20 0 155
7:30 AM 1 44 0 54 2 0 44 20 3 165
7:45 AM 2 48 2 44 6 1 61 29 0 190
TOTAL: 6 146 3 188 15 1 194 94 7 643
APPROACH
152 203 288
TOTAL
8:00 AM 1 37 1 36 9 0 55 23 2 161
8:15 AM 3 51 1 39 3 0 45 24 1 165
8:30 AM 2 31 0 35 8 3 61 25 1 162
8:45 AM 7 71 0 49 18 4 64 10 0 219
TOTAL: 13 190 2 159 38 7 225 82 4 707
APPROACH
203 197 307
TOTAL
9:00 AM 7 52 0 42 3 2 35 18 0 157
9:15 AM 0 43 0 44 1 0 33 16 0 137
9:30 AM 2 29 0 35 1 0 38 25 4 130
9:45 AM 0 43 1 41 2 3 28 23 1 137
TOTAL: 9 167 1 162 7 5 134 82 5 561
APPROACH
176 169 216
TOTAL
10:00 AM 0 38 0 31 0 5 38 24 0 131
10:15 AM 3 24 0 29 2 3 33 16 0 107
10:30 AM 1 37 0 22 0 0 32 28 0 120
10:45 AM 1 34 0 46 2 2 32 25 4 140
TOTAL: 5 133 0 128 4 10 135 93 4 498
APPROACH
138 132 228
TOTAL
11:00 AM 2 33 0 38 0 3 39 23 2 135
11:15 AM 1 37 0 35 2 3 39 30 1 144
11:30 AM 1 39 0 52 4 2 38 26 0 160
11:45 AM 6 62 3 44 6 0 32 29 2 179
TOTAL: 10 171 3 169 12 8 148 108 5 618
APPROACH
181 181 256
TOTAL
12:00 PM 1 32 1 47 2 3 38 33 3 153
12:15 PM 3 45 1 34 3 0 37 29 4 151
12:30 PM 0 54 0 34 1 2 34 36 0 159
12:45 PM 3 47 1 34 8 0 49 48 2 189
TOTAL: 7 178 3 149 14 5 158 146 9 652
APPROACH
185 163 304
TOTAL
1:00 PM 2 44 1 34 2 2 50 29 2 161
1:15 PM 3 39 1 31 2 0 40 40 2 155
1:30 PM 3 54 1 38 2 2 40 49 1 186
1:45 PM 2 35 0 36 0 0 32 31 1 136
TOTAL: 10 172 3 139 6 4 162 149 6 638
APPROACH
182 145 311
TOTAL
2:00 PM 0 36 0 41 3 0 63 38 0 181
2:15 PM 5 46 0 30 3 0 52 47 3 183
2:30 PM 0 45 0 36 3 1 46 57 2 187
2:45 PM 0 52 1 30 3 1 47 40 1 172
TOTAL: 5 179 1 137 12 2 208 182 6 723
APPROACH
184 149 390
TOTAL
3:00 PM 4 47 1 32 5 2 48 35 1 171
3:15 PM 3 57 1 28 11 3 53 55 2 207
3:30 PM 7 77 0 29 11 2 56 57 1 237
3:45 PM 2 52 0 35 1 2 39 45 1 174
TOTAL: 16 233 2 124 28 9 196 192 5 789
APPROACH
249 152 388
TOTAL
4:00 PM 2 67 0 33 6 2 57 57 1 222
4:15 PM 8 66 0 52 12 2 48 62 1 248
4:30 PM 7 76 0 49 2 1 82 55 2 271
4:45 PM 5 73 0 58 4 3 69 58 0 267
TOTAL: 22 282 0 192 24 8 256 232 4 1008
APPROACH
304 216 488
TOTAL
5:00 PM 5 72 0 53 1 4 87 47 0 265
5:15 PM 6 102 0 53 2 3 84 53 2 300
5:30 PM 5 76 0 48 2 1 52 55 0 238
5:45 PM 1 91 0 52 3 0 67 50 4 264
TOTAL: 17 341 0 206 8 8 290 205 6 1067
APPROACH
358 214 495
TOTAL
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Brunswick/Strongsville
STREETS: Howe Road and Boston Road COUNT DATE: 10/4/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
7:00 AM 13 9 0 0 43 27 1 65 68 1 225
7:15 AM 12 11 1 0 42 37 6 66 64 2 232
7:30 AM 15 14 0 0 50 46 3 61 76 1 262
7:45 AM 21 12 0 0 80 40 0 44 81 5 278
TOTAL: 61 46 1 0 215 150 10 236 289 9 997
APPROACH
107 365 525
TOTAL
8:00 AM 10 23 1 0 50 27 1 50 68 2 228
8:15 AM 19 13 0 0 47 32 2 33 63 3 207
8:30 AM 16 12 1 0 46 32 3 39 64 5 209
8:45 AM 13 8 0 0 57 31 2 37 83 7 229
TOTAL: 58 56 2 0 200 122 8 159 278 17 873
APPROACH
114 322 437
TOTAL
9:00 AM 26 21 2 0 45 30 3 37 60 5 219
9:15 AM 16 12 1 0 52 25 3 33 57 2 195
9:30 AM 14 7 1 1 41 26 2 36 42 4 167
9:45 AM 14 14 2 0 37 23 3 25 39 2 152
TOTAL: 70 54 6 1 175 104 11 131 198 13 733
APPROACH
124 280 329
TOTAL
10:00 AM 18 12 1 0 43 19 8 26 46 3 164
10:15 AM 24 8 0 0 39 25 5 26 50 1 172
10:30 AM 13 10 0 0 44 38 2 26 57 1 188
10:45 AM 13 14 0 0 52 34 6 23 50 3 186
TOTAL: 68 44 1 0 178 116 21 101 203 8 710
APPROACH
112 294 304
TOTAL
11:00 AM 24 16 0 0 46 27 2 20 42 3 175
11:15 AM 28 13 0 0 30 30 2 22 39 1 162
11:30 AM 20 28 0 0 49 36 4 29 52 3 214
11:45 AM 24 18 0 0 57 30 8 32 55 3 216
TOTAL: 96 75 0 0 182 123 16 103 188 10 767
APPROACH
171 305 291
TOTAL
12:00 PM 39 17 2 0 52 31 1 27 41 1 207
12:15 PM 23 20 0 1 31 29 1 26 56 2 186
12:30 PM 30 23 3 0 49 35 1 27 53 3 217
12:45 PM 28 12 2 0 54 32 1 23 70 3 219
TOTAL: 120 72 7 1 186 127 4 103 220 9 829
APPROACH
192 314 323
TOTAL
1:00 PM 31 16 1 1 56 39 6 26 52 3 221
1:15 PM 33 30 0 1 47 25 4 18 57 4 211
1:30 PM 43 20 0 0 45 36 2 27 49 1 220
1:45 PM 24 28 1 0 47 43 2 28 50 4 220
TOTAL: 131 94 2 2 195 143 14 99 208 12 872
APPROACH
225 340 307
TOTAL
2:00 PM 37 17 1 0 53 39 6 23 41 6 210
2:15 PM 37 23 0 0 50 20 7 28 61 2 219
2:30 PM 39 25 1 0 56 35 4 28 74 4 257
2:45 PM 27 26 1 0 79 32 7 22 73 2 259
TOTAL: 140 91 3 0 238 126 24 101 249 14 945
APPROACH
231 364 350
TOTAL
3:00 PM 35 31 2 0 66 27 1 28 77 1 264
3:15 PM 40 31 0 0 67 33 2 29 53 0 253
3:30 PM 34 41 0 0 75 37 0 27 94 3 308
3:45 PM 39 40 0 0 78 37 1 24 76 4 294
TOTAL: 148 143 2 0 286 134 4 108 300 8 1119
APPROACH
291 420 408
TOTAL
4:00 PM 41 45 0 0 87 33 3 27 79 2 312
4:15 PM 41 42 0 0 95 35 2 29 86 2 328
4:30 PM 54 39 0 0 99 41 1 29 62 3 324
4:45 PM 41 32 0 0 99 41 1 33 76 1 322
TOTAL: 177 158 0 0 380 150 7 118 303 8 1286
APPROACH
335 530 421
TOTAL
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Brunswick/Strongsville
STREETS: North Carpenter Road and Boston Road COUNT DATE: 10/4/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
7:00 AM 22 46 1 32 0 18 1 51 34 1 203
7:15 AM 12 49 1 33 0 25 1 64 20 0 203
7:30 AM 31 61 2 28 0 19 1 74 27 0 240
7:45 AM 20 76 0 56 0 23 1 71 34 0 280
TOTAL: 85 232 4 149 0 85 4 260 115 1 926
APPROACH
317 234 375
TOTAL
8:00 AM 36 6 3 33 0 21 1 49 23 0 168
8:15 AM 17 42 1 39 0 18 2 50 28 0 194
8:30 AM 21 40 1 34 0 20 1 59 26 4 200
8:45 AM 15 56 0 28 0 15 0 74 29 2 217
TOTAL: 89 144 5 134 0 74 4 232 106 6 779
APPROACH
233 208 338
TOTAL
9:00 AM 7 47 1 33 0 6 0 62 30 5 185
9:15 AM 10 45 1 29 0 8 0 43 32 0 167
9:30 AM 9 39 1 27 0 13 0 40 19 0 147
9:45 AM 10 32 1 29 0 13 0 28 27 1 139
TOTAL: 36 163 4 118 0 40 0 173 108 6 638
APPROACH
199 158 281
TOTAL
10:00 AM 9 34 0 21 0 9 0 43 18 1 134
10:15 AM 21 46 1 26 0 14 0 40 37 0 184
10:30 AM 11 35 0 40 0 18 0 53 25 0 182
10:45 AM 20 57 1 37 0 13 1 48 25 2 200
TOTAL: 61 172 2 124 0 54 1 184 105 3 700
APPROACH
233 178 289
TOTAL
11:00 AM 7 44 0 26 0 18 1 38 29 0 162
11:15 AM 20 35 0 30 0 12 1 35 36 0 168
11:30 AM 12 54 0 32 0 18 0 50 25 1 191
11:45 AM 12 52 3 33 0 17 0 49 34 1 197
TOTAL: 51 185 3 121 0 65 2 172 124 2 718
APPROACH
236 186 296
TOTAL
12:00 PM 24 51 1 19 0 6 0 43 38 0 181
12:15 PM 14 38 0 17 0 10 0 46 34 0 159
12:30 PM 11 52 0 17 1 16 0 53 39 0 189
12:45 PM 16 48 0 41 0 15 0 56 47 0 223
TOTAL: 65 189 1 94 1 47 0 198 158 0 752
APPROACH
254 142 356
TOTAL
1:00 PM 22 61 1 33 0 13 0 38 44 0 211
1:15 PM 18 42 0 31 0 12 2 40 42 3 185
1:30 PM 12 47 0 34 0 17 0 55 46 0 211
1:45 PM 29 49 0 44 0 21 0 49 32 1 224
TOTAL: 81 199 1 142 0 63 2 182 164 4 831
APPROACH
280 205 346
TOTAL
2:00 PM 14 58 1 32 0 20 0 41 39 0 204
2:15 PM 20 50 1 13 0 14 0 47 43 0 187
2:30 PM 24 46 0 16 2 11 7 58 54 1 211
2:45 PM 12 68 1 40 0 10 0 63 44 2 237
TOTAL: 70 222 3 101 2 55 7 209 180 3 839
APPROACH
292 158 389
TOTAL
3:00 PM 24 51 1 32 0 19 1 59 54 1 239
3:15 PM 26 58 1 31 1 15 2 47 44 0 222
3:30 PM 21 77 1 33 1 9 1 85 45 0 271
3:45 PM 23 74 2 38 0 20 0 54 56 2 265
TOTAL: 94 260 5 134 2 63 4 245 199 3 997
APPROACH
354 199 444
TOTAL
4:00 PM 30 80 2 31 0 15 0 68 40 0 264
4:15 PM 27 81 2 5 0 7 0 67 61 1 248
4:30 PM 27 102 0 21 0 7 0 53 66 0 276
4:45 PM 43 81 0 41 0 20 0 72 59 0 316
TOTAL: 127 344 4 98 0 49 0 260 226 1 1104
APPROACH
471 147 486
TOTAL
5:00 PM 33 95 0 31 0 15 0 86 56 0 316
5:15 PM 35 90 0 44 0 15 1 87 49 1 320
5:30 PM 35 103 0 55 0 35 0 84 62 1 374
5:45 PM 33 92 0 42 0 22 0 57 67 0 313
TOTAL: 136 380 0 172 0 87 1 314 234 2 1323
APPROACH
516 259 548
TOTAL
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Brunswick
STREETS: North Carpenter Road and Grafton Road COUNT DATE: 10/4/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
7:00 AM 2 50 14 1 65 42 4 4 8 12 15 2 15 70 25 1 322
7:15 AM 10 26 15 0 25 45 8 1 11 25 23 3 21 75 22 3 306
7:30 AM 6 35 13 2 23 60 9 7 7 28 22 0 17 69 22 3 311
7:45 AM 15 55 18 1 25 38 12 3 18 35 21 0 15 66 34 4 352
TOTAL: 33 166 60 4 138 185 33 15 44 100 81 5 68 280 103 11 1291
APPROACH
259 356 225 451
TOTAL
8:00 AM 8 30 12 0 16 32 10 2 19 24 10 1 15 63 21 4 260
8:15 AM 8 41 9 0 9 30 7 0 15 28 13 4 13 47 11 2 231
8:30 AM 5 40 13 4 10 35 7 2 17 20 10 0 22 42 18 2 239
8:45 AM 10 33 9 3 27 54 4 7 17 38 19 5 10 39 29 3 289
TOTAL: 31 144 43 7 62 151 28 11 68 110 52 10 60 191 79 11 1019
APPROACH
218 241 230 330
TOTAL
9:00 AM 5 33 5 0 10 32 5 3 12 25 12 1 13 47 11 2 210
9:15 AM 5 28 8 1 18 24 5 2 11 24 9 3 10 28 12 2 182
9:30 AM 5 33 3 2 15 17 7 2 10 26 16 0 8 24 14 0 178
9:45 AM 3 33 14 0 16 22 6 1 15 22 15 1 5 33 15 4 199
TOTAL: 18 127 30 3 59 95 23 8 48 97 52 5 36 132 52 8 769
APPROACH
175 177 197 220
TOTAL
10:00 AM 2 22 9 2 15 20 4 1 9 26 11 4 6 26 18 1 168
10:15 AM 6 41 16 0 18 17 4 0 17 22 16 0 9 33 19 9 218
10:30 AM 3 30 8 0 24 27 10 1 18 27 15 1 17 21 13 1 213
10:45 AM 4 30 17 0 9 19 6 0 19 30 24 2 9 39 23 3 229
TOTAL: 15 123 50 2 66 83 24 2 63 105 66 7 41 119 73 14 828
APPROACH
188 173 234 233
TOTAL
11:00 AM 6 29 16 1 14 28 3 4 18 30 9 1 16 40 13 1 222
11:15 AM 8 44 14 2 22 25 3 1 15 20 25 3 15 28 22 0 241
11:30 AM 6 29 7 0 13 35 8 1 12 37 15 3 11 40 14 2 227
11:45 AM 6 35 11 0 17 38 7 1 17 33 22 0 19 36 16 3 257
TOTAL: 26 137 48 3 66 126 21 7 62 120 71 7 61 144 65 6 947
APPROACH
211 213 253 270
TOTAL
12:00 PM 7 39 17 0 23 27 10 1 13 28 18 0 14 20 19 3 235
12:15 PM 7 36 15 2 16 41 8 3 20 27 15 1 13 28 20 2 246
12:30 PM 7 28 11 1 15 28 4 3 26 39 18 5 10 48 23 2 257
12:45 PM 6 53 16 0 23 24 10 1 21 32 20 1 14 33 17 2 269
TOTAL: 27 156 59 3 77 120 32 8 80 126 71 7 51 129 79 9 1007
APPROACH
242 229 277 259
TOTAL
1:00 PM 4 48 17 1 16 32 2 2 19 38 20 0 11 37 18 2 262
1:15 PM 9 51 14 2 17 44 2 2 23 28 18 3 10 34 14 0 264
1:30 PM 10 37 17 1 11 29 7 2 27 38 23 5 10 29 15 2 253
1:45 PM 7 31 15 0 12 34 7 1 17 39 18 1 16 38 24 1 258
TOTAL: 30 167 63 4 56 139 18 7 86 143 79 9 47 138 71 5 1037
APPROACH
260 213 308 256
TOTAL
2:00 PM 6 37 13 3 19 40 8 0 17 25 20 2 16 24 26 4 251
2:15 PM 4 44 15 1 16 36 7 0 27 41 25 7 17 19 21 3 272
2:30 PM 14 47 20 4 19 51 8 4 30 39 29 4 15 49 19 6 340
2:45 PM 6 37 15 1 24 45 6 5 19 41 14 0 22 54 25 6 308
TOTAL: 30 165 63 9 78 172 29 9 93 146 88 13 70 146 91 19 1171
APPROACH
258 279 327 307
TOTAL
3:00 PM 6 46 21 2 15 55 10 4 36 28 21 3 17 48 15 9 318
3:15 PM 11 43 12 0 17 63 7 1 31 41 26 2 15 45 21 2 332
3:30 PM 11 44 17 2 19 70 10 3 33 31 17 3 23 46 27 5 348
3:45 PM 12 53 27 3 19 52 8 1 30 32 19 1 22 49 15 3 338
TOTAL: 40 186 77 7 70 240 35 9 130 132 83 9 77 188 78 19 1336
APPROACH
303 345 345 343
TOTAL
4:00 PM 8 48 29 2 22 70 14 3 32 35 30 0 27 59 21 4 395
4:15 PM 16 58 30 1 26 57 12 1 34 44 30 0 15 68 20 2 410
4:30 PM 14 58 27 0 25 89 14 3 42 37 23 0 24 69 24 0 446
4:45 PM 9 66 25 0 32 70 12 3 37 47 16 0 21 65 29 2 429
TOTAL: 47 230 111 3 105 286 52 10 145 163 99 0 87 261 94 8 1680
APPROACH
388 443 407 442
TOTAL
5:00 PM 12 41 32 0 40 88 9 3 45 53 17 0 17 49 25 0 428
5:15 PM 5 48 29 0 30 94 18 0 43 42 28 0 14 58 24 1 433
5:30 PM 11 61 41 1 30 83 10 1 36 43 24 0 30 63 30 1 462
5:45 PM 9 54 25 0 26 87 11 1 41 40 35 0 17 68 25 1 438
TOTAL: 37 204 127 1 126 352 48 5 165 178 104 0 78 238 104 3 1761
APPROACH
368 526 447 420
TOTAL
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Strongsville
STREETS: State Route 82 and Howe Road COUNT DATE: 10/12/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Strongsville
STREETS: State Route 82 and I71 Northbound Ramps COUNT DATE: 10/12/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Strongsville
STREETS: State Route 82 and I71 Southbound Ramps COUNT DATE: 10/12/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Strongsville/North Royalton
STREETS: State Route 82 and West 130th Street COUNT DATE: 10/12/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Brunswick
STREETS: State Route 303 and I71 Northbound Ramps COUNT DATE: 10/18/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Brunswick
STREETS: State Route 303 and I71 Southbound Ramps COUNT DATE: 10/18/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Brunswick
STREETS: State Route 303 and North Carpenter Road COUNT DATE: 10/18/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Brunswick
STREETS: State Route 303 and South Carpenter Road COUNT DATE: 10/18/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Brunswick/Hinckley
STREETS: State Route 303 and West 130th Street COUNT DATE: 10/18/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
7:00 AM 23 25 51 2 3 43 13 1 12 20 7 1 36 49 14 2 296
7:15 AM 22 22 40 4 3 61 9 2 15 25 8 3 29 47 11 6 292
7:30 AM 35 42 54 3 3 71 19 1 16 21 5 4 36 57 9 8 368
7:45 AM 23 37 29 3 10 71 21 3 7 30 10 0 48 67 6 3 359
TOTAL: 103 126 174 12 19 246 62 7 50 96 30 8 149 220 40 19 1315
APPROACH
403 327 176 409
TOTAL
8:00 AM 24 25 28 2 7 54 21 1 8 19 5 3 32 50 9 3 282
8:15 AM 22 20 43 2 4 51 24 3 7 34 9 0 22 53 14 6 303
8:30 AM 27 30 47 7 5 64 11 4 13 18 6 5 28 58 8 3 315
8:45 AM 18 19 40 4 8 82 16 7 10 31 6 2 38 47 7 5 322
TOTAL: 91 94 158 15 24 251 72 15 38 102 26 10 120 208 38 17 1222
APPROACH
343 347 166 366
TOTAL
9:00 AM 17 24 57 4 10 62 12 3 12 15 8 3 34 43 8 6 302
9:15 AM 10 21 33 4 8 54 14 1 11 16 5 3 19 55 7 5 253
9:30 AM 9 24 41 8 10 64 14 4 8 16 7 5 25 39 7 6 264
9:45 AM 20 18 34 7 2 48 18 2 12 18 3 6 23 39 9 3 244
TOTAL: 56 87 165 23 30 228 58 10 43 65 23 17 101 176 31 20 1063
APPROACH
308 316 131 308
TOTAL
10:00 AM 16 22 36 6 6 59 12 5 7 15 9 5 23 46 8 5 259
10:15 AM 7 16 31 8 3 54 11 5 12 22 5 2 19 57 15 3 252
10:30 AM 11 21 27 4 8 52 12 1 14 19 5 5 30 41 8 3 248
10:45 AM 17 21 40 11 2 51 15 3 8 21 5 5 23 40 7 2 250
TOTAL: 51 80 134 29 19 216 50 14 41 77 24 17 95 184 38 13 1009
APPROACH
265 285 142 317
TOTAL
11:00 AM 14 26 49 6 5 53 11 8 8 17 10 4 28 44 15 3 280
11:15 AM 8 29 32 4 5 59 14 3 13 16 5 4 34 61 7 4 283
11:30 AM 10 21 34 3 3 64 10 3 16 27 4 2 37 40 7 4 273
11:45 AM 17 25 39 1 4 55 13 2 10 17 4 4 39 34 9 2 266
TOTAL: 49 101 154 14 17 231 48 16 47 77 23 14 138 179 38 13 1102
APPROACH
304 296 147 355
TOTAL
12:00 PM 19 17 51 3 2 64 11 3 19 19 2 4 43 51 13 5 311
12:15 PM 19 33 36 7 4 56 8 1 17 20 4 3 40 66 16 7 319
12:30 PM 18 32 34 4 4 51 19 4 18 23 2 3 44 63 8 6 316
12:45 PM 20 36 38 10 6 63 19 1 20 21 6 1 37 55 14 3 335
TOTAL: 76 118 159 24 16 234 57 9 74 83 14 11 164 235 51 21 1281
APPROACH
353 307 171 450
TOTAL
1:00 PM 12 29 48 2 8 65 15 8 7 22 3 5 42 48 14 4 313
1:15 PM 14 32 63 8 9 79 12 2 8 20 3 1 45 49 11 3 345
1:30 PM 18 34 52 3 10 63 7 4 13 22 6 3 40 77 9 5 351
1:45 PM 14 24 36 3 3 49 8 1 17 16 4 4 29 62 12 3 274
TOTAL: 58 119 199 16 30 256 42 15 45 80 16 13 156 236 46 15 1283
APPROACH
376 328 141 438
TOTAL
2:00 PM 28 29 36 7 4 62 11 3 16 14 2 1 30 55 13 3 300
2:15 PM 19 19 44 1 4 70 10 2 7 26 6 3 50 65 11 6 331
2:30 PM 20 33 46 1 5 61 16 1 9 30 6 5 42 74 7 3 349
2:45 PM 12 31 34 3 5 60 17 2 12 28 5 0 45 57 12 2 318
TOTAL: 79 112 160 12 18 253 54 8 44 98 19 9 167 251 43 14 1298
APPROACH
351 325 161 461
TOTAL
3:00 PM 26 37 50 3 7 66 18 0 14 38 7 0 44 67 12 3 386
3:15 PM 13 27 36 2 13 58 20 0 8 31 3 3 41 69 11 3 330
3:30 PM 22 33 42 1 8 77 26 3 19 37 7 2 49 69 10 4 399
3:45 PM 25 46 32 5 6 76 19 0 11 36 8 1 32 64 12 2 367
TOTAL: 86 143 160 11 34 277 83 3 52 142 25 6 166 269 45 12 1482
APPROACH
389 394 219 480
TOTAL
4:00 PM 26 59 52 3 5 55 31 2 12 32 6 4 44 62 13 3 397
4:15 PM 28 19 37 6 18 71 28 4 11 31 8 1 15 37 2 3 305
4:30 PM 29 66 28 5 5 72 25 1 6 38 5 3 41 53 12 5 380
4:45 PM 19 41 29 4 7 73 23 2 9 32 3 0 45 55 7 3 343
TOTAL: 102 185 146 18 35 271 107 9 38 133 22 8 145 207 34 14 1425
APPROACH
433 413 193 386
TOTAL
5:00 PM 23 47 46 3 15 67 28 2 17 44 10 4 26 55 6 1 384
5:15 PM 25 29 50 2 13 74 29 1 10 26 5 1 56 65 10 5 392
5:30 PM 22 37 47 3 8 73 30 1 8 24 5 0 49 50 5 0 358
5:45 PM 16 25 30 1 6 69 21 0 5 26 3 0 55 61 5 1 322
TOTAL: 86 138 173 9 42 283 108 4 40 120 23 5 186 231 26 7 1456
APPROACH
397 433 183 443
TOTAL
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Brunswick/Strongsville
STREETS: US 42 and Boston Road COUNT DATE: 10/4/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
7:00 AM 5 14 7 2 20 26 20 0 11 50 24 0 11 45 9 0 242
7:15 AM 7 25 3 0 19 41 20 0 14 62 35 0 15 49 6 0 296
7:30 AM 6 47 8 1 24 47 13 0 21 81 38 0 11 49 12 0 357
7:45 AM 7 45 4 0 36 62 21 0 18 77 35 0 24 51 12 1 392
TOTAL: 25 131 22 3 99 176 74 0 64 270 132 0 61 194 39 1 1287
APPROACH
178 349 466 294
TOTAL
8:00 AM 14 27 3 1 38 45 15 0 18 71 29 2 15 45 13 1 333
8:15 AM 14 33 4 2 24 30 11 1 14 81 23 1 21 42 19 0 316
8:30 AM 12 31 9 0 26 28 17 0 15 59 19 0 17 51 10 0 294
8:45 AM 5 37 8 1 44 35 20 0 10 61 31 1 13 46 15 0 325
TOTAL: 45 128 24 4 132 138 63 1 57 272 102 4 66 184 57 1 1268
APPROACH
197 333 431 307
TOTAL
9:00 AM 12 40 10 1 33 24 16 0 8 67 22 2 11 37 13 0 293
9:15 AM 10 63 8 1 25 25 15 0 6 65 23 2 6 25 13 0 284
9:30 AM 11 53 14 0 25 19 15 0 9 60 18 0 7 31 12 0 274
9:45 AM 13 56 7 2 23 13 17 1 4 70 12 1 16 26 9 0 266
TOTAL: 46 212 39 4 106 81 63 1 27 262 75 5 40 119 47 0 1117
APPROACH
297 250 364 206
TOTAL
10:00 AM 15 44 12 1 28 13 15 0 10 63 19 2 7 24 9 0 259
10:15 AM 12 56 8 1 19 23 17 2 5 69 21 2 9 25 6 0 270
10:30 AM 9 53 9 3 18 21 11 0 8 70 27 2 8 33 9 1 276
10:45 AM 10 58 10 3 32 27 15 0 9 77 21 0 11 24 11 1 305
TOTAL: 46 211 39 8 97 84 58 2 32 279 88 6 35 106 35 2 1110
APPROACH
296 239 399 176
TOTAL
12:00 PM 19 74 21 2 36 23 12 1 12 61 29 3 17 23 21 1 348
12:15 PM 13 75 18 0 26 24 9 0 13 88 14 1 16 35 22 1 353
12:30 PM 20 73 17 0 29 25 15 0 12 90 27 2 15 29 18 2 370
12:45 PM 21 75 13 0 36 18 24 2 12 72 20 2 14 31 17 0 353
TOTAL: 73 297 69 2 127 90 60 3 49 311 90 8 62 118 78 4 1424
APPROACH
439 277 450 258
TOTAL
1:00 PM 24 83 15 1 43 28 9 2 18 72 21 2 7 23 21 1 364
1:15 PM 20 91 11 2 32 21 18 1 13 78 25 2 9 22 11 0 351
1:30 PM 14 71 17 1 36 29 15 1 6 89 26 0 7 27 14 0 351
1:45 PM 18 92 11 2 32 27 10 1 15 79 23 7 10 24 12 0 353
TOTAL: 76 337 54 6 143 105 52 5 52 318 95 11 33 96 58 1 1419
APPROACH
467 300 465 187
TOTAL
2:00 PM 19 65 17 2 32 30 21 0 16 64 24 1 7 22 17 0 334
2:15 PM 20 86 32 1 32 25 16 2 8 78 29 0 12 28 14 0 380
2:30 PM 20 104 9 1 29 23 24 0 18 68 21 0 8 36 24 0 384
2:45 PM 19 87 11 1 40 35 23 1 15 86 27 1 15 42 16 1 416
TOTAL: 78 342 69 5 133 113 84 3 57 296 101 2 42 128 71 1 1514
APPROACH
489 330 454 241
TOTAL
3:00 PM 17 82 21 2 51 46 15 0 16 67 29 0 16 49 16 1 425
3:15 PM 15 92 18 1 41 39 21 0 20 81 25 1 10 42 25 0 429
3:30 PM 22 88 13 1 62 41 16 1 20 82 32 2 9 41 25 0 451
3:45 PM 18 113 23 0 43 42 22 1 14 89 24 0 15 37 19 0 459
TOTAL: 72 375 75 4 197 168 74 2 70 319 110 3 50 169 85 1 1764
APPROACH
522 439 499 304
TOTAL
4:00 PM 17 84 15 0 62 57 20 0 17 69 23 2 13 52 23 0 452
4:15 PM 23 96 21 0 50 54 32 0 23 82 26 1 16 58 23 1 504
4:30 PM 20 139 26 0 69 58 27 0 21 101 22 1 13 50 25 0 571
4:45 PM 21 111 24 0 69 42 24 0 16 85 32 1 9 51 22 0 506
TOTAL: 81 430 86 0 250 211 103 0 77 337 103 5 51 211 93 1 2033
APPROACH
597 564 517 355
TOTAL
5:00 PM 20 99 20 2 56 62 21 0 31 94 35 0 12 43 22 2 515
5:15 PM 27 124 20 0 59 48 25 0 23 91 36 1 11 48 30 2 542
5:30 PM 28 121 22 0 57 54 22 0 15 80 33 0 12 51 23 0 518
5:45 PM 32 108 14 0 63 66 14 0 11 96 21 0 11 30 30 0 496
TOTAL: 107 452 76 2 235 230 82 0 80 361 125 1 46 172 105 4 2071
APPROACH
635 547 566 323
TOTAL
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Brunswick/Strongsville
STREETS: W 130th Street and Boston Road COUNT DATE: 10/4/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
8:00 AM 9 54 17 1 9 16 10 1 2 88 17 2 38 23 10 0 293
8:15 AM 12 47 19 0 8 16 21 0 4 67 17 0 50 18 8 0 287
8:30 AM 15 56 23 4 7 15 17 0 4 76 16 3 44 18 9 0 300
8:45 AM 9 55 35 5 11 8 25 0 19 79 19 4 54 19 9 0 342
TOTAL: 45 212 94 10 35 55 73 1 29 310 69 9 186 78 36 0 1222
APPROACH
351 163 408 300
TOTAL
9:00 AM 9 51 28 1 5 6 14 1 5 62 4 0 33 23 9 2 249
9:15 AM 13 48 24 3 12 11 20 0 8 53 12 1 34 16 10 0 261
9:30 AM 13 38 26 1 14 18 13 1 3 57 3 2 42 17 8 3 252
9:45 AM 15 51 18 0 12 13 20 1 9 69 10 2 19 9 5 0 250
TOTAL: 50 188 96 5 43 48 67 3 25 241 29 5 128 65 32 5 1012
APPROACH
334 158 295 225
TOTAL
10:00 AM 23 48 28 3 12 12 13 2 5 47 10 2 32 4 6 0 240
10:15 AM 7 39 30 2 13 14 14 1 4 45 16 2 20 13 9 0 224
10:30 AM 11 52 25 7 16 17 17 3 6 40 4 4 28 14 7 0 237
10:45 AM 16 41 36 1 9 20 15 2 12 55 8 0 29 16 12 1 269
TOTAL: 57 180 119 13 50 63 59 8 27 187 38 8 109 47 34 1 970
APPROACH
356 172 252 190
TOTAL
11:00 AM 18 43 26 2 9 12 15 2 5 63 10 0 23 16 5 1 245
11:15 AM 16 58 26 1 2 4 20 1 5 65 13 1 22 12 5 0 248
11:30 AM 17 51 24 4 12 11 18 1 14 61 9 0 40 17 12 1 286
11:45 AM 17 69 31 0 12 19 13 1 8 61 14 1 34 19 4 2 301
TOTAL: 68 221 107 7 35 46 66 5 32 250 46 2 119 64 26 4 1080
APPROACH
396 147 328 209
TOTAL
12:00 PM 25 54 41 3 7 11 25 0 5 56 15 1 21 15 10 0 285
12:15 PM 15 47 22 1 23 15 24 0 9 48 12 0 35 12 7 0 269
12:30 PM 19 63 29 3 20 9 15 1 14 57 10 1 30 12 8 1 286
12:45 PM 21 62 31 3 19 20 19 0 6 65 13 1 27 19 13 1 315
TOTAL: 80 226 123 10 69 55 83 1 34 226 50 3 113 58 38 2 1155
APPROACH
429 207 310 209
TOTAL
1:00 PM 29 60 33 1 16 16 26 1 6 64 8 3 29 10 9 0 306
1:15 PM 19 64 33 2 13 22 23 2 8 59 16 1 20 7 8 0 292
1:30 PM 21 67 23 3 10 18 17 1 10 59 14 0 18 20 8 0 285
1:45 PM 14 53 37 2 15 15 22 0 10 56 5 1 21 14 10 0 272
TOTAL: 83 244 126 8 54 71 88 4 34 238 43 5 88 51 35 0 1155
APPROACH
453 213 315 174
TOTAL
2:00 PM 13 63 35 3 11 20 13 1 15 67 11 3 25 16 6 0 295
2:15 PM 25 63 29 2 12 16 19 0 13 58 10 1 35 25 14 0 319
2:30 PM 23 83 30 2 10 21 26 2 10 80 22 0 29 16 18 0 368
2:45 PM 26 86 48 1 13 28 20 0 20 71 16 0 32 21 14 0 395
TOTAL: 87 295 142 8 46 85 78 3 58 276 59 4 121 78 52 0 1377
APPROACH
524 209 393 251
TOTAL
3:00 PM 27 84 41 1 15 15 18 1 16 87 13 1 30 21 15 2 382
3:15 PM 29 90 49 1 27 28 18 0 13 72 4 0 23 17 13 0 383
3:30 PM 34 106 60 3 24 28 20 1 8 83 24 0 32 18 11 0 448
3:45 PM 33 106 64 0 20 33 19 1 10 61 20 1 30 20 8 0 424
TOTAL: 123 386 214 5 86 104 75 3 47 303 61 2 115 76 47 2 1637
APPROACH
723 265 411 238
TOTAL
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Brunswick
STREETS: I71 NB between 82&303 COUNT DATE: 10/12/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Strongsville
STREETS: I71 NB North of SR 82 COUNT DATE: 10/12/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Brunswick
STREETS: I71 SB between 82&303 COUNT DATE: 10/12/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
CITY: Brunswick
STREETS: I71 SB between 82&303 COUNT DATE: 10/12/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
6:00 PM 0
6:15 PM 0
6:30 PM 0
6:45 PM 0
TOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH
0 0 0 0
TOTAL
ODOT Resources
PEAK HOUR to DESIGN HOUR FACTORS
FUNCTIONAL CLASSIFICATION = 01u
(Urban Interstate)
source: year 2016, 2017, & 2018 Automatic Traffic Recorders (ATR) Data
PEAK HOUR to DESIGN HOUR FACTORS
FUNCTIONAL CLASSIFICATION = 03, 04, 05u
(Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector)
source: year 2016, 2017, & 2018 Automatic Traffic Recorders (ATR) Data
2021 Urban Seasonal Adjustment Factors
(All Vehicles)
Group URBAN INTERSTATE (U01) Group URBAN FREEWAY EXPRESSWAY (U02)
From Year: 2021 To Year: 2021 From Year: 2021 To Year: 2021
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
Jan 1.808 1.169 1.113 1.097 1.075 1.031 1.358 Jan 1.884 1.132 1.077 1.059 1.044 1.005 1.376
Feb 1.615 1.288 1.284 1.100 1.108 1.004 1.296 Feb 1.678 1.223 1.228 1.061 1.068 0.984 1.304
Mar 1.371 1.038 0.995 0.972 0.985 0.906 1.118 Mar 1.456 1.003 0.960 0.944 0.962 0.902 1.140
Apr 1.289 0.978 0.951 0.955 0.936 0.871 1.112 Apr 1.397 0.959 0.918 0.928 0.927 0.876 1.142
May 1.224 0.974 0.942 0.921 0.883 0.847 1.048 May 1.312 0.951 0.911 0.899 0.871 0.855 1.082
Jun 1.155 0.939 0.907 0.903 0.870 0.835 1.029 Jun 1.252 0.935 0.898 0.897 0.877 0.846 1.071
Jul 1.175 0.931 0.908 0.884 0.862 0.817 1.020 Jul 1.291 0.927 0.900 0.881 0.873 0.838 1.086
Aug 1.175 0.938 0.917 0.896 0.872 0.827 1.022 Aug 1.286 0.928 0.897 0.887 0.871 0.833 1.061
Sep 1.229 0.954 0.935 0.926 0.881 0.828 1.057 Sep 1.314 0.929 0.905 0.902 0.865 0.824 1.086
Oct 1.237 0.961 0.924 0.905 0.887 0.841 1.054 Oct 1.352 0.937 0.897 0.881 0.871 0.843 1.097
Nov 1.351 0.970 0.929 0.926 0.916 0.857 1.104 Nov 1.480 0.948 0.909 0.898 0.900 0.853 1.147
Dec 1.332 0.987 0.947 0.937 0.923 0.877 1.128 Dec 1.435 0.956 0.926 0.918 0.901 0.866 1.162
Group URBAN OTHER PRINCIPAL ARTERIAL (U03) Group URBAN MINOR ARTERIAL, COLLECTORS, LOCAL (U04,05,06,07)
From Year: 2021 To Year: 2021 From Year: 2021 To Year: 2021
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
Jan 1.740 1.135 1.084 1.072 1.056 0.997 1.272 Jan 1.831 1.129 1.026 1.012 1.007 0.959 1.329
Feb 1.564 1.239 1.246 1.067 1.091 0.983 1.228 Feb 1.608 1.248 1.307 1.044 1.077 0.982 1.289
Mar 1.375 1.005 0.968 0.943 0.976 0.899 1.078 Mar 1.384 0.960 0.923 0.908 0.936 0.880 1.110
Apr 1.332 0.959 0.919 0.936 0.933 0.862 1.061 Apr 1.317 0.913 0.881 0.903 0.900 0.850 1.117
May 1.247 0.952 0.920 0.909 0.877 0.852 1.020 May 1.260 0.922 0.891 0.879 0.849 0.838 1.038
Jun 1.227 0.948 0.912 0.915 0.888 0.854 1.027 Jun 1.254 0.937 0.892 0.910 0.881 0.872 1.079
Jul 1.285 0.952 0.921 0.905 0.893 0.842 1.046 Jul 1.308 0.929 0.910 0.896 0.907 0.869 1.122
Aug 1.257 0.953 0.931 0.920 0.893 0.846 1.026 Aug 1.279 0.918 0.909 0.900 0.880 0.857 1.088
Sep 1.295 0.960 0.945 0.935 0.900 0.841 1.061 Sep 1.324 0.948 0.918 0.924 0.870 0.829 1.083
Oct 1.331 0.973 0.936 0.920 0.906 0.852 1.068 Oct 1.377 0.954 0.913 0.904 0.901 0.873 1.122
Nov 1.393 0.957 0.934 0.917 0.921 0.855 1.093 Nov 1.478 0.968 0.941 0.928 0.953 0.894 1.197
Dec 1.364 0.973 0.941 0.926 0.918 0.863 1.109 Dec 1.426 0.972 0.954 0.958 0.932 0.893 1.212
Peak Hour and Daily Traffic Data
2022 Peak Hour Traffic Volumes
(Total Entering Volume, Vehicles per Hour)
HOUR BEGINS
INTERSECTION
7:00 7:15 7:30 7:45 8:00 8:15 8:30 8:45 9:00 9:15 9:30 9:45 10:00 10:15 10:30 10:45 11:00 11:15 11:30 11:45
Benbow Rd & Boston Rd 664 661 640 595 563 545 518 489 416 405 407 431 472 504 485 508 481 507 505 506
Drake Rd & Howe Rd 1,609 1,620 1,607 1,581 1,528 1,480 1,427 1,325 1,219 1,197 1,194 1,273 1,139 1,158 1,239 1,309 1,315 1,309 1,337 1,333
Drake Rd & Hunt Rd 643 671 681 678 707 703 675 643 561 539 546 576 498 520 564 603 618 636 643 642
Howe Rd & Boston Rd 997 1,000 975 922 873 864 852 810 733 689 656 703 710 753 767 796 767 799 823 826
N Carpenter Rd & Boston Rd 926 891 882 842 779 796 769 716 638 615 616 660 700 747 722 728 718 737 728 725
N Carpenter Rd & Grafton Rd 1,291 1,229 1,154 1,082 1,019 969 920 859 769 781 840 889 828 895 923 967 947 960 965 995
U.S. 42 & Boston Rd 1,287 1,378 1,398 1,335 1,268 1,228 1,196 1,176 1,117 1,155 1,146 1,254 1,110 1,199 1,282 1,376 1,353 1,370 1,448 1,436
W 130th St & Boston Rd 1,432 1,418 1,356 1,269 1,222 1,178 1,152 1,104 1,012 1,008 995 1,029 970 1,015 1,060 1,109 1,080 1,120 1,141 1,141
S.R. 82 & Howe Rd 3,125 3,111 3,073 2,949 2,844 2,803 2,763 2,742 2,674 2,808 2,877 3,079 2,981 3,172 3,268 3,356 3,202 3,290 3,359 3,352
S.R. 82 & I-71 NB Ramps 4,377 4,268 3,996 3,767 3,448 3,455 3,396 3,198 3,062 2,882 2,819 2,933 2,816 2,874 2,883 3,006 3,029 3,110 3,111 3,067
S.R. 82 & I-71 SB Ramps 3,357 3,428 3,466 3,390 3,242 3,147 3,042 2,933 2,905 2,963 3,052 3,224 2,981 3,174 3,318 3,492 3,316 3,431 3,500 3,506
S.R. 82 & W 130th St 1,902 2,032 1,999 1,933 1,890 1,882 1,845 1,792 1,702 1,625 1,624 1,653 1,635 1,693 1,763 1,816 1,721 1,760 1,808 1,850
S.R. 303 & I-71 NB Ramps 2,410 2,298 2,207 2,109 1,956 1,927 1,850 1,734 1,637 1,588 1,569 1,565 1,600 1,715 1,771 1,835 1,598 1,732 1,809 1,853
S.R. 303 & I-71 SB Ramps 2,667 2,593 2,508 2,370 2,224 2,166 2,104 2,015 1,906 1,870 1,832 1,855 1,793 1,977 2,060 2,174 1,909 2,077 2,188 2,233
S.R. 303 & N Carpenter Rd 2,239 2,197 2,078 2,048 2,003 1,953 1,914 1,883 1,816 1,849 1,900 1,940 1,804 1,992 2,118 2,257 1,997 2,105 2,220 2,322
S.R. 303 & S Carpenter Rd 2,524 2,407 2,297 2,188 2,082 2,038 1,999 1,929 1,818 1,820 1,807 1,845 1,725 1,937 2,050 2,120 1,911 2,073 2,192 2,201
S.R. 303 & W 130th St 1,315 1,301 1,312 1,259 1,222 1,242 1,192 1,141 1,063 1,041 1,071 1,080 1,009 1,061 1,128 1,196 1,102 1,133 1,169 1,212
TOTAL 32,765 32,503 31,629 30,317 28,870 28,376 27,614 26,489 25,048 24,835 24,951 25,989 24,771 26,386 27,401 28,648 27,064 28,149 28,946 29,200
HOUR BEGINS
INTERSECTION
12:00 12:15 12:30 12:45 13:00 13:15 13:30 13:45 14:00 14:15 14:30 14:45 15:00 15:15 15:30 15:45 16:00 16:15 16:30 16:45 17:00
Benbow Rd & Boston Rd 505 502 510 503 506 543 596 673 618 686 757 816 720 762 822 827 870 894 911 949 948
Drake Rd & Howe Rd 1,374 1,405 1,409 1,437 1,374 1,445 1,517 1,627 1,577 1,648 1,792 1,972 1,790 1,846 1,935 2,050 2,102 2,196 2,303 2,269 2,281
Drake Rd & Hunt Rd 652 660 664 691 638 648 700 751 723 764 829 913 789 840 881 915 1,008 1,051 1,103 1,070 1,067
Howe Rd & Boston Rd 829 843 868 871 872 915 957 1,045 945 1,047 1,156 1,223 1,119 1,167 1,242 1,258 1,286 1,328 1,313 1,369 1,348
N Carpenter Rd & Boston Rd 751 781 807 830 831 859 895 954 837 897 958 1,025 995 1,020 1,047 1,053 1,104 1,156 1,228 1,326 1,323
N Carpenter Rd & Grafton Rd 1,007 1,034 1,052 1,048 1,037 1,093 1,161 1,256 1,171 1,315 1,453 1,559 1,336 1,413 1,491 1,589 1,680 1,713 1,736 1,752 1,761
U.S. 42 & Boston Rd 1,424 1,440 1,438 1,419 1,419 1,480 1,558 1,658 1,514 1,632 1,756 1,943 1,764 1,791 1,866 1,986 2,033 2,096 2,134 2,081 2,071
W 130th St & Boston Rd 1,155 1,176 1,199 1,198 1,155 1,231 1,322 1,485 1,377 1,533 1,747 1,911 1,637 1,706 1,856 1,940 2,000 2,091 2,106 2,102 2,088
S.R. 82 & Howe Rd 3,435 3,451 3,514 3,513 3,513 3,616 3,741 3,922 3,596 3,755 3,986 4,138 4,081 4,114 4,207 4,484 4,746 5,046 5,296 5,061 4,819
S.R. 82 & I-71 NB Ramps 3,083 3,081 3,098 3,076 3,071 3,253 3,450 3,649 3,351 3,591 3,852 4,090 3,918 4,017 4,170 4,314 4,431 4,553 4,680 4,599 4,394
S.R. 82 & I-71 SB Ramps 3,578 3,606 3,604 3,591 3,587 3,717 3,884 4,130 3,895 4,232 4,581 4,818 4,431 4,638 4,897 5,053 5,174 5,322 5,395 5,353 5,237
S.R. 82 & W 130th St 1,778 1,817 1,844 1,817 1,902 1,970 2,056 2,114 2,096 2,171 2,287 2,393 2,179 2,184 2,256 2,394 2,527 2,614 2,567 2,521 2,425
S.R. 303 & I-71 NB Ramps 1,894 1,843 1,869 1,885 1,841 1,909 1,927 2,050 1,899 2,023 2,124 2,269 2,177 2,247 2,311 2,375 2,394 2,473 2,498 2,352 2,281
S.R. 303 & I-71 SB Ramps 2,292 2,222 2,229 2,214 2,160 2,254 2,364 2,534 2,341 2,499 2,620 2,774 2,696 2,784 2,824 2,886 2,886 2,864 2,844 2,764 2,713
S.R. 303 & N Carpenter Rd 2,429 2,384 2,365 2,349 2,290 2,409 2,438 2,501 2,504 2,592 2,674 2,723 2,615 2,669 2,739 2,780 2,826 2,821 2,863 2,905 2,865
S.R. 303 & S Carpenter Rd 2,240 2,147 2,114 2,098 2,026 2,125 2,225 2,371 2,251 2,360 2,430 2,515 2,506 2,536 2,555 2,630 2,689 2,731 2,800 2,703 2,641
S.R. 303 & W 130th St 1,281 1,283 1,309 1,344 1,283 1,356 1,341 1,389 1,298 1,395 1,369 1,400 1,482 1,493 1,468 1,449 1,425 1,412 1,499 1,477 1,456
TOTAL 29,707 29,675 29,893 29,884 29,505 30,823 32,132 34,109 31,993 34,140 36,371 38,482 36,235 37,227 38,567 39,983 41,181 42,361 43,276 42,653 41,718
LEGEND
Most vehicles approaching intersection within one-hour interval, evaluated once before noon (AM peak) and once after noon (PM peak)
Most vehicles approaching entire study area within one-hour interval, evaluated once before noon (AM peak) and once after noon (PM peak)
CITY: Brunswick/Strongsville
STREETS: Benbow Road and Boston Road COUNT DATE: 10/04/2022
WEATHER: 54°-60° Cloudy / Rainy TRAFFIC COUNT
Note: Pedestrians are counted by which crosswalk they use.
Morning Peak Hour 7:00 AM to 8:00 AM i.e. A pedestrian crossing the western approach crosswalk is counted under From: W.
N-S Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
PHF 0.72 0.88 0.80 0.75 0.65 0.80 0.83 0.87 0.46 0.85 0.86 0.45
% trucks 0% 0% 0% 0%
Directional Distribution 30% 70%
PHF 0.86 0.91 0.94 0.56 0.76 0.88 0.84 0.96 0.71 0.88 0.89 0.85
% trucks 0% 3% 1% 1%
Directional Distribution 68% 32%
N-S Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
N-S Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
N-S Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
N-S Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
PHF 0.55 0.75 0.83 0.53 0.77 0.69 0.61 0.71 0.88 0.81 0.93 0.76
% trucks 2% 4% 2% 2%
Directional Distribution 54% 46%
PHF 0.71 0.81 0.88 0.79 0.91 0.74 0.93 0.84 0.75 0.79 0.87 0.88
% trucks 0% 2% 0% 1%
Directional Distribution 46% 54%
N-S Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
PHF 0.79 0.64 0.89 0.67 0.76 0.70 0.86 0.80 0.87 0.66 0.91 0.75
% trucks 2% 7% 1% 6%
Directional Distribution 10% 90%
PHF 0.84 0.84 0.89 0.97 0.94 0.87 0.79 0.88 0.88 0.82 0.95 0.58
% trucks 1% 1% 1% 2%
Directional Distribution 40% 60%
N-S Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.90
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.90
N-S Roadway Classification Urban Interstate DHV Factor 1.10 Seasonal Adjustment Factor 0.91
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.90
N-S Roadway Classification Urban Interstate DHV Factor 1.10 Seasonal Adjustment Factor 0.91
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.90
PHF 0.42 0.52 0.67 0.79 0.76 0.59 0.82 0.75 0.80 0.63 0.92 0.76
% trucks 3% 6% 3% 5%
Directional Distribution 40% 60%
PHF 0.84 0.84 0.93 0.82 0.88 0.60 0.92 0.79 0.72 0.81 0.94 0.93
% trucks 2% 2% 2% 3%
Directional Distribution 54% 46%
N-S Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.90
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor
N-S Roadway Classification Urban Interstate DHV Factor 1.11 Seasonal Adjustment Factor 0.92
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
PHF 0.91 N/A 0.64 0.79 0.80 0.88 0.94 0.88 0.93
% trucks 6% 9% 5% 3%
Directional Distribution 100% 21% 79%
PHF 0.97 0.25 0.94 0.86 0.95 0.71 0.99 0.87 0.92
% trucks 4% 2% 1% 1%
Directional Distribution 100% 49% 51%
N-S Roadway Classification Urban Interstate DHV Factor 1.11 Seasonal Adjustment Factor 0.92
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
PHF 0.93 0.71 0.56 0.72 0.86 0.69 0.55 0.63 0.70 0.56 0.85 0.44
% trucks 2% 5% 3% 6%
Directional Distribution 89% 11%
PHF 0.87 0.78 0.82 0.89 0.95 0.87 0.83 0.91 0.88 0.88 0.90 0.52
% trucks 0% 1% 0% 1%
Directional Distribution 62% 38%
N-S Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
N-S Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
PHF 0.74 0.75 0.81 0.48 0.87 0.74 0.78 0.80 0.75 0.78 0.82 0.71
% trucks 3% 2% 5% 5%
Directional Distribution 70% 30%
PHF 0.83 0.69 0.77 0.67 0.97 0.91 0.62 0.80 0.58 0.75 0.88 0.73
% trucks 3% 1% 4% 3%
Directional Distribution 68% 32%
N-S Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
PHF 0.89 0.70 0.69 0.69 0.71 0.88 0.76 0.83 0.87 0.64 0.95 0.81
% trucks 2% 0% 0% 0%
Directional Distribution 28% 72%
PHF 0.81 0.85 0.87 0.92 0.85 0.90 0.73 0.92 0.87 0.87 0.94 0.83
% trucks 0% 0% 1% 1%
Directional Distribution 53% 47%
N-S Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
PHF 0.79 0.71 0.62 0.87 0.64 0.84 0.78 0.94 0.78 0.91 0.72 0.75
% trucks 2% 1% 1% 1%
Directional Distribution 44% 56%
PHF 0.84 0.91 0.89 0.72 0.72 0.82 0.73 0.92 0.76 0.86 0.92 0.88
% trucks 0% 0% 0% 0%
Directional Distribution 59% 41%
N-S Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor 0.91
PHF 0.89
% trucks 5%
Directional Distribution 0% 100%
PHF 0.96
% trucks 4%
Directional Distribution 0% 100%
N-S Roadway Classification Urban Interstate DHV Factor 1.10 Seasonal Adjustment Factor 0.91
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor
PHF 0.87
% trucks 4%
Directional Distribution
PHF 0.98
% trucks 3%
Directional Distribution
N-S Roadway Classification Urban Interstate DHV Factor 1.10 Seasonal Adjustment Factor 0.91
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor
PHF 0.92
% trucks 7%
Directional Distribution 100%
PHF 0.98
% trucks 3%
Directional Distribution 100%
N-S Roadway Classification Urban Interstate DHV Factor 1.10 Seasonal Adjustment Factor 0.91
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor
PHF 0.90
% trucks 6%
Directional Distribution 100%
PHF 0.97
% trucks 2%
Directional Distribution 100%
N-S Roadway Classification Urban Interstate DHV Factor 1.10 Seasonal Adjustment Factor 0.91
E-W Roadway Classification Urban Principal Arterial, Urban Minor Arterial, & Urban Minor Collector DHV Factor 1.10 Seasonal Adjustment Factor
TRAFFIC ANALYSES
LIST OF TABLES
Table 1 – LOS Criteria
Table 2 – 2027 Opening Year Intersection Capacity Analysis Results – No Build & Build
AM Peak
Table 3 – 2027 Opening Year Intersection Capacity Analysis Results – No Build & Build
PM Peak
Table 4 – 2047 Design Year Intersection Capacity Analysis Results – No Build & Build AM
Peak
Table 5 – 2047 Design Year Intersection Capacity Analysis Results – No Build & Build PM
Peak
Table 6 – 2027 Opening Year Freeway Segment Capacity Analysis Results – No Build &
Build Northbound
Table 7 – 2027 Opening Year Freeway Segment Capacity Analysis Results – No Build &
Build Southbound
Table 8 – 2047 Design Year Freeway Segment Capacity Analysis Results – No Build &
Build Northbound
Table 9 – 2047 Design Year Freeway Segment Capacity Analysis Results – No Build &
Build Southbound
Table 10 – 2027 Opening Year Ramp Junction Capacity Analysis Results – No Build &
Build Northbound
Table 11 – 2027 Opening Year Ramp Junction Capacity Analysis Results – No Build &
Build Southbound
Table 12 – 2047 Design Year Ramp Junction Capacity Analysis Results – No Build & Build
Northbound
Table 13 – 2047 Design Year Ramp Junction Capacity Analysis Results – No Build & Build
Southbound
TRAFFIC ANALYSES
Level of Service Analyses
Capacity analyses were performed utilizing Highway Capacity Software (HCS) developed by
McTrans Corporation. Analyses were performed for all intersections and the freeway facility
consisting of ramps and segments as shown in Appendix A. The analysis included opening year
and design year for each alternative including the No Build.
All intersections and freeway facility entities are located withing the Northeast Ohio Areawide
Coordinating Agency (NOACA) Metropolitan Planning Organization (MPO) area. According to the
ODOT Analysis and Traffic Simulation Manual (OATS), for intersections within an MPO, an
approach and control level of service (LOS) of E or better is acceptable while the overall
intersection must operate at a LOS of D or better. For freeway facilities within an MPO
(segments, ramp merges, and ramp diverges), a level of service of D or better is acceptable.
Table 1 shows the level of service (LOS) thresholds according to the Highway Capacity Manual
for the freeway segment, ramps junction, stop controlled and signalized intersections.
Level of service comparison exhibits are provided in Appendix K to aid in a visual summary of
the 2047 HCS results.
Intersection Analyses:
The existing and proposed study area intersections were analyzed using Highway Capacity
Software (HCS) for the peak hours for both 2027 and 2047 volumes. The analyses were
conducted based on guidance and criteria provided in the ODOT OATS Manual.
The intersections are structured along the three main east-west corridors in the study area; SR
82, Boston Road, and SR 303. These corridors are evaluated to points of adjacent north-south
connections along both sides of I-71. These include North Carpenter Road and Howe Road, west
of I-71, and West 130th Street, east of I-71.
• The SR 82 corridor includes the intersections with Howe Road, I-71SB ramps, I-71NB
ramps, and West 130th Street.
• The Boston Road corridor includes the intersections with US 42, Howe Road, North
Carpenter Road, Benbow Road, and West 130th Street. In build scenarios, I-71 ramp
intersections are included.
• The SR 303 corridor includes the intersections with North Carpenter Road, South
Carpenter Road, I-71SB ramps, I-71NB ramps, and West 130th Street.
• Additionally, the intersections at Grafton Road and Drake Road along these north-south
corridors as well as the Drake Road & Hunt Road intersection are included.
Based on existing signal data obtained from local agencies, the intersections known to have
coordinated signals were analyzed together as a coordinated corridor. Otherwise, intersections
were assumed to be uncoordinated and analyzed individually.
Generally, infrastructure improvements considered were limited to the Boston Road corridor
and nearby intersections according to capacity needed for modelled build conditions. No
improvements or reconfigurations were considered for the SR 82 and SR 303 corridors.
The analysis delay and LOS results are organized by design year and peak hour period on Tables
2 through 5. Within each table, the results for each alternative are organized by intersection,
grouped along east-west corridors, for comparison of overall operations performance.
Additionally, refer to Appendix K for comparisons of change in LOS performance between an
alternative and No Build conditions.
Traffic Plates illustrating peak hour traffic volumes for each intersection are provided in
Appendix H. HCS reports detailing analysis results are provided in Appendix L. Turn lane length
calculations were completed and are provided in Appendix N.
No Build
The LOS for opening year 2027 and design year 2047 peak hours for the study intersection was
calculated. These LOS values are used to identify capacity and or operational deficiencies in
current conditions.
SR 82 – With the exception of the SR 82-Howe Road intersection, all intersections along SR 82
result in acceptable delays and LOS for both opening year 2027 and design year 2047. Results
ranged from LOS A to LOS C. The I-71 SB ramp intersection and West 130th Street intersection
resulted in LOS D during the 2047 PM period.
The SR 82/Howe Road intersection typically resulted in LOS D for the AM periods and LOS E for
PM periods for both opening year 2027 and design year 2047.
The SR 82/Howe Road intersection typically resulted in poor/failing level of service throughout
each scenario, including No Build conditions. Attaining acceptable operational performance at
this intersection is outside the study scope. The results at this location should be appraised for
degree of improvement.
Boston Road – With one exception, all intersections along Boston Road result in acceptable
delays and LOS for both opening year 2027 and design year 2047. Results ranged from LOS A to
LOS D. The exception noted is US 42-Boston Road intersection has an LOS E for the 2047 PM
period.
SR 303 – All intersections along SR 303 result in acceptable delays and LOS for both opening
year 2027 and design year 2047. Results ranged from LOS A to LOS C.
Drake & Grafton – The Drake Road-Howe Road intersection results in LOS C or D. The Drake
Road-Hunt Road intersection is stop controlled with a LOS B for AM periods and LOS D and E for
PM periods. The North Carpenter Road-Grafton Road intersection results in LOS B in all periods.
Alternative 1
SR 82 – Overall delay is improved along this corridor for all periods. The LOS range from LOS A
to LOS E. Generally, as the decrease in delay is moderate at each individual intersection, the
LOS is unchanged over No Build scenario. However, the I-71 SB ramp intersection decreased
from LOS C to LOS D for 2027 PM period and improved from LOS D to LOS C for the 2047 PM
period.
Boston Road – Delays and LOS along Boston Road are mixed with some having an increase in
delay and some having a decrease in delay. The levels of service range from LOS B to LOS D.
Results are acceptable.
SR 303 – Overall delays range from nominal change to modest improvement. LOS ranges from
LOS A to LOS C. Results are acceptable.
Drake & Grafton – The Howe Road-Drake Road intersection LOS improves from LOS D to LOS C
for the 2047 AM period. The Drake Road-Hunt Road intersection improves from a LOS D and
failing LOS E to a LOS C for 2027 and 2047 PM periods, respectively. The North Carpenter Road-
Grafton Road intersection results in increased delay but with LOS B or C in all periods.
Alternative 2
SR 82 – Generally, the corridor experiences a nominal to moderate decrease in delays resulting
in a LOS equal to or better than No Build conditions in each analysis period. The I-71 SB ramp
and West 130th Street intersections improve from LOS D to LOS C for the 2047 PM period. The
Howe Road intersection improves but remains LOS E for PM periods. Results are acceptable.
Boston Road – Delays and LOS along Boston Road are mixed with some having an increase in
delay and some having a decrease in delay. The levels of service range from LOS A to LOS D.
Results are acceptable.
SR 303 – Overall delays range from nominal change to modest improvement. LOS ranges from
LOS A to LOS C. Results are acceptable.
Drake & Grafton – The Howe Road-Drake Road intersection LOS improves from LOS D to LOS C
for the 2047 AM period. The Drake Road-Hunt Road intersection improves from a LOS D and
failing LOS E to a LOS C for 2027 and 2047 PM periods, respectively. The North Carpenter Road-
Grafton Road intersection results in increased delay but with LOS B or C in all periods.
Alternative 3
SR 82 – Generally, the corridor experiences a nominal to moderate decrease in delays resulting
in a LOS equal to or better than No Build conditions in each analysis period. The I-71 SB ramp
and West 130th Street intersections improve from LOS D to LOS C for the 2047 PM period. The
Howe Road intersection improves but remains LOS E for PM periods. Results are acceptable.
Boston Road – Delays and LOS along Boston Road are mixed with some having an increase in
delay and some having a decrease in delay. The levels of service range from LOS A to LOS D.
Results are acceptable.
SR 303 – Overall delays range from nominal change to modest improvement. LOS ranges from
LOS A to LOS C. Results are acceptable.
Drake & Grafton – The Howe Road-Drake Road intersection LOS improves from LOS D to LOS C
for the 2047 AM period. The Drake Road-Hunt Road intersection improves from a LOS D and
failing LOS E to a LOS C for 2027 and 2047 PM periods, respectively. The North Carpenter Road-
Grafton Road intersection results in increased delay but with LOS B or C in all periods.
Alternative 4
SR 82 – Generally, the corridor experiences a nominal to moderate decrease in delays resulting
in no change in LOS. The I-71 SB ramp intersection improved from LOS D to LOS C for the 2047
PM period. The Howe Road intersection experiences a nominal decrease in delay but remains
LOS E for 2047 periods. Otherwise, results are acceptable.
Boston Road – Delays and LOS along Boston Road are mixed with some having an increase in
delay and some having a decrease in delay. The levels of service range from LOS B to LOS D.
Results are acceptable.
SR 303 – Overall delays range from nominal change to modest improvement. LOS ranges from
LOS A to LOS C. Results are acceptable.
Drake & Grafton – The Howe Road-Drake Road intersection LOS improves from LOS D to LOS C
for the 2047 AM period. The Drake Road-Hunt Road intersection improves from a LOS D and
failing LOS E to a LOS C for 2027 and 2047 PM periods, respectively. The North Carpenter Road-
Grafton Road intersection results had minimal change in delay.
Full Interchange
SR 82 – Generally, the corridor experiences a nominal to moderate decrease in delays resulting
in a LOS equal to or better than No Build conditions in each analysis period. The I-71 SB ramp
and West 130th Street intersections improved from LOS D to LOS C for the 2047 PM period. The
Howe Road intersection improves but remains LOS F for 2047 periods. Results are acceptable.
Boston Road – Delays and LOS along Boston Road are mixed with some having an increase in
delay and some having a decrease in delay. The levels of service range from LOS B to LOS D.
Results are acceptable.
SR 303 – Overall delays range from nominal change to modest improvement. LOS ranges from
LOS A to LOS C. Results are acceptable.
Drake & Grafton – The Howe Road-Drake Road intersection LOS improves from LOS D to LOS C
for the 2047 AM period. The Drake Road-Hunt Road intersection improves from a LOS D and
failing LOS E to a LOS C for 2027 and 2047 PM periods, respectively. The North Carpenter Road-
Grafton Road intersection results had minimal change in delay.
Table 2 – 2027 Opening Year Intersection Capacity Analysis Results – No Build & Build AM Peak
NB SB EB WB Overall
Intersection Build L L L L L
Delay Delay Delay Delay Delay
O O O O O
(sec) (sec) (sec) (sec) (sec)
S S S S S
No Build 46.4 D 39.6 D 43.8 D 45.3 D 45.1 D
SR 82 Alt 1 43.4 D 37.0 D 43.9 D 36.9 D 40.2 D
(Royalton Alt 2 See “Alt 3”
Road) & Alt 3 41.5 D 34.9 C 37.7 D 38.2 D 38.8 D
Howe Road Alt 4 45.0 D 39.6 D 39.6 D 41.7 D 41.9 D
Full 35.8 D 32.5 C 34.9 C 33.1 C 34.2 C
No Build 28.9 C 27.5 C 28.6 C 27.6 C 28.1 C
SR 82 Alt 1 31.4 C 27.9 C 32.0 C 28.2 C 30.0 C
(Royalton Alt 2 See “Alt 3”
Road) & Alt 3 21.9 C 22.6 C 22.1 C 22.3 C 22.2 C
I-71 SB Alt 4 24.8 C 25.0 C 25.2 C 24.9 C 25.1 C
Full 22.4 C 22.9 C 23.1 C 23.6 C 23.2 C
No Build 45.9 D 1.4 A 6.5 A 6.8 A
N/A
SR 82 Alt 1 42.9 D 2.0 A 6.9 A 7.6 A
(Royalton Alt 2 See “Alt 3”
Road) & Alt 3 41.9 D 4.0 A 5.8 A 8.3 A
I-71 NB Alt 4 45.0 D N/A 1.7 A 6.9 A 7.6 A
Full 39.1 D 3.1 A 6.4 A 7.6 A
No Build 20.7 C 25.6 C 19.7 B 20.3 C 20.9 C
SR 82 Alt 1 20.7 C 25.5 C 19.2 B 20.1 C 20.7 C
(Royalton
Alt 2 See “Alt 3”
Road) &
Alt 3 19.8 B 25.4 C 15.5 B 21.9 C 20.0 B
W. 130th
Street Alt 4 20.7 C 25.5 C 17.9 B 20.0 C 20.3 C
Full 21.7 C 25.7 C 17.8 B 20.3 C 20.6 C
No Build 20.9 C 17.1 B 35.1 D 34.8 C 27.4 C
Alt 1 17.2 B 18.8 B 34.5 C 37.2 D 26.7 C
US 42 (Pearl
Alt 2 See “Alt 3"
Road) &
Boston Road Alt 3 17.2 B 18.8 B 34.5 C 37.2 D 26.7 C
Alt 4 16.6 B 18.5 B 34.6 C 37.8 D 26.7 C
Full 17.2 B 18.8 B 34.5 C 36.9 D 26.7 C
No Build 24.2 C 15.5 B 4.7 A 12.3 B
Alt 1 37.9 D 4.4 A 12.7 B 10.9 B
Howe Road N/A
Alt 2 See “Alt 3”
& Boston
Road Alt 3 43.1 D 3.8 A 3.0 A 6.9 A
Alt 4 40.2 D 25.3 C 28.6 C 37.4 D 32.4 C
Full 25.3 C 37.1 D 20.9 C 30.6 C 25.2 C
Table 2 – 2027 Opening Year Intersection Capacity Analysis Results – No Build & Build AM Peak,
cont.
NB SB EB WB Overall
Intersection Build L L L L L
Delay Delay Delay Delay Delay
O O O O O
(sec) (sec) (sec) (sec) (sec)
S S S S S
Ex. North No Build 28.3 C N/A 6.7 A 6.5 A 12.2 B
Carpenter Alt 1 34.0 C 29.1 C 5.8 A 7.1 A 17.7 B
Road / Prop. Alt 2 See “Alt 3”
SB Ramp(s) Alt 3 29.6 C 14.1 B 23.5 C 20.2 C 23.8 C
& Boston Alt 4 39.8 D 4.8 A 4.9 A 11.6 B
Road N/A
Full 39.6 D 3.4 A 12.5 B 10.8 B
No Build 13.6 B 0.3 A N/A N/A
Ex. Benbow Alt 1 13.3 B 0.6 A N/A N/A
Road / Prop. N/A
Alt 2 48.2 D 4.6 A 10.2 B 9.8 A
NB Ramp(s)
& Boston Alt 3 N/A 8.1 A 8.4 A 8.2 A
Road Alt 4 15.6 C 0.7 A N/A N/A
Full 36.4 D N/A 13.6 B 18.4 B 19.3 B
No Build 16.6 B 15.2 B 37.4 D 43.1 D 24.6 C
Alt 1 16.7 B 14.8 B 36.5 D 44.8 D 24.5 C
W. 130th
Alt 2 See “Alt 3”
Street &
Boston Road Alt 3 17.2 B 15.9 B 29.3 C 39.5 D 21.8 C
Alt 4 16.7 B 14.8 B 36.5 D 44.8 D 24.5 C
Full 17.2 B 15.6 B 31.1 C 38.3 D 22.8 C
No Build 36.4 D 18.5 C 30.5 C 41.9 D 33.2 C
Alt 1 51.1 D 17.3 B 23.2 C 27.6 C 31.8 C
Drake Road
Alt 2 See “Alt 3”
& Howe
Road Alt 3 51.1 D 17.3 B 23.2 C 27.6 C 31.8 C
Alt 4 51.8 D 17.3 B 22.8 C 28.1 C 31.9 C
Full 51.8 D 17.3 B 22.6 C 25.6 C 31.4 C
No Build 12.4 B N/A 12.5 B 10.4 B 12.0 B
Alt 1 See “Alt 3”
Drake Road Alt 2 See “Alt 3”
& Hunt Road Alt 3 12.7 B 10.8 B 10.7 B 11.4 B
Alt 4 13.0 B N/A 12.9 B 10.8 B 12.4 B
Full 12.4 B 10.8 B 10.8 B 11.3 B
No Build 13.3 B 13.5 B 14.7 B 16.2 B 14.6 B
North Alt 1 13.4 B 13.8 B 14.7 B 16.2 B 14.7 B
Carpenter Alt 2 See “Alt 3”
Road & Alt 3 13.4 B 13.8 B 14.7 B 16.2 B 14.7 B
Grafton Road Alt 4 13.7 B 13.9 B 14.4 B 15.9 B 14.6 B
Full 13.4 B 13.6 B 14.4 B 16.1 B 14.5 B
Table 2 – 2027 Opening Year Intersection Capacity Analysis Results – No Build & Build AM Peak,
cont.
NB SB EB WB Overall
Intersection Build L L L L L
Delay Delay Delay Delay Delay
O O O O O
(sec) (sec) (sec) (sec) (sec)
S S S S S
SR 303 No Build 28.7 C 26.6 C 24.6 C 27.1 C 25.9 C
(Center Alt 1 26.2 C 26.7 C 25.3 C 26.8 C 26.0 C
Road) & Alt 2 See “Alt 3”
North Alt 3 26.2 C 26.7 C 25.7 C 26.5 C 26.2 C
Carpenter Alt 4 26.2 C 25.9 C 25.4 C 27.6 C 26.1 C
Road Full 26.2 C 29.2 C 23.7 C 25.1 C 25.7 C
No Build 29.7 C 23.4 C 14.8 B 23.0 C
SR 303 N/A
(Center Alt 1 32.3 C 22.2 C 12.1 B 22.4 C
Road) & Alt 2 See “Alt 3”
South Alt 3 22.4 C 18.2 B 13.6 B 18.1 B
Carpenter Alt 4 22.0 C N/A 18.5 B 14.2 B 18.4 B
Road Full 22.7 C 19.9 B 14.0 B 19.2 B
No Build 30.2 C 21.7 C 11.8 B 20.9 C
N/A
SR 303 Alt 1 29.1 C 19.9 B 10.7 B 19.1 B
(Center Alt 2 See “Alt 3”
Road) & Alt 3 29.1 C 13.0 B 10.4 B 14.4 B
I-71 SB Alt 4 N/A 33.7 C 23.0 C 12.6 B 22.9 C
Full 30.6 C 18.9 B 11.8 B 19.4 B
No Build 30.9 C 3.0 A 2.5 A 7.5 A
N/A
SR 303 Alt 1 29.1 C 2.4 A 2.4 A 6.9 A
(Center Alt 2 See “Alt 3”
Road) & Alt 3 28.0 C 3.8 A 3.6 A 8.5 A
I-71 NB Alt 4 29.2 C N/A 2.4 A 2.4 A 6.5 A
Full 29.1 C 4.4 A 2.5 A 7.8 A
No Build 19.5 B 20.6 C 10.5 B 17.6 B 16.6 B
SR 303 Alt 1 19.5 B 20.6 C 10.9 B 18.0 B 16.8 B
(Center Alt 2 See “Alt 3”
Road) & W. Alt 3 19.4 B 20.4 C 11.1 B 18.2 B 16.9 B
130th Street Alt 4 19.5 B 20.5 C 10.9 B 18.0 B 16.8 B
Full 19.5 B 20.6 C 10.5 B 17.6 B 16.6 B
Table 3 – 2027 Opening Year Intersection Capacity Analysis Results – No Build & Build PM Peak
NB SB EB WB Overall
Intersection Build L L L L L
Delay Delay Delay Delay Delay
O O O O O
(sec) (sec) (sec) (sec) (sec)
S S S S S
No Build 46.8 D 58.2 E 74.4 E 61.7 E 62.7 E
SR 82 Alt 1 45.7 D 54.6 D 64.5 E 61.3 E 59.2 E
(Royalton Alt 2 See “Alt 3”
Road) & Alt 3 37.5 D 56.6 E 63.3 E 70.8 E 62.2 E
Howe Road Alt 4 40.1 D 67.3 E 61.4 E 74.5 E 64.8 E
Full 59.7 E 67.7 E 64.8 E 56.6 E 60.2 E
No Build 31.0 C 31.2 C 34.9 C 35.9 C 33.8 C
SR 82 Alt 1 36.6 D 34.6 C 38.3 D 35.3 D 36.6 D
(Royalton Alt 2 See “Alt 3”
Road) & Alt 3 24.4 C 25.8 C 23.6 C 25.1 C 24.6 C
I-71 SB Alt 4 36.7 D 28.2 C 37.0 D 27.6 C 32.6 C
Full 24.0 C 25.7 C 26.5 C 29.7 C 27.0 C
No Build 46.2 D 7.9 A 8.2 A 11.9 B
N/A
SR 82 Alt 1 46.8 D 5.2 A 8.9 A 10.5 B
(Royalton Alt 2 See “Alt 3”
Road) & Alt 3 35.4 D 12.5 B 11.7 B 15.3 B
I-71 NB Alt 4 40.7 D N/A 7.6 A 8.8 A 11.2 B
Full 39.6 D 13.0 B 10.0 A 15.0 B
No Build 31.4 C 35.7 D 31.5 C 35.8 D 33.6 C
SR 82 Alt 1 31.1 C 36.5 D 32.1 C 36.0 D 34.0 C
(Royalton
Alt 2 See “Alt 3”
Road) &
Alt 3 31.2 C 33.3 C 31.6 C 32.8 C 32.2 C
W. 130th
Street Alt 4 30.7 C 30.7 C 30.8 C 30.6 C 30.7 C
Full 29.4 C 29.7 C 29.7 C 29.5 C 29.6 C
No Build 44.0 D 34.9 C 54.2 D 44.0 D 42.9 D
Alt 1 28.9 C 30.2 C 40.9 D 38.6 D 33.8 C
US 42 (Pearl
Alt 2 See “Alt 3”
Road) &
Boston Road Alt 3 28.9 C 30.2 C 40.9 D 38.6 D 33.8 C
Alt 4 26.6 C 35.8 D 37.4 D 35.6 D 33.3 C
Full 24.4 C 32.1 C 37.1 D 30.1 C 30.2 C
No Build 45.6 D 17.7 B 8.1 A 20.8 C
Alt 1 43.0 D 7.0 A 14.8 B 19.9 B
Howe Road N/A
Alt 2 See “Alt 3”
& Boston
Road Alt 3 38.5 D 10.8 B 11.8 B 17.2 B
Alt 4 45.9 D 43.3 D 33.6 C 29.3 C 35.1 D
Full 30.4 C 38.2 D 19.9 B 28.1 C 27.2 C
Table 3 – 2027 Opening Year Intersection Capacity Analysis Results – No Build & Build PM Peak
Cont.
NB SB EB WB Overall
Intersection Build L L Dela L Dela L L
Delay Delay Delay
O O y O y O O
(sec) (sec) (sec)
S S (sec) S (sec) S S
Ex. North No Build 30.5 C N/A 4.1 A 6.9 A 9.4 A
Carpenter Alt 1 27.3 C 14.5 B 13.4 B 29.8 C 18.9 B
Road / Alt 2 See “Alt 3”
Prop. SB Alt 3 31.7 C 17.0 B 28.2 C 24.9 C 23.3 C
Ramp(s) & Alt 4 35.2 D 23.6 C 21.4 C 29.0 C
Boston Road N/A
Full 52.6 D 30.7 C 35.4 D 41.2 D
No Build N/A 15.5 C 0.7 A N/A N/A
Ex. Benbow Alt 1 N/A 18.0 C 1.0 A N/A N/A
Road /
Alt 2 N/A 47.5 D 11.4 B 15.4 B 20.3 C
Prop. NB
Ramp(s) & Alt 3 N/A N/A 4.2 A 3.9 A 4.1 A
Boston Road Alt 4 N/A 18.3 C 1.1 A N/A N/A
Full 34.6 C N/A 14.0 B 22.6 C 21.8 C
No Build 23.6 C 27.5 C 27.5 C 35.9 D 28.0 C
Alt 1 24.5 C 28.0 C 27.1 C 37.1 D 28.6 C
W. 130th
Alt 2 See “Alt 3”
Street &
Boston Road Alt 3 25.7 C 30.1 C 27.1 C 37.1 D 29.8 C
Alt 4 24.5 C 28.0 C 27.1 C 37.1 D 28.6 C
Full 24.2 C 27.9 C 28.5 C 36.3 D 28.5 C
No Build 32.9 C 23.1 C 28.7 C 38.1 D 29.7 C
Alt 1 34.8 C 23.0 C 22.6 C 33.2 C 27.2 C
Drake Road
Alt 2 See “Alt 3”
& Howe
Road Alt 3 34.8 C 23.0 C 22.6 C 33.2 C 27.2 C
Alt 4 35.3 D 23.2 C 22.6 C 33.9 C 27.4 C
Full 35.1 D 23.3 C 22.6 C 31.9 C 26.9 C
No Build 16.3 C N/A 42.8 E 19.8 C 30.2 D
Alt 1 See “Alt 3”
Drake Road Alt 2 See “Alt 3”
& Hunt Road Alt 3 16.7 C 17.7 C 21.2 C 18.6 C
Alt 4 16.7 C N/A 17.7 C 21.2 C 18.6 C
Full 16.7 C 17.7 C 21.2 C 18.6 C
No Build 14.4 B 12.5 B 17.0 B 18.3 B 15.8 B
North Alt 1 14.6 B 12.7 B 20.7 C 22.6 C 18.1 B
Carpenter
Alt 2 See “Alt 3”
Road &
Grafton Alt 3 14.6 B 12.7 B 20.7 C 22.6 C 18.1 B
Road Alt 4 14.7 B 12.8 B 16.7 B 17.7 B 15.7 B
Full 14.4 B 12.5 B 16.8 B 18.1 B 15.7 B
Table 3 – 2027 Opening Year Intersection Capacity Analysis Results – No Build & Build PM Peak
Cont.
NB SB EB WB Overall
Intersection Build L L L L L
Delay Delay Delay Delay Delay
O O O O O
(sec) (sec) (sec) (sec) (sec)
S S S S S
SR 303 No Build 35.1 D 26.7 C 25.1 C 34.0 C 29.8 C
(Center Alt 1 35.2 D 25.0 C 26.7 C 31.3 C 29.0 C
Road) & Alt 2 See “Alt 3”
North Alt 3 37.2 D 24.3 C 28.2 C 35.9 D 31.3 C
Carpenter Alt 4 37.1 D 26.3 C 25.2 C 37.4 D 31.3 C
Road Full 33.6 C 25.8 C 25.2 C 33.0 C 29.1 C
No Build 27.3 C 21.4 C 15.5 B 19.1 B
SR 303 N/A
(Center Alt 1 27.3 C 22.0 C 19.0 B 21.1 C
Road) & Alt 2 See “Alt 3”
South Alt 3 24.0 C 17.6 B 12.8 B 15.9 B
Carpenter Alt 4 25.8 C N/A 16.4 B 6.3 A 12.3 B
Road Full 26.2 C 16.9 B 6.2 A 12.5 B
No Build 29.7 C 10.5 B 10.5 B 14.0 B
N/A
SR 303 Alt 1 29.4 C 8.9 A 12.0 B 13.6 B
(Center Alt 2 See “Alt 3”
Road) & Alt 3 28.0 C 9.4 A 10.8 B 13.0 B
I-71 SB Alt 4 N/A 29.4 C 18.5 B 9.8 A 16.6 B
Full 28.8 C 16.8 B 9.1 A 15.6 B
No Build 25.7 C 6.2 A 7.7 A 11.0 B
N/A
SR 303 Alt 1 25.6 C 5.5 A 7.7 A 10.9 B
(Center Alt 2 See “Alt 3”
Road) & Alt 3 23.9 C 8.7 A 8.3 A 12.0 B
I-71 NB Alt 4 25.9 C N/A 7.0 A 7.8 A 11.4 B
Full 16.1 B 4.7 A 7.1 A 8.2 A
No Build 19.1 B 20.5 C 12.1 B 19.6 B 17.7 B
SR 303 Alt 1 19.0 B 20.7 C 12.4 B 20.2 C 18.1 B
(Center Alt 2 See “Alt 3”
Road) & W. Alt 3 19.1 B 20.7 C 12.2 B 19.8 B 17.8 B
130th Street Alt 4 19.0 B 20.6 C 12.4 B 20.1 C 18.0 B
Full 19.1 B 20.6 C 12.2 B 19.7 B 17.8 B
Table 4 – 2047 Design Year Intersection Capacity Analysis Results – No Build & Build AM Peak
NB SB EB WB Overall
Intersection Build L L L L L
Delay Delay Delay Delay Delay
O O O O O
(sec) (sec) (sec) (sec) (sec)
S S S S S
No Build 47.0 D 43.8 D 49.0 D 47.5 D 47.6 D
SR 82 Alt 1 43.6 D 37.7 D 45.1 D 38.3 D 41.3 D
(Royalton Alt 2 See “Alt 3”
Road) & Alt 3 41.5 D 39.2 D 38.6 D 41.9 D 40.9 D
Howe Road Alt 4 44.8 D 43.6 D 43.7 D 44.8 D 44.5 D
Full 33.1 C 33.1 C 37.5 D 36.4 D 35.8 D
No Build 32.9 C 31.5 C 32.3 C 31.0 C 31.8 C
SR 82 Alt 1 25.6 C 24.1 C 25.3 C 23.9 C 24.7 C
(Royalton Alt 2 “See Alt 3”
Road) & Alt 3 25.6 C 24.1 C 25.3 C 23.9 C 24.7 C
I-71 SB Alt 4 26.2 C 25.7 C 26.3 C 25.1 C 25.8 C
Full 20.1 C 19.9 B 20.4 C 21.3 C 20.6 C
No Build 49.4 D 1.5 A 7.3 A 7.5 A
N/A
SR 82 Alt 1 42.9 D 2.6 A 7.1 A 8.0 A
(Royalton Alt 2 See “Alt 3”
Road) & Alt 3 45.4 D 5.5 A 6.3 A 9.8 A
I-71 NB Alt 4 49.3 D N/A 2.8 A 7.2 A 8.6 A
Full 39.1 D 2.8 A 6.4 A 7.4 A
No Build 23.5 C 25.7 C 21.1 C 23.5 C 23.1 C
SR 82 Alt 1 23.6 C 25.5 C 20.2 C 22.1 C 22.3 C
(Royalton
Alt 2 See “Alt 3”
Road) &
Alt 3 19.0 B 27.3 C 17.9 B 26.5 C 22.5 C
W. 130th
Street Alt 4 24.0 C 25.4 C 19.8 B 21.5 C 22.1 C
Full 26.5 C 25.8 C 19.8 B 22.9 C 23.2 C
No Build 27.3 C 20.5 C 38.6 D 35.6 D 31.3 C
Alt 1 19.1 B 22.1 C 34.9 C 29.9 C 26.2 C
US 42 (Pearl
Alt 2 See “Alt 3”
Road) &
Boston Road Alt 3 19.1 B 22.1 C 34.9 C 29.9 C 26.2 C
Alt 4 19.1 B 21.6 C 35.1 D 29.6 C 26.0 C
Full 20.9 C 19.7 B 38.0 D 34.9 C 28.5 C
No Build 29.1 C 11.0 B 2.6 A 9.5 A
Alt 1 37.8 D 37.4 D 21.6 C 31.4 C
Howe Road N/A
Alt 2 See “Alt 3”
& Boston
Road Alt 3 48.2 D 4.6 A 10.5 B 10.0 A
Alt 4 48.7 D 39.1 D 27.3 C 34.6 C 34.8 C
Full 21.0 C 31.8 C 28.8 C 24.5 C 27.3 C
Table 4 – 2047 Design Year Intersection Capacity Analysis Results – No Build & Build AM Peak
Cont.
NB SB EB WB Overall
Intersection Build L L L Dela L L
Delay Delay Delay Delay
O O O y O O
(sec) (sec) (sec) (sec)
S S S (sec) S S
No Build 24.3 C N/A 6.6 A 7.5 A 11.5 B
Ex. North Alt 1 21.5 C 38.3 D 8.9 A 11.7 B 20.8 C
Carpenter
Alt 2 See “Alt 3”
Road / Prop.
SB Ramp(s) & Alt 3 34.3 C 23.5 C 28.5 C 30.0 C 29.7 C
Boston Road Alt 4 43.2 D 18.2 B 8.3 A 20.8 C
N/A
Full 25.1 C 5.7 A 14.7 B 11.4 B
No Build N/A 14.2 C 0.3 A N/A N/A
Ex. Benbow Alt 1 N/A 14.3 B 0.8 A N/A N/A
Road / Prop. Alt 2 N/A 57.5 E 3.4 A 7.2 A 6.6 A
NB Ramp(s) & Alt 3 N/A N/A 19.7 B 16.0 B 18.0 B
Boston Road Alt 4 N/A 19.4 C 1.0 A N/A N/A
Full 31.4 C N/A 20.1 C 30.6 C 26.6 C
No Build 17.4 B 15.8 B 37.8 D 42.6 D 25.2 C
Alt 1 18.3 B 17.1 B 31.0 C 38.1 D 23.4 C
W. 130th Street Alt 2 See “Alt 3”
& Boston Road Alt 3 18.3 B 17.1 B 29.2 C 40.6 D 22.6 C
Alt 4 18.3 B 17.1 B 31.0 C 38.1 D 23.4 C
Full 20.9 C 18.5 B 24.5 C 29.8 C 22.2 C
No Build 38.9 D 20.5 C 36.3 D 38.5 D 35.5 D
Alt 1 35.9 D 18.1 B 22.0 C 25.0 C 25.6 C
Drake Road & Alt 2 See “Alt 3”
Howe Road Alt 3 35.9 D 18.1 B 22.0 C 25.0 C 25.6 C
Alt 4 40.4 D 18.5 B 20.9 C 23.7 C 26.2 C
Full 38.7 D 22.2 C 27.7 C 30.6 C 30.7 C
No Build 13.3 B N/A 13.2 B 10.7 B 12.7 B
Alt 1 See “Alt 3”
Drake Road & Alt 2 See “Alt 3”
Hunt Road Alt 3 12.8 B 10.8 B 10.7 B 11.4 B
Alt 4 13.9 B N/A 13.5 B 11.0 B 13.0 B
Full 12.6 B 11.0 B 10.9 B 11.5 B
No Build 14.8 B 15.3 B 14.2 B 15.9 B 15.0 B
North Alt 1 24.9 C 20.8 C 46.5 D 33.2 C 33.2 C
Carpenter Alt 2 See “Alt 3”
Road & Alt 3 24.9 C 20.8 C 46.5 D 33.2 C 33.2 C
Grafton Road Alt 4 14.4 B 14.8 B 14.6 B 15.8 B 14.9 B
Full 14.2 B 14.9 B 14.0 B 15.8 B 14.7 B
Table 4 – 2047 Design Year Intersection Capacity Analysis Results – No Build & Build AM Peak
Cont.
NB SB EB WB Overall
Intersection Build L L L L L
Delay Delay Delay Delay Delay
O O O O O
(sec) (sec) (sec) (sec) (sec)
S S S S S
SR 303 No Build 36.3 D 26.1 C 31.9 C 30.1 C 30.0 C
(Center Alt 1 31.0 C 28.7 C 30.3 C 26.7 C 29.1 C
Road) & Alt 2 See “Alt 3”
North Alt 3 36.0 D 27.8 C 31.7 C 31.0 C 30.6 C
Carpenter Alt 4 48.7 D 35.1 D 25.6 C 17.2 B 26.7 C
Road Full 28.4 C 28.6 C 28.7 C 28.3 C 28.6 C
No Build 29.4 C 43.1 D 15.9 B 34.3 C
SR 303 N/A
(Center Alt 1 42.6 D 34.5 C 13.6 B 31.7 C
Road) & Alt 2 See “Alt 3”
South Alt 3 27.6 C 24.9 C 17.1 B 23.6 C
Carpenter Alt 4 36.8 D N/A 18.2 B 11.4 B 20.4 C
Road Full 23.6 C 22.5 C 15.3 B 21.1 C
No Build 35.2 C 24.5 C 14.6 B 23.9 C
N/A
SR 303 Alt 1 33.2 C 27.1 C 12.2 B 24.6 C
(Center Alt 2 See “Alt 3”
Road) & Alt 3 37.5 D 17.1 B 13.0 B 18.6 B
I-71 SB Alt 4 N/A 41.6 D 24.4 C 8.8 A 24.4 C
Full 32.2 C 32.7 C 13.3 B 28.7 C
No Build 36.8 D 2.6 A 3.1 A 8.6 A
N/A
SR 303 Alt 1 32.7 C 2.2 A 2.8 A 7.6 A
(Center Alt 2 See “Alt 3”
Road) & Alt 3 35.4 D 5.1 A 4.3 A 10.7 B
I-71 NB Alt 4 47.9 D N/A 1.0 A 2.8 A 8.7 A
Full 30.5 C 4.5 A 2.7 A 8.3 A
No Build 19.2 B 20.5 C 11.9 B 19.1 B 17.4 B
SR 303 Alt 1 19.4 B 20.6 C 11.4 B 18.4 B 17.0 B
(Center Alt 2 See “Alt 3”
Road) & W. Alt 3 19.4 B 20.1 C 13.2 B 20.6 C 18.0 B
130th Street Alt 4 19.4 B 20.6 C 11.4 B 18.4 B 17.0 B
Full 19.7 B 20.8 C 11.0 B 19.5 B 17.1 B
Table 5 – 2047 Design Year Intersection Capacity Analysis Results – No Build & Build PM Peak
NB SB EB WB Overall
Intersection Build L L L L L
Delay Delay Delay Delay Delay
O O O O O
(sec) (sec) (sec) (sec) (sec)
S S S S S
No Build 48.3 D 89.7 F 86.4 F 51.0 D 63.6 E
SR 82 Alt 1 49.0 D 65.0 E 58.5 E 58.9 E 57.9 E
(Royalton Alt 2 See “Alt 3”
Road) & Alt 3 42.3 D 67.0 E 67.1 E 69.0 E 64.3 E
Howe Road Alt 4 43.3 D 77.8 E 69.5 E 58.1 E 60.9 E
Full 81.6 F 68.7 E 70.4 E 80.1 F 77.0 E
No Build 32.6 C 36.0 C 40.4 D 36.2 D 37.3 D
SR 82 Alt 1 31.9 C 28.7 C 31.4 C 32.3 C 31.1 C
(Royalton Alt 2 See “Alt 3”
Road) & Alt 3 22.1 C 26.9 C 23.4 C 26.4 C 24.8 C
I-71 SB Alt 4 32.9 C 29.4 C 31.5 D 29.2 C 30.6 C
Full 25.7 C 30.9 C 25.9 C 31.5 C 28.6 C
No Build 45.5 D 7.7 A 9.1 A 12.2 B
N/A
SR 82 Alt 1 44.6 D 8.5 A 10.9 B 13.4 B
(Royalton Alt 2 See “Alt 3”
Road) & Alt 3 37.3 D 15.7 B 11.9 B 17.4 B
I-71 NB Alt 4 40.8 D N/A 9.4 A 10.7 B 13.3 B
Full 39.6 D 11.2 B 10.1 B 13.9 B
No Build 41.4 D 41.5 D 41.5 D 41.3 D 41.4 D
SR 82 Alt 1 40.7 D 40.8 D 41.6 D 41.4 D 41.2 D
(Royalton
Alt 2 See “Alt 3”
Road) &
Alt 3 32.0 C 34.5 C 32.4 C 34.3 C 33.3 C
W. 130th
Street Alt 4 36.1 D 35.5 D 34.9 C 36.9 D 35.8 D
Full 31.4 C 32.3 C 31.6 C 32.3 C 31.9 C
No Build 61.7 E 40.5 D 63.6 E 60.1 E 55.4 E
Alt 1 32.9 C 39.3 D 39.3 D 32.6 D 35.6 D
US 42 (Pearl
Alt 2 See “Alt 3”
Road) &
Boston Road Alt 3 32.9 C 39.3 D 39.3 D 32.6 C 35.6 D
Alt 4 34.1 C 37.1 D 38.3 D 33.1 C 35.2 D
Full 30.5 C 36.9 D 38.5 D 32.6 C 34.0 C
No Build 35.6 D 31.3 C 11.2 B 24.2 C
Alt 1 42.9 D 14.7 B 17.7 B 22.5 C
Howe Road N/A
Alt 2 See “Alt 3”
& Boston
Road Alt 3 47.5 D 11.4 B 15.3 B 20.3 C
Alt 4 45.9 D 44.6 D 46.2 D 28.1 C 37.3 D
Full 33.5 C 38.3 D 36.9 D 34.4 C 35.7 D
Table 5 – 2047 Design Year Intersection Capacity Analysis Results – No Build & Build PM Peak
Cont.
NB SB EB WB Overall
Intersection Build L L L L L
Delay Delay Delay Delay Delay
O O O O O
(sec) (sec) (sec) (sec) (sec)
S S S S S
Ex. North No Build 30.0 C N/A 7.8 A 10.7 B 12.6 B
Carpenter Alt 1 41.7 D 48.2 D 23.2 C 32.0 C 40.9 D
Road / Alt 2 See “Alt 3”
Prop. SB Alt 3 27.5 C 35.7 D 30.1 C 33.3 C 32.7 C
Ramp(s) & Alt 4 33.3 C 9.3 A 27.1 C 26.3 C
Boston Road N/A
Full 35.2 D 25.4 C 32.7 C 31.7 C
No Build N/A 16.0 C 1.0 A N/A N/A
Ex. Benbow Alt 1 N/A 20.6 C 1.3 A N/A N/A
Road /
Alt 2 N/A 51.9 D 13.3 B 6.9 A 12.8 B
Prop. NB
Ramp(s) & Alt 3 N/A N/A 2.2 A 2.7 A 2.4 A
Boston Road Alt 4 N/A 30.3 D 1.4 A N/A N/A
Full 43.7 D N/A 43.3 D 43.0 D 43.4 D
No Build 25.4 C 30.3 C 27.6 C 36.5 D 29.7 C
Alt 1 29.7 C 32.9 C 26.7 C 38.9 D 32.1 C
W. 130th
Alt 2 See “Alt 3”
Street &
Boston Road Alt 3 27.7 C 30.8 C 28.5 C 38.8 D 31.1 C
Alt 4 29.7 C 32.9 C 26.7 C 38.9 D 32.1 C
Full 30.2 C 34.0 C 25.9 C 40.4 D 32.9 C
No Build 33.0 C 23.8 C 28.6 C 37.0 D 29.7 C
Alt 1 35.3 D 36.3 D 21.5 C 32.5 C 31.2 C
Drake Road
Alt 2 See “Alt 3”
& Howe
Road Alt 3 35.3 D 36.3 D 21.5 C 32.5 C 31.2 C
Alt 4 35.0 C 35.7 D 22.6 C 37.0 D 32.4 C
Full 33.1 C 33.4 C 25.4 C 38.1 D 32.3 C
No Build 18.0 C N/A 55.5 F 22.3 C 37.3 E
Alt 1 See “Alt 3”
Drake Road
Alt 2 See “Alt 3”
& Hunt
Road Alt 3 20.0 C 20.4 C 24.8 C 21.6 C
Alt 4 18.2 C N/A 19.3 C 22.4 C 20.0 C
Full 18.3 C 19.5 C 23.6 C 20.5 C
No Build 16.5 B 14.0 B 16.5 B 18.1 B 16.5 B
North Alt 1 23.5 C 23.4 C 35.5 D 35.3 D 29.9 C
Carpenter
Alt 2 See “Alt 3”
Road &
Grafton Alt 3 23.5 C 23.4 C 35.5 D 35.3 D 29.9 C
Road Alt 4 16.0 B 13.8 B 16.4 B 17.8 B 16.2 B
Full 17.0 B 14.7 B 22.0 C 23.8 C 19.9 B
Table 5 – 2047 Design Year Intersection Capacity Analysis Results – No Build & Build PM Peak
Cont.
NB SB EB WB Overall
Intersection Build L L L L L
Delay Delay Delay Delay Delay
O O O O O
(sec) (sec) (sec) (sec) (sec)
S S S S S
SR 303 No Build 41.5 D 30.0 C 27.9 C 41.1 C 34.6 C
(Center Alt 1 39.9 D 44.1 D 25.3 C 29.7 C 31.9 C
Road) & Alt 2 See “Alt 3”
North Alt 3 35.7 D 43.4 D 25.7 C 30.4 C 31.7 C
Carpenter Alt 4 39.4 D 28.7 C 27.0 C 39.7 D 33.5 C
Road Full 34.4 C 27.4 C 26.6 C 33.4 C 30.1 C
No Build 29.3 C 21.6 C 16.6 B 19.8 B
SR 303 N/A
(Center Alt 1 41.2 D 10.0 B 7.8 A 12.3 B
Road) & Alt 2 See “Alt 3”
South Alt 3 33.2 C 11.5 B 7.0 A 11.7 B
Carpenter Alt 4 29.0 C N/A 19.2 B 13.2 B 17.2 B
Road Full 28.3 C 18.7 B 9.6 A 15.2 B
No Build 30.0 C 19.1 B 14.6 B 19.2 B
N/A
SR 303 Alt 1 37.4 D 9.2 A 5.8 A 12.0 B
(Center Alt 2 See “Alt 3”
Road) & Alt 3 35.4 D 8.2 A 5.5 A 11.2 B
I-71 SB Alt 4 N/A 30.2 C 10.0 B 15.1 B 15.8 B
Full 30.2 C 10.2 B 13.5 B 15.2 B
No Build 27.4 C 3.6 A 9.8 B 11.5 B
N/A
SR 303 Alt 1 31.0 C 4.1 A 10.6 B 13.1 B
(Center Alt 2 “See Alt 3”
Road) & Alt 3 29.1 C 5.1 A 10.9 B 13.1 B
I-71 NB Alt 4 28.2 C N/A 8.1 A 10.4 A 13.8 B
Full 26.7 C 7.2 A 8.7 A 12.1 B
No Build 18.7 B 20.5 C 14.0 B 21.5 C 18.7 B
SR 303 Alt 1 18.5 B 20.2 C 14.3 B 22.6 C 19.2 B
(Center Alt 2 See “Alt 3”
Road) & W. Alt 3 18.8 B 20.5 C 13.7 B 21.5 C 18.6 B
130th Street Alt 4 18.6 B 20.8 C 14.4 B 22.8 C 19.4 B
Full 18.8 B 20.7 C 13.8 B 21.2 C 18.6 B
Freeway Section/Ramp Junction Analyses:
The existing and proposed study area freeway segments and ramp junctions were analyzed as
a freeway facility using Highway Capacity Software (HCS) for the peak hours for both 2027 and
2047 volumes. The analyses were conducted based on guidance and criteria provided in the
ODOT OATS Manual. For northbound between the SR 303 eastbound entrance to I-71 and SR 303
westbound entrance to I-71, the ramp influence areas are adjacent to one another. Therefore,
this section is not analyzed separately in HCS and is not included in the tables below.
The analysis density in passenger car per mile per lane (pc/mi/ln) and LOS results are organized
by design year and direction of flow on Tables 6 through 9 for freeway segments and Tables 10
through 13 for ramp junctions. Within each table, the AM and PM peak results for each
alternative are organized by segment or ramp in the direction of travel, for comparison of
overall operations performance. Additionally, refer to Appendix G for comparisons of change in
LOS performance between an alternative and No Build conditions.
The level of service comparison figures provided in Appendix G show if the letter grade LOS is
different than in the No Build condition. A comparison result for proposed new ramps are not
shown in this exhibit since they have no existing condition to compare to. It should also be
noted that many of the freeway segments/ramp junctions that were different than the No Build
condition were observed to have only a slight change in density. For example, a high C may
have changed to a low D but only changed by two pc/mi/ln.
The HCS reports for the freeway facility are provided in Appendix M.
Table 6 – 2027 Opening Year Freeway Segment Capacity Analysis Results – No Build & Build
Northbound
AM Peak PM Peak
Freeway Segment Condition Density Density
LOS LOS
(pc/mi/ln) (pc/mi/ln)
No Build 13.1 B 11.2 B
Alt 1 See “No Build”
Alt 2 See “Alt 3”
South of SR 303
Alt 3 11.7 B 10.8 A
Alt 4 See “No Build”
Full Build 13.0 B 11.3 B
No Build 10.9 A 8.3 A
Alt 1 See “No Build”
Between exit to SR 303 and Alt 2 See “Alt 3”
SR 303 EB Entrance Alt 3 9.3 A 8.0 A
Alt 4 See “No Build”
Full Build 10.9 A 8.5 B
No Build See “Between SR 82 and Boston Road”
Alt 1 See “No Build”
Between Boston Road and Alt 2 See “Alt 3”
SR 303 Alt 3 13.6 B 11.0 A
Alt 4 See “No Build”
Full Build 16.4 B 13.0 B
No Build
Alt 1
Alt 2 N/A
Between Boston Road Ramps
Alt 3
Alt 4
Full Build 14.0 B 9.3 A
No Build 17.6 B 13.0 B
Alt 1 See “No Build”
Between SR 82 and Alt 2 20.5 C 13.9 B
Boston Road Alt 3 20.5 C 13.9 B
Alt 4 See “No Build”
Full Build 20.1 C 12.2 B
Table 6 – 2027 Opening Year Freeway Segment Capacity Analysis Results – No Build & Build
Northbound, cont.
AM Peak PM Peak
Freeway Segment Condition Density Density
LOS LOS
(pc/mi/ln) (pc/mi/ln)
No Build 15.9 B 10.5 B
Alt 1 See “No Build”
Between exit to SR 82 Alt 2 See “Alt 3”
and
Alt 3 19.4 C 11.5 B
SR 82 EB entrance
Alt 4 See “No Build”
Full Build 19.2 C 10.3 A
No Build 24.2 C 16.3 B
Alt 1 See “No Build”
Between SR 82 EB Alt 2 25.5 C 16.5 B
entrance and SR 82 WB
Alt 3 25.5 C 16.5 B
entrance
Alt 4 See “No Build”
Full Build 26.0 C 15.3 B
No Build 30.6 D 19.8 C
Alt 1 See “No Build”
Alt 2 30.6 D 19.9 C
North of SR 82
Alt 3 30.6 D 19.9 C
Alt 4 See “No Build”
Full Build 31.8 D 18.7 C
Table 7 – 2027 Opening Year Freeway Segment Capacity Analysis Results – No Build & Build
Southbound
AM Peak PM Peak
Freeway Segment Condition Density Density
LOS LOS
(pc/mi/ln) (pc/mi/ln)
No Build 12.6 B 23.6 C
Alt 1 12.7 B 24.7 C
Alt 2 See “Alt 3”
North of SR 82
Alt 3 12.7 B 24.7 C
Alt 4 11.5 B 23.5 C
Full Build 11.4 B 24.4 C
No Build 11.4 B 20.5 C
Alt 1 12.1 B 25.2 C
Between exit to SR 82 WB Alt 2 See “Alt 3”
and exit to SR 82 EB Alt 3 12.1 A 25.2 C
Alt 4 10.5 A 22.8 C
Full Build 10.6 A 23.2 C
No Build 9.3 A 16.9 B
Alt 1 10.1 A 21.1 C
Between exit to SR 82 EB and Alt 2 See “Alt 3”
SR 82 entrance Alt 3 10.1 A 21.1 C
Alt 4 8.5 A 19.0 C
Full Build 8.6 A 19.9 C
No Build 10.9 A 19.9 C
Alt 1 11.7 B 24.9 C
Between SR 82 and Alt 2 See “Alt 3”
Boston Road Alt 3 11.7 A 24.9 C
Alt 4 9.9 A 22.0 C
Full Build 10.1 A 23.3 C
No Build
Alt 1
N/A
Alt 2
Between Boston Road Ramps
Alt 3
Alt 4 8.0 A 14.7 B
Full Build 8.2 A 15.3 B
Table 7 – 2027 Opening Year Freeway Segment Capacity Analysis Results – No Build & Build
Southbound, cont.
AM Peak PM Peak
Freeway Segment Condition Density Density
LOS LOS
(pc/mi/ln) (pc/mi/ln)
No Build See “Between SR 82 & Boston Road”
Alt 1 9.6 A 16.9 B
Between Boston Road and Alt 2 See “Alt 3”
SR 303 Alt 3 9.6 A 16.9 B
Alt 4 11.9 B 18.0 B
Full Build 11.6 B 19.0 C
No Build 7.3 A 15.1 B
Alt 1 7.1 A 13.7 B
Alt 2 See “Alt 3”
Between SR 303 Ramps
Alt 3 7.1 A 13.7 B
Alt 4 8.2 A 14.1 B
Full Build 8.2 A 15.0 B
No Build 9.9 A 17.9 B
Alt 1 9.7 A 16.4 B
Alt 2 See “Alt 3”
South of SR 303
Alt 3 9.7 A 16.4 B
Alt 4 10.0 A 16.7 B
Full Build 9.9 A 17.6 B
Table 8 – 2047 Design Year Freeway Segment Capacity Analysis Results –No Build & Build
Northbound
AM Peak PM Peak
Freeway Segment Condition Density Density
LOS LOS
(pc/mi/ln) (pc/mi/ln)
No Build 13.4 B 11.7 B
Alt 1 See “No Build”
Alt 2 See “Alt 3”
South of SR 303
Alt 3 12.6 B 11.5 B
Alt 4 See “No Build”
Full Build 13.5 B 12.4 B
No Build 10.9 A 8.3 A
Alt 1 See “No Build”
Between exit to SR 303 and Alt 2 See “Alt 3”
SR 303 EB Entrance Alt 3 10.1 B 8.3 A
Alt 4 See “No Build”
Full Build 11.2 B 9.4 B
No Build See “Between SR 82 and Boston Road”
Alt 1 See “No Build”
Between Boston Road and Alt 2 See “Alt 3”
SR 303 Alt 3 14.4 B 11.4 B
Alt 4 See “No Build”
Full Build 17.3 B 13.9 B
No Build
Alt 1
Alt 2 N/A
Between Boston Road Ramps
Alt 3
Alt 4
Full Build 14.7 B 9.4 A
No Build 18.7 C 13.6 B
Alt 1 See “No Build”
Between SR 82 and Alt 2 See “Alt 3”
Boston Road Alt 3 21.8 C 14.7 B
Alt 4 See “No Build”
Full Build 21.4 C 12.9 B
Table 8 – 2047 Design Year Freeway Segment Capacity Analysis Results – No Build & Build
Northbound, cont.
AM Peak PM Peak
Freeway Segment Condition Density Density
LOS LOS
(pc/mi/ln) (pc/mi/ln)
No Build 16.8 B 11.0 B
Alt 1 See “No Build”
Between exit to SR 82 and Alt 2 See “Alt 3”
SR 82 EB entrance Alt 3 20.5 C 12.3 B
Alt 4 See “No Build”
Full Build 20.4 C 11.0 A
No Build 26.3 D 17.4 C
Alt 1 See “No Build”
Between SR 82 EB entrance Alt 2 See “Alt 3”
and SR 82 WB entrance Alt 3 27.7 D 17.3 B
Alt 4 See “No Build”
Full Build 27.5 D 16.0 B
No Build 33.4 D 21.0 C
Alt 1 See “No Build”
Alt 2 33.3 D 20.8 C
North of SR 82
Alt 3 33.3 D 20.8 C
Alt 4 See “No Build”
Full Build 33.7 D 19.4 C
Table 9 – 2047 Design Year Freeway Segment Capacity Analysis Results – No Build & Build
Southbound
AM Peak PM Peak
Freeway Segment Condition Density Density
LOS LOS
(pc/mi/ln) (pc/mi/ln)
No Build 13.1 B 24.5 C
Alt 1 13.4 B 26.8 D
Alt 2 See “Alt 3”
North of SR 82
Alt 3 13.4 B 26.8 D
Alt 4 11.8 B 24.9 C
Full Build 11.7 B 26.3 D
No Build 12.0 B 21.7 C
Alt 1 13.0 A 27.5 D
Between exit to SR 82 WB Alt 2 See “Alt 3”
and exit to SR 82 EB Alt 3 13.0 B 27.5 D
Alt 4 10.9 A 24.4 C
Full Build 11.0 A 24.4 C
No Build 9.7 A 17.6 B
Alt 1 10.9 A 22.9 C
Between exit to SR 82 EB and Alt 2 See “Alt 3”
SR 82 entrance Alt 3 10.9 A 22.9 C
Alt 4 8.9 A 20.2 C
Full Build 9.0 A 20.6 C
No Build 11.5 B 20.9 C
Alt 1 12.8 B 27.2 D
Between SR 82 and Alt 2 See “Alt 3”
Boston Road Alt 3 12.8 B 27.2 D
Alt 4 10.5 A 23.6 C
Full Build 10.7 A 24.8 C
No Build
Alt 1
N/A
Alt 2
Between Boston Road Ramps
Alt 3
Alt 4 8.1 A 14.7 B
Full Build 8.3 A 15.3 B
Table 9 – 2047 Design Year Freeway Segment Capacity Analysis Results – No Build & Build
Southbound, cont.
AM Peak PM Peak
Freeway Segment Condition Density Density
LOS LOS
(pc/mi/ln) (pc/mi/ln)
No Build See “Between SR 82 & Boston Road”
Alt 1 10.1 A 17.0 B
Between Boston Road and Alt 2 See “Alt 3”
SR 303 Alt 3 10.1 A 17.0 B
Alt 4 13.0 B 18.6 C
Full Build 12.6 B 19.3 C
No Build 7.5 A 15.5 B
Alt 1 7.3 A 13.7 B
Alt 2 See “Alt 3”
Between SR 303 Ramps
Alt 3 7.3 A 13.7 B
Alt 4 8.8 A 14.7 B
Full Build 9.0 A 15.2 B
No Build 10.2 A 18.7 C
Alt 1 10.4 A 16.9 B
Alt 2 See “Alt 3”
South of SR 303
Alt 3 10.4 A 16.9 B
Alt 4 10.9 A 17.7 B
Full Build 10.9 A 18.1 C
Table 10 – 2027 Opening Year Ramp Junction Capacity Analysis Results – No Build & Build
Northbound
AM Peak PM Peak
Ramp Junction Condition Density Density
LOS LOS
(pc/mi/ln) (pc/mi/ln)
No Build 16.0 B 14.3 B
Alt 1 See “No Build”
I-71 Northbound Diverge to Alt 2 See “Alt 3”
SR 303 Alt 3 14.7 B 13.9 B
Alt 4 See “No Build”
Full Build 16.0 B 14.4 B
No Build 19.0 B 13.0 B
Alt 1 See “No Build”
SR 303 Eastbound Merge to Alt 2 See “Alt 3”
I-71 Northbound Alt 3 14.9 B 10.9 B
Alt 4 See “No Build”
Full Build 17.2 B 12.9 B
No Build 17.5 B 13.3 B
Alt 1 See “No Build”
SR 303 Westbound Merge to Alt 2 See “Alt 3”
I-71 Northbound Alt 3 13.3 B 11.1 B
Alt 4 See “No Build”
Full Build 16.4 B 13.3 B
No Build
Alt 1
I-71 Northbound Diverge to Alt 2 N/A
Boston Road Alt 3
Alt 4
Full Build 16.9 B 13.9 B
No Build N/A
Alt 1 N/A
Boston Road Merge to I-71 Alt 2 25.5 C 16.4 B
Northbound Alt 3 25.5 C 16.7 B
Alt 4 N/A
Full Build 24.3 C 14.7 B
Table 10 – 2027 Opening Year Ramp Junction Capacity Analysis Results – No Build & Build
Northbound, cont.
AM Peak PM Peak
Ramp Junction Condition Density Density
LOS LOS
(pc/mi/ln) (pc/mi/ln)
No Build 20.4 C 16.0 B
Alt 1 See “No Build”
I-71 Northbound Diverge to Alt 2 24.0 C 17.9 B
SR 82 Alt 3 24.3 C 17.9 B
Alt 4 See “No Build”
Full Build 23.7 C 15.8 B
No Build 24.9 C 16.9 B
Alt 1 See “No Build”
SR 82 Eastbound Merge to Alt 2 24.2 C 16.5 B
I-71 Northbound Alt 3 24.2 C 16.5 B
Alt 4 See “No Build”
Full Build 24.8 C 15.3 B
No Build 28.2 D 19.0 B
Alt 1 See “No Build”
SR 82 Westbound Merge to Alt 2 27.6 C 19.2 B
I-71 Northbound Alt 3 27.6 D 19.2 B
Alt 4 See “No Build”
Full Build 28.5 D 18.0 B
Table 11 – 2027 Opening Year Ramp Junction Capacity Analysis Results – No Build & Build
Southbound
AM Peak PM Peak
Ramp Junction Condition Density Density
LOS LOS
(pc/mi/ln) (pc/mi/ln)
No Build 3.3 A 15.3 B
Alt 1 2.7 A 12.7 B
I-71 Southbound Diverge to Alt 2 See “Alt 3”
SR 82 Westbound Alt 3 2.7 A 12.7 B
Alt 4 2.2 A 12.8 B
Full Build 1.9 A 14.1 B
No Build 16.2 B 26.1 C
Alt 1 16.9 B 29.6 D
I-71 Southbound Diverge to Alt 2 See “Alt 3”
SR 82 Eastbound Alt 3 16.9 B 29.6 D
Alt 4 15.1 B 27.9 C
Full Build 15.2 B 28.1 D
No Build 11.1 B 20.4 C
Alt 1 11.9 B 24.9 C
SR 82 Merge to I-71 Alt 2 See “Alt 3”
Southbound Alt 3 11.9 B 24.9 C
Alt 4 10.0 A 22.2 C
Full Build 10.2 B 23.4 C
No Build N/A
Alt 1 12.1 B 26.6 C
I-71 Southbound Diverge to Alt 2 See “Alt 3”
Boston Road Alt 3 12.1 B 26.6 C
Alt 4 9.9 A 24.2 C
Full Build 10.1 A 25.4 C
Table 11 – 2027 Opening Year Ramp Junction Capacity Analysis Results – No Build & Build
Southbound, cont.
AM Peak PM Peak
Ramp Junction Condition Density Density
LOS LOS
(pc/mi/ln) (pc/mi/ln)
No Build
Alt 1
N/A
Boston Road Merge to I-71 Alt 2
Southbound Alt 3
Alt 4 14.6 B 20.3 C
Full Build 14.0 B 21.4 C
No Build 15.3 B 24.9 C
Alt 1 13.9 B 22.2 C
I-71 Southbound Diverge to Alt 2 See “Alt 3”
SR 303 Alt 3 13.9 B 22.2 C
Alt 4 17.1 B 23.7 C
Full Build 16.6 B 24.7 C
No Build 10.5 B 18.5 B
Alt 1 10.4 B 17.0 B
SR 303 Merge to I-71 Alt 2 See “Alt 3”
Southbound Alt 3 10.4 B 17.0 B
Alt 4 10.4 B 17.3 B
Full Build 10.1 B 18.2 B
Table 12 – 2047 Design Year Ramp Junction Capacity Analysis Results – No Build & Build
Northbound
AM Peak PM Peak
Ramp Junction Condition Density Density
LOS LOS
(pc/mi/ln) (pc/mi/ln)
No Build 16.6 B 15.1 B
Alt 1 See “No Build”
I-71 Northbound Diverge to Alt 2 See “Alt 3”
SR 303 Alt 3 15.7 B 14.8 B
Alt 4 See “No Build”
Full Build 16.6 B 15.7 B
No Build 20.7 C 14.0 B
Alt 1 See “No Build”
SR 303 Eastbound Merge to Alt 2 See “Alt 3”
I-71 Northbound Alt 3 15.6 B 11.3 B
Alt 4 See “No Build”
Full Build 18.4 B 13.7 B
No Build 18.5 B 13.9 B
Alt 1 See “No Build”
SR 303 Westbound Merge to Alt 2 See “Alt 3”
I-71 Northbound Alt 3 14.1 B 11.5 B
Alt 4 See “No Build”
Full Build 17.3 B 14.2 B
No Build
Alt 1
I-71 Northbound Diverge to Alt 2 N/A
Boston Road Alt 3
Alt 4
Full Build 17.9 B 15.3 B
No Build N/A
Alt 1 N/A
Boston Road Merge to I-71 Alt 2 27.0 C 17.8 B
Northbound Alt 3 27.0 C 19.4 B
Alt 4 N/A
Full Build 25.7 C 15.8 B
Table 12 – 2047 Design Year Ramp Junction Capacity Analysis Results – No Build & Build
Northbound, cont.
AM Peak PM Peak
Ramp Junction Condition Density Density
LOS LOS
(pc/mi/ln) (pc/mi/ln)
No Build 21.5 C 16.7 B
Alt 1 See “No Build”
I-71 Northbound Diverge to Alt 2 25.2 C 18.8 B
SR 82 Alt 3 25.2 C 18.8 B
Alt 4 See “No Build”
Full Build 24.7 C 16.6 B
No Build 26.8 C 18.3 B
Alt 1 See “No Build”
SR 82 Eastbound Merge to Alt 2 26.0 C 17.2 B
I-71 Northbound Alt 3 26.0 C 17.2 B
Alt 4 See “No Build”
Full Build 25.9 C 16.0 B
No Build 29.9 D 20.3 C
Alt 1 See “No Build”
SR 82 Westbound Merge to Alt 2 29.1 D 20.0 B
I-71 Northbound Alt 3 29.1 D 20.0 B
Alt 4 See “No Build”
Full Build 29.6 D 18.7 B
Table 13 – 2047 Design Year Ramp Junction Capacity Analysis Results – No Build & Build
Southbound
AM Peak PM Peak
Ramp Junction Condition Density Density
LOS LOS
(pc/mi/ln) (pc/mi/ln)
No Build 3.6 A 15.9 B
Alt 1 3.1 A 14.5 B
I-71 Southbound Diverge to Alt 2 See “Alt 3”
SR 82 Westbound Alt 3 3.1 A 14.5 B
Alt 4 2.4 A 13.9 B
Full Build 2.1 A 16.6 B
No Build 17.0 B 27.3 C
Alt 1 17.8 B 31.1 D
I-71 Southbound Diverge to Alt 2 See “Alt 3”
SR 82 Eastbound Alt 3 17.8 B 31.1 D
Alt 4 15.5 B 29.2 D
Full Build 15.7 B 29.1 D
No Build 11.7 B 21.4 C
Alt 1 13.0 B 26.6 C
SR 82 Merge to I-71 Alt 2 See “Alt 3”
Southbound Alt 3 13.0 B 26.6 C
Alt 4 10.6 B 23.5 C
Full Build 10.9 B 24.9 C
No Build N/A
Alt 1 13.5 B 28.8 D
I-71 Southbound Diverge to Alt 2 See “Alt 3”
Boston Road Alt 3 13.5 B 28.8 D
Alt 4 10.8 B 26.0 C
Full Build 11.0 B 27.4 C
Table 13 – 2047 Design Year Ramp Junction Capacity Analysis Results – No Build & Build
Southbound, cont.
AM Peak PM Peak
Ramp Junction Condition Density Density
LOS LOS
(pc/mi/ln) (pc/mi/ln)
No Build
Alt 1
N/A
Boston Road Merge to I-71 Alt 2
Southbound Alt 3
Alt 4 16.3 B 21.2 C
Full Build 15.6 B 21.9 C
No Build 16.1 B 26.0 C
Alt 1 14.5 B 22.4 C
I-71 Southbound Diverge to Alt 2 See “Alt 3”
SR 303 Alt 3 14.5 B 22.4 C
Alt 4 18.7 B 24.3 C
Full Build 17.9 B 25.0 C
No Build 10.9 B 19.5 B
Alt 1 11.4 B 17.7 B
SR 303 Merge to I-71 Alt 2 See “Alt 3”
Southbound Alt 3 11.4 B 17.7 B
Alt 4 11.4 B 18.4 B
Full Build 11.3 B 18.9 B
APPENDIX K
Note: Traffic volumes may not change for every intersection for every alternative. Therefore,
intersection results may reference other alternatives. Refer to Table 2 through Table 5 for
which alternatives are referenced and therefore do not have reports in their respective
sections in this Appendix.
2027
AM PEAK
NO BUILD
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 30 1010 20 420 1000 80 80 40 990 80 20 30
Signal Information
Cycle, s 110.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 23.6 23.0 4.4 9.9 19.1 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 10.4 39.4 29.6 58.6 25.1 15.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 3.0 22.8 21.1 4.5
Green Extension Time ( g e ), s 1.3 0.0 0.8 0.0 0.0 0.2
Phase Call Probability 0.63 1.00 1.00 0.99
Max Out Probability 0.76 0.54 1.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.44 B 2.47 B 2.74 C 2.60 C
Bicycle LOS Score / LOS 1.11 A 1.82 B 2.46 B 0.72 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/9/2023 8:59:20 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 1910 170 130 700 0 400 0 800
Signal Information
Cycle, s 110.0 Reference Phase 2
1 2 3 4
Offset, s 6 Reference Point End
Green 24.0 30.0 20.0 18.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 30.0 66.0 26.0 62.0 18.0 18.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.1 19.5 17.6 20.0
Green Extension Time ( g e ), s 0.0 0.0 0.4 0.0 0.2 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 1.00 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.13 B 2.26 B 2.60 C 2.73 C
Bicycle LOS Score / LOS 1.76 B 0.99 A 1.22 A 1.95 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/9/2023 8:59:20 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 580 1730 1510 120 0 220
Signal Information
Cycle, s 110.0 Reference Phase 2
1 2 3 4
Offset, s 102 Reference Point End
Green 79.8 18.2 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 85.8 85.8 24.2
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.3
Queue Clearance Time ( g s ), s 17.4
Green Extension Time ( g e ), s 0.0 0.0 0.8
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.05 B 1.34 A 2.32 B 2.47 B
Bicycle LOS Score / LOS 2.49 B 1.36 A 1.08 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/9/2023 8:59:20 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 430 130 70 640 40 210 170 60 30 130 140
Signal Information
Cycle, s 65.8 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 5.4 20.1 3.3 3.7 15.3 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 9.4 26.1 9.4 26.1 11.0 23.0 7.3 19.3
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 4.0 14.2 4.0 14.3 9.0 7.7 3.1 12.0
Green Extension Time ( g e ), s 0.1 1.9 0.0 3.1 0.0 1.1 0.1 1.1
Phase Call Probability 0.77 1.00 0.77 1.00 0.99 1.00 0.47 1.00
Max Out Probability 0.00 0.51 1.00 0.00 1.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.10 B 1.91 B 2.27 B 2.43 B
Bicycle LOS Score / LOS 1.08 A 1.19 A 1.31 A 1.05 A
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 210 40 110 190 80 70 300 150 30 140 20
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.0 29.5 3.9 6.0 0.7 16.5
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 3.0
Phase Duration, s 11.5 22.0 12.1 22.7 11.5 46.5 9.4 44.4
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 5.0 14.8 6.7 16.1 4.3 2.0
Green Extension Time ( g e ), s 0.1 1.0 0.2 1.0 0.1 0.0 0.3 0.0
Phase Call Probability 0.85 1.00 0.95 1.00 0.85 0.56
Max Out Probability 0.00 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.93 B 2.12 B 1.95 B 1.90 B
Bicycle LOS Score / LOS 1.06 A 1.17 A 1.42 A 0.83 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 3:27:40 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 350 250 160 70 0 50
Signal Information
Cycle, s 60.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 41.1 8.9 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 4
Case Number 8.0 8.0 12.0
Phase Duration, s 46.1 46.1 13.9
Change Period, ( Y+R c ), s 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 6.4
Green Extension Time ( g e ), s 0.0 0.0 0.2
Phase Call Probability 0.89
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.32 A 1.32 A 1.71 B 1.72 B
Bicycle LOS Score / LOS 1.61 B 1.24 A 0.71 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 1:29:22 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 300 130 90 250 160 0 90
Signal Information
Cycle, s 60.0 Reference Phase 2
Offset, s 51 Reference Point End
Green 37.4 12.6 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 12.0
Phase Duration, s 42.4 42.4 17.6
Change Period, ( Y+R c ), s 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 12.4
Green Extension Time ( g e ), s 0.0 0.0 0.4
Phase Call Probability 0.99
Max Out Probability 0.07
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.63 B 1.34 A 1.72 B 1.94 B
Bicycle LOS Score / LOS 1.34 A 1.16 A 0.98 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 1:29:22 PM
HCS7 Two-Way Stop-Control Report
General Information Site Information
Analyst SNP Intersection Boston and Benbow
Lanes
Movement U L T R U L T R U L T R U L T R
Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12
Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 0 1 0
Configuration LT TR LR
Approach LOS B
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ TWSC Version 7.9.5 Generated: 5/10/2023 1:17:19 PM
Boston and Benbow_2027 AM_No Build.xtw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 220 130 40 60 50 80 30 450 80 50 270 110
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 4.2 38.9 5.5 5.9 2.0 10.7
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 4.0
Phase Duration, s 18.9 23.7 11.4 16.2 9.7 54.0 11.0 55.3
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.1 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 13.4 11.2 5.1 10.0 3.0 2.0
Green Extension Time ( g e ), s 0.0 0.6 0.1 0.6 0.0 0.0 0.6 0.0
Phase Call Probability 1.00 1.00 0.84 1.00 0.60 0.78
Max Out Probability 1.00 0.00 0.00 0.00 0.00 0.06
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.30 B 2.30 B 1.95 B 1.90 B
Bicycle LOS Score / LOS 1.19 A 0.83 A 0.99 A 0.87 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 3:49:03 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 360 240 30 10 210 170 30 500 10 60 70 100
Signal Information
Cycle, s 120.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 48.8 6.3 24.7 18.2 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 2 1 6
Case Number 1.0 4.0 5.3 6.4 1.0 3.0
Phase Duration, s 30.2 53.9 23.7 54.3 11.8 66.1
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 23.9 16.2 16.8 2.0
Green Extension Time ( g e ), s 0.8 1.5 1.5 0.0 0.5 0.0
Phase Call Probability 1.00 1.00 1.00 0.90
Max Out Probability 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.92 B 2.14 B 2.15 B 1.91 B
Bicycle LOS Score / LOS 1.67 B 1.22 A 1.50 B 0.92 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 3:39:05 PM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration TR LT LR
Approach LOS B B B
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/11/2023 10:55:38 AM
Drake and Hunt_2027 AM_No Build.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 310 110 150 200 40 50 110 90 40 180 70
Signal Information
Cycle, s 60.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 25.0 25.0 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 4 8 2 6
Case Number 6.0 6.0 6.0 6.0
Phase Duration, s 30.0 30.0 30.0 30.0
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.4 3.4 0.0 0.0
Queue Clearance Time ( g s ), s 14.1 24.2
Green Extension Time ( g e ), s 2.1 0.9 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.05 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.89 B 1.89 B 1.89 B
Bicycle LOS Score / LOS 1.37 A 1.19 A 0.94 A 1.01 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 3:35:56 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 120 900 10 30 630 90 20 30 30 340 40 280
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 2.6 3.9 24.5 2.5 1.5 10.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 2.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 12.5 34.4 8.6 30.5 8.5 16.0 16.0 23.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.3 3.1 3.3
Queue Clearance Time ( g s ), s 5.6 2.6 2.8 4.5 12.0 14.2
Green Extension Time ( g e ), s 0.1 0.0 0.0 0.0 0.0 0.6 0.0 0.5
Phase Call Probability 0.93 0.38 0.36 1.00 1.00 1.00
Max Out Probability 0.06 0.00 0.00 0.07 1.00 0.29
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 2.10 B 2.29 B 2.28 B
Bicycle LOS Score / LOS 1.40 A 1.15 A 0.63 A 1.66 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/9/2023 7:17:50 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1470 50 80 410 130 410
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 34 Reference Point End
Green 5.8 33.2 18.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 39.2 11.8 51.0 24.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 3.6 19.5
Green Extension Time ( g e ), s 0.0 0.1 0.0 0.0
Phase Call Probability 0.83 1.00
Max Out Probability 0.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 0.67 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.77 B 0.90 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/9/2023 7:17:50 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1480 400 90 440 310 0 50
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 71 Reference Point End
Green 6.0 35.8 15.2 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 41.8 12.0 53.8 21.2
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.2
Queue Clearance Time ( g s ), s 3.7 14.6
Green Extension Time ( g e ), s 0.0 0.1 0.0 0.6
Phase Call Probability 0.86 1.00
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.37 A 1.64 B 2.30 B 2.30 B
Bicycle LOS Score / LOS 2.16 B 0.96 A 1.13 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/9/2023 7:17:50 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 740 1050 310 300 220 0 220
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 59 Reference Point End
Green 49.2 13.8 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 55.2 55.2 19.8
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 12.8
Green Extension Time ( g e ), s 0.0 0.0 0.9
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.86 B 1.34 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 2.04 B 1.02 A 1.25 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/9/2023 7:17:50 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 160 240 40 20 270 70 50 110 30 110 140 190
Signal Information
Cycle, s 64.3 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.5 19.9 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.5 25.5 25.9 25.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.3 3.3
Queue Clearance Time ( g s ), s 6.2 8.7 7.4 18.1 14.4
Green Extension Time ( g e ), s 0.0 1.2 0.7 1.6 1.4
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.02 0.01 0.00 0.02
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 1.91 B 2.10 B 2.10 B
Bicycle LOS Score / LOS 1.30 A 0.82 A 0.84 A 1.30 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/8/2023 12:48:51 PM
2027
AM PEAK
ALTERNATIVE 1 – SOUTHBOUND EXIT ONLY
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 30 1040 20 410 900 80 80 40 950 80 20 30
Signal Information
Cycle, s 105.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 22.6 21.1 4.3 9.8 17.2 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 10.3 37.4 28.6 55.7 23.2 15.8
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 3.0 22.0 19.2 4.4
Green Extension Time ( g e ), s 1.4 0.0 0.6 0.0 0.0 0.1
Phase Call Probability 0.61 1.00 1.00 0.98
Max Out Probability 0.75 1.00 1.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.44 B 2.47 B 2.74 C 2.60 C
Bicycle LOS Score / LOS 1.13 A 1.72 B 2.39 B 0.72 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 1:33:19 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 1890 180 140 680 0 390 0 710
Signal Information
Cycle, s 105.0 Reference Phase 2
1 2 3 4
Offset, s 79 Reference Point End
Green 24.0 31.0 19.0 13.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 30.0 67.0 25.0 62.0 13.0 13.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.1 20.2 15.0 15.0
Green Extension Time ( g e ), s 0.0 0.0 0.0 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 1.00 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.13 B 2.25 B 2.60 C 2.73 C
Bicycle LOS Score / LOS 1.75 B 0.99 A 1.20 A 1.79 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 1:33:19 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 640 1640 1370 260 0 140
Signal Information
Cycle, s 105.0 Reference Phase 2
1 2 3 4
Offset, s 57 Reference Point End
Green 73.9 19.1 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 79.9 79.9 25.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 18.3
Green Extension Time ( g e ), s 0.0 0.0 0.8
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.05 B 1.34 A 2.32 B 2.47 B
Bicycle LOS Score / LOS 2.47 B 1.28 A 1.18 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 1:33:19 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 420 140 70 650 40 210 170 60 30 130 130
Signal Information
Cycle, s 65.3 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 5.4 20.1 3.3 3.7 14.8 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 9.4 26.1 9.4 26.1 11.0 22.5 7.3 18.8
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 3.9 14.1 4.0 14.4 9.0 7.7 3.1 11.6
Green Extension Time ( g e ), s 0.1 2.0 0.0 3.2 0.0 1.1 0.1 1.0
Phase Call Probability 0.77 1.00 0.77 1.00 0.99 1.00 0.46 1.00
Max Out Probability 0.00 0.49 1.00 0.00 1.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.10 B 1.91 B 2.27 B 2.43 B
Bicycle LOS Score / LOS 1.08 A 1.20 A 1.31 A 1.03 A
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 220 50 120 190 80 70 310 150 30 160 20
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.2 26.4 4.2 6.2 0.6 18.9
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 2.0 4.0 1.2 3.0 1.3 3.0
Phase Duration, s 11.7 24.4 12.3 25.0 11.7 43.6 9.7 41.6
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 5.2 17.7 5.6 17.7 4.7 2.0
Green Extension Time ( g e ), s 0.1 1.2 0.3 1.2 0.1 0.0 0.5 0.0
Phase Call Probability 0.88 1.00 0.97 1.00 0.88 0.60
Max Out Probability 0.00 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.12 B 2.14 B 1.91 B
Bicycle LOS Score / LOS 1.17 A 1.27 A 1.55 B 0.91 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:47:23 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 350 260 150 70 50
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 7.2 55.2 9.6 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 4
Case Number 1.0 4.0 7.3 9.0
Phase Duration, s 13.2 74.4 61.2 15.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 6.8 5.6
Green Extension Time ( g e ), s 0.4 0.0 0.0 0.2
Phase Call Probability 1.00 0.96
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 0.64 A 1.87 B 1.95 B 1.96 B
Bicycle LOS Score / LOS 1.58 B 1.22 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 12:32:03 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 160 70 190 150 90 50 200 90
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 60 Reference Point End
Green 58.2 19.8 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8 4
Case Number 7.0 6.0 5.0 5.0
Phase Duration, s 64.2 64.2 25.8 25.8
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.3 3.3
Queue Clearance Time ( g s ), s 18.6 6.7
Green Extension Time ( g e ), s 0.0 0.0 1.2 1.4
Phase Call Probability 1.00 1.00
Max Out Probability 0.03 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.06 B 2.06 B 1.93 B 1.93 B
Bicycle LOS Score / LOS 1.24 A 0.95 A F 0.79 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 12:32:03 PM
HCS7 Two-Way Stop-Control Report
General Information Site Information
Analyst SNP Intersection Boston and Benbow
Lanes
Movement U L T R U L T R U L T R U L T R
Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12
Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 0 1 0
Configuration LT TR LR
Approach LOS B
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ TWSC Version 7.9.5 Generated: 5/10/2023 12:49:18 PM
Boston and Benbow_2027 AM_Partial Build SB Exit.xtw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 220 130 40 60 60 80 30 450 80 50 280 120
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 4.2 1.3 48.2 5.9 2.0 11.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 0.0 1.5 1.5 1.5 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 4.0
Phase Duration, s 18.9 24.0 11.4 16.5 9.7 53.7 11.0 54.9
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.1 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 13.3 11.2 5.1 10.6 2.9 3.4
Green Extension Time ( g e ), s 0.1 0.5 0.1 0.4 0.0 0.0 0.1 0.0
Phase Call Probability 1.00 1.00 0.84 1.00 0.60 0.78
Max Out Probability 1.00 0.00 0.00 0.12 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.30 B 2.30 B 1.90 B 1.90 B
Bicycle LOS Score / LOS 1.19 A 0.85 A 0.99 A 0.89 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 11:16:55 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 360 250 30 10 210 170 30 500 10 60 70 100
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 29.4 5.7 18.8 14.1 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 2 1 6
Case Number 1.0 4.0 5.3 6.4 1.0 3.0
Phase Duration, s 24.3 43.8 19.6 34.9 11.2 46.2
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 18.1 12.7 13.0 2.0
Green Extension Time ( g e ), s 0.6 1.5 1.1 0.0 0.3 0.0
Phase Call Probability 1.00 1.00 1.00 0.82
Max Out Probability 0.01 0.00 0.18 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.13 B 2.14 B 1.90 B
Bicycle LOS Score / LOS 1.69 B 1.22 A 1.50 B 0.92 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:44:40 AM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration T R LT LR
Approach LOS B B B
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/24/2023 10:42:08 AM
Drake and Hunt_2027 AM_Partial Build SB Exit Only.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 310 110 150 200 40 50 110 90 40 190 80
Signal Information
Cycle, s 60.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 25.0 25.0 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 4 8 2 6
Case Number 6.0 6.0 6.0 6.0
Phase Duration, s 30.0 30.0 30.0 30.0
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.4 3.4 0.0 0.0
Queue Clearance Time ( g s ), s 14.1 24.2
Green Extension Time ( g e ), s 2.1 0.9 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.05 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.89 B 1.89 B 1.89 B
Bicycle LOS Score / LOS 1.37 A 1.19 A 0.94 A 1.04 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:45:38 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 120 910 10 30 630 90 20 30 30 340 40 270
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 2.4 4.0 21.6 2.4 5.6 10.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 0.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 12.4 31.6 8.4 27.6 8.4 16.0 14.0 21.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.3 3.1 3.3
Queue Clearance Time ( g s ), s 5.4 2.6 2.7 4.3 10.0 13.0
Green Extension Time ( g e ), s 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.4
Phase Call Probability 0.92 0.35 0.34 1.00 1.00 1.00
Max Out Probability 1.00 0.01 0.01 0.11 1.00 0.81
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 2.10 B 2.29 B 2.28 B
Bicycle LOS Score / LOS 1.41 A 1.15 A 0.63 A 1.64 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 1:43:24 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1490 50 80 390 130 400
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 44 Reference Point End
Green 5.6 31.4 15.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 37.4 11.6 49.0 21.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 3.5 17.0
Green Extension Time ( g e ), s 0.0 0.1 0.0 0.0
Phase Call Probability 0.81 1.00
Max Out Probability 0.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 0.67 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.78 B 0.88 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 1:43:24 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1480 410 100 410 250 0 60
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 13 Reference Point End
Green 6.1 34.0 11.9 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 40.0 12.1 52.1 17.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.2
Queue Clearance Time ( g s ), s 3.7 11.4
Green Extension Time ( g e ), s 0.0 0.1 0.0 0.5
Phase Call Probability 0.87 1.00
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.37 A 1.63 B 2.30 B 2.30 B
Bicycle LOS Score / LOS 2.16 B 0.94 A 1.04 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 1:43:24 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 620 1110 290 300 220 0 210
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 69 Reference Point End
Green 45.4 12.6 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 51.4 51.4 18.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 11.7
Green Extension Time ( g e ), s 0.0 0.0 0.9
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.86 B 1.34 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.99 B 1.00 A 1.23 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 1:43:24 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 170 250 40 20 280 70 50 110 30 110 140 200
Signal Information
Cycle, s 65.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.4 20.5 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.4 25.4 26.5 26.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.3 3.3
Queue Clearance Time ( g s ), s 6.6 9.2 7.7 18.8 14.9
Green Extension Time ( g e ), s 0.0 1.2 0.7 1.7 1.5
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.03 0.02 0.00 0.02
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 1.91 B 2.10 B 2.10 B
Bicycle LOS Score / LOS 1.34 A 0.83 A 0.84 A 1.32 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 1:46:15 PM
2027
AM PEAK
ALTERNATIVE 2 – PARTIAL BUILD NORTHBOUND LOOP
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 640 300 150 70 50
Signal Information
Cycle, s 110.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.3 74.9 9.8 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 4
Case Number 1.0 4.0 7.3 9.0
Phase Duration, s 13.3 94.2 80.9 15.8
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 6.9 6.4
Green Extension Time ( g e ), s 0.4 0.0 0.0 0.1
Phase Call Probability 1.00 0.98
Max Out Probability 0.00 0.67
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 0.63 A 1.87 B 1.96 B 1.96 B
Bicycle LOS Score / LOS 2.10 B 1.29 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/11/2023 10:51:53 AM
2027
AM PEAK
ALTERNATIVE 3 – PARTIAL BUILD NORTH SIDE
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 30 950 20 410 920 80 80 40 950 80 20 30
Signal Information
Cycle, s 100.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 19.8 18.1 4.1 9.8 18.2 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 10.1 34.2 25.8 49.9 24.2 15.8
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 2.9 19.2 20.2 4.3
Green Extension Time ( g e ), s 1.3 0.0 0.5 0.0 0.0 0.1
Phase Call Probability 0.59 1.00 1.00 0.98
Max Out Probability 0.72 1.00 1.00 0.04
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.44 B 2.46 B 2.74 C 2.59 C
Bicycle LOS Score / LOS 1.08 A 1.74 B 2.39 B 0.72 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 2:33:19 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 1800 180 140 700 0 390 0 710
Signal Information
Cycle, s 100.0 Reference Phase 2
1 2 3 4
Offset, s 5 Reference Point End
Green 25.0 17.0 25.0 15.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 31.0 54.0 31.0 54.0 15.0 15.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.1 15.1 14.7 17.0
Green Extension Time ( g e ), s 0.0 0.0 3.3 0.0 0.2 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.21 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.12 B 2.26 B 2.60 C 2.73 C
Bicycle LOS Score / LOS 1.70 B 1.00 A 1.20 A 1.79 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 2:33:19 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 940 1250 1200 230 0 150
Signal Information
Cycle, s 100.0 Reference Phase 2
1 2 3 4
Offset, s 66 Reference Point End
Green 71.5 16.5 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 77.5 77.5 22.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 15.7
Green Extension Time ( g e ), s 0.0 0.0 0.8
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.04 B 1.34 A 2.31 B 2.47 B
Bicycle LOS Score / LOS 2.39 B 1.18 A 1.15 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 2:33:19 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 80 420 130 10 640 40 220 170 60 30 130 130
Signal Information
Cycle, s 65.5 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 1.4 0.4 18.8 3.3 0.7 14.9
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 9.7 29.2 5.4 24.8 12.0 23.6 7.3 18.9
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 4.2 12.0 2.3 14.6 9.2 7.6 3.1 11.6
Green Extension Time ( g e ), s 0.2 2.3 0.0 1.7 0.0 1.1 0.1 1.1
Phase Call Probability 0.81 1.00 0.19 1.00 0.99 1.00 0.46 1.00
Max Out Probability 0.00 0.29 0.02 0.00 1.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.09 B 1.91 B 2.27 B 2.43 B
Bicycle LOS Score / LOS 1.08 A 1.13 A 1.33 A 1.03 A
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 220 50 120 190 80 70 310 150 30 160 20
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.2 26.4 4.2 6.2 0.6 18.9
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 2.0 4.0 1.2 3.0 1.3 3.0
Phase Duration, s 11.7 24.4 12.3 25.0 11.7 43.6 9.7 41.6
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 5.2 17.7 5.6 17.7 4.7 2.0
Green Extension Time ( g e ), s 0.1 1.2 0.3 1.2 0.1 0.0 0.5 0.0
Phase Call Probability 0.88 1.00 0.97 1.00 0.88 0.60
Max Out Probability 0.00 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.12 B 2.14 B 1.91 B
Bicycle LOS Score / LOS 1.17 A 1.27 A 1.55 B 0.91 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:34:11 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 630 260 150 70 50
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 74.2 5.8 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 4
Case Number 6.0 8.0 9.0
Phase Duration, s 79.2 79.2 10.8
Change Period, ( Y+R c ), s 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 5.7
Green Extension Time ( g e ), s 0.0 0.0 0.2
Phase Call Probability 0.96
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 0.61 A 1.81 B 1.73 B 1.96 B
Bicycle LOS Score / LOS 2.08 B 1.22 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 12:08:20 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 560 160 70 170 150 610 50 200 90
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 59 Reference Point End
Green 36.8 41.2 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8 4
Case Number 7.0 6.0 5.0 5.0
Phase Duration, s 42.8 42.8 47.2 47.2
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.3 3.3
Queue Clearance Time ( g s ), s 38.1 5.2
Green Extension Time ( g e ), s 0.0 0.0 3.1 3.2
Phase Call Probability 1.00 1.00
Max Out Probability 0.02 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.10 B 2.10 B 1.90 B 1.90 B
Bicycle LOS Score / LOS 1.78 B 0.92 A F 0.79 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 12:08:20 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 970 250 240 560
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 39 Reference Point End
Green 16.7 61.3 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6
Case Number 1.0 4.0 7.3
Phase Duration, s 22.7 90.0 67.3
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 0.0
Queue Clearance Time ( g s ), s 13.8
Green Extension Time ( g e ), s 3.0 0.0 0.0
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 0.54 A 1.34 A 1.95 B 1.95 B
Bicycle LOS Score / LOS 2.68 C 1.92 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 12:08:20 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 220 130 40 10 60 60 30 440 80 50 290 110
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 3.9 31.0 5.2 1.7 5.2 10.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 4.0
Phase Duration, s 17.9 26.2 7.2 15.5 9.4 45.9 10.7 47.2
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 12.1 9.8 2.5 8.5 3.0 2.0
Green Extension Time ( g e ), s 0.3 0.6 0.0 0.6 0.0 0.0 0.9 0.0
Phase Call Probability 1.00 1.00 0.24 1.00 0.56 0.74
Max Out Probability 0.00 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.30 B 1.95 B 1.90 B
Bicycle LOS Score / LOS 1.19 A 0.72 A 0.98 A 0.89 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:32:14 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 360 250 30 10 210 170 30 500 10 60 70 100
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 29.4 5.7 18.8 14.1 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 2 1 6
Case Number 1.0 4.0 5.3 6.4 1.0 3.0
Phase Duration, s 24.3 43.8 19.6 34.9 11.2 46.2
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 18.1 12.7 13.0 2.0
Green Extension Time ( g e ), s 0.6 1.5 1.1 0.0 0.3 0.0
Phase Call Probability 1.00 1.00 1.00 0.82
Max Out Probability 0.01 0.00 0.18 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.13 B 2.14 B 1.90 B
Bicycle LOS Score / LOS 1.69 B 1.22 A 1.50 B 0.92 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:25:40 AM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration T R LT LR
Approach LOS B B B
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/24/2023 10:24:13 AM
Drake and Hunt_2027 AM_Partial Build N Side.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 310 110 150 200 40 50 110 90 40 190 80
Signal Information
Cycle, s 60.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 25.0 25.0 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 4 8 2 6
Case Number 6.0 6.0 6.0 6.0
Phase Duration, s 30.0 30.0 30.0 30.0
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.4 3.4 0.0 0.0
Queue Clearance Time ( g s ), s 14.1 24.2
Green Extension Time ( g e ), s 2.1 0.9 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.05 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.89 B 1.89 B 1.89 B
Bicycle LOS Score / LOS 1.37 A 1.19 A 0.94 A 1.04 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:28:14 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 120 910 10 30 630 90 20 30 30 340 40 270
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 2.6 3.8 21.6 2.4 5.6 10.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 0.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 12.4 31.4 8.6 27.6 8.4 16.0 14.0 21.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.3 3.1 3.3
Queue Clearance Time ( g s ), s 5.4 2.7 2.7 4.3 10.0 13.0
Green Extension Time ( g e ), s 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.4
Phase Call Probability 0.92 0.38 0.34 1.00 1.00 1.00
Max Out Probability 1.00 0.01 0.01 0.11 1.00 0.81
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 2.10 B 2.29 B 2.28 B
Bicycle LOS Score / LOS 1.41 A 1.15 A 0.63 A 1.64 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 2:41:45 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1360 50 80 450 130 400
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 27 Reference Point End
Green 5.6 28.3 18.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 34.3 11.6 46.0 24.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 3.6 17.3
Green Extension Time ( g e ), s 0.0 0.1 0.0 0.7
Phase Call Probability 0.81 1.00
Max Out Probability 0.00 0.29
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 0.67 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.67 B 0.93 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 2:41:45 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1350 410 100 470 250 0 60
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 70 Reference Point End
Green 6.1 34.0 11.9 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 40.0 12.1 52.1 17.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.2
Queue Clearance Time ( g s ), s 3.7 11.4
Green Extension Time ( g e ), s 0.0 0.1 0.0 0.5
Phase Call Probability 0.87 1.00
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.37 A 1.63 B 2.30 B 2.30 B
Bicycle LOS Score / LOS 2.05 B 0.99 A 1.04 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 2:41:45 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 900 700 300 160 270 0 210
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 49 Reference Point End
Green 43.8 14.2 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 49.8 49.8 20.2
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 13.1
Green Extension Time ( g e ), s 0.0 0.0 1.0
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.86 B 1.34 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.88 B 0.89 A 1.32 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 2:41:45 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 160 250 40 20 270 70 50 110 30 120 140 210
Signal Information
Cycle, s 65.5 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.4 21.1 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.4 25.4 27.1 27.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.4 3.4
Queue Clearance Time ( g s ), s 6.4 9.3 7.5 19.3 15.4
Green Extension Time ( g e ), s 0.0 1.2 0.7 1.7 1.6
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.03 0.01 0.00 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 1.91 B 2.10 B 2.10 B
Bicycle LOS Score / LOS 1.32 A 0.82 A 0.84 A 1.36 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 2:40:42 PM
2027
AM PEAK
ALTERNATIVE 4 – SOUTHBOUND EXIT SOUTHBOUND ENTRANCE
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 30 980 20 410 930 80 80 40 980 80 20 30
Signal Information
Cycle, s 110.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 23.6 23.0 4.4 9.9 19.1 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 10.4 39.4 29.6 58.6 25.1 15.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 3.0 22.8 21.1 4.5
Green Extension Time ( g e ), s 1.3 0.0 0.8 0.0 0.0 0.1
Phase Call Probability 0.63 1.00 1.00 0.99
Max Out Probability 0.75 0.54 1.00 0.05
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.44 B 2.47 B 2.74 C 2.60 C
Bicycle LOS Score / LOS 1.10 A 1.75 B 2.44 B 0.72 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 7:41:34 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 1910 130 130 690 0 390 0 730
Signal Information
Cycle, s 110.0 Reference Phase 2
1 2 3 4
Offset, s 10 Reference Point End
Green 28.0 21.0 27.0 16.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 34.0 61.0 33.0 60.0 16.0 16.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.1 17.2 16.1 18.0
Green Extension Time ( g e ), s 0.0 0.0 3.8 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.29 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.13 B 2.26 B 2.60 C 2.73 C
Bicycle LOS Score / LOS 1.73 B 0.99 A 1.20 A 1.83 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 7:41:34 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 660 1640 1370 260 0 140
Signal Information
Cycle, s 110.0 Reference Phase 2
1 2 3 4
Offset, s 56 Reference Point End
Green 78.1 19.9 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 84.1 84.1 25.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 19.1
Green Extension Time ( g e ), s 0.0 0.0 0.8
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.05 B 1.34 A 2.32 B 2.47 B
Bicycle LOS Score / LOS 2.48 B 1.28 A 1.18 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 7:41:34 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 420 140 70 650 40 210 170 60 30 130 130
Signal Information
Cycle, s 65.3 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 5.4 20.1 3.3 3.7 14.8 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 9.4 26.1 9.4 26.1 11.0 22.5 7.3 18.8
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 3.9 12.3 4.0 14.4 9.0 7.7 3.1 11.6
Green Extension Time ( g e ), s 0.1 2.3 0.0 3.2 0.0 1.1 0.1 1.0
Phase Call Probability 0.77 1.00 0.77 1.00 0.99 1.00 0.46 1.00
Max Out Probability 0.00 0.32 1.00 0.00 1.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.10 B 1.91 B 2.27 B 2.43 B
Bicycle LOS Score / LOS 1.08 A 1.20 A 1.31 A 1.03 A
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 210 50 120 190 80 70 300 150 40 150 20
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.2 26.2 4.9 6.2 0.6 18.4
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 2.0 4.0 1.2 3.0 1.3 3.0
Phase Duration, s 11.7 23.9 12.3 24.5 11.7 43.4 10.4 42.1
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 5.2 17.1 5.6 17.8 4.8 2.0
Green Extension Time ( g e ), s 0.1 1.2 0.3 1.2 0.1 0.0 0.4 0.0
Phase Call Probability 0.88 1.00 0.97 1.00 0.88 0.70
Max Out Probability 0.00 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.12 B 2.14 B 1.91 B
Bicycle LOS Score / LOS 1.15 A 1.27 A 1.53 B 0.91 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 11:13:08 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 560 30 110 210 80 60 250 90 170 20 50
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 14.7 8.5 6.6 5.6 3.6 20.9
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 0.0 2.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.2 4.0 1.3 4.0 1.1 4.0 1.1 4.0
Phase Duration, s 20.7 35.3 12.6 27.1 11.6 26.9 15.2 30.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.1 3.1 3.1
Queue Clearance Time ( g s ), s 14.3 2.0 4.4 20.2 9.0 5.2
Green Extension Time ( g e ), s 0.4 0.0 0.7 0.0 0.1 0.7 0.3 0.9
Phase Call Probability 1.00 0.94 0.80 1.00 0.99 1.00
Max Out Probability 0.00 0.00 0.00 0.01 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.94 B 1.93 B 2.29 B 2.28 B
Bicycle LOS Score / LOS 1.25 A 0.85 A 1.20 A 0.92 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 12:59:24 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 280 500 260 180 100 200
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 68.0 10.0 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 4
Case Number 7.0 8.0 9.0
Phase Duration, s 74.0 74.0 16.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.3
Queue Clearance Time ( g s ), s 9.1
Green Extension Time ( g e ), s 0.0 0.0 0.7
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.32 A 1.84 B 1.95 B 2.15 B
Bicycle LOS Score / LOS 1.89 B 0.88 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 12:59:24 PM
HCS7 Two-Way Stop-Control Report
General Information Site Information
Analyst SNP Intersection Boston and Benbow
Lanes
Movement U L T R U L T R U L T R U L T R
Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12
Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 0 1 0
Configuration LT TR LR
Approach LOS C
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ TWSC Version 7.9.5 Generated: 5/10/2023 12:51:26 PM
Boston and Benbow_2027 AM_Partial Build SB Only.xtw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 220 130 40 60 60 80 30 450 80 50 280 120
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 4.2 1.3 48.2 5.9 2.0 11.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 0.0 1.5 1.5 1.5 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 4.0
Phase Duration, s 18.9 24.0 11.4 16.5 9.7 53.7 11.0 54.9
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.1 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 13.3 11.2 5.1 10.6 2.9 3.4
Green Extension Time ( g e ), s 0.1 0.5 0.1 0.4 0.0 0.0 0.1 0.0
Phase Call Probability 1.00 1.00 0.84 1.00 0.60 0.78
Max Out Probability 1.00 0.00 0.00 0.12 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.30 B 2.30 B 1.90 B 1.90 B
Bicycle LOS Score / LOS 1.19 A 0.85 A 0.99 A 0.89 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 11:11:03 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 360 240 40 10 210 180 30 500 10 60 70 100
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 29.3 5.7 18.7 14.2 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 2 1 6
Case Number 1.0 4.0 5.3 6.4 1.0 3.0
Phase Duration, s 24.2 43.9 19.7 34.8 11.2 46.1
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 18.1 12.8 13.0 2.0
Green Extension Time ( g e ), s 0.7 1.5 1.2 0.0 0.4 0.0
Phase Call Probability 1.00 1.00 1.00 0.82
Max Out Probability 0.00 0.00 0.13 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.13 B 2.14 B 1.90 B
Bicycle LOS Score / LOS 1.69 B 1.24 A 1.50 B 0.92 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 11:04:26 AM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration TR LT LR
Approach LOS B B B
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/24/2023 11:03:13 AM
Drake and Hunt_2027 AM_Partial Build SB Only.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 320 110 150 210 40 50 120 90 40 180 70
Signal Information
Cycle, s 60.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 24.5 25.5 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 4 8 2 6
Case Number 6.0 6.0 6.0 6.0
Phase Duration, s 30.5 30.5 29.5 29.5
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.4 3.4 0.0 0.0
Queue Clearance Time ( g s ), s 14.4 24.5
Green Extension Time ( g e ), s 2.2 1.1 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.05 0.95
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.89 B 1.89 B 1.89 B
Bicycle LOS Score / LOS 1.38 A 1.20 A 0.95 A 1.01 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 11:07:05 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 120 910 10 30 630 100 20 30 30 330 40 270
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 2.5 3.9 21.6 2.4 5.6 10.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 0.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 12.4 31.5 8.5 27.6 8.4 16.0 14.0 21.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.3 3.1 3.3
Queue Clearance Time ( g s ), s 5.4 2.6 2.7 4.3 10.0 13.0
Green Extension Time ( g e ), s 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.3
Phase Call Probability 0.92 0.36 0.34 1.00 1.00 1.00
Max Out Probability 1.00 0.07 0.01 0.21 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 2.10 B 2.29 B 2.28 B
Bicycle LOS Score / LOS 1.41 A 1.16 A 0.63 A 1.62 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 2:32:32 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1360 50 80 420 130 400
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 31 Reference Point End
Green 5.6 28.3 18.1 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 34.3 11.6 45.9 24.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 3.6 17.3
Green Extension Time ( g e ), s 0.0 0.1 0.0 0.8
Phase Call Probability 0.81 1.00
Max Out Probability 0.00 0.17
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 0.67 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.67 B 0.91 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 2:32:32 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1450 310 70 440 410 0 60
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 64 Reference Point End
Green 5.3 28.6 18.1 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 34.6 11.3 45.9 24.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.2
Queue Clearance Time ( g s ), s 3.4 17.5
Green Extension Time ( g e ), s 0.0 0.1 0.0 0.6
Phase Call Probability 0.76 1.00
Max Out Probability 0.00 0.25
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.38 A 1.65 B 2.30 B 2.30 B
Bicycle LOS Score / LOS 2.05 B 0.94 A 1.32 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 2:32:32 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 750 1110 290 300 220 0 210
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 52 Reference Point End
Green 45.5 12.5 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 51.5 51.5 18.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 11.7
Green Extension Time ( g e ), s 0.0 0.0 0.9
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.86 B 1.34 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 2.10 B 1.00 A 1.23 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 2:32:32 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 170 250 40 20 280 70 50 110 30 110 140 200
Signal Information
Cycle, s 65.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.4 20.5 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.4 25.4 26.5 26.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.3 3.3
Queue Clearance Time ( g s ), s 6.6 9.2 7.7 18.8 14.9
Green Extension Time ( g e ), s 0.0 1.2 0.7 1.7 1.5
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.03 0.01 0.00 0.02
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 1.91 B 2.10 B 2.10 B
Bicycle LOS Score / LOS 1.34 A 0.83 A 0.84 A 1.32 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 2:31:43 PM
2027
AM PEAK
FULL INTERCHANGE
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 30 910 20 410 890 80 80 40 840 80 20 30
Signal Information
Cycle, s 95.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 19.8 17.1 4.0 9.7 14.2 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 10.0 33.2 25.8 49.0 20.2 15.7
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 2.9 18.8 16.2 4.1
Green Extension Time ( g e ), s 1.2 0.0 1.1 0.0 0.0 0.1
Phase Call Probability 0.57 1.00 1.00 0.97
Max Out Probability 0.70 0.09 1.00 0.03
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.44 B 2.46 B 2.74 C 2.59 C
Bicycle LOS Score / LOS 1.06 A 1.71 B 2.19 B 0.72 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 8:48:09 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 1690 140 140 690 0 390 0 690
Signal Information
Cycle, s 95.0 Reference Phase 2
1 2 3 4
Offset, s 88 Reference Point End
Green 18.1 23.0 18.0 17.9 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 24.1 53.1 24.0 53.0 17.9 17.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.0 16.9 14.5 16.3
Green Extension Time ( g e ), s 0.0 0.0 0.7 0.0 2.1 1.6
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 1.00 0.56 0.91
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.13 B 2.26 B 2.59 C 2.72 C
Bicycle LOS Score / LOS 1.61 B 0.99 A 1.20 A 1.75 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 8:48:09 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 730 1350 1250 250 0 100
Signal Information
Cycle, s 95.0 Reference Phase 2
1 2 3 4
Offset, s 70 Reference Point End
Green 66.1 16.9 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 72.1 72.1 22.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 16.1
Green Extension Time ( g e ), s 0.0 0.0 0.7
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.05 B 1.34 A 2.31 B 2.46 B
Bicycle LOS Score / LOS 2.29 B 1.21 A 1.10 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 8:48:09 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 80 410 130 70 650 40 220 170 70 30 130 130
Signal Information
Cycle, s 65.5 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 5.4 0.3 20.0 3.3 3.7 14.8
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 9.7 26.3 9.4 26.0 11.0 22.5 7.3 18.8
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 4.2 12.3 4.0 14.5 9.0 7.7 3.1 11.6
Green Extension Time ( g e ), s 0.2 2.2 0.0 3.0 0.0 1.1 0.1 1.0
Phase Call Probability 0.81 1.00 0.77 1.00 0.99 1.00 0.46 1.00
Max Out Probability 0.00 0.31 1.00 0.00 1.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.10 B 1.91 B 2.27 B 2.43 B
Bicycle LOS Score / LOS 1.07 A 1.20 A 1.35 A 1.03 A
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 220 50 120 180 80 70 300 150 40 150 20
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.2 25.7 4.9 6.2 0.6 18.9
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 2.0 4.0 1.2 3.0 1.3 3.0
Phase Duration, s 11.7 24.4 12.3 25.0 11.7 42.9 10.4 41.7
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 5.2 17.7 5.6 17.1 4.8 2.0
Green Extension Time ( g e ), s 0.1 1.2 0.3 1.2 0.1 0.0 0.5 0.0
Phase Call Probability 0.88 1.00 0.97 1.00 0.88 0.70
Max Out Probability 0.00 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.12 B 2.14 B 1.91 B
Bicycle LOS Score / LOS 1.17 A 1.25 A 1.53 B 0.91 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:16:36 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 1030 30 110 360 80 20 90 90 140 20 50
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 12.2 25.1 6.7 6.1 10.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 7 4
Case Number 1.2 4.0 1.3 4.0 7.3 2.0 4.0
Phase Duration, s 18.2 49.2 12.7 43.8 16.0 12.1 28.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 11.7 2.0 7.8 5.9 5.3
Green Extension Time ( g e ), s 0.5 0.0 1.2 0.0 0.6 0.3 0.6
Phase Call Probability 1.00 0.96 1.00 0.98 1.00
Max Out Probability 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.94 B 2.10 B 2.30 B 2.29 B
Bicycle LOS Score / LOS 1.67 B 0.98 A 0.85 A 0.86 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 11:54:17 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 770 430 240 380 90 200
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 85 Reference Point End
Green 55.0 7.0 10.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.4 1.0 4.0 9.0
Phase Duration, s 61.0 13.0 74.0 16.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 2.0 9.1
Green Extension Time ( g e ), s 0.0 1.0 0.0 0.6
Phase Call Probability 1.00 1.00
Max Out Probability 0.22 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.43 A 1.84 B 2.31 B 2.32 B
Bicycle LOS Score / LOS 1.56 B 1.04 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 11:54:17 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 680 180 360 580 260 90
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 79 Reference Point End
Green 47.6 7.0 17.4 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8
Case Number 1.0 4.0 7.4 9.0
Phase Duration, s 13.0 66.6 53.6 23.4
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 2.0 16.7
Green Extension Time ( g e ), s 1.4 0.0 0.0 0.7
Phase Call Probability 1.00 1.00
Max Out Probability 0.49 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.64 B 1.72 B 2.15 B 2.31 B
Bicycle LOS Score / LOS 2.03 B 1.33 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 11:54:17 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 210 130 40 60 60 80 30 450 80 50 280 110
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 3.9 31.2 5.2 5.6 0.8 10.3
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 4.0
Phase Duration, s 17.4 22.1 11.1 15.8 9.4 46.1 10.7 47.4
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.1 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 11.6 10.3 4.8 9.7 3.0 2.0
Green Extension Time ( g e ), s 0.4 0.6 0.1 0.6 0.0 0.0 0.8 0.0
Phase Call Probability 1.00 1.00 0.80 1.00 0.56 0.74
Max Out Probability 0.00 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.30 B 1.95 B 1.90 B
Bicycle LOS Score / LOS 1.17 A 0.85 A 0.99 A 0.88 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:14:01 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 360 240 30 10 210 170 30 500 10 60 70 100
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 29.3 5.7 18.8 14.2 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 2 1 6
Case Number 1.0 4.0 5.3 6.4 1.0 3.0
Phase Duration, s 24.3 43.9 19.7 34.8 11.2 46.1
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 18.1 12.3 13.0 2.0
Green Extension Time ( g e ), s 0.7 1.5 1.2 0.0 0.3 0.0
Phase Call Probability 1.00 1.00 1.00 0.82
Max Out Probability 0.00 0.00 0.07 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.13 B 2.14 B 1.90 B
Bicycle LOS Score / LOS 1.67 B 1.22 A 1.50 B 0.92 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:08:05 AM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration T R LT LR
Approach LOS B B B
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/24/2023 10:06:36 AM
Drake and Hunt_2027 AM_Full Build.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 310 110 150 210 40 50 110 90 40 180 70
Signal Information
Cycle, s 60.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 24.8 25.2 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 4 8 2 6
Case Number 6.0 6.0 6.0 6.0
Phase Duration, s 30.2 30.2 29.8 29.8
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.4 3.4 0.0 0.0
Queue Clearance Time ( g s ), s 14.1 24.1
Green Extension Time ( g e ), s 2.1 1.1 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.04 0.85
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.89 B 1.89 B 1.89 B
Bicycle LOS Score / LOS 1.37 A 1.20 A 0.94 A 1.01 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:11:15 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 120 910 10 30 630 90 20 30 30 330 40 270
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 2.6 3.9 22.6 2.4 4.6 10.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 0.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 12.4 32.4 8.6 28.6 8.4 16.0 13.0 20.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.3 3.1 3.3
Queue Clearance Time ( g s ), s 5.3 2.6 2.7 4.3 9.0 13.2
Green Extension Time ( g e ), s 0.1 0.0 0.0 0.0 0.0 0.5 0.0 0.2
Phase Call Probability 0.92 0.37 0.34 1.00 1.00 1.00
Max Out Probability 0.52 0.00 0.09 0.21 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 2.10 B 2.29 B 2.28 B
Bicycle LOS Score / LOS 1.41 A 1.15 A 0.63 A 1.62 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 9:15:19 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1170 50 80 430 130 400
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 26 Reference Point End
Green 5.6 28.4 18.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 34.4 11.6 46.0 24.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 3.6 17.3
Green Extension Time ( g e ), s 0.0 0.1 0.0 0.6
Phase Call Probability 0.81 1.00
Max Out Probability 0.00 0.49
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 0.67 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.51 B 0.92 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 9:15:19 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1310 260 90 440 350 0 70
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 57 Reference Point End
Green 5.9 30.3 15.8 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 36.3 11.9 48.2 21.8
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.2
Queue Clearance Time ( g s ), s 3.7 15.2
Green Extension Time ( g e ), s 0.0 0.1 0.0 0.6
Phase Call Probability 0.84 1.00
Max Out Probability 0.00 0.05
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.38 A 1.64 B 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.88 B 0.96 A 1.23 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 9:15:19 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 850 810 310 300 220 0 210
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 48 Reference Point End
Green 45.4 12.6 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 51.4 51.4 18.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 11.7
Green Extension Time ( g e ), s 0.0 0.0 0.9
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.86 B 1.34 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.93 B 1.02 A 1.23 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 9:15:19 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 160 250 40 20 270 70 50 110 30 120 140 190
Signal Information
Cycle, s 64.3 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.4 19.9 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.4 25.4 25.9 25.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.3 3.3
Queue Clearance Time ( g s ), s 6.2 9.0 7.4 18.1 14.4
Green Extension Time ( g e ), s 0.0 1.2 0.7 1.7 1.5
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.03 0.01 0.00 0.02
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 1.91 B 2.10 B 2.10 B
Bicycle LOS Score / LOS 1.32 A 0.82 A 0.84 A 1.32 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 10:29:39 AM
2027
PM PEAK
NO BUILD
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 1550 30 890 1440 420 120 140 660 310 110 170
Signal Information
Cycle, s 115.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 35.0 19.5 8.5 12.0 10.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 14.5 40.0 41.0 66.5 16.0 18.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 8.4 37.0 12.0 14.0
Green Extension Time ( g e ), s 0.1 0.0 0.0 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 1.00 1.00 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.44 B 2.47 B 2.75 C 2.61 C
Bicycle LOS Score / LOS 1.53 B 2.93 C 2.12 B 1.53 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/9/2023 8:04:17 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 2090 430 120 1090 0 690 0 1660
Signal Information
Cycle, s 115.0 Reference Phase 2
1 2 3 4
Offset, s 51 Reference Point End
Green 56.0 46.0 1.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 62.0 62.0 52.0 52.0 1.0 1.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.0 12.3 3.0 3.0
Green Extension Time ( g e ), s 0.0 0.0 6.2 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.01 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.11 B 2.28 B 2.61 C 2.74 C
Bicycle LOS Score / LOS 2.03 B 1.23 A 1.75 B 3.53 D
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/9/2023 8:04:17 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1460 1320 1520 220 0 270
Signal Information
Cycle, s 115.0 Reference Phase 2
1 2 3 4
Offset, s 31 Reference Point End
Green 80.4 22.6 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 86.4 86.4 28.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.3
Queue Clearance Time ( g s ), s 21.5
Green Extension Time ( g e ), s 0.0 0.0 1.1
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.05 B 1.35 A 2.32 B 2.47 B
Bicycle LOS Score / LOS 2.90 C 1.37 A 1.34 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/9/2023 8:04:17 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 160 600 150 120 690 40 210 200 90 110 300 160
Signal Information
Cycle, s 108.1 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 8.1 2.0 33.9 7.8 0.2 34.1
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 14.1 41.9 12.1 39.9 16.0 42.3 11.8 38.1
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.1 3.1 3.1
Queue Clearance Time ( g s ), s 9.7 33.1 7.9 24.0 12.0 12.1 7.8 29.7
Green Extension Time ( g e ), s 0.3 2.0 0.2 0.0 0.0 1.8 0.0 1.8
Phase Call Probability 1.00 1.00 0.98 1.00 1.00 1.00 0.98 1.00
Max Out Probability 0.00 0.00 0.00 1.00 1.00 0.00 1.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.12 B 1.93 B 2.28 B 2.44 B
Bicycle LOS Score / LOS 1.34 A 1.28 A 1.43 A 1.56 B
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 50 210 110 290 230 110 100 420 150 100 530 100
Signal Information
Cycle, s 120.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.8 47.4 5.9 6.1 26.3 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 11.4 31.8 23.0 43.5 12.3 52.9 12.3 52.9
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 4.7 25.1 17.7 23.3 6.2 6.2
Green Extension Time ( g e ), s 0.1 1.3 0.0 1.4 0.2 0.0 0.1 0.0
Phase Call Probability 0.84 1.00 1.00 1.00 0.97 0.97
Max Out Probability 0.00 0.02 1.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.94 B 2.12 B 1.92 B 1.92 B
Bicycle LOS Score / LOS 1.15 A 1.62 B 1.69 B 1.80 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 3:29:19 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 140 390 440 180 210 0 160
Signal Information
Cycle, s 70.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 42.0 18.0 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 4
Case Number 8.0 8.0 12.0
Phase Duration, s 47.0 47.0 23.0
Change Period, ( Y+R c ), s 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 17.8
Green Extension Time ( g e ), s 0.0 0.0 0.1
Phase Call Probability 1.00
Max Out Probability 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.35 A 1.35 A 1.72 B 1.72 B
Bicycle LOS Score / LOS 1.43 A 1.59 B 1.14 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 1:27:53 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 350 250 150 450 160 0 70
Signal Information
Cycle, s 70.0 Reference Phase 2
Offset, s 6 Reference Point End
Green 48.3 11.7 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 12.0
Phase Duration, s 53.3 53.3 16.7
Change Period, ( Y+R c ), s 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 11.4
Green Extension Time ( g e ), s 0.0 0.0 0.5
Phase Call Probability 0.99
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.62 B 1.33 A 1.72 B 1.95 B
Bicycle LOS Score / LOS 1.52 B 1.52 B 0.88 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 1:27:53 PM
HCS7 Two-Way Stop-Control Report
General Information Site Information
Analyst SNP Intersection Boston and Benbow
Lanes
Movement U L T R U L T R U L T R U L T R
Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12
Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 0 1 0
Configuration LT TR LR
Approach LOS C
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ TWSC Version 7.9.5 Generated: 5/10/2023 1:19:03 PM
Boston and Benbow_2027 PM_No Build.xtw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 100 50 120 190 130 90 470 80 140 500 280
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.3 20.9 6.8 6.7 2.5 19.2
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 4.0
Phase Duration, s 14.7 27.2 12.2 24.7 11.8 38.3 12.3 38.7
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.1 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 9.2 8.5 6.8 18.4 5.3 2.0
Green Extension Time ( g e ), s 0.1 0.9 0.2 0.8 0.1 0.0 1.6 0.0
Phase Call Probability 0.99 1.00 0.96 1.00 0.90 0.97
Max Out Probability 1.00 0.00 0.00 0.00 0.00 0.11
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.29 B 1.94 B 1.91 B
Bicycle LOS Score / LOS 1.05 A 1.24 A 1.04 A 1.28 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 3:33:23 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 400 60 30 390 180 60 300 20 180 400 250
Signal Information
Cycle, s 120.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 44.8 7.0 15.6 30.5 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 2 1 6
Case Number 1.0 4.0 5.3 6.4 1.0 3.0
Phase Duration, s 21.1 57.2 36.0 50.3 12.5 62.8
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 15.1 27.1 28.1 2.0
Green Extension Time ( g e ), s 0.5 2.4 2.4 0.0 1.8 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.92 B 2.13 B 2.15 B 1.91 B
Bicycle LOS Score / LOS 1.77 B 1.55 B 1.16 A 1.96 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 3:39:59 PM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration TR LT LR
Approach LOS E C C
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/11/2023 10:54:37 AM
Drake and Hunt_2027 PM_No Build.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 80 260 110 140 370 60 180 210 90 40 240 120
Signal Information
Cycle, s 60.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 28.0 22.0 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 4 8 2 6
Case Number 6.0 6.0 6.0 6.0
Phase Duration, s 27.0 27.0 33.0 33.0
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.3 3.3 0.0 0.0
Queue Clearance Time ( g s ), s 18.9 20.3
Green Extension Time ( g e ), s 1.9 1.7 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.25 0.38
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 1.90 B 1.88 B 1.88 B
Bicycle LOS Score / LOS 1.25 A 1.46 A 1.30 A 1.17 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 3:36:50 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 200 680 70 150 1080 230 90 140 80 200 130 200
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 6.4 1.9 23.6 6.1 0.9 12.1
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 0.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 14.2 31.5 12.4 29.6 12.1 18.1 13.0 19.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 8.2 5.3 5.3 11.6 9.0 10.6
Green Extension Time ( g e ), s 0.1 0.0 0.1 0.0 0.0 0.5 0.0 0.7
Phase Call Probability 0.99 0.91 0.87 1.00 0.99 1.00
Max Out Probability 0.59 0.04 1.00 0.91 1.00 0.33
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.10 B 2.29 B 2.29 B
Bicycle LOS Score / LOS 1.33 A 1.78 B 1.04 A 1.43 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/9/2023 8:07:06 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1090 180 380 950 120 190
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 6 Reference Point End
Green 8.0 39.0 10.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 45.0 14.0 59.0 16.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 9.1 9.6
Green Extension Time ( g e ), s 0.0 0.0 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 0.65 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.56 B 1.61 B F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/9/2023 8:07:06 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 940 340 200 1040 200 0 290
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 47 Reference Point End
Green 6.9 33.0 17.1 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 39.0 12.9 51.9 23.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 6.1 16.2
Green Extension Time ( g e ), s 0.0 0.3 0.0 0.9
Phase Call Probability 0.99 1.00
Max Out Probability 0.00 0.02
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.38 A 1.64 B 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.62 B 1.59 B 1.36 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/9/2023 8:07:06 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 560 580 800 350 440 0 130
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 38 Reference Point End
Green 40.4 22.6 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 46.4 46.4 28.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 21.4
Green Extension Time ( g e ), s 0.0 0.0 1.2
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 1.36 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.48 A 1.49 A 1.48 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/9/2023 8:07:06 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 250 50 40 310 120 50 150 30 110 210 170
Signal Information
Cycle, s 67.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.4 22.6 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.4 25.4 28.6 28.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.3 3.3
Queue Clearance Time ( g s ), s 7.2 10.0 9.6 20.6 16.5
Green Extension Time ( g e ), s 0.0 1.4 0.9 1.9 1.7
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.07 0.06 0.00 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.91 B 2.10 B 2.10 B
Bicycle LOS Score / LOS 1.38 A 0.92 A 0.91 A 1.40 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/9/2023 8:09:03 AM
2027
PM PEAK
ALTERNATIVE 1 – SOUTHBOUND EXIT ONLY
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 1540 30 880 920 420 120 140 650 310 110 170
Signal Information
Cycle, s 120.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 35.0 22.0 9.0 13.0 11.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 15.0 43.0 41.0 69.0 17.0 19.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 8.6 37.0 13.0 15.0
Green Extension Time ( g e ), s 0.3 0.0 0.0 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 1.00 1.00 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.44 B 2.47 B 2.75 C 2.61 C
Bicycle LOS Score / LOS 1.52 B 2.46 B 2.10 B 1.53 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 1:57:01 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 1970 530 110 1040 0 670 0 1180
Signal Information
Cycle, s 120.0 Reference Phase 2
1 2 3 4
Offset, s 74 Reference Point End
Green 14.0 43.0 11.0 34.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 20.0 69.0 17.0 66.0 34.0 34.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.1 13.0 32.7 36.0
Green Extension Time ( g e ), s 0.0 0.0 0.0 0.0 1.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 1.00 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.14 B 2.27 B 2.59 C 2.72 C
Bicycle LOS Score / LOS 2.02 B 1.19 A 1.72 B 2.65 C
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 1:57:01 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1230 1410 1380 320 0 140
Signal Information
Cycle, s 120.0 Reference Phase 2
1 2 3 4
Offset, s 112 Reference Point End
Green 82.1 25.9 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 88.1 88.1 31.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 24.9
Green Extension Time ( g e ), s 0.0 0.0 1.0
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.06 B 1.35 A 2.32 B 2.47 B
Bicycle LOS Score / LOS 2.78 C 1.29 A 1.29 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 1:57:01 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 170 610 150 120 680 40 210 210 90 110 300 170
Signal Information
Cycle, s 108.3 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 8.2 2.2 33.6 7.0 1.1 34.2
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 14.3 41.8 12.2 39.6 16.1 43.3 11.0 38.2
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.1 3.1 3.1
Queue Clearance Time ( g s ), s 10.2 33.2 8.0 23.7 11.9 12.5 7.9 30.6
Green Extension Time ( g e ), s 0.0 2.0 0.2 0.0 0.1 0.0 0.0 1.1
Phase Call Probability 1.00 1.00 0.98 1.00 1.00 1.00 0.98 1.00
Max Out Probability 1.00 0.00 0.00 1.00 1.00 1.00 1.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.12 B 1.93 B 2.28 B 2.44 B
Bicycle LOS Score / LOS 1.36 A 1.28 A 1.44 A 1.58 B
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 50 210 110 300 240 120 110 430 140 100 510 110
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.6 25.2 6.7 5.4 0.7 22.2
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 2.0 4.0 1.3 3.0 1.2 3.0
Phase Duration, s 10.9 27.7 17.1 33.9 12.2 43.0 12.1 42.9
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 4.2 20.9 10.9 21.7 2.0 6.2
Green Extension Time ( g e ), s 0.1 1.4 0.7 1.4 0.9 0.0 0.1 0.0
Phase Call Probability 0.78 1.00 1.00 1.00 0.96 0.95
Max Out Probability 0.00 0.01 0.00 0.00 0.43 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.12 B 2.11 B 1.95 B
Bicycle LOS Score / LOS 1.14 A 1.66 B 1.69 B 1.77 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:47:08 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 140 200 990 190 210 160
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 5.9 60.8 15.3 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 4
Case Number 1.0 4.0 7.3 9.0
Phase Duration, s 11.9 78.7 66.8 21.3
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 4.9 14.5
Green Extension Time ( g e ), s 0.3 0.0 0.0 0.8
Phase Call Probability 0.99 1.00
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 0.65 A 1.88 B 1.96 B 1.96 B
Bicycle LOS Score / LOS 1.10 A 2.60 C F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 12:31:47 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 200 190 140 360 220 90 360 730 230
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 49 Reference Point End
Green 35.6 52.4 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8 4
Case Number 7.0 6.0 5.0 5.0
Phase Duration, s 41.6 41.6 58.4 58.4
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.5 3.5
Queue Clearance Time ( g s ), s 48.7 15.7
Green Extension Time ( g e ), s 0.0 0.0 3.7 6.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.51 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.11 B 2.11 B 1.89 B 1.89 B
Bicycle LOS Score / LOS 1.19 A 1.38 A F 1.67 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 12:31:47 PM
HCS7 Two-Way Stop-Control Report
General Information Site Information
Analyst SNP Intersection Boston and Benbow
Lanes
Movement U L T R U L T R U L T R U L T R
Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12
Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 0 1 0
Configuration LT TR LR
Approach LOS C
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ TWSC Version 7.9.5 Generated: 5/10/2023 12:47:50 PM
Boston and Benbow_2027 PM_Partial Build SB Exit.xtw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 120 50 120 190 140 90 490 90 140 500 270
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.3 20.4 6.8 6.7 2.5 19.8
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 4.0
Phase Duration, s 14.7 27.8 12.2 25.3 11.8 37.7 12.3 38.2
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.1 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 9.1 9.4 6.7 19.0 5.3 2.0
Green Extension Time ( g e ), s 0.1 1.0 0.1 0.9 0.1 0.0 1.4 0.0
Phase Call Probability 0.99 1.00 0.96 1.00 0.90 0.97
Max Out Probability 0.38 0.00 0.00 0.01 0.00 0.21
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.29 B 1.94 B 1.91 B
Bicycle LOS Score / LOS 1.09 A 1.26 A 1.06 A 1.27 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 11:16:39 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 400 60 30 400 180 70 300 20 190 400 250
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 31.5 7.0 13.2 26.3 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 2 1 6
Case Number 1.0 4.0 5.3 6.4 1.0 3.0
Phase Duration, s 18.7 50.5 31.8 37.0 12.5 49.5
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 12.7 22.2 24.2 2.0
Green Extension Time ( g e ), s 0.5 2.4 2.0 0.0 1.7 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.00 0.14 0.02
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.12 B 2.14 B 1.91 B
Bicycle LOS Score / LOS 1.77 B 1.57 B 1.18 A 1.98 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:43:20 AM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration T R LT LR
Approach LOS C C C
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/24/2023 10:41:03 AM
Drake and Hunt_2027 PM_Partial Build SB Exit Only.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 80 270 110 140 370 60 180 210 90 40 240 120
Signal Information
Cycle, s 70.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 34.8 25.2 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 4 8 2 6
Case Number 6.0 6.0 6.0 6.0
Phase Duration, s 30.2 30.2 39.8 39.8
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.3 3.3 0.0 0.0
Queue Clearance Time ( g s ), s 21.9 24.2
Green Extension Time ( g e ), s 1.5 0.9 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.61 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 1.90 B 1.88 B 1.88 B
Bicycle LOS Score / LOS 1.27 A 1.46 A 1.30 A 1.17 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:45:23 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 190 690 70 150 1070 230 90 140 80 200 130 190
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 6.3 1.7 22.9 6.1 1.9 12.1
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 0.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 14.0 30.6 12.3 28.9 12.1 18.1 14.0 20.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 8.0 5.2 5.3 11.6 9.1 10.0
Green Extension Time ( g e ), s 0.1 0.0 0.1 0.0 0.0 0.5 0.0 0.8
Phase Call Probability 0.99 0.90 0.87 1.00 0.99 1.00
Max Out Probability 1.00 0.13 0.49 0.91 1.00 0.14
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.10 B 2.29 B 2.29 B
Bicycle LOS Score / LOS 1.33 A 1.77 B 1.04 A 1.41 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 2:27:16 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1040 180 380 900 120 190
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 5 Reference Point End
Green 8.0 39.0 10.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 45.0 14.0 59.0 16.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 8.8 9.6
Green Extension Time ( g e ), s 0.0 0.0 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 0.65 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.51 B 1.57 B F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 2:27:16 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 880 350 190 1030 170 0 250
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 43 Reference Point End
Green 6.9 35.0 15.1 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 41.0 12.9 53.9 21.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 5.7 14.3
Green Extension Time ( g e ), s 0.0 0.3 0.0 0.8
Phase Call Probability 0.98 1.00
Max Out Probability 0.00 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.38 A 1.64 B 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.58 B 1.57 B 1.23 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 2:27:16 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 500 550 770 350 450 0 120
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 22 Reference Point End
Green 39.9 23.1 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 45.9 45.9 29.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 21.9
Green Extension Time ( g e ), s 0.0 0.0 1.2
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 1.37 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.40 A 1.46 A 1.48 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 2:27:16 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 170 250 40 40 320 120 50 180 30 110 200 190
Signal Information
Cycle, s 67.8 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.4 23.5 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.4 25.4 29.5 29.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.3 3.3
Queue Clearance Time ( g s ), s 7.0 9.8 9.9 21.4 17.1
Green Extension Time ( g e ), s 0.0 1.4 1.0 2.0 1.9
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.06 0.00 0.00 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.91 B 2.10 B 2.10 B
Bicycle LOS Score / LOS 1.34 A 0.93 A 0.97 A 1.41 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 2:23:20 PM
2027
PM PEAK
ALTERNATIVE 2 – PARTIAL BUILD NORTHBOUND LOOP
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 140 440 710 220 210 160
Signal Information
Cycle, s 110.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 68.5 6.9 16.5 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 4
Case Number 1.0 4.0 7.4 9.0
Phase Duration, s 12.9 87.5 74.5 22.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 2.0 15.7
Green Extension Time ( g e ), s 0.7 0.0 0.0 0.8
Phase Call Probability 0.99 1.00
Max Out Probability 0.39 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 0.65 A 1.95 B 1.96 B 1.96 B
Bicycle LOS Score / LOS 1.53 B 2.16 B F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/11/2023 10:52:48 AM
2027
PM PEAK
ALTERNATIVE 3 – PARTIAL BUILD NORTH SIDE
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 1540 30 880 1010 420 120 140 650 310 110 170
Signal Information
Cycle, s 100.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 26.0 16.2 7.8 10.0 10.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 13.8 36.0 32.0 54.2 16.0 16.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 7.5 28.0 12.0 12.0
Green Extension Time ( g e ), s 0.3 0.0 0.0 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 1.00 1.00 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.44 B 2.46 B 2.74 C 2.60 C
Bicycle LOS Score / LOS 1.52 B 2.54 C 2.10 B 1.53 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 7:25:46 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 1970 530 110 1130 0 670 0 1180
Signal Information
Cycle, s 100.0 Reference Phase 2
1 2 3 4
Offset, s 12 Reference Point End
Green 42.0 3.0 42.0 1.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 48.0 51.0 48.0 51.0 1.0 1.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.0 10.6 3.0 3.0
Green Extension Time ( g e ), s 0.0 0.0 6.3 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.01 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.10 B 2.27 B 2.61 C 2.74 C
Bicycle LOS Score / LOS 2.02 B 1.25 A 1.72 B 2.65 C
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 7:25:46 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1480 1160 1360 410 0 210
Signal Information
Cycle, s 100.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 60.4 27.6 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 66.4 66.4 33.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 26.3
Green Extension Time ( g e ), s 0.0 0.0 1.4
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.07 B 1.36 A 2.31 B 2.47 B
Bicycle LOS Score / LOS 2.78 C 1.27 A 1.56 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 7:25:46 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 170 610 160 120 680 40 200 200 90 110 300 160
Signal Information
Cycle, s 103.4 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 8.0 2.6 31.2 7.8 2.2 33.6
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 14.6 39.8 12.0 37.2 14.0 39.7 11.8 37.6
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.1 3.1 3.1
Queue Clearance Time ( g s ), s 9.9 28.8 7.8 23.3 11.5 12.0 7.5 28.5
Green Extension Time ( g e ), s 0.4 3.7 0.1 4.1 0.0 1.8 0.2 1.8
Phase Call Probability 1.00 1.00 0.98 1.00 1.00 1.00 0.98 1.00
Max Out Probability 0.00 0.09 0.93 0.00 1.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.11 B 1.93 B 2.28 B 2.44 B
Bicycle LOS Score / LOS 1.37 A 1.28 A 1.41 A 1.56 B
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 50 210 110 300 240 120 110 430 140 100 510 110
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.6 25.2 6.7 5.4 0.7 22.2
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 2.0 4.0 1.3 3.0 1.2 3.0
Phase Duration, s 10.9 27.7 17.1 33.9 12.2 43.0 12.1 42.9
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 4.2 20.9 10.9 21.7 2.0 6.2
Green Extension Time ( g e ), s 0.1 1.4 0.7 1.4 0.9 0.0 0.1 0.0
Phase Call Probability 0.78 1.00 1.00 1.00 0.96 0.95
Max Out Probability 0.00 0.01 0.00 0.00 0.43 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.12 B 2.11 B 1.95 B
Bicycle LOS Score / LOS 1.14 A 1.66 B 1.69 B 1.77 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:34:03 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 140 400 590 190 210 160
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 64.0 14.0 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 4
Case Number 6.0 8.0 9.0
Phase Duration, s 70.0 70.0 20.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 13.2
Green Extension Time ( g e ), s 0.0 0.0 0.8
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 0.65 A 1.85 B 1.73 B 1.96 B
Bicycle LOS Score / LOS 1.46 A 1.89 B F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 12:08:40 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 450 190 140 360 220 340 360 730 230
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 17 Reference Point End
Green 37.0 41.0 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8 4
Case Number 7.0 6.0 5.0 5.0
Phase Duration, s 43.0 43.0 47.0 47.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.5 3.5
Queue Clearance Time ( g s ), s 43.0 15.9
Green Extension Time ( g e ), s 0.0 0.0 0.0 6.8
Phase Call Probability 1.00 1.00
Max Out Probability 1.00 0.09
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.10 B 2.10 B 1.90 B 1.90 B
Bicycle LOS Score / LOS 1.64 B 1.38 A F 1.67 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 12:08:40 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 540 610 500 180
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 50 Reference Point End
Green 69.1 8.9 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6
Case Number 1.0 4.0 7.4
Phase Duration, s 14.9 90.0 75.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 0.0
Queue Clearance Time ( g s ), s 10.9
Green Extension Time ( g e ), s 0.0 0.0 0.0
Phase Call Probability 1.00
Max Out Probability 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 0.54 A 1.43 A 1.95 B 1.95 B
Bicycle LOS Score / LOS 2.55 C 1.71 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 12:08:40 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 110 50 120 190 140 90 490 80 140 500 270
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.4 19.3 6.8 6.8 2.6 20.6
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 4.0
Phase Duration, s 14.9 28.7 12.3 26.1 11.9 36.7 12.3 37.2
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.1 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 9.3 9.2 6.9 19.7 5.6 2.0
Green Extension Time ( g e ), s 0.1 1.0 0.2 0.9 0.1 0.0 1.7 0.0
Phase Call Probability 0.99 1.00 0.96 1.00 0.91 0.98
Max Out Probability 1.00 0.00 0.00 0.02 0.00 0.11
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.29 B 1.94 B 1.92 B
Bicycle LOS Score / LOS 1.10 A 1.29 A 1.08 A 1.30 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:31:55 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 400 60 30 400 180 70 300 20 190 400 250
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 31.5 7.0 13.2 26.3 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 2 1 6
Case Number 1.0 4.0 5.3 6.4 1.0 3.0
Phase Duration, s 18.7 50.5 31.8 37.0 12.5 49.5
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 12.7 22.2 24.2 2.0
Green Extension Time ( g e ), s 0.5 2.4 2.0 0.0 1.7 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.00 0.14 0.02
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.12 B 2.14 B 1.91 B
Bicycle LOS Score / LOS 1.77 B 1.57 B 1.18 A 1.98 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:25:12 AM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration T R LT LR
Approach LOS C C C
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/24/2023 10:23:07 AM
Drake and Hunt_2027 PM_Partial Build N Side.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 80 270 110 140 370 60 180 210 90 40 240 120
Signal Information
Cycle, s 70.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 34.8 25.2 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 4 8 2 6
Case Number 6.0 6.0 6.0 6.0
Phase Duration, s 30.2 30.2 39.8 39.8
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.3 3.3 0.0 0.0
Queue Clearance Time ( g s ), s 21.9 24.2
Green Extension Time ( g e ), s 1.5 0.9 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.61 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 1.90 B 1.88 B 1.88 B
Bicycle LOS Score / LOS 1.27 A 1.46 A 1.30 A 1.17 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:27:55 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 190 690 70 150 1070 230 90 140 80 200 130 190
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 6.2 1.4 20.2 5.9 1.1 11.2
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 0.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 13.6 27.6 12.2 26.2 11.9 17.2 13.0 18.2
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 7.7 5.0 5.1 11.0 8.7 9.6
Green Extension Time ( g e ), s 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.5
Phase Call Probability 0.98 0.88 0.85 1.00 0.98 1.00
Max Out Probability 1.00 1.00 1.00 1.00 1.00 0.85
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.10 B 2.29 B 2.28 B
Bicycle LOS Score / LOS 1.33 A 1.77 B 1.04 A 1.41 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 7:34:16 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1040 180 380 900 120 190
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 68 Reference Point End
Green 8.9 33.1 10.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 39.1 14.9 54.0 16.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 8.9 8.8
Green Extension Time ( g e ), s 0.0 0.0 0.0 0.2
Phase Call Probability 1.00 1.00
Max Out Probability 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 0.65 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.51 B 1.57 B F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 7:34:16 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 880 350 190 1030 170 0 250
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 34 Reference Point End
Green 6.9 30.9 14.2 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 36.9 12.9 49.8 20.2
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 5.6 13.5
Green Extension Time ( g e ), s 0.0 0.3 0.0 0.7
Phase Call Probability 0.98 1.00
Max Out Probability 0.00 0.02
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.38 A 1.64 B 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.58 B 1.57 B 1.23 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 7:34:16 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 700 350 780 250 440 0 130
Signal Information
Cycle, s 70.0 Reference Phase 2
1 2 3 4
Offset, s 18 Reference Point End
Green 36.7 21.3 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 42.7 42.7 27.3
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 20.1
Green Extension Time ( g e ), s 0.0 0.0 1.2
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 1.36 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.40 A 1.38 A 1.48 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 7:34:16 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 260 40 40 320 120 50 170 30 110 200 180
Signal Information
Cycle, s 67.2 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.4 22.7 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.4 25.4 28.8 28.7
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.3 3.3
Queue Clearance Time ( g s ), s 7.2 10.0 9.8 20.7 16.5
Green Extension Time ( g e ), s 0.0 1.5 0.9 1.9 1.8
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.07 0.04 0.00 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.91 B 2.10 B 2.10 B
Bicycle LOS Score / LOS 1.38 A 0.93 A 0.95 A 1.40 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 7:32:59 AM
2027
PM PEAK
ALTERNATIVE 4 – SOUTHBOUND EXIT SOUTHBOUND ENTRANCE
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 1540 30 890 1020 420 120 140 660 310 110 170
Signal Information
Cycle, s 105.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 29.0 17.8 8.2 10.0 10.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 14.2 38.0 35.0 58.8 16.0 16.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 7.8 31.0 12.0 12.0
Green Extension Time ( g e ), s 0.3 0.0 0.0 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 1.00 1.00 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.44 B 2.46 B 2.74 C 2.60 C
Bicycle LOS Score / LOS 1.52 B 2.55 C 2.12 B 1.53 B
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 2070 440 110 1040 0 690 0 1290
Signal Information
Cycle, s 105.0 Reference Phase 2
1 2 3 4
Offset, s 80 Reference Point End
Green 42.0 7.0 34.0 4.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 48.0 61.0 40.0 53.0 4.0 4.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.1 11.8 6.0 6.0
Green Extension Time ( g e ), s 0.0 0.0 5.6 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.04 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.12 B 2.27 B 2.61 C 2.74 C
Bicycle LOS Score / LOS 2.02 B 1.19 A 1.75 B 2.85 C
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 7:57:02 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1350 1410 1380 320 0 140
Signal Information
Cycle, s 105.0 Reference Phase 2
1 2 3 4
Offset, s 59 Reference Point End
Green 70.0 23.0 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 76.0 76.0 29.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 22.0
Green Extension Time ( g e ), s 0.0 0.0 1.0
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.06 B 1.35 A 2.32 B 2.47 B
Bicycle LOS Score / LOS 2.88 C 1.29 A 1.29 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 7:57:02 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 170 610 150 120 680 40 210 210 90 110 300 170
Signal Information
Cycle, s 92.5 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.1 2.2 26.4 6.7 2.3 29.9
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 13.2 34.6 11.1 32.4 13.0 36.1 10.7 33.9
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.1 3.1 3.1
Queue Clearance Time ( g s ), s 9.2 25.3 7.2 21.0 10.8 11.2 6.9 26.1
Green Extension Time ( g e ), s 0.1 3.2 0.0 3.9 0.0 1.8 0.0 1.8
Phase Call Probability 0.99 1.00 0.97 1.00 1.00 1.00 0.96 1.00
Max Out Probability 1.00 0.22 1.00 0.03 1.00 0.00 1.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.11 B 1.92 B 2.28 B 2.43 B
Bicycle LOS Score / LOS 1.36 A 1.28 A 1.44 A 1.58 B
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 50 210 110 280 250 120 110 440 150 100 510 100
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.6 18.9 6.5 5.2 5.0 20.3
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 2.0 4.0 1.2 3.0 1.3 3.0
Phase Duration, s 10.7 25.8 15.6 30.7 12.1 36.6 12.0 36.5
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 4.0 18.9 9.5 20.4 6.4 2.0
Green Extension Time ( g e ), s 0.1 1.3 0.7 1.4 0.2 0.0 1.6 0.0
Phase Call Probability 0.74 1.00 1.00 1.00 0.95 0.93
Max Out Probability 0.00 0.02 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.11 B 2.14 B 1.92 B
Bicycle LOS Score / LOS 1.14 A 1.64 B 1.73 B 1.75 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 11:13:02 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 140 330 40 490 640 100 140 200 70 180 70 160
Signal Information
Cycle, s 120.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 9.4 10.7 34.7 10.1 2.5 22.6
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 0.0 2.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 4.0
Phase Duration, s 15.4 40.7 32.1 57.4 16.1 28.6 18.6 31.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 9.2 25.1 10.0 21.5 12.6 19.0
Green Extension Time ( g e ), s 0.3 0.0 1.0 0.0 0.1 1.1 0.1 1.1
Phase Call Probability 0.99 1.00 0.99 1.00 1.00 1.00
Max Out Probability 0.00 0.00 0.00 0.00 1.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.93 B 1.92 B 2.30 B 2.30 B
Bicycle LOS Score / LOS 0.94 A 1.59 B 1.22 A 1.22 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 12:54:05 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 370 280 340 370 880
Signal Information
Cycle, s 120.0 Reference Phase 2
Offset, s 80 Reference Point End
Green 63.3 44.7 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 4
Case Number 7.0 8.0 9.0
Phase Duration, s 69.3 69.3 50.7
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.3
Queue Clearance Time ( g s ), s 40.5
Green Extension Time ( g e ), s 0.0 0.0 4.2
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.38 A 1.90 B 1.96 B 2.16 B
Bicycle LOS Score / LOS 1.47 A 1.04 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 12:54:05 PM
HCS7 Two-Way Stop-Control Report
General Information Site Information
Analyst SNP Intersection Boston and Benbow
Lanes
Movement U L T R U L T R U L T R U L T R
Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12
Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 0 1 0
Configuration LT TR LR
Approach LOS C
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ TWSC Version 7.9.5 Generated: 5/10/2023 12:52:42 PM
Boston and Benbow_2027 PM_Partial Build SB Only.xtw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 120 50 120 190 140 90 490 90 140 500 270
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.3 20.4 6.8 6.7 2.5 19.8
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 4.0
Phase Duration, s 14.7 27.8 12.2 25.3 11.8 37.7 12.3 38.2
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.1 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 9.1 9.4 6.7 19.0 5.3 2.0
Green Extension Time ( g e ), s 0.1 1.0 0.1 0.9 0.1 0.0 1.4 0.0
Phase Call Probability 0.99 1.00 0.96 1.00 0.90 0.97
Max Out Probability 0.38 0.00 0.00 0.01 0.00 0.21
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.29 B 1.94 B 1.91 B
Bicycle LOS Score / LOS 1.09 A 1.26 A 1.06 A 1.27 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 11:10:47 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 400 60 30 400 180 70 310 20 190 400 250
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 31.5 7.0 13.2 26.3 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 2 1 6
Case Number 1.0 4.0 5.3 6.4 1.0 3.0
Phase Duration, s 18.7 50.5 31.8 37.0 12.5 49.5
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 12.7 22.2 24.2 2.0
Green Extension Time ( g e ), s 0.5 2.4 2.1 0.0 1.8 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.00 0.10 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.12 B 2.14 B 1.91 B
Bicycle LOS Score / LOS 1.77 B 1.57 B 1.20 A 1.98 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 11:04:09 AM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration T R LT LR
Approach LOS C C C
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/24/2023 11:02:02 AM
Drake and Hunt_2027 PM_Partial Build SB Only.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 80 270 110 140 370 60 180 220 90 40 230 120
Signal Information
Cycle, s 60.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 27.6 22.4 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 4 8 2 6
Case Number 6.0 6.0 6.0 6.0
Phase Duration, s 27.4 27.4 32.6 32.6
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.3 3.3 0.0 0.0
Queue Clearance Time ( g s ), s 18.7 20.6
Green Extension Time ( g e ), s 2.1 1.9 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.14 0.24
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 1.90 B 1.88 B 1.88 B
Bicycle LOS Score / LOS 1.27 A 1.46 A 1.32 A 1.15 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 11:06:56 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 190 680 70 150 1070 240 90 140 80 190 130 190
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 6.4 1.4 24.2 6.1 0.9 12.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 0.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 13.8 31.6 12.4 30.2 12.1 18.0 13.0 18.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 7.8 5.1 5.4 11.6 8.9 10.2
Green Extension Time ( g e ), s 0.1 0.0 0.1 0.0 0.1 0.4 0.0 0.6
Phase Call Probability 0.99 0.91 0.87 1.00 0.99 1.00
Max Out Probability 1.00 0.11 0.03 1.00 1.00 0.44
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.10 B 2.29 B 2.29 B
Bicycle LOS Score / LOS 1.32 A 1.78 B 1.04 A 1.39 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 2:28:26 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1080 180 380 950 120 190
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 59 Reference Point End
Green 10.6 36.4 10.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 42.4 16.6 59.0 16.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 10.2 9.3
Green Extension Time ( g e ), s 0.0 0.4 0.0 0.4
Phase Call Probability 1.00 1.00
Max Out Probability 0.32 0.16
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 0.65 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.55 B 1.61 B F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 2:28:26 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 930 340 200 1030 190 0 300
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 42 Reference Point End
Green 6.9 32.5 17.6 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 38.5 12.9 51.4 23.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 6.2 16.7
Green Extension Time ( g e ), s 0.0 0.3 0.0 1.0
Phase Call Probability 0.99 1.00
Max Out Probability 0.00 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.38 A 1.64 B 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.61 B 1.58 B 1.36 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 2:28:26 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 570 550 780 350 450 0 120
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 37 Reference Point End
Green 39.9 23.1 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 45.9 45.9 29.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 21.9
Green Extension Time ( g e ), s 0.0 0.0 1.2
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 1.37 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.46 A 1.47 A 1.48 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 2:28:26 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 170 250 40 40 320 120 50 180 30 110 200 190
Signal Information
Cycle, s 67.8 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.4 23.4 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.4 25.4 29.4 29.4
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.3 3.3
Queue Clearance Time ( g s ), s 7.0 9.8 9.9 21.3 17.1
Green Extension Time ( g e ), s 0.0 1.4 0.9 2.0 1.9
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.06 0.07 0.00 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.91 B 2.10 B 2.10 B
Bicycle LOS Score / LOS 1.34 A 0.93 A 0.97 A 1.41 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 2:27:49 PM
2027
PM PEAK
FULL INTERCHANGE
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 1340 30 890 1240 420 220 210 810 310 110 170
Signal Information
Cycle, s 105.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 30.0 14.1 7.9 10.0 13.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 13.9 34.0 36.0 56.1 19.0 16.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 7.8 32.0 15.0 12.0
Green Extension Time ( g e ), s 0.1 0.0 0.0 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 1.00 1.00 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.44 B 2.46 B 2.74 C 2.60 C
Bicycle LOS Score / LOS 1.40 A 2.75 C 2.69 C 1.53 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 10:39:25 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 2000 460 130 1140 0 600 0 1410
Signal Information
Cycle, s 105.0 Reference Phase 2
1 2 3 4
Offset, s 10 Reference Point End
Green 48.0 1.0 43.0 1.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 55.0 54.0 50.0 49.0 1.0 1.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.0 11.8 3.0 3.0
Green Extension Time ( g e ), s 0.0 0.0 6.5 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.01 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.10 B 2.27 B 2.61 C 2.74 C
Bicycle LOS Score / LOS 1.99 B 1.26 A 1.59 B 3.07 C
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 10:39:25 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1450 1150 1450 350 0 150
Signal Information
Cycle, s 105.0 Reference Phase 2
1 2 3 4
Offset, s 92 Reference Point End
Green 68.1 24.9 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 74.1 74.1 30.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 23.8
Green Extension Time ( g e ), s 0.0 0.0 1.1
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.06 B 1.36 A 2.32 B 2.47 B
Bicycle LOS Score / LOS 2.75 C 1.33 A 1.36 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 10:39:25 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 160 610 150 120 680 40 200 210 100 110 300 170
Signal Information
Cycle, s 89.8 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 6.9 1.7 25.9 6.7 1.3 29.4
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 12.6 33.5 10.9 31.9 12.0 34.6 10.7 33.4
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.1 3.1 3.1
Queue Clearance Time ( g s ), s 8.6 24.1 7.1 20.5 10.0 11.0 6.7 25.3
Green Extension Time ( g e ), s 0.0 3.3 0.0 4.0 0.0 1.9 0.2 1.8
Phase Call Probability 0.99 1.00 0.97 1.00 1.00 1.00 0.96 1.00
Max Out Probability 1.00 0.21 1.00 0.00 1.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.11 B 1.92 B 2.28 B 2.43 B
Bicycle LOS Score / LOS 1.35 A 1.28 A 1.44 A 1.58 B
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 50 210 110 290 240 120 110 430 140 100 510 110
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.6 20.4 6.5 5.2 3.5 20.3
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 3.0 1.3 3.0
Phase Duration, s 10.7 25.8 14.1 29.2 12.1 38.1 12.0 38.0
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 4.0 18.9 8.0 20.3 6.3 2.0
Green Extension Time ( g e ), s 0.1 1.3 0.7 1.4 0.2 0.0 1.5 0.0
Phase Call Probability 0.74 1.00 1.00 1.00 0.95 0.93
Max Out Probability 0.00 0.02 0.00 0.01 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.12 B 2.14 B 1.91 B
Bicycle LOS Score / LOS 1.14 A 1.64 B 1.69 B 1.77 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:15:53 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 140 710 40 450 740 110 50 100 70 210 90 160
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 7.6 33.5 7.1 8.8 12.9 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 7 4
Case Number 1.2 4.0 1.3 4.0 7.3 2.0 4.0
Phase Duration, s 13.6 53.1 13.1 52.7 18.9 14.8 33.8
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.1 3.3
Queue Clearance Time ( g s ), s 7.4 6.1 12.1 8.5 16.1
Green Extension Time ( g e ), s 0.3 0.0 1.0 0.0 0.8 0.4 1.0
Phase Call Probability 0.99 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.76 0.08 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.95 B 2.09 B 2.30 B 2.29 B
Bicycle LOS Score / LOS 1.29 A 1.65 B 0.88 A 1.31 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 11:39:14 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 590 450 270 580 560 790
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 80 Reference Point End
Green 35.0 14.1 32.9 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.4 1.0 4.0 9.0
Phase Duration, s 41.0 20.1 61.1 38.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 13.1 35.8
Green Extension Time ( g e ), s 0.0 1.9 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.43 A 1.89 B 1.96 B 2.15 B
Bicycle LOS Score / LOS 2.35 B 2.01 B F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 11:39:14 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 440 710 410 170 440 210
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 98 Reference Point End
Green 10.1 42.9 29.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8
Case Number 1.0 4.0 7.3 9.0
Phase Duration, s 16.1 65.0 48.9 35.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 9.0 27.5
Green Extension Time ( g e ), s 1.1 0.0 0.0 1.5
Phase Call Probability 1.00 1.00
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.66 B 1.68 B 1.96 B 2.15 B
Bicycle LOS Score / LOS 2.55 C 1.53 B F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 11:39:14 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 110 50 120 190 140 90 490 80 140 500 270
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.3 20.5 6.8 6.7 2.4 19.8
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 4.0
Phase Duration, s 14.5 27.7 12.2 25.3 11.8 37.8 12.3 38.3
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.1 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 9.1 8.9 6.7 19.0 5.3 2.0
Green Extension Time ( g e ), s 0.0 1.0 0.2 0.9 0.1 0.0 1.3 0.0
Phase Call Probability 0.99 1.00 0.96 1.00 0.90 0.97
Max Out Probability 1.00 0.00 0.00 0.01 0.00 0.30
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.29 B 1.94 B 1.91 B
Bicycle LOS Score / LOS 1.07 A 1.26 A 1.05 A 1.27 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:13:51 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 400 60 30 400 180 70 300 20 190 410 250
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 31.5 7.0 13.2 26.3 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 2 1 6
Case Number 1.0 4.0 5.3 6.4 1.0 3.0
Phase Duration, s 18.7 50.5 31.8 37.0 12.5 49.5
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 12.7 22.2 24.2 2.0
Green Extension Time ( g e ), s 0.5 2.4 2.1 0.0 1.4 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.00 0.10 0.20
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.12 B 2.14 B 1.91 B
Bicycle LOS Score / LOS 1.77 B 1.57 B 1.18 A 2.00 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:07:42 AM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration T R LT LR
Approach LOS C C C
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/24/2023 10:04:28 AM
Drake and Hunt_2027 PM_Full Build.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 80 270 110 140 370 60 180 200 90 40 220 120
Signal Information
Cycle, s 60.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 27.7 22.3 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 4 8 2 6
Case Number 6.0 6.0 6.0 6.0
Phase Duration, s 27.3 27.3 32.7 32.7
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.3 3.3 0.0 0.0
Queue Clearance Time ( g s ), s 18.8 20.7
Green Extension Time ( g e ), s 1.9 1.7 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.25 0.43
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 1.90 B 1.88 B 1.88 B
Bicycle LOS Score / LOS 1.27 A 1.46 A 1.29 A 1.13 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/24/2023 10:10:31 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 200 680 70 150 1070 220 90 140 80 190 130 190
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 6.4 1.9 23.5 6.1 0.9 12.2
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 0.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 14.3 31.4 12.4 29.5 12.1 18.2 13.0 19.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 8.2 5.3 5.3 11.6 8.9 10.1
Green Extension Time ( g e ), s 0.1 0.0 0.1 0.0 0.1 0.6 0.0 0.8
Phase Call Probability 0.99 1.00 0.87 1.00 0.99 1.00
Max Out Probability 0.65 0.01 0.03 0.53 1.00 0.15
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.10 B 2.29 B 2.29 B
Bicycle LOS Score / LOS 1.33 A 1.77 B 1.04 A 1.39 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 10:58:45 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1080 180 380 930 120 190
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 72 Reference Point End
Green 9.9 41.1 10.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 43.1 15.9 59.0 16.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 9.1 9.4
Green Extension Time ( g e ), s 0.0 0.8 0.0 0.6
Phase Call Probability 1.00 1.00
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 0.65 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.55 B 1.59 B F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 10:58:45 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 930 340 200 1010 190 0 300
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 58 Reference Point End
Green 6.9 32.4 17.6 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 38.4 12.9 51.4 23.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 6.2 16.7
Green Extension Time ( g e ), s 0.0 0.3 0.0 1.0
Phase Call Probability 0.99 1.00
Max Out Probability 0.00 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.38 A 1.64 B 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.61 B 1.56 B 1.36 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 10:58:45 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 570 550 780 350 430 0 130
Signal Information
Cycle, s 49.5 Reference Phase 2
1 2 3 4
Offset, s 45 Reference Point End
Green 21.8 15.7 0.0 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 27.8 27.8 21.7
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.2 3.2 3.2
Queue Clearance Time ( g s ), s 14.9 10.4 14.2
Green Extension Time ( g e ), s 6.6 6.7 1.2
Phase Call Probability 1.00 1.00 1.00
Max Out Probability 0.01 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 1.36 A 2.29 B 2.29 B
Bicycle LOS Score / LOS 1.46 A 1.47 A 1.46 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 10:58:45 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 250 40 40 310 120 50 160 30 110 200 180
Signal Information
Cycle, s 67.2 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.4 22.7 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.4 25.4 28.7 28.7
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.3 3.3
Queue Clearance Time ( g s ), s 7.2 9.7 9.6 20.8 16.5
Green Extension Time ( g e ), s 0.0 1.4 0.9 1.9 1.8
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.06 0.04 0.00 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.91 B 2.10 B 2.10 B
Bicycle LOS Score / LOS 1.36 A 0.92 A 0.93 A 1.40 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 10:52:28 AM
2047
AM PEAK
NO BUILD
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 30 1050 20 440 1010 80 90 40 1070 80 20 30
Signal Information
Cycle, s 120.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 27.2 25.2 4.6 9.9 23.1 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 10.6 41.8 33.2 64.4 29.1 15.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 3.1 25.6 25.1 4.7
Green Extension Time ( g e ), s 1.4 0.0 1.6 0.0 0.0 0.2
Phase Call Probability 0.66 1.00 1.00 0.99
Max Out Probability 0.79 0.00 1.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.45 B 2.47 B 2.75 C 2.60 C
Bicycle LOS Score / LOS 1.14 A 1.84 B 2.62 C 0.72 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/9/2023 9:28:23 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 2030 170 150 730 0 440 0 800
Signal Information
Cycle, s 120.0 Reference Phase 2
1 2 3 4
Offset, s 7 Reference Point End
Green 30.0 31.0 27.0 14.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 36.0 73.0 33.0 70.0 14.0 14.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.1 23.5 16.0 16.0
Green Extension Time ( g e ), s 0.0 0.0 2.0 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.94 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.13 B 2.26 B 2.61 C 2.74 C
Bicycle LOS Score / LOS 1.83 B 1.03 A 1.29 A 1.95 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/9/2023 9:28:23 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 600 1870 1570 130 0 240
Signal Information
Cycle, s 120.0 Reference Phase 2
1 2 3 4
Offset, s 102 Reference Point End
Green 86.9 21.1 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 92.9 92.9 27.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.3
Queue Clearance Time ( g s ), s 20.2
Green Extension Time ( g e ), s 0.0 0.0 0.8
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.05 B 1.34 A 2.32 B 2.47 B
Bicycle LOS Score / LOS 2.63 C 1.40 A 1.13 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/9/2023 9:28:23 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 80 460 150 70 690 40 230 180 60 30 140 150
Signal Information
Cycle, s 66.8 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 5.4 0.3 19.9 3.3 3.7 16.2
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 9.7 26.2 9.4 25.9 11.0 23.9 7.3 20.2
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 4.3 15.4 4.1 15.8 9.0 8.1 3.1 12.9
Green Extension Time ( g e ), s 0.1 1.8 0.0 2.6 0.0 1.2 0.1 1.2
Phase Call Probability 0.82 1.00 0.77 1.00 0.99 1.00 0.47 1.00
Max Out Probability 0.00 0.71 1.00 0.25 1.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.10 B 1.91 B 2.27 B 2.43 B
Bicycle LOS Score / LOS 1.13 A 1.24 A 1.37 A 1.09 A
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 230 50 130 200 80 80 320 170 30 150 20
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.4 34.4 4.2 6.2 2.1 19.3
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 3.0
Phase Duration, s 11.7 24.8 13.7 26.9 11.9 51.8 9.7 49.6
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 5.3 18.1 8.1 17.9 4.9 2.0
Green Extension Time ( g e ), s 0.1 1.2 0.2 1.2 0.2 0.0 0.4 0.0
Phase Call Probability 0.88 1.00 0.98 1.00 0.91 0.60
Max Out Probability 0.00 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.94 B 2.13 B 1.95 B 1.91 B
Bicycle LOS Score / LOS 1.12 A 1.22 A 1.51 B 0.85 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 3:30:30 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 270 380 270 160 70 0 50
Signal Information
Cycle, s 60.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 43.9 6.1 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 4
Case Number 8.0 8.0 12.0
Phase Duration, s 48.9 48.9 11.1
Change Period, ( Y+R c ), s 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 6.6
Green Extension Time ( g e ), s 0.0 0.0 0.2
Phase Call Probability 0.89
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.31 A 1.31 A 1.71 B 1.72 B
Bicycle LOS Score / LOS 1.68 B 1.28 A 0.71 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 1:26:38 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 320 140 100 270 170 0 100
Signal Information
Cycle, s 60.0 Reference Phase 2
Offset, s 52 Reference Point End
Green 36.3 13.7 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 12.0
Phase Duration, s 41.3 41.3 18.7
Change Period, ( Y+R c ), s 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 13.2
Green Extension Time ( g e ), s 0.0 0.0 0.6
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.63 B 1.34 A 1.72 B 1.94 B
Bicycle LOS Score / LOS 1.40 A 1.22 A 1.02 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 1:26:38 PM
HCS7 Two-Way Stop-Control Report
General Information Site Information
Analyst SNP Intersection Boston and Benbow
Lanes
Movement U L T R U L T R U L T R U L T R
Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12
Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 0 1 0
Configuration LT TR LR
Approach LOS B
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ TWSC Version 7.9.5 Generated: 5/10/2023 1:21:18 PM
Boston and Benbow_2047 AM_No Build.xtw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 230 140 40 70 60 80 30 470 90 50 280 110
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 4.2 38.1 5.5 6.2 1.9 11.2
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 4.0
Phase Duration, s 19.0 24.1 11.7 16.7 9.7 53.3 11.0 54.5
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.1 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 13.8 11.8 5.6 10.6 3.0 2.0
Green Extension Time ( g e ), s 0.0 0.7 0.1 0.6 0.0 0.0 0.7 0.0
Phase Call Probability 1.00 1.00 0.88 1.00 0.60 0.78
Max Out Probability 1.00 0.00 0.00 0.00 0.00 0.03
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.30 B 2.30 B 1.95 B 1.90 B
Bicycle LOS Score / LOS 1.22 A 0.86 A 1.02 A 0.88 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 3:47:39 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 370 240 30 10 210 190 30 510 10 70 70 100
Signal Information
Cycle, s 120.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 47.6 6.5 24.8 19.1 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 2 1 6
Case Number 1.0 4.0 5.3 6.4 1.0 3.0
Phase Duration, s 30.3 54.9 24.6 53.1 12.0 65.1
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 24.4 16.1 17.6 2.0
Green Extension Time ( g e ), s 0.5 1.5 1.5 0.0 0.5 0.0
Phase Call Probability 1.00 1.00 1.00 0.93
Max Out Probability 0.28 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.92 B 2.14 B 2.15 B 1.91 B
Bicycle LOS Score / LOS 1.69 B 1.26 A 1.52 B 0.94 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 3:40:44 PM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration TR LT LR
Approach LOS B B B
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/11/2023 10:53:29 AM
Drake and Hunt_2047 AM_No Build.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 80 330 120 160 210 40 50 120 100 40 200 80
Signal Information
Cycle, s 60.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 23.6 26.4 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 4 8 2 6
Case Number 6.0 6.0 6.0 6.0
Phase Duration, s 31.4 31.4 28.6 28.6
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.4 3.4 0.0 0.0
Queue Clearance Time ( g s ), s 14.8 26.0
Green Extension Time ( g e ), s 2.2 0.4 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.08 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.89 B 1.89 B 1.89 B
Bicycle LOS Score / LOS 1.44 A 1.22 A 0.97 A 1.06 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 3:37:35 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 130 1010 10 30 710 110 20 30 30 380 40 300
Signal Information
Cycle, s 90.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 3.0 3.8 30.5 2.9 9.8 10.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 2.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 12.8 40.3 9.0 36.5 8.9 16.0 24.8 31.8
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.3 3.1 3.3
Queue Clearance Time ( g s ), s 6.7 2.7 3.0 5.1 18.6 17.0
Green Extension Time ( g e ), s 0.1 0.0 0.0 0.0 0.0 0.6 0.2 0.7
Phase Call Probability 0.97 0.43 0.42 1.00 1.00 1.00
Max Out Probability 0.01 0.00 0.00 0.17 1.00 0.02
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.11 B 2.30 B 2.28 B
Bicycle LOS Score / LOS 1.51 B 1.24 A 0.63 A 1.77 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/11/2023 7:37:46 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1640 50 80 470 130 410
Signal Information
Cycle, s 90.0 Reference Phase 2
1 2 3 4
Offset, s 23 Reference Point End
Green 6.2 42.3 23.5 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 48.3 12.2 60.5 29.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 3.9 22.6
Green Extension Time ( g e ), s 0.0 0.1 0.0 0.9
Phase Call Probability 0.88 1.00
Max Out Probability 0.00 0.08
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 0.68 A 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.91 B 0.95 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/11/2023 7:37:46 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1640 410 110 500 360 0 50
Signal Information
Cycle, s 90.0 Reference Phase 2
1 2 3 4
Offset, s 67 Reference Point End
Green 6.6 45.0 20.4 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 51.0 12.6 63.6 26.4
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.1
Queue Clearance Time ( g s ), s 4.4 19.6
Green Extension Time ( g e ), s 0.0 0.2 0.0 0.9
Phase Call Probability 0.94 1.00
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.38 A 1.64 B 2.31 B 2.31 B
Bicycle LOS Score / LOS 2.31 B 1.03 A 1.22 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/11/2023 7:37:46 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 740 1260 350 300 260 0 250
Signal Information
Cycle, s 90.0 Reference Phase 2
1 2 3 4
Offset, s 44 Reference Point End
Green 60.1 17.9 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 66.1 66.1 23.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 16.7
Green Extension Time ( g e ), s 0.0 0.0 1.1
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.86 B 1.34 A 2.31 B 2.31 B
Bicycle LOS Score / LOS 2.22 B 1.05 A 1.37 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/11/2023 7:37:46 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 250 40 20 290 80 50 130 30 130 160 210
Signal Information
Cycle, s 66.7 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.4 22.3 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.4 25.4 28.3 28.3
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.4 3.4
Queue Clearance Time ( g s ), s 7.2 9.6 8.3 20.4 16.3
Green Extension Time ( g e ), s 0.0 1.2 0.7 1.9 1.7
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.04 0.02 0.00 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 1.91 B 2.10 B 2.10 B
Bicycle LOS Score / LOS 1.36 A 0.85 A 0.88 A 1.41 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/11/2023 7:53:58 AM
2047
AM PEAK
ALTERNATIVE 1 – SOUTHBOUND EXIT ONLY
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 30 1060 20 410 920 80 80 40 960 90 20 30
Signal Information
Cycle, s 105.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 24.0 20.7 4.3 9.9 16.1 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 10.3 37.0 30.0 56.7 22.1 15.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 3.0 21.7 18.1 4.7
Green Extension Time ( g e ), s 1.4 0.0 0.5 0.0 0.0 0.1
Phase Call Probability 0.61 1.00 1.00 0.99
Max Out Probability 0.76 1.00 1.00 0.02
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.44 B 2.47 B 2.74 C 2.60 C
Bicycle LOS Score / LOS 1.14 A 1.74 B 2.40 B 0.74 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 9:41:14 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 1920 190 160 700 0 390 0 710
Signal Information
Cycle, s 105.0 Reference Phase 2
1 2 3 4
Offset, s 105 Reference Point End
Green 21.0 33.0 20.0 13.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 27.0 66.0 26.0 65.0 13.0 13.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.1 22.0 15.0 15.0
Green Extension Time ( g e ), s 0.0 0.0 0.0 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 1.00 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.13 B 2.25 B 2.60 C 2.73 C
Bicycle LOS Score / LOS 1.78 B 1.01 A 1.20 A 1.79 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 9:41:14 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 650 1660 1460 260 0 140
Signal Information
Cycle, s 105.0 Reference Phase 2
1 2 3 4
Offset, s 55 Reference Point End
Green 73.9 19.1 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 79.9 79.9 25.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 18.3
Green Extension Time ( g e ), s 0.0 0.0 0.8
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.05 B 1.34 A 2.32 B 2.47 B
Bicycle LOS Score / LOS 2.49 B 1.33 A 1.18 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 9:41:14 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 60 400 150 80 710 50 230 190 60 40 110 140
Signal Information
Cycle, s 65.1 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 5.0 0.7 20.0 4.0 3.0 14.4
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 9.0 26.0 9.7 26.7 11.0 21.4 8.0 18.4
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 3.7 14.9 4.3 15.8 9.0 8.5 3.4 11.2
Green Extension Time ( g e ), s 0.1 1.9 0.0 2.5 0.0 1.1 0.1 1.1
Phase Call Probability 0.71 1.00 0.81 1.00 0.99 1.00 0.56 1.00
Max Out Probability 0.00 0.63 1.00 0.30 1.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.10 B 1.91 B 2.28 B 2.43 B
Bicycle LOS Score / LOS 1.06 A 1.28 A 1.39 A 1.03 A
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 240 70 150 210 80 70 320 150 40 210 20
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.2 23.1 4.9 6.2 0.8 21.4
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 2.0 3.0 1.2 3.0 1.3 3.0
Phase Duration, s 11.7 26.9 12.4 27.7 11.7 40.2 10.4 39.0
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 5.1 20.1 6.6 12.6 4.9 2.0
Green Extension Time ( g e ), s 0.1 1.3 0.4 1.4 0.1 0.0 0.6 0.0
Phase Call Probability 0.88 1.00 0.99 1.00 0.88 0.70
Max Out Probability 0.00 0.01 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.12 B 2.31 B 1.91 B
Bicycle LOS Score / LOS 1.25 A 1.37 A 1.57 B 1.03 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:34:11 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 380 300 150 70 50
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 14.4 48.0 9.6 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 4
Case Number 2.0 4.0 7.3 9.0
Phase Duration, s 20.4 74.4 54.0 15.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 16.1 5.6
Green Extension Time ( g e ), s 0.0 0.0 0.0 0.1
Phase Call Probability 1.00 0.96
Max Out Probability 1.00 0.27
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 0.64 A 1.89 B 1.95 B 1.96 B
Bicycle LOS Score / LOS 1.64 B 1.29 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 2:11:56 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 270 190 90 200 150 100 70 260 120
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 55 Reference Point End
Green 40.1 6.4 6.0 3.1 10.4 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 2.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 3 8 7 4
Case Number 7.4 1.0 4.0 1.1 3.0 1.1 3.0
Phase Duration, s 46.1 12.4 58.5 15.1 19.5 12.0 16.4
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 2.0 9.0 7.2 5.3 9.3
Green Extension Time ( g e ), s 0.0 0.5 0.0 0.2 1.1 0.1 1.1
Phase Call Probability 0.91 0.98 1.00 0.85 1.00
Max Out Probability 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.14 B 2.07 B 1.94 B 1.94 B
Bicycle LOS Score / LOS 1.31 A 1.01 A F 0.89 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 2:11:56 PM
HCS7 Two-Way Stop-Control Report
General Information Site Information
Analyst SNP Intersection Boston and Benbow
Lanes
Movement U L T R U L T R U L T R U L T R
Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12
Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 1 0 1
Configuration LT TR L R
Approach LOS B
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ TWSC Version 7.9.5 Generated: 5/8/2023 2:33:13 PM
Boston and Benbow_2047 AM_Partial Build SB Exit.xtw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 220 140 60 60 70 80 30 450 80 60 320 160
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 3.9 29.8 5.6 5.6 1.2 10.9
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 4.0
Phase Duration, s 17.8 23.1 11.1 16.4 9.4 44.7 11.1 46.4
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.1 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 12.0 11.9 4.7 10.2 3.0 2.0
Green Extension Time ( g e ), s 0.4 0.7 0.1 0.7 0.0 0.0 1.0 0.0
Phase Call Probability 1.00 1.00 0.80 1.00 0.56 0.80
Max Out Probability 0.00 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.30 B 1.94 B 1.90 B
Bicycle LOS Score / LOS 1.24 A 0.86 A 0.99 A 0.97 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:50:47 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 360 260 30 10 210 170 30 500 10 10 210 170
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 3.4 24.3 1.7 18.8 14.3 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 5 2 1 6
Case Number 1.0 4.0 5.3 1.2 4.0 1.3 3.0
Phase Duration, s 24.3 44.1 19.8 8.9 38.7 7.2 37.0
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 18.1 13.1 13.0 3.2 2.0
Green Extension Time ( g e ), s 0.7 1.5 1.3 0.0 0.0 0.6 0.0
Phase Call Probability 1.00 1.00 1.00 0.57 0.25
Max Out Probability 0.00 0.00 0.03 0.00 0.03
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.13 B 2.14 B 1.92 B
Bicycle LOS Score / LOS 1.71 B 1.22 A 1.50 B 1.22 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:29:17 PM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration T R LT LR
Approach LOS B B B
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/23/2023 3:31:00 PM
Drake and Hunt_2047 AM_Partial Build SB Exit Only.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 320 110 150 210 40 50 110 90 60 210 100
Signal Information
Cycle, s 120.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.2 38.9 5.9 6.4 3.4 34.2
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 1.0 1.0 0.0 1.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.3 4.0 1.2 3.0
Phase Duration, s 11.4 39.2 14.9 42.6 10.9 54.7 11.2 55.1
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 5.6 32.7 9.7 16.9 2.0 4.7
Green Extension Time ( g e ), s 0.1 1.4 0.3 1.5 0.2 0.0 0.1 0.0
Phase Call Probability 0.92 1.00 1.00 1.00 0.84 0.89
Max Out Probability 0.00 0.00 0.00 0.00 0.20 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.93 B 2.12 B 1.92 B 1.96 B
Bicycle LOS Score / LOS 1.38 A 1.20 A 0.94 A 1.15 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:32:48 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 120 1080 10 30 740 100 20 20 30 370 40 270
Signal Information
Cycle, s 80.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 2.6 4.0 27.4 2.7 3.3 10.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 2.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 12.6 37.4 8.6 33.4 8.7 16.0 18.0 25.3
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.3 3.1 3.3
Queue Clearance Time ( g s ), s 5.8 2.6 2.8 4.3 14.0 14.4
Green Extension Time ( g e ), s 0.1 0.0 0.0 0.0 0.0 0.6 0.0 0.5
Phase Call Probability 0.94 0.37 0.38 1.00 1.00 1.00
Max Out Probability 0.00 0.00 0.01 0.06 1.00 0.09
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.10 B 2.29 B 2.28 B
Bicycle LOS Score / LOS 1.56 B 1.26 A 0.61 A 1.69 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:27:13 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1630 50 90 450 130 400
Signal Information
Cycle, s 80.0 Reference Phase 2
1 2 3 4
Offset, s 27 Reference Point End
Green 6.2 39.8 16.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 45.8 12.2 58.0 22.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 3.7 18.0
Green Extension Time ( g e ), s 0.0 0.1 0.0 0.0
Phase Call Probability 0.88 1.00
Max Out Probability 0.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 0.66 A 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.90 B 0.94 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:27:13 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1550 480 130 470 260 0 70
Signal Information
Cycle, s 80.0 Reference Phase 2
1 2 3 4
Offset, s 70 Reference Point End
Green 6.7 41.5 13.8 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 47.5 12.7 60.2 19.8
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.2
Queue Clearance Time ( g s ), s 4.3 13.3
Green Extension Time ( g e ), s 0.0 0.2 0.0 0.5
Phase Call Probability 0.95 1.00
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.37 A 1.63 B 2.31 B 2.31 B
Bicycle LOS Score / LOS 2.29 B 1.02 A 1.07 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:27:13 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 620 1190 340 300 260 0 210
Signal Information
Cycle, s 80.0 Reference Phase 2
1 2 3 4
Offset, s 48 Reference Point End
Green 52.7 15.3 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 58.7 58.7 21.3
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 14.3
Green Extension Time ( g e ), s 0.0 0.0 1.0
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.86 B 1.34 A 2.31 B 2.31 B
Bicycle LOS Score / LOS 2.06 B 1.04 A 1.30 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:27:13 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 270 40 20 290 70 50 110 30 130 140 210
Signal Information
Cycle, s 65.6 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.4 21.2 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.4 25.4 27.2 27.2
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.4 3.4
Queue Clearance Time ( g s ), s 7.0 9.9 7.9 19.4 15.4
Green Extension Time ( g e ), s 0.0 1.2 0.8 1.8 1.6
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.05 0.00 0.00 0.02
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 1.91 B 2.10 B 2.10 B
Bicycle LOS Score / LOS 1.40 A 0.84 A 0.84 A 1.38 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:37:12 AM
2047
AM PEAK
ALTERNATIVE 2 – PARTIAL BUILD NORTHBOUND LOOP
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 30 240 970 650 260 30 30 0 30
Signal Information
Cycle, s 110.0 Reference Phase 2
Offset, s 28 Reference Point End
Green 94.6 5.4 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 4
Case Number 7.0 6.0 12.0
Phase Duration, s 99.6 99.6 10.4
Change Period, ( Y+R c ), s 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 6.2
Green Extension Time ( g e ), s 0.0 0.0 0.1
Phase Call Probability 0.86
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.58 B 1.28 A 1.96 B 2.15 B
Bicycle LOS Score / LOS 2.71 C 2.17 B 0.60 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 3:14:58 PM
2047
AM PEAK
ALTERNATIVE 3 - PARTIAL BUILD NORTH SIDE
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 30 1060 20 410 940 80 80 40 960 90 20 30
Signal Information
Cycle, s 110.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 21.9 22.7 4.4 9.9 21.1 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 10.4 39.1 27.9 56.6 27.1 15.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 3.0 20.8 23.1 4.8
Green Extension Time ( g e ), s 1.4 0.0 1.1 0.0 0.0 0.2
Phase Call Probability 0.63 1.00 1.00 0.99
Max Out Probability 0.77 0.03 1.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.44 B 2.47 B 2.74 C 2.59 C
Bicycle LOS Score / LOS 1.14 A 1.76 B 2.40 B 0.74 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 10:14:40 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 1920 190 160 720 0 390 0 710
Signal Information
Cycle, s 110.0 Reference Phase 2
1 2 3 4
Offset, s 103 Reference Point End
Green 41.0 9.0 38.0 4.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 47.0 62.0 44.0 59.0 4.0 4.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.1 17.9 6.0 6.0
Green Extension Time ( g e ), s 0.0 0.0 4.3 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.02 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.12 B 2.27 B 2.61 C 2.74 C
Bicycle LOS Score / LOS 1.78 B 1.03 A 1.20 A 1.79 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 10:14:40 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 960 1350 1220 250 0 150
Signal Information
Cycle, s 110.0 Reference Phase 2
1 2 3 4
Offset, s 78 Reference Point End
Green 78.7 19.3 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 84.7 84.7 25.3
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 18.4
Green Extension Time ( g e ), s 0.0 0.0 0.9
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.05 B 1.34 A 2.32 B 2.47 B
Bicycle LOS Score / LOS 2.49 B 1.19 A 1.18 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 10:14:40 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 100 390 150 10 680 50 250 160 80 40 150 150
Signal Information
Cycle, s 71.3 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 1.4 0.9 19.1 4.2 2.5 17.3
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 10.3 30.0 5.4 25.1 14.7 27.8 8.2 21.3
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 5.1 14.1 2.3 17.4 10.4 7.4 3.5 14.1
Green Extension Time ( g e ), s 0.0 2.0 0.0 1.7 0.2 1.1 0.0 1.2
Phase Call Probability 0.89 1.00 0.20 1.00 1.00 1.00 0.59 1.00
Max Out Probability 1.00 0.51 0.03 0.06 0.30 0.00 0.53 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.10 B 1.92 B 2.27 B 2.43 B
Bicycle LOS Score / LOS 1.09 A 1.18 A 1.41 A 1.13 A
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 240 70 150 210 80 70 320 150 40 210 20
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.2 23.1 4.9 6.2 0.8 21.4
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 2.0 3.0 1.2 3.0 1.3 3.0
Phase Duration, s 11.7 26.9 12.4 27.7 11.7 40.2 10.4 39.0
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 5.1 20.1 6.6 12.6 4.9 2.0
Green Extension Time ( g e ), s 0.1 1.3 0.4 1.4 0.1 0.0 0.6 0.0
Phase Call Probability 0.88 1.00 0.99 1.00 0.88 0.70
Max Out Probability 0.00 0.01 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.12 B 2.31 B 1.91 B
Bicycle LOS Score / LOS 1.25 A 1.37 A 1.57 B 1.03 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:20:58 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 640 300 150 70 50
Signal Information
Cycle, s 110.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 7.4 74.8 9.8 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 4
Case Number 1.0 4.0 7.3 9.0
Phase Duration, s 13.4 94.2 80.8 15.8
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 6.9 6.4
Green Extension Time ( g e ), s 0.5 0.0 0.0 0.1
Phase Call Probability 1.00 0.98
Max Out Probability 0.00 0.67
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 0.63 A 1.87 B 1.96 B 1.96 B
Bicycle LOS Score / LOS 2.10 B 1.29 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 11:01:48 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 560 190 90 170 150 610 70 260 120
Signal Information
Cycle, s 110.0 Reference Phase 2
Offset, s 84 Reference Point End
Green 31.0 6.6 6.3 2.1 40.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 2.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 3 8 7 4
Case Number 7.4 1.0 4.0 1.1 3.0 1.1 3.0
Phase Duration, s 37.0 12.6 49.7 14.4 48.0 12.3 46.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.1 3.3 3.1 3.3
Queue Clearance Time ( g s ), s 2.0 8.3 44.0 4.8 8.3
Green Extension Time ( g e ), s 0.0 0.3 0.0 0.1 0.0 0.1 2.8
Phase Call Probability 0.95 0.99 1.00 0.90 1.00
Max Out Probability 0.17 0.37 1.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.14 B 2.11 B 2.28 B 2.28 B
Bicycle LOS Score / LOS 1.16 A 0.72 A F 0.89 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 11:01:48 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 970 270 260 650
Signal Information
Cycle, s 110.0 Reference Phase 2
Offset, s 18 Reference Point End
Green 31.4 68.6 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6
Case Number 2.0 4.0 7.3
Phase Duration, s 36.4 110.0 73.6
Change Period, ( Y+R c ), s 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.1 0.0 0.0
Queue Clearance Time ( g s ), s 28.9
Green Extension Time ( g e ), s 2.5 0.0 0.0
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 0.51 A 1.65 B 1.96 B 2.15 B
Bicycle LOS Score / LOS 2.71 C 2.12 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 11:01:48 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 230 140 50 10 80 60 30 440 80 70 360 130
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 3.9 29.6 6.0 1.7 5.7 10.2
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 4.0
Phase Duration, s 18.4 26.9 7.2 15.7 9.4 44.5 11.5 46.5
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 12.5 10.8 2.5 9.5 3.0 2.0
Green Extension Time ( g e ), s 0.4 0.7 0.0 0.6 0.0 0.0 1.1 0.0
Phase Call Probability 1.00 1.00 0.24 1.00 0.56 0.85
Max Out Probability 0.00 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.30 B 1.94 B 1.90 B
Bicycle LOS Score / LOS 1.24 A 0.76 A 0.98 A 0.99 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:18:55 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 360 260 30 10 210 170 30 500 10 10 210 170
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 3.4 24.3 1.7 18.8 14.3 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 5 2 1 6
Case Number 1.0 4.0 5.3 1.2 4.0 1.3 3.0
Phase Duration, s 24.3 44.1 19.8 8.9 38.7 7.2 37.0
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 18.1 13.1 13.0 3.2 2.0
Green Extension Time ( g e ), s 0.7 1.5 1.3 0.0 0.0 0.6 0.0
Phase Call Probability 1.00 1.00 1.00 0.57 0.25
Max Out Probability 0.00 0.00 0.03 0.00 0.03
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.13 B 2.14 B 1.92 B
Bicycle LOS Score / LOS 1.71 B 1.22 A 1.50 B 1.22 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:17:39 PM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration T R LT LR
Approach LOS B B B
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/23/2023 3:15:23 PM
Drake and Hunt_2047 AM_Partial Build N Side.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 320 110 150 210 40 50 110 90 60 210 100
Signal Information
Cycle, s 120.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.2 38.9 5.9 6.4 3.4 34.2
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 1.0 1.0 0.0 1.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.3 4.0 1.2 3.0
Phase Duration, s 11.4 39.2 14.9 42.6 10.9 54.7 11.2 55.1
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 5.6 32.7 9.7 16.9 2.0 4.7
Green Extension Time ( g e ), s 0.1 1.4 0.3 1.5 0.2 0.0 0.1 0.0
Phase Call Probability 0.92 1.00 1.00 1.00 0.84 0.89
Max Out Probability 0.00 0.00 0.00 0.00 0.20 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.93 B 2.12 B 1.92 B 1.96 B
Bicycle LOS Score / LOS 1.38 A 1.20 A 0.94 A 1.15 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:09:20 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 120 1080 10 30 740 100 20 20 30 370 40 270
Signal Information
Cycle, s 90.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 3.1 3.6 32.3 2.9 8.1 10.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 2.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 12.7 41.9 9.1 38.3 8.9 16.0 23.0 30.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.3 3.1 3.3
Queue Clearance Time ( g s ), s 6.2 2.8 3.0 4.6 18.5 15.5
Green Extension Time ( g e ), s 0.1 0.0 0.0 0.0 0.0 0.5 0.0 0.6
Phase Call Probability 0.96 0.44 0.42 1.00 1.00 1.00
Max Out Probability 0.00 0.00 0.00 0.13 1.00 0.02
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.11 B 2.30 B 2.28 B
Bicycle LOS Score / LOS 1.56 B 1.26 A 0.61 A 1.69 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/18/2023 2:43:45 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1450 50 90 520 130 400
Signal Information
Cycle, s 90.0 Reference Phase 2
1 2 3 4
Offset, s 35 Reference Point End
Green 6.3 42.5 23.2 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 48.5 12.3 60.8 29.2
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 4.1 22.0
Green Extension Time ( g e ), s 0.0 0.1 0.0 1.2
Phase Call Probability 0.91 1.00
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 0.68 A 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.75 B 1.00 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/18/2023 2:43:45 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1370 480 130 540 260 0 70
Signal Information
Cycle, s 90.0 Reference Phase 2
1 2 3 4
Offset, s 90 Reference Point End
Green 6.8 49.9 15.3 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 55.9 12.8 68.7 21.3
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.2
Queue Clearance Time ( g s ), s 4.5 14.7
Green Extension Time ( g e ), s 0.0 0.2 0.0 0.6
Phase Call Probability 0.97 1.00
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.37 A 1.63 B 2.31 B 2.31 B
Bicycle LOS Score / LOS 2.13 B 1.08 A 1.07 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/18/2023 2:43:45 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 920 710 370 160 300 0 210
Signal Information
Cycle, s 90.0 Reference Phase 2
1 2 3 4
Offset, s 68 Reference Point End
Green 58.9 19.1 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 64.9 64.9 25.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 18.0
Green Extension Time ( g e ), s 0.0 0.0 1.1
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.87 B 1.35 A 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.90 B 0.95 A 1.37 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/18/2023 2:43:45 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 170 270 40 10 290 70 50 90 30 140 150 260
Signal Information
Cycle, s 69.6 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.4 25.2 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.4 25.4 31.2 31.2
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.4 3.4
Queue Clearance Time ( g s ), s 7.2 10.9 8.4 23.2 18.7
Green Extension Time ( g e ), s 0.0 1.2 0.7 2.0 1.9
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.07 0.02 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.91 B 2.09 B 2.09 B
Bicycle LOS Score / LOS 1.38 A 0.83 A 0.80 A 1.51 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/18/2023 2:42:52 PM
2047
AM PEAK
ALTERNATIVE 4 – SOUTHBOUND EXIT SOUTHBOUND ENTRANCE
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 30 1000 20 410 940 80 80 40 1050 90 20 30
Signal Information
Cycle, s 120.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 26.1 25.3 4.6 9.9 24.1 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 10.6 41.9 32.1 63.4 30.1 15.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 3.1 24.6 26.1 5.1
Green Extension Time ( g e ), s 1.3 0.0 1.5 0.0 0.0 0.2
Phase Call Probability 0.66 1.00 1.00 0.99
Max Out Probability 0.78 0.00 1.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.45 B 2.47 B 2.75 C 2.60 C
Bicycle LOS Score / LOS 1.11 A 1.76 B 2.56 C 0.74 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 10:36:52 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 2000 140 160 700 0 390 0 730
Signal Information
Cycle, s 120.0 Reference Phase 2
1 2 3 4
Offset, s 15 Reference Point End
Green 42.0 12.0 40.0 8.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 48.0 66.0 46.0 64.0 8.0 8.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.0 21.1 10.0 10.0
Green Extension Time ( g e ), s 0.0 0.0 5.2 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.07 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.12 B 2.27 B 2.61 C 2.74 C
Bicycle LOS Score / LOS 1.80 B 1.01 A 1.20 A 1.83 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 10:36:52 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 670 1720 1460 260 0 140
Signal Information
Cycle, s 120.0 Reference Phase 2
1 2 3 4
Offset, s 90 Reference Point End
Green 86.5 21.5 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 92.5 92.5 27.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 20.6
Green Extension Time ( g e ), s 0.0 0.0 0.8
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.05 B 1.34 A 2.32 B 2.47 B
Bicycle LOS Score / LOS 2.56 C 1.33 A 1.18 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 10:36:52 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 60 400 150 80 710 50 230 190 60 40 150 140
Signal Information
Cycle, s 67.6 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 5.2 0.6 20.2 4.1 2.9 16.5
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 9.2 26.2 9.8 26.9 11.0 23.4 8.1 20.5
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 3.8 13.7 4.4 16.6 9.0 8.6 3.4 13.0
Green Extension Time ( g e ), s 0.1 2.1 0.0 3.4 0.0 1.2 0.1 1.2
Phase Call Probability 0.73 1.00 0.82 1.00 0.99 1.00 0.58 1.00
Max Out Probability 0.00 0.48 1.00 0.00 1.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.10 B 1.91 B 2.27 B 2.43 B
Bicycle LOS Score / LOS 1.06 A 1.28 A 1.39 A 1.11 A
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 230 70 140 190 80 80 300 150 60 190 20
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.4 22.6 5.9 6.2 0.7 20.8
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 2.0 3.0 1.2 3.0 1.3 3.0
Phase Duration, s 11.7 26.3 12.4 27.0 11.9 39.9 11.4 39.4
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 5.1 19.5 6.2 11.5 5.4 2.0
Green Extension Time ( g e ), s 0.1 1.2 0.4 1.3 0.2 0.0 0.6 0.0
Phase Call Probability 0.88 1.00 0.99 1.00 0.91 0.84
Max Out Probability 0.00 0.01 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.12 B 2.30 B 1.91 B
Bicycle LOS Score / LOS 1.23 A 1.31 A 1.55 B 1.03 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:46:37 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 640 30 130 250 90 70 250 90 220 20 50
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 7.3 5.7 29.0 6.2 4.8 22.9
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 0.0 2.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 4.0
Phase Duration, s 19.1 40.8 13.3 35.0 12.2 28.9 17.0 33.7
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.1 3.1 3.1
Queue Clearance Time ( g s ), s 12.7 7.4 5.2 22.3 12.2 5.5
Green Extension Time ( g e ), s 0.4 0.0 0.1 0.0 0.1 0.6 0.0 0.9
Phase Call Probability 1.00 0.98 0.88 1.00 1.00 1.00
Max Out Probability 0.01 0.01 0.00 0.10 1.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.92 B 1.93 B 2.29 B 2.29 B
Bicycle LOS Score / LOS 1.32 A 0.91 A 1.22 A 1.01 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 11:13:38 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 280 640 330 190 140 260
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 82 Reference Point End
Green 74.6 13.4 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 4
Case Number 7.0 8.0 9.0
Phase Duration, s 80.6 80.6 19.4
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.3
Queue Clearance Time ( g s ), s 12.3
Green Extension Time ( g e ), s 0.0 0.0 1.0
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.33 A 1.84 B 1.96 B 2.15 B
Bicycle LOS Score / LOS 2.14 B 0.95 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 11:13:38 AM
HCS7 Two-Way Stop-Control Report
General Information Site Information
Analyst SNP Intersection Boston and Benbow
Lanes
Movement U L T R U L T R U L T R U L T R
Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12
Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 0 1 0
Configuration LT TR LR
Approach LOS C
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ TWSC Version 7.9.5 Generated: 5/8/2023 2:28:55 PM
Boston and Benbow_2047 AM_Partial Build SB Only.xtw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 220 140 60 60 70 80 30 450 80 60 320 160
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 3.9 29.8 5.6 5.6 1.2 10.9
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 4.0
Phase Duration, s 17.8 23.1 11.1 16.4 9.4 44.7 11.1 46.4
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.1 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 12.0 11.9 4.7 10.2 3.0 2.0
Green Extension Time ( g e ), s 0.4 0.7 0.1 0.7 0.0 0.0 1.0 0.0
Phase Call Probability 1.00 1.00 0.80 1.00 0.56 0.80
Max Out Probability 0.00 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.30 B 1.94 B 1.90 B
Bicycle LOS Score / LOS 1.24 A 0.86 A 0.99 A 0.97 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:43:56 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 360 240 50 10 210 200 30 510 10 10 210 200
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 3.4 23.3 1.7 18.5 15.6 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 5 2 1 6
Case Number 1.0 4.0 5.3 1.2 4.0 1.3 3.0
Phase Duration, s 24.0 45.1 21.1 8.9 37.7 7.2 36.0
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 17.8 13.0 14.2 3.2 2.0
Green Extension Time ( g e ), s 0.7 1.6 1.4 0.0 0.0 0.7 0.0
Phase Call Probability 1.00 1.00 1.00 0.57 0.25
Max Out Probability 0.00 0.00 0.06 0.00 0.03
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 2.13 B 2.14 B 1.92 B
Bicycle LOS Score / LOS 1.71 B 1.28 A 1.52 B 1.28 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:36:24 PM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration TR LT LR
Approach LOS B B B
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/23/2023 3:40:54 PM
Drake and Hunt_2047 AM_Partial Build SB Only.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 340 110 150 220 40 50 140 90 50 180 90
Signal Information
Cycle, s 60.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 24.1 25.9 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 4 8 2 6
Case Number 6.0 6.0 6.0 6.0
Phase Duration, s 30.9 30.9 29.1 29.1
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.4 3.4 0.0 0.0
Queue Clearance Time ( g s ), s 14.9 25.3
Green Extension Time ( g e ), s 2.2 0.6 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.08 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.89 B 1.89 B 1.89 B
Bicycle LOS Score / LOS 1.42 A 1.22 A 0.99 A 1.06 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:41:46 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 110 1060 10 30 730 120 20 20 30 340 40 270
Signal Information
Cycle, s 115.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 3.6 3.3 51.9 3.5 12.8 10.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 2.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 12.8 61.1 9.6 57.9 9.5 16.0 28.3 34.8
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.3 3.1 3.3
Queue Clearance Time ( g s ), s 6.2 2.8 3.3 5.4 21.6 20.1
Green Extension Time ( g e ), s 0.2 0.0 0.0 0.0 0.0 0.8 0.7 0.8
Phase Call Probability 0.98 0.51 0.50 1.00 1.00 1.00
Max Out Probability 0.00 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.10 B 2.31 B 2.30 B
Bicycle LOS Score / LOS 1.53 B 1.27 A 0.61 A 1.64 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:47:14 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1440 50 90 500 130 400
Signal Information
Cycle, s 115.0 Reference Phase 2
1 2 3 4
Offset, s 29 Reference Point End
Green 6.7 61.0 29.3 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 67.0 12.7 79.7 35.3
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 4.4 28.1
Green Extension Time ( g e ), s 0.0 0.1 0.0 1.2
Phase Call Probability 0.95 1.00
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 0.68 A 2.32 B 2.32 B
Bicycle LOS Score / LOS 1.74 B 0.98 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:47:14 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1490 350 80 520 470 0 70
Signal Information
Cycle, s 115.0 Reference Phase 2
1 2 3 4
Offset, s 61 Reference Point End
Green 6.5 57.9 32.6 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 63.9 12.5 76.4 38.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.2
Queue Clearance Time ( g s ), s 4.3 31.4
Green Extension Time ( g e ), s 0.0 0.1 0.0 1.2
Phase Call Probability 0.93 1.00
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.39 A 1.66 B 2.32 B 2.32 B
Bicycle LOS Score / LOS 2.12 B 1.02 A 1.45 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:47:14 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 770 1190 340 300 260 0 210
Signal Information
Cycle, s 115.0 Reference Phase 2
1 2 3 4
Offset, s 115 Reference Point End
Green 82.1 20.9 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 88.1 88.1 26.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 19.9
Green Extension Time ( g e ), s 0.0 0.0 1.0
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.86 B 1.34 A 2.32 B 2.32 B
Bicycle LOS Score / LOS 2.19 B 1.04 A 1.30 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:47:14 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 270 40 20 290 70 50 110 30 130 140 210
Signal Information
Cycle, s 65.6 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.4 21.2 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.4 25.4 27.2 27.2
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.4 3.4
Queue Clearance Time ( g s ), s 7.0 9.9 7.9 19.4 15.4
Green Extension Time ( g e ), s 0.0 1.2 0.8 1.8 1.6
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.05 0.00 0.00 0.02
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 1.91 B 2.10 B 2.10 B
Bicycle LOS Score / LOS 1.40 A 0.84 A 0.84 A 1.38 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:49:55 AM
2047
AM PEAK
FULL INTERCHANGE
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 30 940 20 470 900 50 90 40 840 90 20 30
Signal Information
Cycle, s 95.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 19.0 16.0 4.0 9.8 16.2 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 10.0 32.0 25.0 47.0 22.2 15.8
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 2.9 21.0 18.2 4.4
Green Extension Time ( g e ), s 1.3 0.0 0.0 0.0 0.0 0.2
Phase Call Probability 0.57 1.00 1.00 0.98
Max Out Probability 0.71 1.00 1.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.44 B 2.46 B 2.74 C 2.59 C
Bicycle LOS Score / LOS 1.07 A 1.75 B 2.21 B 0.74 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 11:58:43 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 1710 160 160 690 0 390 0 690
Signal Information
Cycle, s 95.0 Reference Phase 2
1 2 3 4
Offset, s 34 Reference Point End
Green 37.0 1.0 36.0 3.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 43.0 50.0 42.0 49.0 3.0 3.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.0 16.5 5.0 5.0
Green Extension Time ( g e ), s 0.0 0.0 4.5 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.03 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.11 B 2.26 B 2.60 C 2.73 C
Bicycle LOS Score / LOS 1.63 B 1.01 A 1.20 A 1.75 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 11:58:43 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 730 1350 1270 250 0 100
Signal Information
Cycle, s 95.0 Reference Phase 2
1 2 3 4
Offset, s 31 Reference Point End
Green 66.2 16.8 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 72.2 72.2 22.8
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 16.1
Green Extension Time ( g e ), s 0.0 0.0 0.7
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.05 B 1.34 A 2.31 B 2.46 B
Bicycle LOS Score / LOS 2.29 B 1.22 A 1.10 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 11:58:43 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 130 380 150 80 710 40 240 150 90 40 150 150
Signal Information
Cycle, s 68.3 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 5.8 0.8 19.8 4.1 2.9 16.9
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 10.6 26.6 9.8 25.8 11.0 23.8 8.1 20.9
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 6.0 14.2 4.5 16.8 9.0 7.1 3.4 13.5
Green Extension Time ( g e ), s 0.3 2.0 0.0 2.7 0.0 1.2 0.1 1.2
Phase Call Probability 0.94 1.00 0.82 1.00 0.99 1.00 0.58 1.00
Max Out Probability 0.00 0.53 1.00 0.06 1.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.10 B 1.91 B 2.27 B 2.43 B
Bicycle LOS Score / LOS 1.11 A 1.27 A 1.39 A 1.13 A
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 80 240 70 160 180 80 70 310 150 60 190 20
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 5.9 0.3 33.6 6.4 0.6 21.2
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 0.0 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 2.0 3.0 1.1 3.0 1.1 3.0
Phase Duration, s 11.9 26.7 12.4 27.3 11.7 39.4 11.4 39.1
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 5.6 20.1 6.9 10.9 4.5 4.1
Green Extension Time ( g e ), s 0.1 1.1 0.0 1.3 0.1 0.0 0.1 0.0
Phase Call Probability 0.91 1.00 0.99 1.00 0.88 0.84
Max Out Probability 0.00 0.04 1.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.12 B 2.27 B 1.91 B
Bicycle LOS Score / LOS 1.27 A 1.33 A 1.55 B 1.03 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 2:42:46 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 1080 30 140 410 80 20 90 90 180 30 50
Signal Information
Cycle, s 80.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 12.3 14.0 6.8 6.9 10.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 7 4
Case Number 1.2 4.0 1.3 4.0 7.3 2.0 4.0
Phase Duration, s 18.3 38.3 12.8 32.8 16.0 12.9 28.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 11.8 3.3 7.0 6.4 5.1
Green Extension Time ( g e ), s 0.5 0.0 1.3 0.0 0.5 0.3 0.6
Phase Call Probability 1.00 0.97 1.00 0.99 1.00
Max Out Probability 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.94 B 2.10 B 2.29 B 2.28 B
Bicycle LOS Score / LOS 1.72 B 1.05 A 0.85 A 0.95 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 10:38:43 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 770 540 310 400 130 260
Signal Information
Cycle, s 80.0 Reference Phase 2
Offset, s 15 Reference Point End
Green 10.9 31.1 20.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 37.1 16.9 54.0 26.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 10.9 9.2
Green Extension Time ( g e ), s 0.0 0.0 0.0 0.8
Phase Call Probability 1.00 1.00
Max Out Probability 1.00 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.39 A 1.87 B 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.66 B 1.12 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 10:38:43 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 690 210 420 650 290 90
Signal Information
Cycle, s 80.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 37.8 7.0 17.2 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8
Case Number 1.0 4.0 7.4 9.0
Phase Duration, s 13.0 56.8 43.8 23.2
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 2.0 16.5
Green Extension Time ( g e ), s 1.4 0.0 0.0 0.8
Phase Call Probability 1.00 1.00
Max Out Probability 0.50 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.64 B 1.71 B 2.14 B 2.31 B
Bicycle LOS Score / LOS 2.10 B 1.45 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 10:38:43 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 210 150 60 60 80 80 30 450 80 70 320 130
Signal Information
Cycle, s 70.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 3.3 14.6 5.4 5.0 4.2 10.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 4.0
Phase Duration, s 14.7 19.7 10.5 15.5 8.8 28.9 10.9 31.0
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.1 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 9.3 10.1 4.1 8.6 2.9 2.0
Green Extension Time ( g e ), s 0.0 0.5 0.0 0.3 0.0 0.0 0.7 0.0
Phase Call Probability 0.99 1.00 0.72 1.00 0.47 0.77
Max Out Probability 1.00 0.14 0.02 0.94 0.00 0.27
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.28 B 2.29 B 1.93 B 1.90 B
Bicycle LOS Score / LOS 1.24 A 0.88 A 0.99 A 0.95 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 2:39:12 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 360 250 50 10 210 170 30 500 10 70 90 100
Signal Information
Cycle, s 110.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 3.9 34.0 6.4 22.7 17.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 1.5 1.5 1.5 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 5 2 1 6
Case Number 1.0 4.0 5.3 1.2 4.0 1.3 3.0
Phase Duration, s 28.2 50.7 22.5 7.9 47.4 11.9 51.4
Change Period, ( Y+R c ), s 5.5 5.5 5.5 4.0 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 21.9 16.8 15.5 3.3 2.0
Green Extension Time ( g e ), s 0.8 1.6 1.5 0.0 0.0 0.4 0.0
Phase Call Probability 1.00 1.00 1.00 0.65 0.91
Max Out Probability 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.92 B 2.14 B 2.14 B 1.91 B
Bicycle LOS Score / LOS 1.73 B 1.22 A 1.50 B 0.98 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 2:26:17 PM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration T R LT LR
Approach LOS B B B
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/23/2023 2:35:22 PM
Drake and Hunt_2047 AM_Full Build.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 70 320 110 160 220 40 50 110 90 50 190 90
Signal Information
Cycle, s 60.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 24.1 25.9 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 4 8 2 6
Case Number 6.0 6.0 6.0 6.0
Phase Duration, s 30.9 30.9 29.1 29.1
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.4 3.4 0.0 0.0
Queue Clearance Time ( g s ), s 14.2 25.0
Green Extension Time ( g e ), s 2.2 1.0 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.05 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.89 B 1.89 B 1.89 B
Bicycle LOS Score / LOS 1.38 A 1.24 A 0.94 A 1.08 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 2:47:39 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 120 1070 10 30 720 90 20 20 30 340 40 270
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 2.7 3.9 25.5 2.5 0.5 10.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 2.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 12.5 35.4 8.7 31.5 8.5 16.0 15.0 22.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.3 3.1 3.3
Queue Clearance Time ( g s ), s 5.5 2.6 2.8 4.1 11.0 13.9
Green Extension Time ( g e ), s 0.1 0.0 0.0 0.0 0.0 0.5 0.0 0.3
Phase Call Probability 0.93 0.38 0.36 1.00 1.00 1.00
Max Out Probability 0.06 0.00 0.00 0.10 1.00 0.84
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 2.10 B 2.29 B 2.28 B
Bicycle LOS Score / LOS 1.55 B 1.23 A 0.61 A 1.64 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 10:36:15 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1340 50 90 480 130 400
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 35 Reference Point End
Green 6.0 31.7 19.3 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 37.7 12.0 49.7 25.3
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 3.9 18.4
Green Extension Time ( g e ), s 0.0 0.1 0.0 0.9
Phase Call Probability 0.86 1.00
Max Out Probability 0.00 0.11
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 0.67 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.66 B 0.97 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 10:36:15 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1440 300 90 490 370 0 80
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 69 Reference Point End
Green 6.0 33.3 17.7 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 39.3 12.0 51.3 23.7
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.2
Queue Clearance Time ( g s ), s 3.8 17.0
Green Extension Time ( g e ), s 0.0 0.1 0.0 0.7
Phase Call Probability 0.86 1.00
Max Out Probability 0.00 0.03
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.38 A 1.64 B 2.30 B 2.30 B
Bicycle LOS Score / LOS 2.03 B 1.00 A 1.29 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 10:36:15 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 930 880 320 300 260 0 210
Signal Information
Cycle, s 75.0 Reference Phase 2
1 2 3 4
Offset, s 56 Reference Point End
Green 48.5 14.5 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 54.5 54.5 20.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 13.5
Green Extension Time ( g e ), s 0.0 0.0 1.0
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.86 B 1.34 A 2.30 B 2.30 B
Bicycle LOS Score / LOS 2.06 B 1.03 A 1.30 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 10:36:15 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 170 280 40 20 280 70 50 110 30 120 140 200
Signal Information
Cycle, s 65.6 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 20.0 20.6 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 39.0 26.0 26.6 26.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.3 3.3
Queue Clearance Time ( g s ), s 6.6 10.1 7.7 18.9 15.1
Green Extension Time ( g e ), s 0.0 1.2 1.3 1.7 1.5
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.05 0.02 0.00 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 1.91 B 2.10 B 2.10 B
Bicycle LOS Score / LOS 1.40 A 0.83 A 0.84 A 1.34 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/25/2023 10:34:34 AM
2047
PM PEAK
NO BUILD
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 1620 30 950 1460 420 130 140 730 310 110 170
Signal Information
Cycle, s 115.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 37.0 19.2 8.8 10.0 10.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 14.8 40.0 43.0 68.2 16.0 16.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 8.3 39.0 12.0 12.0
Green Extension Time ( g e ), s 0.4 0.0 0.0 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 1.00 1.00 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.44 B 2.47 B 2.75 C 2.61 C
Bicycle LOS Score / LOS 1.57 B 3.00 C 2.26 B 1.53 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/11/2023 8:53:38 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 2210 450 140 1140 0 760 0 1670
Signal Information
Cycle, s 115.0 Reference Phase 2
1 2 3 4
Offset, s 38 Reference Point End
Green 54.0 1.0 47.0 1.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 60.0 61.0 53.0 54.0 1.0 1.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.0 14.5 3.0 3.0
Green Extension Time ( g e ), s 0.0 0.0 6.6 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.01 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.11 B 2.28 B 2.61 C 2.74 C
Bicycle LOS Score / LOS 2.11 B 1.27 A 1.88 B 3.55 D
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/11/2023 8:53:38 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1510 1460 1590 240 0 290
Signal Information
Cycle, s 115.0 Reference Phase 2
1 2 3 4
Offset, s 25 Reference Point End
Green 78.9 24.1 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 84.9 84.9 30.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.3
Queue Clearance Time ( g s ), s 22.9
Green Extension Time ( g e ), s 0.0 0.0 1.2
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.06 B 1.35 A 2.32 B 2.47 B
Bicycle LOS Score / LOS 3.07 C 1.41 A 1.41 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/11/2023 8:53:38 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 640 170 120 740 40 220 210 90 110 320 180
Signal Information
Cycle, s 125.9 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 8.9 3.1 40.8 8.5 1.4 41.2
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 16.0 49.9 12.9 46.8 17.9 50.6 12.5 45.2
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.1 3.1 3.1
Queue Clearance Time ( g s ), s 11.8 40.3 8.8 29.2 13.9 14.0 8.6 37.2
Green Extension Time ( g e ), s 0.2 3.5 0.2 3.6 0.0 1.9 0.0 1.9
Phase Call Probability 1.00 1.00 0.99 1.00 1.00 1.00 0.99 1.00
Max Out Probability 0.00 0.26 0.00 0.21 1.00 0.00 1.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.12 B 1.93 B 2.29 B 2.44 B
Bicycle LOS Score / LOS 1.42 A 1.33 A 1.46 A 1.63 B
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 50 230 130 330 250 110 120 430 170 100 550 100
Signal Information
Cycle, s 110.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.7 0.2 39.6 5.6 4.4 26.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 0.0 1.5 1.5 1.5 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 11.1 31.5 21.0 41.3 12.4 45.3 12.2 45.1
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 4.4 25.8 17.5 22.3 6.9 6.0
Green Extension Time ( g e ), s 0.0 0.2 0.0 1.5 0.2 0.0 0.1 0.0
Phase Call Probability 0.81 1.00 1.00 1.00 0.98 0.96
Max Out Probability 0.01 1.00 1.00 0.01 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.94 B 2.12 B 1.92 B 1.92 B
Bicycle LOS Score / LOS 1.22 A 1.71 B 1.77 B 1.82 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 3:31:25 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 140 420 470 190 220 0 160
Signal Information
Cycle, s 70.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 41.3 18.7 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 4
Case Number 8.0 8.0 12.0
Phase Duration, s 46.3 46.3 23.7
Change Period, ( Y+R c ), s 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 18.1
Green Extension Time ( g e ), s 0.0 0.0 0.6
Phase Call Probability 1.00
Max Out Probability 0.10
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.35 A 1.35 A 1.72 B 1.72 B
Bicycle LOS Score / LOS 1.48 A 1.66 B 1.16 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 1:23:23 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 370 260 170 480 170 0 80
Signal Information
Cycle, s 70.0 Reference Phase 2
Offset, s 22 Reference Point End
Green 47.4 12.6 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.4 0.0 14.4 12.0
Phase Duration, s 52.4 0.0 52.4 17.6
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 0.0 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 12.2
Green Extension Time ( g e ), s 0.0 0.0 0.0 0.5
Phase Call Probability 0.99
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.72 B 1.33 A 1.72 B 1.95 B
Bicycle LOS Score / LOS 1.57 B 1.60 B 0.92 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 1:23:23 PM
HCS7 Two-Way Stop-Control Report
General Information Site Information
Analyst SNP Intersection Boston and Benbow
Lanes
Movement U L T R U L T R U L T R U L T R
Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12
Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 0 1 0
Configuration LT TR LR
Approach LOS C
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ TWSC Version 7.9.5 Generated: 5/10/2023 1:22:25 PM
Boston and Benbow_2047 PM_No Build.xtw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 190 110 60 140 200 140 100 490 90 150 520 290
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.5 19.4 6.9 7.5 2.0 20.3
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 4.0
Phase Duration, s 15.0 27.8 13.0 25.8 12.0 36.8 12.4 37.2
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.1 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 9.5 9.4 7.5 19.4 5.8 2.0
Green Extension Time ( g e ), s 0.1 1.0 0.2 0.9 0.1 0.0 1.7 0.0
Phase Call Probability 0.99 1.00 0.97 1.00 0.93 0.98
Max Out Probability 1.00 0.00 0.00 0.01 0.00 0.12
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.29 B 1.94 B 1.92 B
Bicycle LOS Score / LOS 1.11 A 1.31 A 1.07 A 1.31 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 3:35:11 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 400 60 30 390 200 60 300 20 200 400 250
Signal Information
Cycle, s 120.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 44.8 7.0 15.6 30.6 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 2 1 6
Case Number 1.0 4.0 5.3 6.4 1.0 3.0
Phase Duration, s 21.1 57.2 36.1 50.3 12.5 62.8
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 15.1 27.1 28.1 2.0
Green Extension Time ( g e ), s 0.5 2.5 2.5 0.0 1.8 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.92 B 2.13 B 2.15 B 1.91 B
Bicycle LOS Score / LOS 1.77 B 1.59 B 1.16 A 2.00 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 3:41:33 PM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration TR LT LR
Approach LOS F C C
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/11/2023 10:52:23 AM
Drake and Hunt_2047 PM_No Build.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 90 270 120 150 390 70 190 220 100 40 260 130
Signal Information
Cycle, s 60.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 26.9 23.1 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 4 8 2 6
Case Number 6.0 6.0 6.0 6.0
Phase Duration, s 28.1 28.1 31.9 31.9
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.3 3.3 0.0 0.0
Queue Clearance Time ( g s ), s 20.5 21.5
Green Extension Time ( g e ), s 1.8 1.6 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.43 0.57
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.89 B 1.89 B 1.89 B
Bicycle LOS Score / LOS 1.30 A 1.53 B 1.36 A 1.22 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/10/2023 3:38:20 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 210 770 70 160 1220 260 90 140 80 220 130 210
Signal Information
Cycle, s 80.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 6.5 2.2 26.6 6.2 1.8 12.6
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 0.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 14.8 34.9 12.5 32.6 12.2 18.6 14.0 20.4
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 8.8 5.6 5.6 12.3 10.0 11.6
Green Extension Time ( g e ), s 0.0 0.0 0.1 0.0 0.0 0.3 0.0 0.6
Phase Call Probability 0.99 0.93 0.88 1.00 0.99 1.00
Max Out Probability 1.00 0.01 0.18 1.00 1.00 0.60
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.10 B 2.29 B 2.29 B
Bicycle LOS Score / LOS 1.42 A 1.94 B 1.04 A 1.48 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/11/2023 8:30:52 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1220 180 380 1060 120 190
Signal Information
Cycle, s 80.0 Reference Phase 2
1 2 3 4
Offset, s 76 Reference Point End
Green 8.8 43.0 10.2 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 49.0 14.8 63.8 16.2
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 10.1 10.2
Green Extension Time ( g e ), s 0.0 0.0 0.0 0.1
Phase Call Probability 1.00 1.00
Max Out Probability 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 0.64 A 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.67 B 1.70 B F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/11/2023 8:30:52 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1010 400 220 1140 260 0 300
Signal Information
Cycle, s 80.0 Reference Phase 2
1 2 3 4
Offset, s 62 Reference Point End
Green 7.0 36.2 18.8 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 42.2 13.0 55.2 24.8
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 6.7 17.6
Green Extension Time ( g e ), s 0.0 0.4 0.0 1.2
Phase Call Probability 0.99 1.00
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.38 A 1.64 B 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.74 B 1.69 B 1.48 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/11/2023 8:30:52 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 560 710 850 350 510 0 160
Signal Information
Cycle, s 80.0 Reference Phase 2
1 2 3 4
Offset, s 44 Reference Point End
Green 40.5 27.5 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 46.5 46.5 33.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 26.0
Green Extension Time ( g e ), s 0.0 0.0 1.5
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.37 A 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.59 B 1.53 B 1.65 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/11/2023 8:30:52 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 200 270 40 40 330 140 50 170 30 130 230 190
Signal Information
Cycle, s 69.7 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.4 25.3 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.4 25.4 31.3 31.3
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.3 3.3
Queue Clearance Time ( g s ), s 8.3 10.9 10.9 23.1 18.6
Green Extension Time ( g e ), s 0.0 1.5 1.0 2.1 2.0
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.11 0.08 0.00 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.91 B 2.09 B 2.09 B
Bicycle LOS Score / LOS 1.43 A 0.96 A 0.95 A 1.51 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/11/2023 8:44:48 AM
2047
PM PEAK
ALTERNATIVE 1 – SOUTHBOUND EXIT ONLY
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 1570 40 900 1090 430 130 140 650 310 110 170
Signal Information
Cycle, s 120.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 34.0 23.9 9.1 12.0 11.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 15.1 45.0 40.0 69.9 17.0 18.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 8.6 36.0 13.0 14.0
Green Extension Time ( g e ), s 0.4 0.0 0.0 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 1.00 1.00 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.44 B 2.47 B 2.75 C 2.61 C
Bicycle LOS Score / LOS 1.55 B 2.63 C 2.12 B 1.53 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 9:58:26 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 2170 540 110 1130 0 680 0 1290
Signal Information
Cycle, s 120.0 Reference Phase 2
1 2 3 4
Offset, s 20 Reference Point End
Green 49.0 4.0 43.0 6.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 55.0 65.0 49.0 59.0 6.0 6.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.0 12.5 8.0 8.0
Green Extension Time ( g e ), s 0.0 0.0 6.5 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.01 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.12 B 2.27 B 2.61 C 2.74 C
Bicycle LOS Score / LOS 2.14 B 1.25 A 1.73 B 2.85 C
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 9:58:26 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1340 1510 1440 370 0 170
Signal Information
Cycle, s 120.0 Reference Phase 2
1 2 3 4
Offset, s 115 Reference Point End
Green 78.4 29.6 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 84.4 84.4 35.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 28.5
Green Extension Time ( g e ), s 0.0 0.0 1.2
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.07 B 1.36 A 2.32 B 2.47 B
Bicycle LOS Score / LOS 2.96 C 1.32 A 1.43 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 9:58:26 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 660 170 100 670 50 260 240 110 130 280 190
Signal Information
Cycle, s 124.1 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.8 0.3 38.3 9.9 2.8 39.1
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 16.0 48.5 11.8 44.3 20.7 49.9 13.9 43.1
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 11.8 40.2 7.7 26.9 16.5 15.8 9.8 34.9
Green Extension Time ( g e ), s 0.2 2.0 0.2 0.0 0.1 2.0 0.1 2.0
Phase Call Probability 1.00 1.00 0.98 1.00 1.00 1.00 0.99 1.00
Max Out Probability 0.12 0.14 0.00 1.00 1.00 0.00 0.96 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.12 B 1.93 B 2.29 B 2.45 B
Bicycle LOS Score / LOS 1.43 A 1.26 A 1.63 B 1.61 B
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 50 210 110 360 270 140 140 510 140 100 510 170
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 8.3 21.6 6.6 5.4 2.7 22.3
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 2.0 3.0 1.2 3.0 1.3 3.0
Phase Duration, s 10.9 27.8 19.1 36.0 13.8 40.9 12.1 39.2
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 4.2 20.9 12.7 14.5 8.2 2.0
Green Extension Time ( g e ), s 0.1 1.5 0.9 1.6 0.3 0.0 1.7 0.0
Phase Call Probability 0.78 1.00 1.00 1.00 0.98 0.95
Max Out Probability 0.00 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.12 B 2.31 B 1.92 B
Bicycle LOS Score / LOS 1.14 A 1.85 B 1.89 B 1.87 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:33:55 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 140 230 710 220 210 160
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 60.1 6.6 15.3 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 4
Case Number 1.0 4.0 7.4 9.0
Phase Duration, s 12.6 78.7 66.1 21.3
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 2.0 14.5
Green Extension Time ( g e ), s 0.2 0.0 0.0 0.8
Phase Call Probability 0.99 1.00
Max Out Probability 0.27 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 0.65 A 1.95 B 1.96 B 1.96 B
Bicycle LOS Score / LOS 1.15 A 2.16 B F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 2:08:01 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 200 220 140 360 280 90 500 780 340
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 25 Reference Point End
Green 23.5 6.9 19.0 7.3 15.2 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 2.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 3 8 7 4
Case Number 7.4 1.0 4.0 2.0 3.0 2.0 3.0
Phase Duration, s 29.5 12.9 42.4 25.0 21.2 36.4 32.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.1 3.1 3.1 3.1
Queue Clearance Time ( g s ), s 2.0 18.7 7.1 31.7 24.9
Green Extension Time ( g e ), s 0.0 0.6 0.0 0.3 2.8 0.7 1.6
Phase Call Probability 0.99 1.00 1.00 1.00 1.00
Max Out Probability 0.35 0.07 0.14 0.29 0.77
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.14 B 2.11 B 1.94 B 1.93 B
Bicycle LOS Score / LOS 1.24 A 1.38 A F 1.94 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 2:08:01 PM
HCS7 Two-Way Stop-Control Report
General Information Site Information
Analyst SNP Intersection Boston and Benbow
Lanes
Movement U L T R U L T R U L T R U L T R
Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12
Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 1 0 1
Configuration LT TR L R
Approach LOS C
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ TWSC Version 7.9.5 Generated: 5/8/2023 2:31:39 PM
Boston and Benbow_2047 PM_Partial Build SB Exit.xtw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 200 180 50 120 210 170 90 560 120 140 500 270
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.3 17.2 6.8 6.7 2.9 22.6
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 4.0
Phase Duration, s 15.1 31.0 12.2 28.1 11.8 34.5 12.3 35.0
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.1 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 9.6 11.7 6.5 21.6 5.5 2.0
Green Extension Time ( g e ), s 0.1 1.2 0.2 1.0 0.1 0.0 1.6 0.0
Phase Call Probability 0.99 1.00 0.96 1.00 0.90 0.97
Max Out Probability 1.00 0.00 0.00 0.07 0.00 0.10
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.28 B 2.29 B 1.94 B 1.92 B
Bicycle LOS Score / LOS 1.23 A 1.35 A 1.15 A 1.27 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:50:23 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 400 60 30 440 190 100 310 20 210 400 250
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.4 17.6 7.0 12.8 28.6 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 5 2 1 6
Case Number 1.0 4.0 5.3 1.2 4.0 1.3 3.0
Phase Duration, s 18.3 52.4 34.1 11.9 35.1 12.5 35.6
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 12.3 21.5 26.4 6.7 3.4
Green Extension Time ( g e ), s 0.5 2.6 2.2 0.1 0.0 1.1 0.0
Phase Call Probability 1.00 1.00 1.00 0.95 1.00
Max Out Probability 0.00 0.00 0.15 0.00 0.49
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 2.12 B 2.14 B 1.93 B
Bicycle LOS Score / LOS 1.77 B 1.66 B 1.25 A 2.01 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:29:05 PM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration T R LT LR
Approach LOS C C C
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/23/2023 3:31:31 PM
Drake and Hunt_2047 PM_Partial Build SB Exit Only.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 90 290 110 150 390 60 180 230 100 40 250 120
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 9.4 26.2 4.8 6.5 1.9 26.3
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 1.0 1.0 0.0 1.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 3.0
Phase Duration, s 11.5 31.3 13.3 33.2 14.4 45.6 9.8 41.0
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 5.6 24.0 8.2 26.4 9.1 2.0
Green Extension Time ( g e ), s 0.1 1.7 0.3 1.7 0.3 0.0 0.5 0.0
Phase Call Probability 0.92 1.00 0.99 1.00 0.99 0.68
Max Out Probability 0.03 0.00 0.00 0.00 0.00 0.14
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.93 B 2.12 B 1.95 B 1.92 B
Bicycle LOS Score / LOS 1.32 A 1.51 B 1.36 A 1.19 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:32:42 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 200 810 70 160 1180 300 90 140 80 260 130 180
Signal Information
Cycle, s 95.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 6.7 2.7 36.5 6.5 3.5 15.1
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 0.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 15.4 45.2 12.7 42.5 12.5 21.1 16.0 24.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 9.1 5.7 6.3 14.2 12.0 11.5
Green Extension Time ( g e ), s 0.3 0.0 0.1 0.0 0.1 0.9 0.0 1.0
Phase Call Probability 1.00 0.95 0.92 1.00 1.00 1.00
Max Out Probability 0.00 0.00 0.00 0.05 1.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.10 B 2.30 B 2.29 B
Bicycle LOS Score / LOS 1.45 A 1.94 B 1.04 A 1.50 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:38:49 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1140 190 380 1000 130 190
Signal Information
Cycle, s 95.0 Reference Phase 2
1 2 3 4
Offset, s 25 Reference Point End
Green 9.7 57.3 10.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 63.3 15.7 79.0 16.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 8.7 12.0
Green Extension Time ( g e ), s 0.0 0.8 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 0.64 A 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.61 B 1.65 B F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:38:49 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 910 420 210 1120 190 0 260
Signal Information
Cycle, s 95.0 Reference Phase 2
1 2 3 4
Offset, s 37 Reference Point End
Green 7.2 50.7 19.2 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 56.7 13.2 69.8 25.2
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 6.8 18.2
Green Extension Time ( g e ), s 0.0 0.4 0.0 1.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.37 A 1.64 B 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.67 B 1.67 B 1.29 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:38:49 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 550 550 780 360 550 0 120
Signal Information
Cycle, s 95.0 Reference Phase 2
1 2 3 4
Offset, s 70 Reference Point End
Green 48.5 34.5 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 54.5 54.5 40.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 33.0
Green Extension Time ( g e ), s 0.0 0.0 1.5
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.38 A 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.44 A 1.48 A 1.65 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:38:49 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 120 270 40 50 320 130 50 170 30 110 200 250
Signal Information
Cycle, s 72.2 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.4 27.8 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.4 25.4 33.8 33.8
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.2 3.2 3.3 3.3
Queue Clearance Time ( g s ), s 5.8 11.5 10.9 25.5 20.7
Green Extension Time ( g e ), s 0.0 1.4 0.9 2.2 2.2
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.14 0.08 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.92 B 2.09 B 2.09 B
Bicycle LOS Score / LOS 1.28 A 0.95 A 0.95 A 1.53 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:41:57 AM
2047
PM PEAK
ALTERNATIVE 2 – PARTIAL BUILD NORTHBOUND LOOP
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 50 690 560 250 500 30 30 0 70
Signal Information
Cycle, s 110.0 Reference Phase 2
Offset, s 86 Reference Point End
Green 7.0 75.4 9.6 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 12.0
Phase Duration, s 81.4 13.0 94.4 15.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 6.6 9.1
Green Extension Time ( g e ), s 0.0 0.4 0.0 0.1
Phase Call Probability 1.00 0.96
Max Out Probability 0.00 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.64 B 1.31 A 1.96 B 2.15 B
Bicycle LOS Score / LOS 2.82 C 1.89 B 0.67 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 3:13:11 PM
2047
PM PEAK
ALTERNATIVE 3 – PARTIAL BUILD NORTH SIDE
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 1570 40 900 1110 430 130 140 650 310 110 170
Signal Information
Cycle, s 105.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 29.0 17.8 8.2 10.0 10.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 14.2 38.0 35.0 58.8 16.0 16.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 7.8 31.0 12.0 12.0
Green Extension Time ( g e ), s 0.4 0.0 0.0 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 1.00 1.00 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.44 B 2.46 B 2.74 C 2.60 C
Bicycle LOS Score / LOS 1.55 B 2.65 C 2.12 B 1.53 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 10:26:39 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 2080 540 110 1150 0 680 0 1290
Signal Information
Cycle, s 105.0 Reference Phase 2
1 2 3 4
Offset, s 39 Reference Point End
Green 43.0 1.0 45.0 4.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 49.0 50.0 51.0 52.0 4.0 4.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.0 10.5 6.0 6.0
Green Extension Time ( g e ), s 0.0 0.0 6.5 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.01 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.10 B 2.27 B 2.61 C 2.74 C
Bicycle LOS Score / LOS 2.09 B 1.26 A 1.73 B 2.85 C
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 10:26:39 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1600 1160 1380 410 0 210
Signal Information
Cycle, s 105.0 Reference Phase 2
1 2 3 4
Offset, s 17 Reference Point End
Green 64.1 28.9 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 70.1 70.1 34.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 27.5
Green Extension Time ( g e ), s 0.0 0.0 1.4
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.07 B 1.36 A 2.32 B 2.47 B
Bicycle LOS Score / LOS 2.88 C 1.29 A 1.56 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 10:26:39 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 190 670 180 110 670 30 220 220 100 120 320 150
Signal Information
Cycle, s 107.1 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.6 1.4 33.6 8.5 3.5 34.5
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 13.0 41.0 11.6 39.6 16.0 42.0 12.5 38.5
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.1 3.1 3.1
Queue Clearance Time ( g s ), s 11.0 31.3 7.4 22.6 12.4 13.2 8.2 29.8
Green Extension Time ( g e ), s 0.0 2.9 0.2 3.1 0.0 1.9 0.2 1.9
Phase Call Probability 1.00 1.00 0.98 1.00 1.00 1.00 0.98 1.00
Max Out Probability 1.00 0.00 0.00 0.37 1.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.12 B 1.93 B 2.28 B 2.44 B
Bicycle LOS Score / LOS 1.46 A 1.25 A 1.50 B 1.59 B
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 50 210 110 360 270 140 140 510 140 100 510 170
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 8.3 21.6 6.6 5.4 2.7 22.3
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 2.0 3.0 1.2 3.0 1.3 3.0
Phase Duration, s 10.9 27.8 19.1 36.0 13.8 40.9 12.1 39.2
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 4.2 20.9 12.7 14.5 8.2 2.0
Green Extension Time ( g e ), s 0.1 1.5 0.9 1.6 0.3 0.0 1.7 0.0
Phase Call Probability 0.78 1.00 1.00 1.00 0.98 0.95
Max Out Probability 0.00 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.12 B 2.31 B 1.92 B
Bicycle LOS Score / LOS 1.14 A 1.85 B 1.89 B 1.87 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:20:49 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 140 440 710 220 210 160
Signal Information
Cycle, s 110.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 68.5 6.9 16.5 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 4
Case Number 1.0 4.0 7.4 9.0
Phase Duration, s 12.9 87.5 74.5 22.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 2.0 15.7
Green Extension Time ( g e ), s 0.7 0.0 0.0 0.8
Phase Call Probability 0.99 1.00
Max Out Probability 0.39 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 0.65 A 1.95 B 1.96 B 1.96 B
Bicycle LOS Score / LOS 1.53 B 2.16 B F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 11:00:15 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 450 220 140 360 280 350 500 780 340
Signal Information
Cycle, s 110.0 Reference Phase 2
Offset, s 33 Reference Point End
Green 20.9 6.9 16.9 12.5 24.8 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 2.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 3 8 7 4
Case Number 7.4 1.0 4.0 1.1 3.0 2.0 3.0
Phase Duration, s 26.9 12.9 39.8 22.9 30.8 39.4 47.3
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 4.1 16.3 26.9 34.4 23.2
Green Extension Time ( g e ), s 0.0 1.2 0.0 0.6 0.0 1.0 4.0
Phase Call Probability 0.99 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.00 1.00 0.01 0.05
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.14 B 2.12 B 2.30 B 2.28 B
Bicycle LOS Score / LOS 1.09 A 0.94 A F 1.94 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 11:00:15 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 560 740 500 250
Signal Information
Cycle, s 110.0 Reference Phase 2
Offset, s 86 Reference Point End
Green 91.0 7.0 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6
Case Number 1.0 4.0 7.4
Phase Duration, s 13.0 110.0 97.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 0.0
Queue Clearance Time ( g s ), s 2.0
Green Extension Time ( g e ), s 2.0 0.0 0.0
Phase Call Probability 1.00
Max Out Probability 0.65
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 0.53 A 1.73 B 1.96 B 2.15 B
Bicycle LOS Score / LOS 2.82 C 1.83 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 11:00:15 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 130 50 120 210 170 110 570 100 140 500 270
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.7 24.2 6.9 7.0 2.8 24.9
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 4.0
Phase Duration, s 15.3 33.2 12.5 30.4 12.2 41.9 12.4 42.1
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.1 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 9.6 10.4 7.1 23.8 6.5 2.0
Green Extension Time ( g e ), s 0.3 1.2 0.2 1.1 0.2 0.0 1.9 0.0
Phase Call Probability 0.99 1.00 0.97 1.00 0.96 0.98
Max Out Probability 0.00 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.29 B 1.95 B 1.92 B
Bicycle LOS Score / LOS 1.11 A 1.35 A 1.16 A 1.27 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:18:44 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 400 60 30 440 190 100 310 20 210 400 250
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.4 17.6 7.0 12.8 28.6 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 5 2 1 6
Case Number 1.0 4.0 5.3 1.2 4.0 1.3 3.0
Phase Duration, s 18.3 52.4 34.1 11.9 35.1 12.5 35.6
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 12.3 21.5 26.4 6.7 3.4
Green Extension Time ( g e ), s 0.5 2.6 2.2 0.1 0.0 1.1 0.0
Phase Call Probability 1.00 1.00 1.00 0.95 1.00
Max Out Probability 0.00 0.00 0.15 0.00 0.49
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 2.12 B 2.14 B 1.93 B
Bicycle LOS Score / LOS 1.77 B 1.66 B 1.25 A 2.01 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:12:08 PM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration T R LT LR
Approach LOS C C C
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/23/2023 3:16:18 PM
Drake and Hunt_2047 PM_Partial Build N Side.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 90 290 110 150 390 60 180 230 100 40 250 120
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 9.4 26.2 4.8 6.5 1.9 26.3
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 1.0 1.0 0.0 1.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 3.0
Phase Duration, s 11.5 31.3 13.3 33.2 14.4 45.6 9.8 41.0
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 5.6 24.0 8.2 26.4 9.1 2.0
Green Extension Time ( g e ), s 0.1 1.7 0.3 1.7 0.3 0.0 0.5 0.0
Phase Call Probability 0.92 1.00 0.99 1.00 0.99 0.68
Max Out Probability 0.03 0.00 0.00 0.00 0.00 0.14
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.93 B 2.12 B 1.95 B 1.92 B
Bicycle LOS Score / LOS 1.32 A 1.51 B 1.36 A 1.19 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:08:56 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 200 810 70 160 1180 300 90 140 80 260 130 180
Signal Information
Cycle, s 90.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 6.6 2.5 33.3 6.4 2.6 14.6
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 0.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 15.1 41.8 12.6 39.3 12.4 20.6 15.0 23.2
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 8.8 5.6 6.1 13.5 11.0 11.0
Green Extension Time ( g e ), s 0.3 0.0 0.1 0.0 0.0 1.0 0.0 1.1
Phase Call Probability 1.00 0.95 0.91 1.00 1.00 1.00
Max Out Probability 0.00 0.00 1.00 0.00 1.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.10 B 2.30 B 2.29 B
Bicycle LOS Score / LOS 1.45 A 1.94 B 1.04 A 1.50 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:43:05 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1140 190 380 1000 130 190
Signal Information
Cycle, s 90.0 Reference Phase 2
1 2 3 4
Offset, s 16 Reference Point End
Green 10.4 50.4 11.3 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 56.4 16.4 72.7 17.3
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 9.6 11.1
Green Extension Time ( g e ), s 0.0 0.8 0.0 0.2
Phase Call Probability 1.00 1.00
Max Out Probability 0.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.88 B 0.64 A 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.61 B 1.65 B F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:43:05 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 910 420 210 1120 190 0 260
Signal Information
Cycle, s 90.0 Reference Phase 2
1 2 3 4
Offset, s 40 Reference Point End
Green 7.0 46.7 18.3 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 52.7 13.0 65.7 24.3
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 6.7 17.3
Green Extension Time ( g e ), s 0.0 0.4 0.0 0.9
Phase Call Probability 1.00 1.00
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.37 A 1.64 B 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.67 B 1.67 B 1.29 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:43:05 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 730 370 810 250 520 0 130
Signal Information
Cycle, s 90.0 Reference Phase 2
1 2 3 4
Offset, s 75 Reference Point End
Green 46.9 31.1 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 52.9 52.9 37.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 29.7
Green Extension Time ( g e ), s 0.0 0.0 1.5
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.37 A 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.44 A 1.41 A 1.62 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:43:05 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 280 40 50 340 120 50 230 20 100 210 210
Signal Information
Cycle, s 69.9 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.4 25.5 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.4 25.4 31.5 31.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.3 3.3
Queue Clearance Time ( g s ), s 7.6 11.3 10.7 23.2 18.7
Green Extension Time ( g e ), s 0.0 1.5 0.9 2.2 2.1
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.14 0.11 0.00 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.91 B 2.09 B 2.09 B
Bicycle LOS Score / LOS 1.41 A 0.96 A 1.04 A 1.45 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/24/2023 8:45:17 AM
2047
PM PEAK
ALTERNATIVE 4 – SOUTHBOUND EXIT SOUTHBOUND ENTRANCE
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 1600 40 910 1110 430 120 140 700 310 110 170
Signal Information
Cycle, s 110.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 32.0 19.5 8.5 10.0 10.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 14.5 40.0 38.0 63.5 16.0 16.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 8.1 34.0 12.0 12.0
Green Extension Time ( g e ), s 0.4 0.0 0.0 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 1.00 1.00 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.44 B 2.46 B 2.74 C 2.60 C
Bicycle LOS Score / LOS 1.56 B 2.66 C 2.19 B 1.53 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 10:45:28 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 2260 450 130 1110 0 730 0 1340
Signal Information
Cycle, s 110.0 Reference Phase 2
1 2 3 4
Offset, s 34 Reference Point End
Green 48.0 43.0 1.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 54.0 60.0 49.0 55.0 1.0 1.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.0 13.5 3.0 3.0
Green Extension Time ( g e ), s 0.0 0.0 6.4 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.02 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.11 B 2.27 B 2.61 C 2.74 C
Bicycle LOS Score / LOS 2.14 B 1.25 A 1.83 B 2.94 C
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 10:45:28 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1480 1510 1440 370 0 170
Signal Information
Cycle, s 110.0 Reference Phase 2
1 2 3 4
Offset, s 15 Reference Point End
Green 70.6 27.4 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 76.6 76.6 33.4
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 26.2
Green Extension Time ( g e ), s 0.0 0.0 1.2
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.07 B 1.36 A 2.32 B 2.47 B
Bicycle LOS Score / LOS 3.08 C 1.32 A 1.43 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 10:45:28 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 660 170 100 670 50 260 240 210 130 280 190
Signal Information
Cycle, s 110.5 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.3 0.2 31.3 9.2 0.8 35.7
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 15.5 41.5 11.3 37.3 18.0 44.6 13.2 39.7
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 11.0 31.3 7.3 25.0 14.5 15.0 8.9 31.0
Green Extension Time ( g e ), s 0.4 3.7 0.1 4.3 0.0 2.3 0.3 2.3
Phase Call Probability 1.00 1.00 0.97 1.00 1.00 1.00 0.99 1.00
Max Out Probability 0.00 0.14 0.00 0.00 1.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.12 B 1.93 B 2.28 B 2.44 B
Bicycle LOS Score / LOS 1.43 A 1.26 A 1.82 B 1.61 B
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 60 210 120 300 340 140 130 540 160 120 510 110
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 7.7 23.2 6.8 5.8 0.4 23.1
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 2.0 3.0 1.2 3.0 1.3 3.0
Phase Duration, s 11.3 28.6 17.2 34.5 13.2 41.9 12.3 41.0
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 4.6 21.5 10.9 18.9 7.6 2.0
Green Extension Time ( g e ), s 0.1 1.7 0.8 1.7 0.3 0.0 1.6 0.0
Phase Call Probability 0.83 1.00 1.00 1.00 0.98 0.97
Max Out Probability 0.00 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.12 B 2.31 B 1.92 B
Bicycle LOS Score / LOS 1.18 A 1.87 B 1.96 B 1.80 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:46:30 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 150 390 40 500 740 110 190 260 70 190 80 160
Signal Information
Cycle, s 120.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 10.8 14.8 24.8 12.7 0.2 26.7
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 0.0 2.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 4.0
Phase Duration, s 16.8 30.8 37.6 51.6 18.9 32.8 18.7 32.7
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 10.6 30.9 12.7 25.6 12.7 19.4
Green Extension Time ( g e ), s 0.3 0.0 0.7 0.0 0.2 1.2 0.1 1.2
Phase Call Probability 1.00 1.00 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.28 0.12 0.00 1.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.94 B 1.92 B 2.30 B 2.30 B
Bicycle LOS Score / LOS 1.01 A 1.70 B 1.42 A 1.26 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 11:12:22 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 460 300 350 480 1020
Signal Information
Cycle, s 120.0 Reference Phase 2
Offset, s 34 Reference Point End
Green 56.5 51.5 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 4
Case Number 7.0 8.0 9.0
Phase Duration, s 62.5 62.5 57.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.3
Queue Clearance Time ( g s ), s 46.2
Green Extension Time ( g e ), s 0.0 0.0 5.3
Phase Call Probability 1.00
Max Out Probability 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.39 A 1.91 B 1.96 B 2.16 B
Bicycle LOS Score / LOS 1.64 B 1.07 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 11:12:22 AM
HCS7 Two-Way Stop-Control Report
General Information Site Information
Analyst SNP Intersection Boston and Benbow
Lanes
Movement U L T R U L T R U L T R U L T R
Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12
Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 0 1 0
Configuration LT TR LR
Approach LOS D
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ TWSC Version 7.9.5 Generated: 5/8/2023 2:28:01 PM
Boston and Benbow_2047 PM_Partial Build SB Only.xtw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 200 180 50 120 210 170 90 560 120 140 500 270
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.3 17.2 6.8 6.7 2.9 22.6
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 4.0
Phase Duration, s 15.1 31.0 12.2 28.1 11.8 34.5 12.3 35.0
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.1 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 9.6 11.7 6.5 21.6 5.5 2.0
Green Extension Time ( g e ), s 0.1 1.2 0.2 1.0 0.1 0.0 1.6 0.0
Phase Call Probability 0.99 1.00 0.96 1.00 0.90 0.97
Max Out Probability 1.00 0.00 0.00 0.07 0.00 0.10
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.28 B 2.29 B 1.94 B 1.92 B
Bicycle LOS Score / LOS 1.23 A 1.35 A 1.15 A 1.27 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:43:48 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 400 60 30 420 180 110 340 20 210 410 250
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.9 18.6 7.0 13.1 26.9 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 5 2 1 6
Case Number 1.0 4.0 5.3 1.2 4.0 1.3 3.0
Phase Duration, s 18.6 51.0 32.4 12.4 36.5 12.5 36.6
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 12.6 22.0 25.5 7.1 3.7
Green Extension Time ( g e ), s 0.5 2.5 1.5 0.1 0.0 1.1 0.0
Phase Call Probability 1.00 1.00 1.00 0.96 1.00
Max Out Probability 0.00 0.00 0.61 0.11 0.54
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.12 B 2.14 B 1.92 B
Bicycle LOS Score / LOS 1.77 B 1.61 B 1.32 A 2.03 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:36:10 PM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration T R LT LR
Approach LOS C C C
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/23/2023 3:40:14 PM
Drake and Hunt_2047 PM_Partial Build SB Only.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 80 290 110 140 380 70 180 290 90 40 230 140
Signal Information
Cycle, s 60.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 27.0 23.0 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 4 8 2 6
Case Number 6.0 6.0 6.0 6.0
Phase Duration, s 28.0 28.0 32.0 32.0
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.3 3.3 0.0 0.0
Queue Clearance Time ( g s ), s 19.4 21.3
Green Extension Time ( g e ), s 2.0 1.8 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.24 0.40
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.90 B 1.90 B 1.89 B 1.89 B
Bicycle LOS Score / LOS 1.30 A 1.49 A 1.44 A 1.19 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 3:41:38 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 200 740 70 150 1190 320 90 140 80 210 130 180
Signal Information
Cycle, s 80.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 6.4 2.0 26.9 6.2 1.8 12.7
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 0.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 14.4 34.9 12.4 32.9 12.2 18.7 14.0 20.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 8.4 5.3 5.6 12.3 10.0 10.1
Green Extension Time ( g e ), s 0.0 0.0 0.1 0.0 0.1 0.4 0.0 0.8
Phase Call Probability 0.99 0.92 0.88 1.00 0.99 1.00
Max Out Probability 1.00 0.34 0.05 1.00 1.00 0.15
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.10 B 2.29 B 2.29 B
Bicycle LOS Score / LOS 1.38 A 1.96 B 1.04 A 1.41 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/18/2023 3:26:14 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1150 180 380 1060 130 190
Signal Information
Cycle, s 80.0 Reference Phase 2
1 2 3 4
Offset, s 74 Reference Point End
Green 9.4 42.1 10.4 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 48.1 15.4 63.6 16.4
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 8.9 10.0
Green Extension Time ( g e ), s 0.0 0.5 0.0 0.4
Phase Call Probability 1.00 1.00
Max Out Probability 0.04 0.14
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 0.65 A 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.61 B 1.70 B F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/18/2023 3:26:14 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 950 390 220 1140 190 0 300
Signal Information
Cycle, s 80.0 Reference Phase 2
1 2 3 4
Offset, s 28 Reference Point End
Green 7.0 36.3 18.7 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 42.3 13.0 55.3 24.7
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 6.7 17.6
Green Extension Time ( g e ), s 0.0 0.4 0.0 1.0
Phase Call Probability 0.99 1.00
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.38 A 1.64 B 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.68 B 1.69 B 1.36 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/18/2023 3:26:14 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 590 550 810 360 550 0 120
Signal Information
Cycle, s 80.0 Reference Phase 2
1 2 3 4
Offset, s 7 Reference Point End
Green 38.6 29.4 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 44.6 44.6 35.4
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 27.9
Green Extension Time ( g e ), s 0.0 0.0 1.5
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.38 A 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.48 A 1.50 B 1.65 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/18/2023 3:26:14 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 120 270 40 50 320 130 50 270 30 110 200 250
Signal Information
Cycle, s 72.5 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.4 28.1 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.4 25.4 34.1 34.1
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.2 3.2 3.4 3.4
Queue Clearance Time ( g s ), s 5.8 11.6 10.9 25.5 20.7
Green Extension Time ( g e ), s 0.0 1.4 0.9 2.5 2.5
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.14 0.08 0.00 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.92 B 2.09 B 2.09 B
Bicycle LOS Score / LOS 1.28 A 0.95 A 1.14 A 1.53 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/18/2023 3:24:13 PM
2047
PM PEAK
FULL INTERCHANGE
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 1420 40 930 1420 430 240 210 810 310 110 170
Signal Information
Cycle, s 105.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 30.0 15.2 7.8 10.0 12.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 4.0 2.0 3.0 9.0 9.0
Phase Duration, s 13.8 35.0 36.0 57.2 18.0 16.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.2
Queue Clearance Time ( g s ), s 7.8 32.0 14.0 12.0
Green Extension Time ( g e ), s 0.0 0.0 0.0 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 1.00 1.00 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.44 B 2.46 B 2.74 C 2.60 C
Bicycle LOS Score / LOS 1.46 A 2.95 C 2.72 C 1.53 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 12:10:27 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1 2000 540 170 1140 0 670 0 1640
Signal Information
Cycle, s 105.0 Reference Phase 2
1 2 3 4
Offset, s 12 Reference Point End
Green 41.0 1.0 35.0 10.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 4
Case Number 2.0 3.0 2.0 4.0 7.0 7.0
Phase Duration, s 47.0 54.0 41.0 48.0 10.0 10.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 0.0 0.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.4 3.4
Queue Clearance Time ( g s ), s 2.0 15.7 12.0 12.0
Green Extension Time ( g e ), s 0.0 0.0 5.9 0.0 0.0 0.0
Phase Call Probability 1.00 1.00 1.00 1.00
Max Out Probability 0.00 0.08 1.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.11 B 2.28 B 2.60 C 2.73 C
Bicycle LOS Score / LOS 2.04 B 1.29 A 1.72 B 3.49 C
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 12:10:27 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1520 1150 1490 350 0 150
Signal Information
Cycle, s 105.0 Reference Phase 2
1 2 3 4
Offset, s 86 Reference Point End
Green 68.1 24.9 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 8.0 9.0
Phase Duration, s 74.1 74.1 30.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 23.8
Green Extension Time ( g e ), s 0.0 0.0 1.1
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.06 B 1.36 A 2.32 B 2.47 B
Bicycle LOS Score / LOS 2.81 C 1.35 A 1.36 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/23/2023 12:10:27 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 170 660 170 100 680 50 220 240 110 130 270 180
Signal Information
Cycle, s 101.9 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 6.9 33.0 8.9 2.1 32.9 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 3.0 1.1 4.0 1.1 3.0 1.1 4.0
Phase Duration, s 11.0 39.0 10.9 38.9 15.0 39.0 12.9 36.9
Change Period, ( Y+R c ), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 9.0 29.3 6.6 22.7 12.3 14.2 8.4 27.7
Green Extension Time ( g e ), s 0.0 2.3 0.2 0.2 0.0 1.9 0.3 1.9
Phase Call Probability 1.00 1.00 0.96 1.00 1.00 1.00 0.99 1.00
Max Out Probability 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.11 B 1.92 B 2.28 B 2.44 B
Bicycle LOS Score / LOS 1.43 A 1.27 A 1.56 B 1.58 B
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 50 210 110 320 300 150 140 490 140 120 510 150
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 8.2 22.7 6.8 5.4 1.4 22.4
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 1.5 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 2.0 3.0 1.2 3.0 1.3 3.0
Phase Duration, s 10.9 27.9 17.8 34.8 13.7 41.9 12.3 40.5
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 4.2 20.8 11.5 16.5 8.1 2.0
Green Extension Time ( g e ), s 0.1 1.6 0.8 1.6 0.3 0.0 1.7 0.0
Phase Call Probability 0.78 1.00 1.00 1.00 0.98 0.97
Max Out Probability 0.00 0.00 0.00 0.00 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.29 B 2.12 B 2.31 B 1.92 B
Bicycle LOS Score / LOS 1.14 A 1.85 B 1.85 B 1.87 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 2:42:43 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 140 780 40 450 900 160 50 110 70 210 90 160
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 8.9 18.0 21.2 8.7 13.2 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 2.0 2.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 8 7 4
Case Number 1.2 4.0 1.3 4.0 7.3 2.0 4.0
Phase Duration, s 14.9 38.8 27.2 51.2 19.2 14.7 33.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.3 3.1 3.3
Queue Clearance Time ( g s ), s 8.8 20.5 12.8 8.5 16.1
Green Extension Time ( g e ), s 0.2 0.0 0.8 0.0 0.5 0.2 1.0
Phase Call Probability 0.99 1.00 1.00 1.00 1.00
Max Out Probability 0.00 1.00 0.98 0.10 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.94 B 2.10 B 2.30 B 2.29 B
Bicycle LOS Score / LOS 1.35 A 1.84 B 0.90 A 1.31 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 10:24:06 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 590 510 270 700 710 880
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 80 Reference Point End
Green 22.3 15.0 44.8 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.4 1.0 4.0 9.0
Phase Duration, s 28.3 21.0 49.2 50.8
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 12.7 43.5
Green Extension Time ( g e ), s 0.0 2.5 0.0 1.1
Phase Call Probability 1.00 1.00
Max Out Probability 0.00 1.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.42 A 1.91 B 2.32 B 2.32 B
Bicycle LOS Score / LOS 1.47 A 1.36 A F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 10:24:06 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 480 820 410 250 560 240
Signal Information
Cycle, s 100.0 Reference Phase 2
Offset, s 11 Reference Point End
Green 16.7 28.9 36.3 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8
Case Number 2.0 4.0 7.3 9.0
Phase Duration, s 22.7 57.7 34.9 42.3
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 16.5 35.4
Green Extension Time ( g e ), s 0.2 0.0 0.0 0.9
Phase Call Probability 1.00 1.00
Max Out Probability 1.00 0.88
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.67 B 1.70 B 1.96 B 2.15 B
Bicycle LOS Score / LOS 2.82 C 1.67 B F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/8/2023 10:24:06 AM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 180 170 50 120 230 180 100 580 100 140 500 270
Signal Information
Cycle, s 90.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.5 16.5 6.8 6.7 2.0 24.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 1.5 1.5 1.5 1.5 0.0 1.5
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 3 8 5 2 1 6
Case Number 1.1 4.0 1.1 4.0 1.2 4.0 1.3 4.0
Phase Duration, s 14.2 31.5 12.2 29.5 12.0 34.0 12.3 34.3
Change Period, ( Y+R c ), s 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.2 3.1 3.2 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 8.7 11.2 6.4 23.1 6.0 2.0
Green Extension Time ( g e ), s 0.1 1.3 0.1 0.9 0.1 0.0 1.3 0.0
Phase Call Probability 0.99 1.00 0.96 1.00 0.93 0.97
Max Out Probability 1.00 0.00 0.00 0.17 0.00 0.30
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 2.28 B 2.28 B 1.94 B 1.92 B
Bicycle LOS Score / LOS 1.18 A 1.40 A 1.16 A 1.27 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 2:39:16 PM
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 260 410 60 30 420 190 100 310 20 200 450 250
Signal Information
Cycle, s 110.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 6.6 26.4 7.0 14.1 29.9 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 4.0 4.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 1.5 1.5 1.5 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 7 4 8 5 2 1 6
Case Number 1.0 4.0 5.3 1.2 4.0 1.3 3.0
Phase Duration, s 19.6 55.0 35.4 10.6 42.5 12.5 44.4
Change Period, ( Y+R c ), s 5.5 5.5 5.5 4.0 5.5 5.5 5.5
Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 0.0 3.1 0.0
Queue Clearance Time ( g s ), s 13.7 24.9 27.8 6.7 2.0
Green Extension Time ( g e ), s 0.4 2.6 2.1 0.1 0.0 1.6 0.0
Phase Call Probability 1.00 1.00 1.00 0.96 1.00
Max Out Probability 0.00 0.00 0.17 0.00 0.11
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.12 B 2.14 B 1.92 B
Bicycle LOS Score / LOS 1.78 B 1.62 B 1.25 A 2.08 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 2:22:56 PM
HCS7 All-Way Stop Control Report
General Information Site Information
Analyst SNP Intersection Drake and Hunt
Lanes
Movement L T R L T R L T R L T R
Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
Configuration T R LT LR
Approach LOS C C C
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ AWSC Version 7.9.5 Generated: 5/23/2023 2:36:41 PM
Drake and Hunt_2047 PM_Full Build.xaw
HCS7 Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 80 310 110 140 390 70 180 200 100 40 220 130
Signal Information
Cycle, s 80.0 Reference Phase 2
Offset, s 0 Reference Point End
Green 39.1 30.9 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 1.0 1.0 0.0 0.0 0.0 0.0
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 4 8 2 6
Case Number 6.0 6.0 6.0 6.0
Phase Duration, s 35.9 35.9 44.1 44.1
Change Period, ( Y+R c ), s 5.0 5.0 5.0 5.0
Max Allow Headway ( MAH ), s 3.3 3.3 0.0 0.0
Queue Clearance Time ( g s ), s 25.7 29.0
Green Extension Time ( g e ), s 2.4 2.0 0.0 0.0
Phase Call Probability 1.00 1.00
Max Out Probability 0.13 0.29
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 1.91 B 1.89 B 1.89 B
Bicycle LOS Score / LOS 1.34 A 1.51 B 1.30 A 1.15 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 7.9.5 Generated: 5/23/2023 2:47:29 PM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 200 770 70 150 1200 230 100 140 80 200 130 200
Signal Information
Cycle, s 80.0 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 6.4 2.2 26.4 6.4 1.6 13.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 0.0 4.0 4.0 0.0 4.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 0.0 2.0 2.0 0.0 2.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 1 6 3 8 7 4
Case Number 1.1 4.0 1.1 4.0 1.1 4.0 1.1 3.0
Phase Duration, s 14.6 34.6 12.4 32.4 12.4 19.0 14.0 20.6
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 0.0 3.1 0.0 3.1 3.2 3.1 3.2
Queue Clearance Time ( g s ), s 8.5 5.3 6.0 12.2 9.7 11.1
Green Extension Time ( g e ), s 0.2 0.0 0.1 0.0 0.1 0.7 0.0 0.9
Phase Call Probability 0.99 0.91 1.00 1.00 0.99 1.00
Max Out Probability 0.10 0.00 0.32 0.27 1.00 0.06
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.91 B 2.10 B 2.29 B 2.29 B
Bicycle LOS Score / LOS 1.41 A 1.89 B 1.06 A 1.43 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/19/2023 7:26:13 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 1180 190 380 980 120 190
Signal Information
Cycle, s 80.0 Reference Phase 2
1 2 3 4
Offset, s 74 Reference Point End
Green 10.3 41.3 10.5 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 8
Case Number 7.3 1.0 4.0 9.0
Phase Duration, s 47.3 16.3 63.5 16.5
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 9.6 9.9
Green Extension Time ( g e ), s 0.0 0.7 0.0 0.5
Phase Call Probability 1.00 1.00
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 0.65 A 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.64 B 1.63 B F
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/19/2023 7:26:13 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 980 390 220 1060 200 0 300
Signal Information
Cycle, s 80.0 Reference Phase 2
1 2 3 4
Offset, s 38 Reference Point End
Green 7.0 36.3 18.7 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 1 6 4
Case Number 7.3 1.0 4.0 11.0
Phase Duration, s 42.3 13.0 55.3 24.7
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 3.1 0.0 3.3
Queue Clearance Time ( g s ), s 6.7 17.6
Green Extension Time ( g e ), s 0.0 0.4 0.0 1.0
Phase Call Probability 0.99 1.00
Max Out Probability 0.00 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.38 A 1.64 B 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.70 B 1.62 B 1.37 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/19/2023 7:26:13 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 630 550 800 350 480 0 130
Signal Information
Cycle, s 80.0 Reference Phase 2
1 2 3 4
Offset, s 21 Reference Point End
Green 42.0 26.0 0.0 0.0 0.0 0.0
Uncoordinated No Simult. Gap E/W On Yellow 4.0 4.0 0.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 0.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 2 6 8
Case Number 7.0 7.0 10.0
Phase Duration, s 48.0 48.0 32.0
Change Period, ( Y+R c ), s 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 0.0 0.0 3.2
Queue Clearance Time ( g s ), s 24.6
Green Extension Time ( g e ), s 0.0 0.0 1.3
Phase Call Probability 1.00
Max Out Probability 0.00
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.37 A 2.31 B 2.31 B
Bicycle LOS Score / LOS 1.51 B 1.49 A 1.55 B
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/19/2023 7:26:13 AM
HCS Signalized Intersection Results Summary
Demand Information EB WB NB SB
Approach Movement L T R L T R L T R L T R
Demand ( v ), veh/h 200 270 40 50 330 130 50 200 30 110 200 210
Signal Information
Cycle, s 69.3 Reference Phase 2
1 2 3 4
Offset, s 0 Reference Point End
Green 7.0 19.4 24.9 0.0 0.0 0.0
Uncoordinated Yes Simult. Gap E/W On Yellow 4.0 4.0 4.0 0.0 0.0 0.0
Force Mode Fixed Simult. Gap N/S On Red 2.0 2.0 2.0 0.0 0.0 0.0 5 6 7 8
Timer Results EBL EBT WBL WBT NBL NBT SBL SBT
Assigned Phase 5 2 6 8 4
Case Number 1.0 4.0 6.3 6.0 6.0
Phase Duration, s 13.0 38.4 25.4 30.9 30.9
Change Period, ( Y+R c ), s 6.0 6.0 6.0 6.0 6.0
Max Allow Headway ( MAH ), s 3.1 3.2 3.2 3.3 3.3
Queue Clearance Time ( g s ), s 8.2 10.8 10.6 22.7 18.2
Green Extension Time ( g e ), s 0.0 1.5 1.0 2.1 2.0
Phase Call Probability 1.00 1.00 1.00 1.00 1.00
Max Out Probability 1.00 0.11 0.07 0.00 0.01
Multimodal Results EB WB NB SB
Pedestrian LOS Score / LOS 1.89 B 1.91 B 2.09 B 2.09 B
Bicycle LOS Score / LOS 1.43 A 0.96 A 1.01 A 1.45 A
Copyright © 2023 University of Florida, All Rights Reserved. HCS™ Streets Version 2023 Generated: 5/19/2023 7:24:06 AM
APPENDIX M
Note: Traffic volumes may not change for every facility for every alternative. Therefore,
facility results may reference other alternatives. Refer to Table 6 through Table 13 for which
alternatives are referenced and therefore do not have reports in their respective sections in
this Appendix.
2027 FREEWAY NORTHBOUND
AM PEAK
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/9/23
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2620 468 7050 2200 0.37 0.21 65.5 62.7 13.3 16.0 B
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 1.000 2180 7104 0.31 66.7 10.9 A
Segment 4: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 3297 1117 7050 2000 0.47 0.56 61.8 60.1 17.8 19.0 B
Segment 5: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 3549 319 7050 2000 0.50 0.16 62.1 60.4 19.0 17.5 B
Segment 6: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 7: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 3530 362 7050 2000 0.50 0.18 60.7 56.1 19.4 20.4 C
Segment 8: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 9: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 5030 1840 7050 4000 0.71 0.46 60.0 58.3 27.9 24.9 C
1 1.00 0.94 1.000 1.000 5771 851 7050 2000 0.82 0.43 58.9 57.0 32.7 28.2 D
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 105.79
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/09/2023 11:34:17
71NB Freeway Facility No-Build 2027 AM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/26/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2615 745 7050 2000 0.37 0.37 62.0 60.2 14.1 14.9 B
Segment 5: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2740 170 7050 2000 0.39 0.09 62.4 60.5 14.6 13.3 B
Segment 6: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 7: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 0.980 4391 1661 7200 2000 0.61 0.83 65.3 63.0 22.4 25.5 C
Segment 8: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 9: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 4260 404 7050 2000 0.60 0.20 60.4 55.8 23.5 24.0 C
1 1.00 0.94 1.000 1.000 5210 1330 7050 4000 0.74 0.33 59.9 58.4 29.0 24.2 C
1 1.00 0.94 1.000 1.000 5758 628 7050 2000 0.82 0.31 58.9 57.2 32.6 27.6 C
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 123.10
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/26/2023 07:24:19
71NB Freeway Facility Alternate 2 2027 AM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/26/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2615 745 7050 2000 0.37 0.37 62.0 60.2 14.1 14.9 B
Segment 5: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2740 170 7050 2000 0.39 0.09 62.4 60.5 14.6 13.3 B
Segment 6: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 7: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 0.980 4391 1661 7200 2000 0.61 0.83 65.3 63.0 22.4 25.5 C
Segment 8: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 9: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 4260 404 7050 2000 0.60 0.20 60.3 55.8 23.5 24.3 C
1 1.00 0.94 1.000 1.000 5210 1330 7050 4000 0.74 0.33 59.9 58.4 29.0 24.2 C
1 1.00 0.94 1.000 1.000 5758 628 7050 2000 0.82 0.31 58.9 57.2 32.6 27.6 C
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 122.39
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/26/2023 07:41:45
71NB Freeway Facility Alternate 3 2027 AM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/26/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2610 457 7050 2200 0.37 0.21 65.1 62.3 13.4 16.0 B
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 3042 862 7050 2000 0.43 0.43 61.3 59.6 16.5 17.2 B
Segment 5: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 3309 319 7050 2000 0.47 0.16 61.5 59.8 17.9 16.4 B
Segment 6: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 7: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 0.917 3290 406 7200 2000 0.46 0.20 65.3 59.9 16.8 16.9 B
Segment 8: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 9: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 0.980 4308 1368 7200 2000 0.60 0.68 65.9 63.6 21.8 24.3 C
1 1.00 0.94 1.000 1.000 4200 372 7050 2000 0.60 0.19 60.2 55.6 23.3 23.7 C
Segment 12: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 5286 1436 7050 4000 0.75 0.36 59.4 57.8 29.7 24.8 C
1 1.00 0.94 1.000 1.000 5913 713 7050 2000 0.84 0.36 58.4 56.6 33.8 28.5 D
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 145.46
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/26/2023 08:54:46
71NB Freeway Facility Full Interchange 2027 AM.xuf
2027 FREEWAY NORTHBOUND
PM PEAK
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/9/23
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2240 606 7050 2200 0.32 0.28 64.9 62.4 11.5 14.3 B
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 1.000 1670 7104 0.24 66.7 8.3 A
Segment 4: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2287 617 7050 2000 0.32 0.31 62.6 60.7 12.2 13.0 B
Segment 5: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2622 372 7050 2000 0.37 0.19 62.7 60.8 13.9 13.3 B
Segment 6: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 7: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2600 521 7050 2000 0.37 0.26 59.8 55.8 14.5 16.0 B
Segment 8: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 9: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 3514 1404 7050 4000 0.50 0.35 62.3 60.9 18.8 16.9 B
1 1.00 0.94 1.000 1.000 3994 564 7050 2000 0.57 0.28 61.9 60.4 21.5 19.0 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 42.60
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/09/2023 11:49:09
71NB Freeway Facility No-Build 2027 PM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/26/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 1972 372 7050 2000 0.28 0.19 62.5 60.5 10.5 10.9 B
Segment 5: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2216 266 7050 2000 0.31 0.13 62.6 60.6 11.8 11.1 B
Segment 6: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 7: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2966 766 7200 2000 0.41 0.38 67.8 65.5 14.6 16.4 B
Segment 8: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 9: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2920 660 7050 2000 0.41 0.33 59.2 55.2 16.4 17.9 B
1 1.00 0.94 1.000 1.000 3534 1234 7050 4000 0.50 0.31 62.0 60.6 19.0 16.5 B
1 1.00 0.94 1.000 1.000 4024 564 7050 2000 0.57 0.28 61.5 60.0 21.8 19.2 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 49.58
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/26/2023 07:29:43
71NB Freeway Facility Alternate 2 2027 PM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/26/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 1972 372 7050 2000 0.28 0.19 62.5 60.5 10.5 10.9 B
Segment 5: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2216 266 7050 2000 0.31 0.13 62.6 60.6 11.8 11.1 B
Segment 6: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 7: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 0.952 3005 805 7200 2000 0.42 0.40 67.7 65.4 14.8 16.7 B
Segment 8: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 9: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2920 660 7050 2000 0.41 0.33 59.2 55.2 16.4 17.9 B
1 1.00 0.94 1.000 1.000 3534 1234 7050 4000 0.50 0.31 62.0 60.6 19.0 16.5 B
1 1.00 0.94 1.000 1.000 4024 564 7050 2000 0.57 0.28 61.5 60.0 21.8 19.2 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 49.81
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/26/2023 07:47:46
71NB Freeway Facility Alternate 3 2027 PM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/26/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2260 596 7050 2200 0.32 0.27 64.5 62.0 11.7 14.4 B
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2285 585 7050 2000 0.32 0.29 61.8 60.0 12.3 12.9 B
Segment 5: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2622 372 7050 2000 0.37 0.19 61.9 60.1 14.1 13.3 B
Segment 6: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 7: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 0.962 2600 719 7200 2000 0.36 0.36 63.4 58.9 13.7 13.9 B
Segment 8: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 9: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 0.952 2632 682 7200 2000 0.37 0.34 68.1 65.7 12.9 14.7 B
1 1.00 0.94 1.000 1.000 2560 532 7050 2000 0.36 0.27 59.1 55.2 14.4 15.8 B
Segment 12: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 3283 1223 7050 4000 0.47 0.31 61.8 60.4 17.7 15.3 B
1 1.00 0.94 1.000 1.000 3774 564 7050 2000 0.54 0.28 61.7 60.2 20.4 18.0 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 58.97
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/26/2023 09:18:12
71NB Freeway Facility Full Interchange 2027 PM.xuf
2027 FREEWAY SOUTHBOUND
AM PEAK
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/9/23
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 3181 851 9200 4000 0.35 0.21 60.4 52.5 13.2 3.3 A
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2330 426 7050 2000 0.33 0.21 59.9 56.0 13.0 16.2 B
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2223 319 7050 2000 0.32 0.16 63.0 61.0 11.8 11.1 B
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2223 713 7050 2000 0.32 0.36 59.1 55.6 12.5 15.3 B
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2032 521 7050 2000 0.29 0.26 63.4 61.5 10.7 10.5 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 32.14
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/09/2023 11:36:37
71SB Freeway Facility No-Build 2027 AM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/26/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 3213 755 9200 4000 0.35 0.19 60.6 52.4 13.3 2.7 A
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2457 415 7050 2000 0.35 0.21 59.7 55.7 13.7 16.9 B
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2383 340 7050 2000 0.34 0.17 62.5 60.6 12.7 11.9 B
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.901 2383 401 7200 2000 0.33 0.20 64.6 59.9 12.3 12.1 B
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2021 574 7050 2000 0.29 0.29 59.0 55.6 11.4 13.9 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 40.06
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/26/2023 07:14:16
71SB Freeway Facility Alternate 1 2027 AM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/26/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 3213 755 9200 4000 0.35 0.19 60.6 52.4 13.3 2.7 A
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2457 415 7050 2000 0.35 0.21 59.7 55.7 13.7 16.9 B
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2383 340 7050 2000 0.34 0.17 62.5 60.6 12.7 11.9 B
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.901 2383 401 7200 2000 0.33 0.20 64.6 59.9 12.3 12.1 B
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2021 574 7050 2000 0.29 0.29 59.0 55.6 11.4 13.9 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 40.06
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/26/2023 07:45:42
71SB Freeway Facility Alternates 2 and 3 2027 AM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/26/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
F R F R Freeway Ramp Freeway Ramp F R F R Infl. F R Infl.
1 0.94 0.94 1.000 1.000 2915 777 9200 4000 0.32 0.19 60.2 52.4 12.1 2.2 A
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2138 415 7050 2000 0.30 0.21 59.2 55.5 12.0 15.1 B
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2000 277 7050 2000 0.28 0.14 62.3 60.3 10.7 10.0 A
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.901 2000 354 7200 2000 0.28 0.18 64.5 60.0 10.3 9.9 A
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.962 2521 840 7200 2000 0.35 0.42 67.9 65.7 12.4 14.6 B
1 0.94 0.94 1.000 1.000 2489 830 7050 2000 0.35 0.41 58.2 54.8 14.3 17.1 B
1 0.94 0.94 1.000 1.000 2064 404 7050 2000 0.29 0.20 63.0 61.1 10.9 10.4 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 46.14
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/26/2023 08:01:30
71SB Freeway Facility Alternate 4 2027 AM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/26/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
F R F R Freeway Ramp Freeway Ramp F R F R Infl. F R Infl.
1 0.94 0.94 1.000 1.000 2883 734 9200 4000 0.31 0.18 60.4 52.5 11.9 1.9 A
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2149 415 7050 2000 0.30 0.21 59.2 55.5 12.1 15.2 B
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2032 298 7050 2000 0.29 0.15 62.3 60.3 10.9 10.2 B
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.901 2032 342 7200 2000 0.28 0.17 64.6 60.1 10.5 10.1 B
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.962 2464 741 7200 2000 0.34 0.37 68.1 65.8 12.1 14.0 B
1 0.94 0.94 1.000 1.000 2436 777 7050 2000 0.35 0.39 58.4 54.9 13.9 16.6 B
1 0.94 0.94 1.000 1.000 2032 372 7050 2000 0.29 0.19 63.1 61.1 10.7 10.1 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 44.98
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/26/2023 09:12:52
71SB Freeway Facility Full Interchange 2027 AM.xuf
2027 FREEWAY SOUTHBOUND
PM PEAK
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/9/23
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 5957 1766 9200 4000 0.65 0.44 58.2 50.8 25.6 15.3 B
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 4191 734 7050 2000 0.59 0.37 60.0 55.3 23.3 26.1 C
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 4042 585 7050 2000 0.57 0.29 61.6 60.0 21.9 20.4 C
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 4043 926 7050 2000 0.57 0.46 59.7 55.1 22.6 24.9 C
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 3691 574 7050 2000 0.52 0.29 62.4 60.7 19.7 18.5 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 68.11
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/09/2023 11:51:56
71SB Freeway Facility No-Build 2027 PM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/26/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 6234 1255 9200 4000 0.68 0.31 58.9 51.5 26.5 12.7 B
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 4979 713 7050 2000 0.71 0.36 59.8 55.1 27.8 29.6 D
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 4947 681 7050 2000 0.70 0.34 60.1 58.5 27.4 24.9 C
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.990 4947 1418 7200 2000 0.69 0.71 62.5 56.8 26.4 26.6 C
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 3543 734 7050 2000 0.50 0.37 59.8 55.3 19.7 22.2 C
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 110.47
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/26/2023 07:17:07
71SB Freeway Facility Alternate 1 2027 PM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/26/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 6234 1255 9200 4000 0.68 0.31 58.9 51.5 26.5 12.7 B
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 4979 713 7050 2000 0.71 0.36 59.8 55.1 27.8 29.6 D
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 4947 681 7050 2000 0.70 0.34 60.1 58.5 27.4 24.9 C
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.990 4947 1418 7200 2000 0.69 0.71 62.5 56.8 26.4 26.6 C
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 3543 734 7050 2000 0.50 0.37 59.8 55.3 19.7 22.2 C
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 110.47
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/26/2023 07:51:56
71SB Freeway Facility Alternates 2 and 3 2027 PM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/26/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
F R F R Freeway Ramp Freeway Ramp F R F R Infl. F R Infl.
1 0.94 0.94 1.000 1.000 5947 1372 9200 4000 0.65 0.34 58.8 51.3 25.3 12.8 B
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 4574 734 7050 2000 0.65 0.37 59.4 54.8 25.7 27.9 C
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 4425 585 7050 2000 0.63 0.29 60.4 58.9 24.4 22.2 C
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.990 4426 1343 7200 2000 0.61 0.67 62.5 57.1 23.6 24.2 C
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.957 3819 723 7200 2000 0.53 0.36 67.2 64.8 18.9 20.3 C
1 0.94 0.94 1.000 1.000 3787 915 7050 2000 0.54 0.46 59.0 54.6 21.4 23.7 C
1 0.94 0.94 1.000 1.000 3446 574 7050 2000 0.49 0.29 62.2 60.5 18.5 17.3 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 101.58
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/26/2023 08:03:53
71SB Freeway Facility Alternate 4 2027 PM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/26/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
F R F R Freeway Ramp Freeway Ramp F R F R Infl. F R Infl.
1 0.94 0.94 1.000 1.000 6160 1500 9200 4000 0.67 0.38 58.4 51.0 26.4 14.1 B
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 4660 638 7050 2000 0.66 0.32 59.6 55.0 26.1 28.1 D
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 4649 628 7050 2000 0.66 0.31 60.1 58.6 25.8 23.4 C
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.990 4649 1451 7200 2000 0.65 0.73 62.2 56.7 24.9 25.4 C
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.962 4009 796 7200 2000 0.56 0.40 67.0 64.6 19.9 21.4 C
1 0.94 0.94 1.000 1.000 3979 926 7050 2000 0.56 0.46 59.1 54.6 22.4 24.7 C
1 0.94 0.94 1.000 1.000 3627 574 7050 2000 0.51 0.29 62.0 60.4 19.5 18.2 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 115.23
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/26/2023 09:24:57
71SB Freeway Facility Full Interchange 2027 PM.xuf
2047 FREEWAY NORTHBOUND
AM PEAK
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/9/23
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2690 543 7050 2200 0.38 0.25 65.3 62.5 13.7 16.6 B
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 1.000 2180 7104 0.31 66.7 10.9 A
Segment 4: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 3520 1340 7050 2000 0.50 0.67 61.4 59.8 19.1 20.7 C
Segment 5: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 3759 319 7050 2000 0.53 0.16 62.0 60.3 20.2 18.5 B
Segment 6: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 7: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 3740 394 7050 2000 0.53 0.20 60.7 56.1 20.5 21.5 C
Segment 8: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 9: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 5359 1989 7050 4000 0.76 0.50 59.0 57.1 30.3 26.8 C
1 1.00 0.94 1.000 1.000 6112 872 7050 2000 0.87 0.44 58.0 55.9 35.1 29.9 D
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 135.58
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/11/2023 08:04:16
71NB Freeway Facility 2047 No Build AM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/23/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2775 755 7050 2000 0.39 0.38 61.9 60.1 14.9 15.6 B
Segment 5: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2900 170 7050 2000 0.41 0.09 62.2 60.4 15.5 14.1 B
Segment 6: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 7: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 0.980 4649 1759 7200 2000 0.65 0.88 64.7 62.3 24.0 27.0 C
Segment 8: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 9: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 4510 426 7050 2000 0.64 0.21 60.4 55.7 24.9 25.2 C
1 1.00 0.94 1.000 1.000 5546 1436 7050 4000 0.79 0.36 59.1 57.4 31.3 26.0 C
1 1.00 0.94 1.000 1.000 6088 628 7050 2000 0.86 0.31 58.0 56.2 35.0 29.1 D
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 158.31
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/23/2023 08:30:36
71NB Freeway Facility Alternate 2 2047 AM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/23/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2775 755 7050 2000 0.39 0.38 61.9 60.1 14.9 15.6 B
Segment 5: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2900 170 7050 2000 0.41 0.09 62.2 60.4 15.5 14.1 B
Segment 6: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 7: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 0.980 4649 1759 7200 2000 0.65 0.88 64.7 62.3 24.0 27.0 C
Segment 8: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 9: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 4510 426 7050 2000 0.64 0.21 60.2 55.7 25.0 25.6 C
1 1.00 0.94 1.000 1.000 5546 1436 7050 4000 0.79 0.36 59.1 57.4 31.3 26.0 C
1 1.00 0.94 1.000 1.000 6088 628 7050 2000 0.86 0.31 58.0 56.2 35.0 29.1 D
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 156.95
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/23/2023 07:34:22
71NB Freeway Facility Alternate 3 2047 AM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/23/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2710 500 7050 2200 0.38 0.23 65.1 62.2 13.9 16.6 B
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 3229 989 7050 2000 0.46 0.49 61.1 59.5 17.6 18.4 B
Segment 5: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 3489 319 7050 2000 0.49 0.16 61.4 59.7 18.9 17.3 B
Segment 6: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 7: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 0.917 3470 441 7200 2000 0.48 0.22 65.2 59.8 17.7 17.9 B
Segment 8: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 9: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 0.980 4545 1455 7200 2000 0.63 0.73 65.4 63.0 23.2 25.7 C
1 1.00 0.94 1.000 1.000 4430 372 7050 2000 0.63 0.19 60.2 55.6 24.5 24.7 C
Segment 12: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 5516 1436 7050 4000 0.78 0.36 58.8 57.2 31.3 25.9 C
1 1.00 0.94 1.000 1.000 6143 713 7050 2000 0.87 0.36 57.8 55.9 35.4 29.6 D
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 172.71
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/23/2023 08:45:23
71NB Freeway Facility Full Interchange 2047 AM.xuf
2047 FREEWAY NORTHBOUND
PM PEAK
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/9/23
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2340 713 7050 2200 0.33 0.32 64.6 62.1 12.1 15.1 B
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 1.000 1670 7104 0.24 66.6 8.3 A
Segment 4: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2425 755 7050 2000 0.34 0.38 62.4 60.6 13.0 14.0 B
Segment 5: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2752 372 7050 2000 0.39 0.19 62.7 60.8 14.6 13.9 B
Segment 6: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 7: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2730 564 7050 2000 0.39 0.28 59.7 55.7 15.2 16.7 B
Segment 8: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 9: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 3753 1553 7050 4000 0.53 0.39 61.9 60.5 20.2 18.3 B
1 1.00 0.94 1.000 1.000 4245 585 7050 2000 0.60 0.29 61.6 60.1 23.0 20.3 C
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 47.27
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/11/2023 09:11:59
71NB Freeway Facility 2047 No Build PM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/23/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2054 394 7050 2000 0.29 0.20 62.5 60.5 11.0 11.3 B
Segment 5: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2296 266 7050 2000 0.33 0.13 62.6 60.6 12.2 11.5 B
Segment 6: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 7: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 0.952 3185 905 7200 2000 0.44 0.45 67.6 65.3 15.7 17.8 B
Segment 8: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 9: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 3090 660 7050 2000 0.44 0.33 59.4 55.2 17.3 18.8 B
1 1.00 0.94 1.000 1.000 3704 1234 7050 4000 0.53 0.31 61.9 60.5 19.9 17.2 B
1 1.00 0.94 1.000 1.000 4194 564 7050 2000 0.59 0.28 61.3 59.8 22.8 20.0 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 52.86
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/23/2023 08:35:40
71NB Freeway Facility Alternate 2 2047 PM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/26/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 1972 372 7050 2000 0.28 0.19 62.5 60.5 10.5 10.9 B
Segment 5: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2216 266 7050 2000 0.31 0.13 62.6 60.6 11.8 11.1 B
Segment 6: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 7: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 0.952 3005 805 7200 2000 0.42 0.40 67.7 65.4 14.8 16.7 B
Segment 8: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 9: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2920 660 7050 2000 0.41 0.33 59.2 55.2 16.4 17.9 B
1 1.00 0.94 1.000 1.000 3534 1234 7050 4000 0.50 0.31 62.0 60.6 19.0 16.5 B
1 1.00 0.94 1.000 1.000 4024 564 7050 2000 0.57 0.28 61.5 60.0 21.8 19.2 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 49.81
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/26/2023 07:47:46
71NB Freeway Facility Alternate 3 2027 PM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/23/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2490 649 7050 2200 0.35 0.29 64.5 61.9 12.9 15.7 B
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2465 585 7050 2000 0.35 0.29 61.7 59.9 13.3 13.7 B
Segment 5: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 2802 372 7050 2000 0.40 0.19 61.8 60.0 15.1 14.2 B
Segment 6: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 7: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 0.962 2780 885 7200 2000 0.39 0.44 62.8 58.4 14.8 15.3 B
Segment 8: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 9: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 0.952 2796 816 7200 2000 0.39 0.41 67.9 65.6 13.7 15.8 B
1 1.00 0.94 1.000 1.000 2710 532 7050 2000 0.38 0.27 59.2 55.2 15.3 16.6 B
Segment 12: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 1.00 0.94 1.000 1.000 3433 1223 7050 4000 0.49 0.31 61.7 60.3 18.5 16.0 B
1 1.00 0.94 1.000 1.000 3924 564 7050 2000 0.56 0.28 61.6 60.1 21.2 18.7 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 64.01
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/23/2023 09:03:12
71NB Freeway Facility Full Interchange 2047 PM.xuf
2047 FREEWAY SOUTHBOUND
AM PEAK
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/9/23
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 3309 851 9200 4000 0.36 0.21 60.6 52.5 13.7 3.6 A
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2457 468 7050 2000 0.35 0.23 59.9 55.9 13.7 17.0 B
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2329 340 7050 2000 0.33 0.17 63.0 61.0 12.3 11.7 B
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2330 787 7050 2000 0.33 0.39 58.9 55.4 13.2 16.1 B
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2096 553 7050 2000 0.30 0.28 63.3 61.4 11.0 10.9 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 33.63
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/11/2023 08:09:35
71SB Freeway Facility 2047 No Build AM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/23/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 3394 755 9200 4000 0.37 0.19 60.7 52.4 14.0 3.1 A
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2638 415 7050 2000 0.37 0.21 59.8 55.7 14.7 17.8 B
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2595 372 7050 2000 0.37 0.19 62.4 60.5 13.9 13.0 B
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.901 2596 531 7200 2000 0.36 0.27 64.2 59.5 13.5 13.5 B
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2117 617 7050 2000 0.30 0.31 59.0 55.5 12.0 14.5 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 43.35
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/23/2023 14:31:41
71SB Freeway Facility Alternate 1 2047 AM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/23/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 3394 755 9200 4000 0.37 0.19 60.7 52.4 14.0 3.1 A
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2638 415 7050 2000 0.37 0.21 59.8 55.7 14.7 17.8 B
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2595 372 7050 2000 0.37 0.19 62.4 60.5 13.9 13.0 B
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.901 2596 531 7200 2000 0.36 0.27 64.2 59.5 13.5 13.5 B
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2117 617 7050 2000 0.30 0.31 59.0 55.5 12.0 14.5 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 43.35
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/23/2023 14:43:43
71SB Freeway Facility Alternates 2 and 3 2047 AM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/23/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
F R F R Freeway Ramp Freeway Ramp F R F R Infl. F R Infl.
1 0.94 0.94 1.000 1.000 2989 777 9200 4000 0.32 0.19 60.3 52.4 12.4 2.4 A
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2213 415 7050 2000 0.31 0.21 59.2 55.5 12.5 15.5 B
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2117 319 7050 2000 0.30 0.16 62.2 60.3 11.3 10.6 B
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.901 2117 472 7200 2000 0.29 0.24 64.1 59.7 11.0 10.8 B
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.962 2764 1073 7200 2000 0.38 0.54 67.6 65.5 13.6 16.3 B
1 0.94 0.94 1.000 1.000 2723 926 7050 2000 0.39 0.46 58.0 54.6 15.6 18.7 B
1 0.94 0.94 1.000 1.000 2255 457 7050 2000 0.32 0.23 62.9 61.0 12.0 11.4 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 50.35
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/23/2023 14:56:33
71SB Freeway Facility Alternate 4 2047 AM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/23/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
F R F R Freeway Ramp Freeway Ramp F R F R Infl. F R Infl.
1 0.94 0.94 1.000 1.000 2968 734 9200 4000 0.32 0.18 60.5 52.5 12.3 2.1 A
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2234 415 7050 2000 0.32 0.21 59.3 55.5 12.6 15.7 B
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 2159 340 7050 2000 0.31 0.17 62.2 60.3 11.6 10.9 B
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.901 2160 460 7200 2000 0.30 0.23 64.1 59.7 11.2 11.0 B
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.962 2685 940 7200 2000 0.37 0.47 67.7 65.6 13.2 15.6 B
1 0.94 0.94 1.000 1.000 2649 819 7050 2000 0.38 0.41 58.4 54.8 15.1 17.9 B
1 0.94 0.94 1.000 1.000 2245 415 7050 2000 0.32 0.21 63.0 61.1 11.9 11.3 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 48.94
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/23/2023 15:10:50
71SB Freeway Facility Full Interchange 2047 AM.xuf
2047 FREEWAY SOUTHBOUND
PM PEAK
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/9/23
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 6181 1777 9200 4000 0.67 0.44 58.1 50.7 26.6 15.9 B
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 4404 809 7050 2000 0.62 0.40 59.8 55.1 24.5 27.3 C
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 4224 628 7050 2000 0.60 0.31 61.4 59.8 22.9 21.4 C
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 4223 1021 7050 2000 0.60 0.51 59.5 54.8 23.7 26.0 C
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 3862 660 7050 2000 0.55 0.33 62.2 60.5 20.7 19.5 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 78.89
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/11/2023 09:17:00
71SB Freeway Facility 2047 No Build PM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/23/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 6702 1372 9200 4000 0.73 0.34 58.6 51.3 28.6 14.5 B
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 5330 723 7050 2000 0.76 0.36 59.7 55.0 29.8 31.1 D
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 5297 691 7050 2000 0.75 0.35 59.5 57.9 29.7 26.6 C
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.990 5298 1741 7200 2000 0.74 0.87 61.6 55.9 28.7 28.8 D
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 3574 766 7050 2000 0.51 0.38 59.7 55.2 20.0 22.4 C
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 143.05
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/23/2023 14:33:58
71SB Freeway Facility Alternate 1 2047 PM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/23/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 6702 1372 9200 4000 0.73 0.34 58.6 51.3 28.6 14.5 B
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 5330 723 7050 2000 0.76 0.36 59.7 55.0 29.8 31.1 D
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 5297 691 7050 2000 0.75 0.35 59.5 57.9 29.7 26.6 C
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.990 5298 1741 7200 2000 0.74 0.87 61.6 55.9 28.7 28.8 D
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 3574 766 7050 2000 0.51 0.38 59.7 55.2 20.0 22.4 C
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 143.05
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/23/2023 14:50:53
71SB Freeway Facility Alternates 2 and 3 2047 PM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/23/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
F R F R Freeway Ramp Freeway Ramp F R F R Infl. F R Infl.
1 0.94 0.94 1.000 1.000 6277 1426 9200 4000 0.68 0.36 58.6 51.2 26.8 13.9 B
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 4851 777 7050 2000 0.69 0.39 59.3 54.7 27.3 29.2 D
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 4691 617 7050 2000 0.67 0.31 60.1 58.6 26.0 23.5 C
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.990 4691 1612 7200 2000 0.65 0.81 61.7 56.3 25.3 26.0 C
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.957 3941 845 7200 2000 0.55 0.42 66.9 64.6 19.6 21.2 C
1 0.94 0.94 1.000 1.000 3904 915 7050 2000 0.55 0.46 59.1 54.6 22.0 24.3 C
1 0.94 0.94 1.000 1.000 3638 649 7050 2000 0.52 0.32 62.0 60.3 19.6 18.4 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 117.62
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/23/2023 15:01:39
71SB Freeway Facility Alternate 4 2047 PM.xuf
HCS Freeway Facilities Report
Project Information
Analyst Logan Sasse Date 5/23/2023
Segment 1: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 2: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
F R F R Freeway Ramp Freeway Ramp F R F R Infl. F R Infl.
1 0.94 0.94 1.000 1.000 6606 1745 9200 4000 0.72 0.44 57.8 50.6 28.6 16.6 B
Segment 3: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 4: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 4862 713 7050 2000 0.69 0.36 59.4 54.8 27.3 29.1 D
Segment 5: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 6: Merge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 1.000 4904 755 7050 2000 0.70 0.38 59.8 58.2 27.3 24.9 C
Segment 7: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
Segment 8: Diverge
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.990 4904 1709 7200 2000 0.68 0.85 61.4 56.0 26.6 27.4 C
Segment 9: Basic
AP PHF fHV Flow Rate Capacity d/c Speed Density LOS
(pc/h) (pc/h) Ratio (mi/h) (pc/mi/ln)
1 0.94 0.94 1.000 0.962 4076 863 7200 2000 0.57 0.43 66.8 64.4 20.3 21.9 C
1 0.94 0.94 1.000 1.000 4043 957 7050 2000 0.57 0.48 59.0 54.5 22.8 25.0 C
1 0.94 0.94 1.000 1.000 3734 649 7050 2000 0.53 0.32 61.9 60.3 20.1 18.9 B
Vehicle Value of Time (VOT), $/h 25.00 Total Delay Cost, $ 137.78
Copyright © 2023 University of Florida. All Rights Reserved. HCS™ Freeways Version 2023 Generated: 05/23/2023 15:15:57
71SB Freeway Facility Full Interchange 2047 PM.xuf
APPENDIX N
Design DHV DHV Cycles per Cycles per Avg V/cycle Avg V/cycle Storage Length Storage Length Larger Storage Total Condition Total Calculated Modeled Back of Modeled Back of Modeled Back of Modeled Back of Recommended Consider Dual Recommended Length
Condition A B C Avg V/cycle (AM) Avg V/cycle (PM)
Speed (AM) (PM) Hour (AM) Hour (PM) (AM) (PM) (AM) (PM) Length A Condition C Length Queue (AM)* Thru Queue (AM) Queue (PM)* Thru Queue (PM) Length Lanes? for Dual Lanes
EB LT 40 B or C 50 125 115 260 140 33 33 7.9 4.2 8 5 325 200 325 375 440 440 64 172 151 156 440 N/A
WB RT 40 B or C 50 125 115 150 220 33 33 4.5 6.7 5 7 200 275 275 325 390 390 60 223 59 510 510 N/A
SB LT 39 B or C 50 125 115 70 210 33 33 2.1 6.4 3 7 125 275 275 325 390 390 91 N/A 261 N/A 390 N/A
SB LT 40 B or C 50 125 115 50 160 33 33 1.5 4.8 2 5 100 200 200 250 315 315 64 N/A 205 N/A 315 N/A
Design DHV DHV Cycles per Cycles per Avg V/cycle Avg V/cycle Storage Length Storage Length Larger Storage Total Condition Total Calculated Modeled Back of Modeled Back of Modeled Back of Modeled Back of Recommended Consider Dual Recommended Length
Condition A B C Avg V/cycle (AM) Avg V/cycle (PM)
Speed (AM) (PM) Hour (AM) Hour (PM) (AM) (PM) (AM) (PM) Length A Condition C Length Queue (AM)* Thru Queue (AM) Queue (PM)* Thru Queue (PM) Length Lanes? for Dual Lanes
EB LT 40 B or C 50 125 115 260 140 33 33 7.9 4.2 8 5 325 200 325 375 440 440 64 172 151 156 440 N/A
WB RT 40 B or C 50 125 115 150 220 33 33 4.5 6.7 5 7 200 275 275 325 390 390 60 223 59 510 510 N/A
SB LT 40 B or C 50 125 115 70 210 33 33 2.1 6.4 3 7 125 275 275 325 390 390 91 N/A 261 N/A 390 N/A
SB RT 40 B or C 50 125 115 50 160 33 33 1.5 4.8 2 5 100 200 200 250 315 315 64 N/A 205 N/A 315 N/A