PROCUREMENT OF POWER PLANT AND PORT FACILITIES UNDER MATARBARI ULTRA SUPER Sheet: Page 11 of 14
CRITICAL COAL-FIRED POWER PROJECT PACKAGE 1.2 Dated: 20 Aug 2023
Provide banksman to
guide Boom lift operator
Topple of boom lift Serious Injury/ Provide steel plate to All operators Site Ongoing
during movement on site Death cover Step 2-4 trench operating the boom Supervisor
opening for access (if lift must be briefed
required). about the hazard Boom Lift
involved Operator
Boom lift is not allowed to
move when platform is Close monitoring by
elevated at height. Supervisor.
Provide banksman to
guide boom lift operator
POC-M1.2-RA-0071
PENTA-OCEAN CONSTRUCTION CO. LTD.
Revision: D
PROCUREMENT OF POWER PLANT AND PORT FACILITIES UNDER MATARBARI ULTRA SUPER Sheet: Page 12 of 14
CRITICAL COAL-FIRED POWER PROJECT PACKAGE 1.2 Dated: 20 Aug 2023
Falling from height Serious Injury/ Ensure only authorized 3 5 15 Application and 2 5 10 Site Ongoing
Death operator to operate the approval of PTW for Supervisor
boom lift. working at height
Boom Lift
To inspect the machine Operator to work Operator
daily before operating. within the platform
Conduct TBM prior
No obstruction to working to commencement of
access of boom lift. work.
Allowed only 02 persons
on the boom lift