Linear Programming Part 3
Linear Programming Part 3
Programming
SLACK VARIABLE AND SURPLUS VARIABLE
SLACK VARIABLE
• There is a standard procedure for transforming inequality
constraints into equations. This transformation is achieved by
adding a new variable, called a slack variable, to each
constraint.
• represents unused resources.
For example:
For the pottery company example, the model constraints are