Asphalt Risk Assessment
Asphalt Risk Assessment
Asphalt Risk Assessment
PAGE No 1 of 16
REV 00
DATE 28/09/2023
SAFETY, HEALTH AND ENVIRONMENTAL MANUAL
RISK ASSESSMENT
NR/ZAID/MSS/013-
ACTIVITY: Asphalt works RA No.
01
LOCATION: ARJAN PROJECT: ARJAN DEVELOPMENT DATE : 28/09/2023
EQUIPMENT TO BE USED SUBSTANCES TO BE USED REVISION STATUS
Bobcat, tyred roller, plate compactor • Asphalt REVISION NUMBER REVISED DATE
• Primer 00 - 28/09/2023 -
POTENTIAL HAZARDS / CONDITIONS CONSIDERED (TICK BOX) PERSONS AT RISK (TICK BOX)
WORKING FROM HEIGHT ELECTRICITY HAND TOOLS TASK LIGHTING CONFINED SPACE EXCAVATION/BACK FILLING EMPLOYEES PUBLIC
FALLING MATERIALS MANUAL HANDLING PEDESTRIAN FATIGUE NOISE & VIBRATION HAZARDOUS SUBSTANCES SUBCONTRACTORS VISITORS
SAFETY INDUCTION ADEQUATE VENTILATION WORK PERMIT PROPER TOOLS / EQUIPMENTS PROPER SUPERVISION
TOOL BOX TALK DUST CONTROL PROPER PPE SAFE WORK PLACE PROPER BARRICADE AND WARNING SIGN IN THE AFFECTED AREA
SAFETY HELMET GOGGLES / SAFETY GLASSES RESPIRATORY PROTECTION / BREATHING APPARATUS GLOVES OVERALLS
SAFETY BOOTS EAR PLUGS / DEFENDERS FULL BODY SAFETY HARNESS HIGH VIZ SAFETY JACKET WELDING/METAL CUTTING PPE
Page 1 of 16
DOC No HSE-RA-23
PAGE No 2 of 16
REV 00
DATE 28/09/2023
SAFETY, HEALTH AND ENVIRONMENTAL MANUAL
RISK LEVEL
H (HIGH-Potential to cause death, permanent injury M (MEDIUM – Potential to cause loss time injury or Long L (LOW – An injury treatable with First Aid or Short Term Environmental Impact)
or Severe Permanent Environmental Harm) Term Environmental Impact)
SEVERITY (S)
LIKELIHOOD (L) CLASS OF RISK (L X S) RISK MATRIX
Health & Safety Environmental Impact
5 5 10 15 20 25
LIKELIHOOD (L)
0 = Impossible 0 = No injury Short Term < less than 1 month
4 4 8 12 16 20
1 = Improbable 1 = Minor – (FAC) 0 = No harm HIGH = 15 – 25 3 3 6 9 12 15
2 = Remote 2 = Major - (MTC) 3 = Minor 2 2 4 6 8 10
3 = Probable 3 = LTI (Lost Time Incident) Long Term > Greater than 1 Month MEDIUM = 07 – 14 1 1 2 3 4 5
NOTE: 1. Risk assessment must be addressed to workers by work in charge before starting job.
2. Risk assessment is a continuous process hence to be reviewed depending on activity and risk involved
2 Construction Manager
APPROVED BY SIGNATURE: DATE:
3 Project Manager (NAME):
Page 2 of 16
DOC No HSE-RA--23
PAGE No 3 of 16
REV 00
DATE 28 /09/2023
SAFETY, HEALTH AND ENVIRONMENTAL MANUAL
Page 3 of 16
DOC No HSE-RA-23
PAGE No 4 of 16
REV 00
DATE 28 / 09 / 2023
SAFETY, HEALTH AND ENVIRONMENTAL MANUAL
Page 4 of 16
DOC No HSE-RA-23
PAGE No 5 of 16
REV 00
DATE 28 / 09 / 2023
SAFETY, HEALTH AND ENVIRONMENTAL MANUAL
Page 6 of 16
DOC No HSE-RA-23
PAGE No 7 of 16
REV 00
DATE 28 / 09 / 2023
SAFETY, HEALTH AND ENVIRONMENTAL MANUAL
Page 7 of 16
DOC No HSE-RA-23
PAGE No 8 of 16
REV 00
DATE 28 / 09 / 2023
SAFETY, HEALTH AND ENVIRONMENTAL MANUAL
Page 8 of 16
DOC No HSE-RA-23
PAGE No 9 of 16
REV 00
DATE 28 / 09 / 2023
SAFETY, HEALTH AND ENVIRONMENTAL MANUAL
Page 10 of 16
DOC No HSE-RA-23
PAGE No 11 of 16
REV 00
DATE 28 / 09 / 2023
SAFETY, HEALTH AND ENVIRONMENTAL MANUAL
Page 11 of 16
DOC No HSE-RA-23
PAGE No 12 of 16
REV 00
DATE 28 / 09 / 2023
SAFETY, HEALTH AND ENVIRONMENTAL MANUAL
Page 12 of 16
DOC No HSE-RA-23
PAGE No 13 of 16
REV 00
DATE 28/09/2023
SAFETY, HEALTH AND ENVIRONMENTAL MANUAL
Page 13 of 16
DOC No HSE-RA-23
PAGE No 14 of 16
REV 00
DATE 28/09/2023
SAFETY, HEALTH AND ENVIRONMENTAL MANUAL
Page 14 of 16
DOC No HSE-RA-23
PAGE No 15 of 16
REV 00
DATE 28/09/2023
SAFETY, HEALTH AND ENVIRONMENTAL MANUAL
Page 16 of 16