LOR-004 Monthly LO Test Report Sept-2022
LOR-004 Monthly LO Test Report Sept-2022
LOR-004 Monthly LO Test Report Sept-2022
Water
Viscosity Total Base Number Spot Test result
MACHINERY (Vol %)
STANDARD VALUE
LIMIT
Remarks if Any
MONTH 11-Sep-22
Water
Viscosity Total Base Number Spot Test result
MACHINERY (Vol %)
STANDARD VALUE
LIMIT
Remarks if Any
MONTH 18-Sep-22
Water
Viscosity Total Base Number Spot Test result
MACHINERY (Vol %)
STANDARD VALUE
LIMIT
Remarks if Any
MONTH 25-Sep-22
Water
Viscosity Total Base Number Spot Test result
MACHINERY (Vol %)
STANDARD VALUE
LIMIT
MONTH
Water
Viscosity Total Base Number Spot Test result
MACHINERY (Vol %)
STANDARD VALUE
LIMIT
MAIN ENGINE
DIESEL GENERATOR
STERN TUBE
TURBO GENERATOR
Remarks if Any
6 MONTHLY LO SAMPLE LANDED ON 16 June 2022 at NEWYORK
Notes:
1. Additionally Iron content test to be done 24 hours after Main engine unit over haul
2. This Report shall be prepared monthly and submitted to the Company through the ShipNet.