DP 14102020
DP 14102020
DP 14102020
DAILY PLAN
SHIFT I 14 Oktober 2020
SHIFT II 14 Oktober 2020
Photo 13/10/20 FRONT PIT F SELATAN
& HIGH DUMP
EX 2033 (1)
AL : +85
RL : +80
Vol. 9500 bcm
Expose C super
EX 302 Dumpingh Pembentukan
Coal Getting Jalan jika material bagus
Seam C super Dumping RL 100 jika
material jelek
Photo 13/10/20 PIT YARDER
EX 1028
Seam C
Plan Blast
Plan Blast
EX 2009
Expose Seam D
5600 bcm
EX3009 OB
Blasting EX 2032
64000 bcm Loading Floor D
Prepare IPD
4600 bcm
Photo 13/10/20 PIT JO
EX 2017 (1)
AL : +80
RL : +70
Vol. 15400 bcm
Loading Alluvial
pembentukan Bench RL
70 dan Slope
Ortophoto_mp1020R0
Photo 13/10/20 IPD IPPKH
RL 130
Alluvial
RL 100
OB Blasting/floor
RL 90
OB Blasting/floor
Prepare IPD EX
2032
Photo 13/10/20 HIGH DUMP
High Dump 2
RL 50
High Dump 1
RL 90
REKLAMASI REKLAMASI IPPKH 140
EX205
Perapihan Free Dump Soil, Penutupan lubang dan area cekung yang terdapat genangan air
REKLAMASI
LANGAP
SELATAN
6 EX 207 General Tanggul mandala & Balsam 7,0 Dewatering 7,0 EX206 DZ3016
7 EX 208 Longsoran Pit F 5,0 Longsoran Pit F 8,0
DZ803
8 EX 209 STAND BY 0,0 Sloping Pit Yarder & JO 8,0 EX203
9 EX 210 STAND BY 0,0 STAND BY 0,0
19 DZ 807 IPD IPPKH RL120 Alluvial 6,0 IPD IPPKH RL120 Alluvial 6,0 DZ1009
20 DZ1009 IPD IPPKH RL100 9,0 Front Pit F 9,0
ERFAN, APRI
3 EX302 PC300 CWE 16 7 7 0,72 13 Coal Getting seam C super Pit F 16,0 14,0 155 170 16,2 17,9 1.811 2.004
EX302 PC300 CWE 13
= PC300 FUSO 13