Excavation

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

BOOK NO:

S NO:
CHECKLIST - EARTH WORKS
EXCAVATION
Drawing No.
Reference No.
Praject name Pr. Start Date

Work Order No.: Pr. End Date

Contractor: Checklist
Enginner: Date:

Item Dscrptn: Inspection Requested by: Villa/Apartment:

Strata: Strata: Strata: Soil Type

Req. on: Req. on: Req. on:


Location Section Level By.: By.: By.: Quantity
Date: Date: Date: Ref. Below:
Time: Time: Time:
Points to Check OP Action Req. OP Action Req. OP Action Req. REMARKS
1. Drawings & Spec. Details Finalised
2. Method Statement Approved
3. Excavation Plan Approval
4. Co-ordinates, Bench Mark & Grids
BEFORE EXECUTION

5. Initial Ground Levels are Checked


6. Depth of Excavation finalised
7. Identification of existing Service Lines
8. Excavation lines Marked on Ground
9. Statutory Approvals if required
10. Disposal area approved
11. Arrangements for Dewatering

Endorsement from Contractor

Approved for Execution Task Start Date:

1. Relocation of Existing Services


2. Final Trimming/ dressing
3. Side Surface clearance from exc. Line
4. Depth of Excavation Checked
5. Final levels are Checked
6. Safety Norms complied

Strata Classification

Relevent BOQ No.

Qty. Executed [Cum]

Work Approval Approved Approved subject to Rectifications Listed Not Approved [See Remarks]

Work approval date Task End Date


REMARKS

Main Contractor Site Engineer Survey Incharge QC Engineer PM/Site Incharge QC/QS Incharge