Cs 26
Cs 26
Cs 26
Cost ($)
30.00 AVC
AC
MC
Ans Q4 (B)
20.00
Total profit = 108.72
0.00
0 5 10 15 20 25
Quantity
Cost Curves
60.00
Q AVC AC MC P MR TR TC Total Profit Marginal Profit
9 41.10 52.21 30.70 35.00 35.00 315 469.89 -154.89 4.30
10 40.00 50.00 30.10 35.00 35.00 350 500 -150 4.90
11 39.10 48.19 30.10 35.00 35.00 385 530.09 -145.09 4.90 50.00
12 38.40 46.73 30.70 35.00 35.00 420 560.76 -140.76 4.30
13 37.90 45.59 31.90 35.00 35.00 455 592.67 -137.67 3.10
14 37.60 44.74 33.70 35.00 35.00 490 626.36 -136.36 1.30
15 37.50 44.17 36.10 35.00 35.00 525 662.55 -137.55 -1.10 40.00
16 37.60 43.85 39.10 35.00 35.00 560 701.6 -141.6 -4.10
17 37.90 43.78 42.70 35.00 35.00 595 744.26 -149.26 -7.70
18 38.40 43.96 46.90 35.00 35.00 630 791.28 -161.28 -11.90
Cost ($)
19 39.10 44.36 51.70 35.00 35.00 665 842.84 -177.84 -16.70 30.00 AVC
20 40.00 45.00 57.10 35.00 35.00 700 900 -200 -22.10 AC
MC
20.00
Ans Q4 (C)