1 - REVISION CONTROL
SUPPLIER PROPOSAL OR
3.1 - VALVE OPERATING CONDITIONS OPERATING CONDITIONS
COMMENTS
Maximum rated pressure [bars] To be filled by designer
Minimum rated pressure [bars] To be filled by designer
Maximum dynamic (surge) pressure [bars] To be filled by designer
Service Temperature Range [ºC] 0 to 60ºC
Storage Temperature Range [ºC] -20 ºC to 70 ºC
SUPPLIER PROPOSAL OR
3.2 - VALVE DESIGN, CONSTRUCTION & TESTS NEOM MIN. REQUIREMENTS
COMMENTS
Nominal size range DN [mm or inches] from DN50 to DN400
Pressure range PN [bars] PN16, PN25, PN40
Air discharge during the pipe filling Yes
Air entrance during the pipe draining Yes
Valve functions
Air pockets release during normal operation Yes
Water-hammer protection (anti-slam) Yes
Doc.: Project: Doc ID: Page 2 of 5
AIR VALVE
DATA SHEET
Water tranmission and distribution XXXXX NEOM-NWA-DAT-2021-021
Service:
lines
Valve construction type (e.g. monobloc, separated air release module, etc) Monobloc construction
Valve body type (e.g. cast, welded, etc) One solid cast piece
Valve design standard (strength, tightness, endurance, hydraulics, etc.) EN 1074-1&4 / AWWA C512
Valve hydraulic tests (body strength, operation, sealing, etc.) EN 1074-1 and 4
Seat tightness in closed position Rate A as per EN 12266-1
Assembly type (Flanged or threaded) Flanged
Flange connection standard (e.g. ASME B16.5, EN 1092, etc.) EN 1092-2
Doc.: Project: Doc ID: Page 3 of 5
AIR VALVE
DATA SHEET
Water tranmission and distribution XXXXX NEOM-NWA-DAT-2021-021
Service:
lines
SUPPLIER PROPOSAL OR
4.1 - INSPECTIONS AND TESTS NEOM MIN. REQUIREMENTS
COMMENTS
Witness testing required (Yes/No) Yes
Prior notification period to appoint inspector and arrange travel [days] 15 days
Valve body pressure test required (Yes/No) Yes, as per EN 1074-1 & 4
Valve sealing pressure test required (Yes/No) Yes, as per EN 1074-1 & 4
Valve operational test required (with air flow) (Yes/No) No
SUPPLIER PROPOSAL OR
4.2 - QUALITY CERTIFICATES AND WARRANTY REQUIREMENTS NEOM MIN. REQUIREMENTS
COMMENTS
Yes, as per Valves Spec.
Manufacturer's Inspection and Test Plan (ITP) to be provided (Yes/No)
Chapter 10.2
3.1 certificate as per EN 10204 required for finished product (Yes/No) Yes, for 100% of supplies
Doc.: Project: Doc ID: Page 4 of 5
AIR VALVE
DATA SHEET
Water tranmission and distribution XXXXX NEOM-NWA-DAT-2021-021
Service:
lines
SUPPLIER PROPOSAL OR
4.3 - TECHNICAL INFORMATION NEOM MIN. REQUIREMENTS
COMMENTS
Performance information to be provided (Yes/No) Yes, air flow diagrams
Valve 2D assembly drawing and 3D model to be provided (Yes/No) Yes
Details of local servicing facilities to be provided (Yes/No) Yes
Electronic copy to be provided (Yes/No) Yes
Manuals
Number of hard copies required 2
Doc.: Project: Doc ID: Page 5 of 5
AIR VALVE
DATA SHEET
Water tranmission and distribution XXXXX NEOM-NWA-DAT-2021-021
Service:
lines
Cell colour = Grey cells are only to be modifed by NEOM. The values depend on each specific project technical requirements
code:
= Yellow cells to be fullfilled by the supplier. To be remarked when a value does not meet NEOM's requirements
Text type code: normal = NEOM's min. requirement. Supplier alternative is accepeted with same or higher quality/performance level.