P2,002,652 is deposited in a savings account that pays 24% cpd. semi-annually.

Equal annual withdrawal are to be made from


Co 2002652 semi annua 2
i 0.24 0.2544 annually 1
ans 509474.6688
The DPWH has two proposed operating systems to charge and track toll fees. The 1st operating system has a cost of P
1st
Co 25000000
Additional 10240363 1094209 18217027.43 9733199 866780.8
k 10
Ao 7722211
L 4
Ao2 5966753
upgrade 15000000
t 13 quarterly 4
i 0.23 0.250609 1.250609 annually 1
ans 54911216.37
A man wants to have a building to be used as a university, and he has two options. The first one is to build it with a first cost of P10,331,744
Co 10331744
Cl 450000
K 30 2816375 120907.641 45068.39 18411.82
Ao 656656
RM 862278
L 10
RC 1000000
T 15 weekly 52
i 0.21 0.233156 1.233156 annually 1
ans 13332506.89
An asset was purchased for P5,374,242 and would retire at the end of 16 years with a salvage value of P555,174. With an annual operating c
Co 5374242
K 16 0.250609 138458.9444
CL 555174
Ao 500000 quarterly 4
i 0.23 0.250609 1.250609 annually 1
ans 5512701.195
The DPWH has two proposed operating systems to charge and track toll fees. The 1st operating system has a cost of P
Co 25000000
Additional 11138479 1798927 20366108.13 15315934 1546500
k 10
Ao 7867206
L 4
Ao2 6351824
upgrade 15000000
t 13 annually 1
i 0.2 0.2 1.2 annually 1
ans 64027468.39
wal are to be made from the account, beginning one year from now and continuing forever. Find the annual withdrawal.

g system has a cost of P25M and an additional cost of P10,240,363 after 10 years. The annual software maintenance contract cost is P

a first cost of P10,331,744 and a salvage of P 450,000 at the end of 30 years. Its annual operating cost is P656,656, while the repair and maintenance cost

With an annual operating cost of P500,000, determine the capitalized cost of the asset based on an interest rate of 23% cpd. qtr.

g system has a cost of P25M and an additional cost of P11,138,479 after 10 years. The annual software maintenance contract cost is P
withdrawal.

aintenance contract cost is P7,722,211 for the first 4 years and P5,966,753 thereafter. In addition, there is expected to be recurring ma

e the repair and maintenance cost is P862,278 for every 10 years and thereafter while the replacement cost is P 1M for every 15 years and thereafter. The s

aintenance contract cost is P7,867,206 for the first 4 years and P6,351,824 thereafter. In addition, there is expected to be recurring ma
expected to be recurring major upgrade cost of P15M every 13 years. The 2nd operating system costs P20M, annual software main

very 15 years and thereafter. The second option is to rent a building with the following annual rental cost shown in the table every 5 years and thereafter. I

expected to be recurring major upgrade cost of P15M every 13 years. The 2nd operating system costs P20M, annual software main
20M, annual software maintenance that costs P4M, additional repair of P10M every 5 years and a recurring major upgrade cost

ble every 5 years and thereafter. If the interest is 21% cpd. weekly, what is the Capitalized Cost of the 1st Option?

20M, annual software maintenance that costs P4M, additional repair of P10M every 5 years and a recurring major upgrade cost
curring major upgrade cost of P50M every 11 years. If interest is 23% cpd. quarterly, find the Capitalized Cost of the 1st Operating

curring major upgrade cost of P50M every 11 years. If interest is 20% cpd. annually, find the Capitalized Cost of the 1st Operating Syst
ed Cost of the 1st Operating System.

ost of the 1st Operating System.