Product Manual 7620
Product Manual 7620
Product Manual 7620
2. Sampling Guidelines:
a) Raw material : As per Cl 3.1.2 of IS 7620 (Part 1)
b) Grouping guidelines : Each variety to be tested for GoL/ CSoL
Two X-ray machines shall be tested in the factory for all the
c) Sample Size :
requirements.
List of Test
3. : Please refer ANNEX – A.
Equipment
Scheme of Inspection
4. : Please refer ANNEX – B.
and Testing
ANNEX A
The above list is indicative only and may not be treated as exhaustive.
Page 2
PM/ IS 7620 (Part 1)/ 1/ May 2019
ANNEX B
1.1 The manufacturer shall prepare a calibration plan for the test equipment.
2. TEST RECORDS – The manufacturer shall maintain test records for the tests carried out
to establish conformity.
3. LABELLING AND MARKING – As per the requirements of IS 7620 (Part 1): 1986.
4. CONTROL UNIT – All X-ray machine, tables, tubes stands of the same type, design and
rating manufactured in a month shall constitute a control unit.
5. LEVELS OF CONTROL - The tests as indicated in column 1 of Table 1 and the levels of
control in column 3 of Table 1, shall be carried out on the whole production of the factory
which is covered by this plan and appropriate records maintained in accordance with
paragraph 2 above.
Page 3
PM/ IS 7620 (Part 1)/ 1/ May 2019
TABLE 1
Note: Levels of control given in column 3 are obligatory in nature, to which the licensee shall comply with.
Page 4