Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Daily Report (The Walk)

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

CONTRACTOR DAILY REPORT Sunday, January 10, 2021

CONSTRUCTION PROGRESS
MANPOWER
Scope of Work
Existing Qty,As per
1st Fix 2nd Fix 3rd Fix Design drawings
Excavation Work Subbase/ Compaction/ Blinding Manhole Installation Warning & Backfilling
As Per Asbuilt ( Marking + Supporting) ( Pipe Installing with levelling) ( Testing ) 3rd Fix
Craft Day Shift Description Unit 4" 6" 8" 10" 12" 14" 16" 18" 20" 22" 32" Drawings‐ ( Testing ) Remarks
Total Qty.
Completed Remaining Completed Remaining Completed Remaining Completed Remaining Completed Remaining Completed Remaining Completed Remaining Completed Remaining

Pipe Sizes,As Per Design Drawings.


STORM UNDER GROUND
PROJECT MANAGER 1 Mtrs 0 140 301 35 153 34 105 313 0 0 0 1,169 1,459
TO MANHOLE NO 5

STORM ‐H/L‐WORKS
MECHANICAL ENGINEER 0 Mtrs 340 2,369 60 0 0 440 0 0 0 0 0 3,209 N/A N/A N/A N/A N/A N/A N/A N/A 260 Survey for all Existing Line
TO MANHOLE NO 5

DRAFTMEN 0 STORM HL‐CURVED AREA Mtrs 73 272 424 70 68 0 0 0 0 0 0 907 N/A N/A N/A N/A N/A N/A N/A N/A 0

SITE ENGINEERS 2 STORM UG CURVED AREA Mtrs 80 18 50 151 0 58 0 78 158 0 0 593 168

STORM PHASE 2‐
QS ENGINEER 0 Mtrs 0 0 0 0 380 473 243 2,494 0 0 0 3,590 N/A N/A N/A N/A N/A N/A N/A N/A 0
H/L‐WORKS

LOGISTIC CORDINATOR 0 STORM PHASE 3 Mtrs 0 0 0 0 471 0 0 0 161 90 722 0

QC OFFICER 0 SLOW DOWN CHAMBER Nos 1 1 0

SAFTEY & HSE OFFICER 0 SUMP PIT Nos 1 1 0

DOCUMENT CONTROLLER 1 CATCH BASIN Nos 198 198 0


Items,As Per Design Drawings.

SUPERVISORS 1 MANHOLE Nos 57 57 44

TECHNICIANS 4

PICK UP DRIVER 1

BUS DRIVER 0

STORE KEEPER 0

Total 10

EQUIPMENTS/ TOOLS ENGINEERING PROGRESS MATERIAL SUBMITALS


PROJECT NAME: MEDICAL VILLAGE
Total
Shop Drawings Calculations Description Submitted Remaining Remarks
Unit PROJECT CODE.: J0160

Total Nos Of CONTRACTOR NAME: FIRST FIX


Description Unit Drawing Title Design Qty. Remarks
Shop Drawing UPVC Pipe and Fittings
PROJECT MANAGER: SYED MUZAFFAR
Completed Remaining Completed Remaining class 4 for suspended/ Done Approved
Underground Network TECHNICAL MANGER: MICHAEL HABIB

Pipe Supporting
Pick Up 1 STORM LINE MAIN PLAN 1 41 N/A Done Approved
System
CLIENT : THE WALK
Bus 0 STORM UG TO MANHOLE NO 5 1 19 Expansion Joints Done U/R by Client

REPRESENTATIVE : MR.JAMAL
Scaffolding 0 STORM HL TO MANOLE NO 5 1 19 Warning Tapes

Ladders 0 STORM H‐LCURVED AREA 1 9 N/A Label & Identification

STORM UG CURVED AREA 1 8 Precast Manhole Done U/R by Client

STORM PHASE 2 1 12 Manhole Cover

Manhole Ring
STORM PHASE 3 1 7
Extension

Gratings for Gutter


SLOW DOWN CHAMPER 1 3 Done
Drain

SUMP PIT DETAILS 1 3 Submersible Pump Done U/R by Client

Valves for Submersiblle


STORM EXISTING 1 3 Pump (Gate valve + Done U/R by Client
Check Valve)

GENERAIL DETAILES 1 3

STORM 12 METER 1 8

PARKING DRAIN BASEMENT 1 28

You might also like