CONSTRUCTION PROGRESS
MANPOWER
Scope of Work
Existing Qty,As per
1st Fix 2nd Fix 3rd Fix Design drawings
Excavation Work Subbase/ Compaction/ Blinding Manhole Installation Warning & Backfilling
As Per Asbuilt ( Marking + Supporting) ( Pipe Installing with levelling) ( Testing ) 3rd Fix
Craft Day Shift Description Unit 4" 6" 8" 10" 12" 14" 16" 18" 20" 22" 32" Drawings‐ ( Testing ) Remarks
Total Qty.
Completed Remaining Completed Remaining Completed Remaining Completed Remaining Completed Remaining Completed Remaining Completed Remaining Completed Remaining
STORM ‐H/L‐WORKS
MECHANICAL ENGINEER 0 Mtrs 340 2,369 60 0 0 440 0 0 0 0 0 3,209 N/A N/A N/A N/A N/A N/A N/A N/A 260 Survey for all Existing Line
TO MANHOLE NO 5
DRAFTMEN 0 STORM HL‐CURVED AREA Mtrs 73 272 424 70 68 0 0 0 0 0 0 907 N/A N/A N/A N/A N/A N/A N/A N/A 0
SITE ENGINEERS 2 STORM UG CURVED AREA Mtrs 80 18 50 151 0 58 0 78 158 0 0 593 168
STORM PHASE 2‐
QS ENGINEER 0 Mtrs 0 0 0 0 380 473 243 2,494 0 0 0 3,590 N/A N/A N/A N/A N/A N/A N/A N/A 0
H/L‐WORKS
TECHNICIANS 4
PICK UP DRIVER 1
BUS DRIVER 0
STORE KEEPER 0
Total 10
Pipe Supporting
Pick Up 1 STORM LINE MAIN PLAN 1 41 N/A Done Approved
System
CLIENT : THE WALK
Bus 0 STORM UG TO MANHOLE NO 5 1 19 Expansion Joints Done U/R by Client
REPRESENTATIVE : MR.JAMAL
Scaffolding 0 STORM HL TO MANOLE NO 5 1 19 Warning Tapes
Manhole Ring
STORM PHASE 3 1 7
Extension
GENERAIL DETAILES 1 3
STORM 12 METER 1 8