PROJECT SCOPE AND SCHEDULING
Subject
2
Assessment Number
DR TREVOR NAIDOO
Tutor’s Name
16 OCTOBER 2023
Date Submitted
First Submission Resubmission
Submission ()
NO 14 FINCH STREET
SOUTHERNWOOD
Postal Address
MTHATHA
5100
zingiemathe@gmail.com
E-Mail
(Work) : 047 502 7723
(Home) : 081 035 0329
Contact Numbers
(Cell) : 072 148 3785
Declaration: I hereby declare that the assignment submitted is an original piece of work produced by myself.
Contents
INTRODUCTION ............................................................................................................. 2
1.1 Purpose of Project Management Plan .................................................................. 2
2. EXECUTIVE SUMMARY…………………………………………………………………....2
2.1.BACKGROUND……………………………………………………………………….…....2
2.2. PROJECT OBJECTIVES………….………………………..…………………………….3
2.3. ASSUMPTIONS/ CONSTRAINTS............................................................................ 4
3. SCOPE MANAGEMENT ............................................................................................. 4
3.1. WORK BREAKDOWN STRUCTURE....................................................................... 5
3.2. DEPLOYMENT PLAN .............................................................................................. 5
3.3. CHANGE CONTROL MANAGEMENT ..................................................................... 7
4. PROJECT SCHEDULE ............................................................................................... 8
5. COST/BUDGET MANAGEMENT ............................................................................... 8
6. QUALITY MANAGEMENT .......................................................................................... 9
7. HUMAN RESOURCE MANAGEMENT ..................................................................... 10
8. COMMUNICATIONS MANAGEMENT ...................................................................... 11
9. RISK MANAGEMENT ............................................................................................... 13
10. ISSUE MANAGEMENT ........................................................................................... 14
11. PROCUREMENT MMANAGEMENT……………………………………………………16
12. APPENDIX A ……………………………………………………………………………...19
13. REFERENCE LIST……………………………………………………………………..…20
Page 1 of 20
[Insert appropriate disclaimer(s)]
MOOIKLOOF MEGACITY DEVELOPMENT PROJECT
INTRODUCTION
The Mooikloof mega city development project aims to transform the existing Mooikloof
area into a thriving and sustainable mega city. The project will involve comprehensive
urban planning, infrastructure development, and community engagement to create a
modern and inclusive city that meets the needs of its residents, businesses, and
visitors.
Page 2 of 20
[Insert appropriate disclaimer(s)]
MOOIKLOOF MEGACITY DEVELOPMENT PROJECT
Location
Deliverables
1. Residential units
2. Commercial units
3. Infrastructure development
4. Educational institutions
5. Recreational facilities
- To develop an integrated master plan for the Mooikloof mega city, encompassing
residential areas, commercial facilities, recreational spaces, and essential infrastructure
- To enhance the quality of life for residents through the provision of efficient
transportation systems, reliable utilities, parks, schools, healthcare facilities, and other
amenities.
- To foster economic growth by attracting investments in various sectors such as
technology, manufacturing, tourism, and real estate.
- To create a sustainable city by implementing environmentally friendly practices in
energy consumption, waste management, water conservation, and green spaces.
- To promote social inclusivity by ensuring affordable housing options, accessible public
transportation networks, and opportunities for employment and entrepreneurship for all
segments of society.
Page 3 of 20
[Insert appropriate disclaimer(s)]
MOOIKLOOF MEGACITY DEVELOPMENT PROJECT
- There is an assumption that there will be sufficient demand for residential and
commercial properties in the Mooikloof area to support the development project.
- There is an assumption that the project will generate enough revenue through property
sales, rentals, and other sources to cover the costs of land acquisition,
infrastructure development, construction, and ongoing maintenance.
- The constraint of securing sufficient funding for the development project through
private investments, loans from financial institutions, or partnerships with other entities.
3. SCOPE MANAGEMENT
Scope management refers to the processes and techniques used to define, control, and
manage the boundaries of a project. It involves determining what work is included in the
project scope and what is not. Scope management ensures that all necessary work is
identified, planned, executed, controlled, and delivered within the approved project
scope (PMI, 2017).
Page 4 of 20
[Insert appropriate disclaimer(s)]
MOOIKLOOF MEGACITY DEVELOPMENT PROJECT
-Urban planning - conduct a thorough analysis of the existing land use patterns and
demographics to design an integrated master plan that maximizes land utilization while
preserving natural resources.
- Road network - design and implement an efficient transportation system that includes
public transportation networks (bus, metro, light rail), pedestrian-friendly walkways, and
cycling infrastructure.
Page 5 of 20
[Insert appropriate disclaimer(s)]
MOOIKLOOF MEGACITY DEVELOPMENT PROJECT
- Collaborate with experienced engineering firms for the design and construction of
infrastructure components.
Page 6 of 20
[Insert appropriate disclaimer(s)]
MOOIKLOOF MEGACITY DEVELOPMENT PROJECT
resources, and quality. This analysis aids in understanding the potential risks and
advantages of adopting the modification.
The Mooikloof mega city development project may efficiently address any
modifications or adjustments required throughout its lifecycle by following these
change control management methods. This proactive strategy helps in the
preservation of project integrity, the reduction of negative consequences, and the
successful completion of the project.
4. PROJECT SCHEDULE
According to the Project Management Institute (PMI), a project schedule is "the planned
dates for performing activities and meeting milestones." it serves as a roadmap for
project managers and team members to understand what needs to be done, when it
needs to be done, and who is responsible for each task.
1. Project initiation - will take a period of two months.
2. Design phase – will take a period of 6 months
3. Site selection – will be completed within a period of 1 month
4. Procurement phase – will be completed within a period of 3 months
5. Infrastructure development - will be completed within a period of 1 month
6. Construction phase - will be completed within a period of 24 months
7. Closure and handover phase - will be completed within a period of 1 month
The overall project will Start on the 1st of July 2023 and End on 30th of September 2026.
5. COST/BUDGET MANAGEMENT
During the cycle of the project the cost and the budget will be controlled though
various measures to ensure effective financial management. Such measures include
the following:
- Cost estimation – detailed and accurate cost estimation will be carried out during
the planning phase of the project. This will therefore include all potential costs,
including land acquisition, construction materials, labor equipment’s and permits.
- Budget allocation – a detailed budget must be allocated based on the estimated
costs for each phase of the project. The budget will allocate funds appropriately
to different activities and resources required for successful completion.
Page 8 of 20
[Insert appropriate disclaimer(s)]
MOOIKLOOF MEGACITY DEVELOPMENT PROJECT
6. QUALITY MANAGEMENT
- Recruitment and selection: the project will have a dedicated human resources
(HR) team responsible for identifying the manpower needs of different
departments within the development project. They will advertise job vacancies,
screen resumes, conduct interviews, and select candidates who possess the
necessary skills and qualifications to contribute to the successful implementation
of the project.
- Compliance with labor laws: compliance with labor laws and regulations is a top
priority in managing human resources in the Mooikloof megacity development
project. The HR team will ensure that all employment practices adhere to local
labor laws regarding working hours, wages, benefits, health and safety
standards, as well as equal opportunity policies.
8. COMMUNICATIONS MANAGEMENT
Project Communication will be managed throughout the life cycle of the Mooikloof
Megacity Development project through a structured and comprehensive approach.
This will involve establishing clear communication channels, defining roles and
Page 11 of 20
[Insert appropriate disclaimer(s)]
MOOIKLOOF MEGACITY DEVELOPMENT PROJECT
Regular meetings will also be held to discuss project status updates, address any
issues or concerns, and ensure alignment among team members. These meetings may
include weekly or bi-weekly team meetings, monthly progress review meetings with
stakeholders, or specific milestone review meetings.
Page 12 of 20
[Insert appropriate disclaimer(s)]
MOOIKLOOF MEGACITY DEVELOPMENT PROJECT
9. RISK MANAGEMENT
Project risk management - is defined as the art and science of identifying, assessing,
and responding to project risk throughout the life of a project and in the best interests of
its objectives (Wideman, 2022). The Mooikloof megacity development project is an
ambitious initiative aimed at creating a sustainable and modern urban development in
the outskirts of Pretoria, South Africa. This risk management plan outlines the strategies
and procedures that will be implemented to identify, assess, and mitigate potential risks
associated with the project.
Page 13 of 20
[Insert appropriate disclaimer(s)]
MOOIKLOOF MEGACITY DEVELOPMENT PROJECT
In conclusion, the risk management plan for Mooikloof megacity development project
aims to proactively identify, assess, and mitigate potential risks associated with various
aspects of the project. By implementing appropriate strategies and maintaining regular
monitoring mechanisms, the project team can enhance its ability to deliver a successful
and sustainable urban development in Mooikloof.
Page 14 of 20
[Insert appropriate disclaimer(s)]
MOOIKLOOF MEGACITY DEVELOPMENT PROJECT
The plan will ensure that any challenges are addressed promptly, minimizing their
impact on project delivery and success.
- Issue identification:
The first step in effective issue management is to identify potential issues early on.
This can be done through regular communication and collaboration among project
stakeholders including developers, contractors, consultants, local authorities, and
community representatives.
- Issue assessment:
Once an issue is identified, it needs to be assessed in terms of its severity, impact
on the project objectives, and potential mitigation measures. Each issue will be
evaluated based on the following criteria:
-Severity: assessing the seriousness or criticality of the issue.
- Impact: determining how significantly the issue affects project scope, schedule,
cost, quality, or stakeholder satisfaction.
- Mitigation measures: identifying strategies to address and resolve the issue
effectively.
- Issue escalation:
some issues may require escalation beyond the project team's capabilities or
authority. In such cases, a clear escalation process will be followed. The process
includes:
- Clearly defined levels of escalation: the project team will have predefined levels
of escalation based on the severity and impact of the issue.
- Escalation matrix: an escalation matrix will be created to identify the appropriate
personnel or authority responsible for addressing and resolving the issue at each
level.
- Issue resolution:
once an issue is identified and assessed, it needs to be resolved promptly to
minimize its impact on the project. The resolution process includes:
- developing action plans: a detailed action plan will be developed to address and
Page 15 of 20
[Insert appropriate disclaimer(s)]
MOOIKLOOF MEGACITY DEVELOPMENT PROJECT
- The aim is to ensure timely availability of high-quality goods, services, and works.
- To promote fairness, transparency, and accountability in procurement activities.
- To mitigate risks associated with procurement by adopting appropriate contracting
methods.
Procurement Process
The following steps will be followed in the procurement process:
- Needs Identification: The project team will identify the specific needs and requirements
for goods, services, or works.
- Market Research: A thorough market research will be conducted to identify potential
suppliers or contractors capable of meeting the project's requirements.
Page 16 of 20
[Insert appropriate disclaimer(s)]
MOOIKLOOF MEGACITY DEVELOPMENT PROJECT
Page 17 of 20
[Insert appropriate disclaimer(s)]
MOOIKLOOF MEGACITY DEVELOPMENT PROJECT
Page 18 of 20
[Insert appropriate disclaimer(s)]
MOOIKLOOF MEGACITY DEVELOPMENT PROJECT
Reference List
Clements, J.B. and Gido, R., 2022. Successful project management. Cengage learning.
Wideman, R.M., 2022. Project and program risk management a guide to managing
project risks and opportunities. Project Management Institute, Inc.
Page 19 of 20
[Insert appropriate disclaimer(s)]