CED Canvass for Material Cost

Item / Description Unit Price 1 Price 2 Price 3 Price 4 Price 5 Pick Price
Portland Cement bag 200.00 200.00 - 250.00 250.00
Sand
S1 Sand cu.m. 1,000.00 850.00 950.00 - - 1,000.00
White Sand cu.m. 1,000.00 800.00 950.00 1,250.00 - 1,250.00
Screened Sand cu.m. 1,750.00 1,000.00 - 35 / bag - 1,750.00
Gravel
G1 Gravel cu.m. 1,350.00 1,100.00 1,200.00 - - 1,350.00
20mm Gravel cu.m. 1,750.00 1,300.00 1,300.00 - - 1,750.00
Ordinary Gravel cu.m. - 1,300.00 - 2,187.50 - 2,187.50
Deformed Bars G40
10 mm x 6 m pc 130.00 134.16 130.00 128.00 - 134.16
12 mm x 6 m pc 180.00 193.41 187.00 185.00 - 193.41
16 mm x 6 m pc 328.00 340.56 370.00 329.00 - 370.00
20 mm x 6 m pc - 532.21 516.00 515.00 - 532.21
25 mm x 6 m pc - 831.55 806.00 802.00 - 831.55
28 mm x 6 m pc - 1,043.28 1,011.00 - - 1,043.28
32 mm x 6 m pc - 1,371.98 1,322.00 - - 1,371.98
Deformed Bars G40
10 mm x 7.5 m pc - 167.71 182.00 160.00 - 182.00
12 mm x 7.5 m pc - 241.76 234.00 232.00 - 241.76
16 mm x 7.5 m pc - 425.70 412.00 411.00 - 425.70
20 mm x 7.5 m pc - 665.26 695.00 642.00 - 695.00
25 mm x 7.5 m pc - 1,039.45 1,007.00 1,003.00 - 1,039.45
28 mm x 7.5 m pc - 1,304.09 1,264.00 - - 1,304.09
32 mm x 7.5 m pc - 1,718.72 1,666.00 - - 1,718.72
Deformed Bars G60
10 mm x 6 m pc - - 136.00 132.00 - 136.00
12 mm x 6 m pc - - 197.00 190.00 - 197.00
16 mm x 6 m pc - - 347.00 336.00 - 347.00
20 mm x 6 m pc - - 542.00 525.00 - 542.00
25 mm x 6 m pc - - 847.00 821.00 - 847.00
28 mm x 6 m pc - - 1,063.00 1,030.00 - 1,063.00
32 mm x 6 m pc - - 1,400.00 1,345.00 - 1,400.00
Deformed Bars G60
10 mm x 7.5 m pc - - 170.00 164.00 - 170.00
12 mm x 7.5 m pc - - 246.00 237.00 - 246.00
16 mm x 7.5 m pc - - 434.00 420.00 - 434.00
20 mm x 7.5 m pc - - 678.00 657.00 - 678.00
25 mm x 7.5 m pc - - 1,059.00 1,026.00 - 1,059.00
28 mm x 7.5 m pc - - 1,329.00 1,287.00 - 1,329.00
32 mm x 7.5 m pc - - 1,751.00 1,681.00 - 1,751.00
Boards / Plywood
4.5mm Ordinary Plywood pc 390.00 - - 300.00 - 390.00
6mm Ordinary Plywood pc 418.00 450.00 - 480.00 - 480.00
12mm Ordinary Plywood pc 790.00 800.00 750.00 720.00 - 800.00
20mm Ordinary Plywood pc 1,250.00 1,160.00 1,150.00 - - 1,250.00
4.5mm Marine Plywood pc - - - 500.00 - 500.00
6mm Marine Plywood pc 458.00 580.00 440.00 310.00 - 580.00
12mm Marine Plywood pc 880.00 960.00 850.00 540.00 - 960.00
20mm Marine Plywood pc 1,350.00 1,400.00 1,250.00 850.00 - 1,400.00
4.5mm Smart Plywood pc - - - - - -
6mm Smart Board pc - 420.00 340.00 - - 420.00
12mm Smart Board pc - 550.00 380.00 - - 550.00
12mm Phenolic Board pc 860.00 960.00 950.00 650.00 - 960.00
20mm Phenolic Board pc 1,080.00 1,200.00 1,250.00 810.00 - 1,250.00
4.5mm Fibercement Board pc - - 340.00 - - 340.00
6mm Fibercement Board pc 485.00 380.00 390.00 - - 485.00
12mm Fibercement Board pc 1,750.00 380.00 1,150.00 - - 1,750.00
12mm Gypsum Board pc - 660.00 660.00
12mm Moisture Resistant Gypsum Board pc - 880.00 880.00
Coco Lumber
2" x 2" x 8' Coco Lumber pc 72.00 80.00 88.00 - - 88.00
2" x 2" x 10' Coco Lumber pc 90.00 100.00 110.00 - - 110.00
2" x 2" x 12' Coco Lumber pc 108.00 120.00 132.00 - - 132.00
2" x 3" x 8' Coco Lumber pc 108.00 120.00 132.00 - - 132.00
2" x 3" x 10' Coco Lumber pc 135.00 150.00 165.00 - - 165.00
2" x 3" x 12' Coco Lumber pc 162.00 180.00 198.00 - - 198.00
2" x 4" x 8' Coco Lumber pc 144.00 160.00 176.00 - - 176.00
2" x 4" x 10' Coco Lumber pc 180.00 200.00 220.00 - - 220.00
2" x 4" x 12' Coco Lumber pc 216.00 240.00 264.00 - - 264.00
Coco Lumber bd ft. - - - 33.00 - 33.00
Good Lumber
2" x 2" x 8' Kiln Dried S4S pc 290.00 260.00 240.00 253.33 - 290.00
2" x 2" x 10' Kiln Dried S4S pc 355.00 320.00 300.00 316.67 - 355.00
2" x 2" x 12' Kiln Dried S4S pc 410.00 380.00 360.00 380.00 - 410.00
2" x 3" x 8' Kiln Dried S4S pc 475.00 390.00 360.00 380.00 - 475.00
2" x 3" x 10' Kiln Dried S4S pc 510.00 480.00 450.00 475.00 - 510.00
2" x 3" x 12' Kiln Dried S4S pc 595.00 570.00 540.00 570.00 - 595.00
2" x 4" x 8' Kiln Dried S4S pc 560.00 540.00 535.00 506.69 - 560.00
2" x 4" x 10' Kiln Dried S4S pc 695.00 666.00 670.00 633.33 - 695.00
2" x 4" x 12' Kiln Dried S4S pc 795.00 797.00 800.00 760.00 - 800.00
Good Lumber bd ft. - - - 65.00 - 65.00
Common Wire Nail kg 66.00 80.00 80.00 - - 80.00
Finishing Nail kg - - - 100.00 - 100.00
G.I. Tie Wire #16 kg 88.00 90.00 57.14 45.83 - 90.00
Angle Bar
2" x 2" x 6mm pc 944.00 900.00 915.00 535.00 - 944.00
2" x 3" x 6mm pc 1,563.00 1,660.00 1,515.00 1,497.00 - 1,660.00
C-Purlins
2" x 4" Gauge 20 pc 380.00 850.00 390.00 - 850.00
2" x 6" Gauge 20 pc 470.00 1,200.00 500.00 - 1,200.00
Flat Bar
4.5mm x 1" pc 300.00 200.00 210.00 - 300.00
6mm x 1" pc 360.00 350.00 305.00 - 360.00
Metal Channel
2" x 3" x 6mm pc - - 1,818.00 - 1,818.00
2" x 4" x 6mm pc - - 2,100.00 - 2,100.00
2" x 6" x 6mm pc - - 3,510.00 - 3,510.00
2" x 12" x 6mm pc - - 8,200.00 - 8,200.00
Tubular
2" x 3" x 6mm pc 3,100.00 - 3,830.00 4,400.00 - 4,400.00
2" x 4" x 6mm pc 3,650.00 - 4,595.00 5,244.00 - 5,244.00
2" x 4" x 1/8" pc 1,750.00 - 2,300.00 2,642.00 2,642.00
2" x 3" x 1/8" pc 1,510.00 - 1,915.00 2,370.00 2,370.00
1" x 1" x 1/8" pc 555.00 - 780.00 802.00 802.00
G.I. Pipe Schedule 20
1" Ø pc 600.00 750.00 405.00 350.00 - 750.00
2" Ø pc 1,310.00 1,450.00 880.00 960.00 - 1,450.00
3" Ø pc 2,440.00 2,300.00 1,635.00 1,783.00 2,440.00
G.I. Pipe Schedule 40
2" Ø pc 1,835.00 1,900.00 1,960.00 2,370.00 775.00 2,370.00
3" Ø pc 3,110.00 2,700.00 4,060.00 4,880.00 1,300.00 4,880.00
4" Ø pc 4,750.00 4,000.00 6,035.00 7,560.00 1,650.00 7,560.00
6" Ø pc 11,600.00 - 10,790.00 14,210.00 - 14,210.00
I-Beam
W8x10 x 6m pc 3,365.00 - 3,616.00 3,275.00 - 3,616.00
W10x30 x 6m pc 9,818.00 - 10,900.00 9,820.00 - 10,900.00
W12x45 x 6m pc 14,727.00 - 16,363.00 14,725.00 - 16,363.00
W12x90 x 6m pc 29,127.00 - 32,700.00 30,105.00 - 32,700.00
Structural Steel kg 55.00 - - - - 55.00
Deformed Bar, Grade 40 kg 43.00 - - - - 44.00
Deformed Bar, Grade 60 kg 45.00 - - - - 46.00
Ready Mix Concrete
Ready Mix Concrete, 3000 psi, 28 days cu.m. - - - - 4,500.00 4,500.00
Ready Mix Concrete, 3500 psi, 28 days cu.m. - - - - 4,750.00 4,750.00
Ready Mix Concrete, 4000 psi, 28 days cu.m. - - - - 5,000.00 5,000.00
Ready Mix Concrete, 4500 psi, 28 days cu.m. - - - - 5,250.00 5,250.00
Ready Mix Concrete, 5000 psi, 28 days cu.m. - - - - 5,500.00 5,500.00
Ready Mix Concrete, 3000 psi, 14 days cu.m. - - - - 4,650.00 4,650.00
Ready Mix Concrete, 3500 psi, 14 days cu.m. - - - - 4,900.00 4,900.00
Ready Mix Concrete, 4000 psi, 14 days cu.m. - - - - 5,150.00 5,150.00
Ready Mix Concrete, 4500 psi, 14 days cu.m. - - - - - -
Ready Mix Concrete, 5000 psi, 14 days cu.m. - - - - 5,650.00 5,650.00
Ready Mix Concrete, 3000 psi, 7 days cu.m. - - - - 4,800.00 4,800.00
Ready Mix Concrete, 3500 psi, 7 days cu.m. - - - - 5,150.00 5,150.00
Ready Mix Concrete, 4000 psi, 7 days cu.m. - - - - 5,300.00 5,300.00
Ready Mix Concrete, 4500 psi, 7 days cu.m. - - - - - -
Ready Mix Concrete, 5000 psi, 7 days cu.m. - - - - 5,800.00 5,800.00
Wall Finishes
Aluminum Composite Panel (1.2m x 2.4m x 4mm) pcs - - - - 3,200.00 3,200.00
Backer Rod pc. - - - - 15.00 15.00
Silicon Sealant tube - - - - 220.00 220.00
Aluminum Angle 1/8" x 1.5" x 16' pc. - - - - 650.00 650.00
Tekscrew pc. - - - - 2.20 2.20
Grinding Disc pc. - - - - 80.00 80.00
Cut-off Blade pc. - - - - 120.00 120.00
Hacksaw Blade pc. - - - - 80.00 80.00
3/8" Expansion Bolt pc. - - - - 20.00 20.00
Welding Rod kgs - - - 100.00 100.00
Welding Rod (box) kgs - - - 2,500.00 2,500.00
200mm x 300mm ceramic wall tiles pcs - - - 30.00 30.00
300mm x 300mm ceramic wall tiles pcs - - - 50.00 50.00
400mm x 400mm homogeneous wall tiles pcs - - - 125.00 125.00
600mm x 600mm homogeneous wall tiles pcs - - - 395.00 395.00
300mm x 600mm homogeneous wall tiles pcs - - - 195.00 195.00
Stoneworks sq.m. - - - 2,800.00 2,800.00
PVC Tile Trim (2.4m) pc - - - 192.00 192.00
PVC Plastering Guide (2.4m) pc - - - 360.00 360.00

Stainless Steel Partition Hinge pc. - - - - 459.00 459.00


Stainless Steel Self-closing Hinge pc. - - - - 779.00 779.00
Stainless Steel Adhustable Foot pc. - - - - 389.00 389.00
Toilet Partition Indicator Lock set - - - - 469.00 469.00
Nylon Hinge pc. - - - - 219.00 219.00
Nylon Plastic Foot pc. - - - - 119.00 119.00
Stainless Steel Door Bumper with Hook pc. - - - - 179.00 179.00
Stainless Steel Bracket pc. - - - - 69.00 69.00
Stainless Steel Bracket (30 x 38 mm) pc. - - - - 19.00 19.00
Stainless Steel Bracket (40 x 40 mm) pc. - - - - 39.00 39.00
Partition Top Rail (3m) pc. - - - - 429.00 429.00
Partition Side Edge (3m) pc. - - - - 169.00 169.00
Aluminum Channel pc. - - - - 329.00 329.00
12 mm thk Compact Laminate (6' x 6') pc. - - - - - -
12 mm thk Compact Laminate (6' x 8') pc. - - - - - -
12 mm thk Compact Laminate (6' x 12') pc. - - - - - -
12 mm thk Compact Laminate (4' x 8') pc. - - - - 1,300.00 1,300.00
12 mm thk Compact Laminate Panel (1.2 m x 1.8 m) sq.m. - - - - 1,782.72 1,782.72
Concrete Hollow Blocks
100mm CHB (non-load bearing) pcs 10.00 - - - - 10.00
100mm CHB (load bearing) pcs 12.00 - - - - 12.00
150mm CHB (non-load bearing) pcs 13.00 - - - - 13.00
150mm CHB (load bearing) pcs 15.00 - - - - 15.00
200mm CHB (non-load bearing) pcs 18.00 - - - - 18.00
200mm CHB (load bearing) pcs 25.00 - - - - 25.00
Floor Finishes
Hardwood Flooring (122mm x 910mm x 18mm) pcs - - - 525.00 525.00
Solid wood planks and accessories pcs - - - - -
600mm x 600mm Granite floor tiles pcs - - - 990.00 990.00
Granite floor slab sq.m. - - - 6,050.00 6,050.00
Granite floor slab (flamed) sq.m. - - - 6,350.00 6,350.00
200mm x 200mm non-skid floor ceramic tiles pcs - - - 15.00 15.00
300mm x 300mm non-skid floor ceramic tiles pcs - - - 40.00 40.00
400mm x 400mm non-skid floor ceramic tiles pcs - - - 80.00 80.00
300mm x 600mm non-skid floor ceramic tiles pcs - - - 110.00 110.00
600mm x 600mm non-skid floor ceramic tiles pcs - - - 230.00 230.00
300mm x 300mm homogeneous floor tiles pcs - - - 60.00 60.00
400mm x 400mm homogeneous floor tiles pcs - - - 115.00 115.00
300mm x 600mm homogeneous floor tiles pcs - - - 180.00 180.00
600mm x 600mm homogeneous floor tiles pcs - - - 380.00 380.00
300mm x 300mm tactile tiles pcs - - - 65.00 65.00
600mm x 600mm tactile tiles pcs - - - 270.00 270.00
300mm x 300mm x 2mm vinyl tiles pcs - - - 28.00 28.00
300mm x 300mm x 3mm vinyl tiles pcs - - - 40.00 40.00
400mm x 400mm x 2mm vinyl tiles pcs - - - 51.00 51.00
400mm x 400mm x 3mm vinyl tiles pcs - - - 66.00 66.00
450mm x 450mm x 2mm carpet vinyl tiles pcs - - - 120.00 120.00
450mm x 450mm x 3mm carpet vinyl tiles pcs - - - 185.00 185.00
150mm x 900mm x 2mm vinyl planks pcs - - - 83.00 83.00
150mm x 900mm x 3mm vinyl planks pcs - - - 125.00 125.00
Vinyl roll (1.5m x 15m x 2mm) roll - - - 5,400.00 5,400.00
Capping Strip lm - - - 180.00 180.00
Antibac Vinyl roll (1.5m x 15m x 2mm) roll - - - 42,186.00 42,186.00
Rubberized paint finish pcs - - - - -
Washout pebbles sack - - - 350.00 350.00
Concrete stamping
Color Harderner (25kgs) bags - - - 2,000.00 2,000.00
Release Agent bags - - - 900.00 900.00
Concrete Sealer liters - - - 800.00 800.00
Concrete pavers (keyhole) pcs - - - 20.00 20.00
Concrete pavers (turf grass) pcs - - - 50.00 50.00
Acrylic Floor Adhesive gals - - - 400.00 400.00
Tile Adhesive (25kgs / bag) bags - - - 500.00 500.00
Tile Grout (2kgs / bag) kgs - - - 100.00 100.00
Rubber nosing (75mm width) lm - - - 450.00 450.00
Aluminum nosing (75mm width) lm - - - 700.00 700.00
Brass nosing (75mm width) lm - - - 850.00 850.00
Metal screw with tox pc - - - 5.00 5.00
76mm x 3.0m x 0.6mm Studs pc. - - - 363.00 363.00
76mm x 3.0m x 0.6mm Tracks pc. - - - 330.00 330.00
1/8Ø" x 1/4" Blind Rivets pc - - - 0.75 0.75
#7x1" Screw pc - - - 1.00 1.00
Drive Pin 1" & Charges (Red) pc - - - 10.00 10.00
Hardistop (gypsum putty 28kg/pail) pail - - - 748.00 748.00
Gypsum Tape (2"x230'/roll) roll - - - 198.00 198.00
Mesh Tape (2"x230'/roll) roll - - - 220.00 220.00
Ceiling Finishes
1mm thk. 13mm x 38mm x 5M Carrying Channel pc. - - - 390.00 390.00
0.40mm thk. 19mm x 50mm x 5M Furring Channel pc. - - - 262.00 262.00
0.60mm thk. 25mm x 25mm x 2.4M Wall Angle pc. - - - 117.00 117.00
6mmØ Round Bar Hanger Rod pc. - - - 13.00 13.00
Suspension Clip w/ Rod Joiner pc. - - - 26.00 26.00
Steel Angle pc. - - - 16.00 16.00
Furring Clip w/ Clip (Double) pc. - - - 9.00 9.00
Ficem Screws 1" pc. - - - 1.00 1.00
Painting
Skimcoat Finishing Compound (25Kgs / Pail) pail - - - 500.00 500.00
Concrete Neutralizer gals - - - 286.00 286.00
Sanding Paper lm - - - 100.00 100.00
Elastosealer l.m. - - - 385.00 385.00
Elastogel Putty gals. - - - 570.00 570.00
Elastogel gals. - - - 726.00 726.00
Steel Brush pcs. - - - 30.00 30.00
Roller Brush pcs. - - - 100.00 100.00
Paint Brush pcs. - - - 50.00 50.00
Acrylic Concrete Primer & Sealer gals. - - - 400.00 400.00
Latex Putty ( Spot Putty) gals. - - - 290.00 290.00
Latex Flat gals. - - - 400.00 400.00
Acri-color pint - - - 90.00 90.00
Roller Brush pcs. - - - 100.00 100.00
Flat Wall Enamel gals. - - - 455.00 455.00
Glasalux Glasing Putty gals. - - - 450.00 450.00
Paint Thinner gals. - - - 250.00 250.00
Tinting-color pint - - - 95.00 95.00
Epoxy primer gals - - - 800.00 800.00
Lacquer Thinner gals - - - 400.00 400.00
Lacquer Flo gals - - - 510.00 510.00
Lacquer Primer Surfacer gals - - - 570.00 570.00
Interior Primer Sealer gals. - - - 430.00 430.00
Prolux Glasing Putty gals. - - - 460.00 460.00
Quick-Dry Enamel gals. - - - 510.00 510.00
Eposeal Clear gals. - - - 1,000.00 1,000.00
Rubberized Paint gals. - - - 1,200.00 1,200.00
Paint Reducer gals. - - - 390.00 390.00
Epopatch (Spot Putty) gals. - - - 2,050.00 2,050.00
gals. - - - -
gals. - - - -
gals. - - - -
gals. - - - -
gals. - - - -
gals. - - - -
gals. - - - -
Republika ng Pilipinas
Lungsod ng Quezon
CITY ENGINEERING DEPARTMENT
5th, 6th, 7th Floor, QC Civic Center Building “B”
Telephone Nos. 8988-4242 Local 8538

MATERIALS PRICE LIST


UNIT PRICE
DESCRIPTION UNIT CANVASS JUL PICK PRICE
DPWH 3Q '19 CED PPD DPWH 4Q '19
'20
MATERIALS
Common Borrow cu.m. 450.00 - - - 450.00
Aggregate Sub-base Course cu.m. 740.00 - - - 740.00
Aggregate Base Course cu.m. 1,050.00 - - - 1,050.00
Emulsified Asphalt (SS-1) m.t. 55,385.00 - - - 55,385.00
Bituminous Concrete Surface m.t. 5,597.50 - - - 5,597.50
Ready Mix Concrete (550 F @ 14 days) cu.m. 4,975.00 - - - 4,975.00
Ready Mix Concrete (550 F @ 7 days) cu.m. 5,025.00 - - - 5,025.00
Reinforcing Steel Bar, Grade 60 kg 65.00 - - 46.00 46.00
Reinforcing Steel Bar, Grade 40 kg - - - 44.00 44.00
Curing Compound lit. 70.00 - - - 70.00
Asphalt Sealant lit. 50.00 - - - 50.00
Steel Forms Rental (9") l.m. 180.00 - - - 180.00
Steel Forms Rental (8") l.m. 160.00 - - - 160.00
Concrete Saw (Diamond Blade) pc. 8,000.00 - - - 8,000.00
Portland Cement bag 230.00 - - 250.00 250.00
Sand cu.m. 800.00 - - 1,000.00 1,000.00
610 mm dia. R.C. Pipes l.m. 1,145.00 - - - 1,145.00
760 mm dia. R.C. Pipes l.m. 1,845.00 - - - 1,845.00
910 mm dia. R.C. Pipes l.m. 3,190.00 - - - 3,190.00
1070 mm dia. R.C. Pipes l.m. 3,645.00 - - - 3,645.00
1200 mm dia. R.C. Pipes l.m. 4,120.00 - - - 4,120.00
Boulders (Riprapping) cu.m. 950.00 - - - 950.00
100 mm dia PVC Pipe (Neltex) l.m. 583.00 - - - 583.00
Filter Cloth sq.m. 275.00 - - - 275.00
G.I. Tie Wire No. 16 kg 80.00 - - 90.00 90.00
Ready Mix Concrete (3,500 psi) cu.m. 4,700.00 - - - 4,700.00
Gravel cu.m. 1,600.00 - - 1,750.00 1,750.00
Coco Lumber bd. ft. 28.00 - - 33.00 33.00
Assorted CWN kg 80.00 - - 80.00 80.00
Finishing Nails kg - - - 100.00 100.00
100mm CHB (non-load bearing) pc. - - - 10.00 10.00
100mm CHB (load bearing) pc. - - - 12.00 12.00
150mm CHB (non-load bearing) pc. - - - 13.00 13.00
150mm CHB (load bearing) pc. 12.00 - - 15.00 15.00
200mm CHB (non-load bearing) pc. - - 18.00 18.00
200mm CHB (load bearing) pc. - - 25.00 25.00
Structural Steel kg 42.00 - - 55.00 55.00
Oxygen / Acetylene set 2,500.00 - - - 2,500.00
Welding Rod kg 95.00 - - 100.00 100.00
Welding Rod (box) kg - - - 2,500.00 2,500.00
200mm x 300mm ceramic wall tiles kg - - - 30.00 30.00
300mm x 300mm ceramic wall tiles kg - - - 50.00 50.00
UNIT PRICE
DESCRIPTION UNIT CANVASS JUL PICK PRICE
DPWH 3Q '19 CED PPD DPWH 4Q '19
'20
MATERIALS
400mm x 400mm homogeneous wall tiles kg - - - 125.00 125.00
600mm x 600mm homogeneous wall tiles kg - - - 395.00 395.00
300mm x 600mm homogeneous wall tiles kg - - - 195.00 195.00
Stoneworks kg - - - 2,800.00 2,800.00
PVC Tile Trim (2.4m) pc - - - 192.00 192.00
PVC Plastering Guide (2.4m) pc - - - 360.00 360.00
Cast Iron Grating pc. 6,000.00 - - - 6,000.00
Plywood 12mm x 4' x 8' (Ordinary) pc. 680.00 - - 800.00 800.00
4" Dia PVC pc. 640.00 - - - 640.00
Caution Tape roll 400.00 - - - 400.00
Reflectorized Sticker roll 50.00 - - - 50.00
PVC Cement, 200 ml. 125.00 - - - 125.00
PVC Elbow pc. 25.00 - - - 25.00
20 m P.E. Tubing m. 20.00 - - - 20.00
PVC Adaptor pc. 210.00 - - - 210.00
Good Lumber bd. ft. 45.00 - - 65.00 65.00
Tarpaulin pc. - 1,200.00 - - 1,200.00
Safety Vest pc. - 150.00 - - 150.00
Safety Helmet / Hard Hat pc. - 400.00 - - 400.00
Safety Shoes pair - 1,000.00 - - 1,000.00
Goggles set - 250.00 - - 250.00
Dust Mask set - 150.00 - - 150.00
First Aid Kit set - 350.00 - - 350.00
Fire Extinguisher each - 1,800.00 - - 1,800.00
Gloves pair - 200.00 - - 200.00
Harness each - 1,500.00 - - 1,500.00
Plastic Safety Barrier each - 5,000.00 - - 5,000.00
Bicycle Lane Sign each - 10,000.00 - - 10,000.00
Thermoplastic Paint (W) bag - - 1,710.00 - 1,710.00
Thermoplastic Paint (Y) bag - - 1,756.00 - 1,756.00
Glass Bead bag - - 1,345.00 - 1,345.00
Primer (W) liter - - 215.00 - 215.00
Primer (Y) liter - - 308.00 - 308.00
LPG Cylinders kg - - 71.00 - 71.00
Reflectorized Traffic Paint (White) liter - - 223.30 - 223.30
Reflectorized Traffic Paint (Green) liter - - 236.00 - 236.00
Kalsomine kg - 11.00 - - 11.00
Ready Mix Concrete, 3000 psi, 28 days cu.m. - - - 4,500.00 4,500.00
Ready Mix Concrete, 3500 psi, 28 days cu.m. - - - 4,750.00 4,750.00
Ready Mix Concrete, 4000 psi, 28 days cu.m. - - - 5,000.00 5,000.00
Ready Mix Concrete, 4500 psi, 28 days cu.m. - - - 5,250.00 5,250.00
Ready Mix Concrete, 5000 psi, 28 days cu.m. - - - 5,500.00 5,500.00
Ready Mix Concrete, 3000 psi, 14 days cu.m. - - - 4,650.00 4,650.00
Ready Mix Concrete, 3500 psi, 14 days cu.m. - - - 4,900.00 4,900.00
Ready Mix Concrete, 4000 psi, 14 days cu.m. - - - 5,150.00 5,150.00
Ready Mix Concrete, 4500 psi, 14 days cu.m. - - - - -
Ready Mix Concrete, 5000 psi, 14 days cu.m. - - - 5,650.00 5,650.00
Ready Mix Concrete, 3000 psi, 7 days cu.m. - - - 4,800.00 4,800.00
Ready Mix Concrete, 3500 psi, 7 days cu.m. - - - 5,150.00 5,150.00
Ready Mix Concrete, 4000 psi, 7 days cu.m. - - - 5,300.00 5,300.00
Ready Mix Concrete, 4500 psi, 7 days cu.m. - - - - -
UNIT PRICE
DESCRIPTION UNIT CANVASS JUL PICK PRICE
DPWH 3Q '19 CED PPD DPWH 4Q '19
'20
MATERIALS
Ready Mix Concrete, 5000 psi, 7 days cu.m. - - - 5,800.00 5,800.00
S1 Sand (Site Mix) cu.m. - - - 1,000.00 1,000.00
Screened Sand (Plastering) cu.m. - - - 1,750.00 1,750.00
Aluminum Composite Panel (1.2m x 2.4m x
sq.m. - - - 3,200.00 3,200.00
4mm)
Backer Rod pc. - - - 15.00 15.00
Silicon Sealant tube - - - 220.00 220.00
Aluminum Angle 1/8" x 1.5" x 16' pc. - - - 650.00 650.00
Tekscrew pc. - - - 2.20 2.20
Grinding Disc pc. - - - 80.00 80.00
Cut-off Blade pc. - - - 120.00 120.00
Hacksaw Blade pc. - - - 80.00 80.00
3/8" Expansion Bolt pc. - - - 20.00 20.00
Stainless Steel Partition Hinge pc. - - - 459.00 459.00
Stainless Steel Self-closing Hinge pc. - - - 779.00 779.00
Stainless Steel Adhustable Foot pc. - - - 389.00 389.00
Toilet Partition Indicator Lock set - - - 469.00 469.00
Nylon Hinge pc. - - - 219.00 219.00
Nylon Plastic Foot pc. - - - 119.00 119.00
Stainless Steel Door Bumper with Hook pc. - - - 179.00 179.00
Stainless Steel Bracket pc. - - - 69.00 69.00
Stainless Steel Bracket (30 x 38 mm) pc. - - - 19.00 19.00
Stainless Steel Bracket (40 x 40 mm) pc. - - - 39.00 39.00
Partition Top Rail (3m) pc. - - - 429.00 429.00
Partition Side Edge (3m) pc. - - - 169.00 169.00
Aluminum Channel pc. - - - 329.00 329.00
12 mm thk Compact Laminate (6' x 6') pc. - - - - -
12 mm thk Compact Laminate (6' x 8') pc. - - - - -
12 mm thk Compact Laminate (6' x 12') pc. - - - - -
12 mm thk Compact Laminate (4' x 8') pc. - - - 1,300.00 1,300.00

12 mm thk Compact Laminate Panel (1.2 m x


sq.m. - - - 1,782.72 1,782.72
1.8 m)
Hardwood Flooring (122mm x 910mm x
sq.m. - - - 525.00 525.00
18mm)
Solid wood planks and accessories sq.m. - - - - -
Granite floor finish sq.m. - - - 990.00 990.00
Granite floor finish (flamed) sq.m. - - - 6,050.00 6,050.00
300mm x 300mm non-skid floor ceramic tiles sq.m. - - - 40.00 40.00

400mm x 400mm non-skid floor ceramic tiles sq.m. - - - 80.00 80.00

300mm x 600mm non-skid floor ceramic tiles sq.m. - - - 110.00 110.00

600mm x 600mm non-skid floor ceramic tiles sq.m. - - - 230.00 230.00


300mm x 300mm homogeneous floor tiles sq.m. - - - 60.00 60.00
400mm x 400mm homogeneous floor tiles sq.m. - - - 115.00 115.00
300mm x 600mm homogeneous floor tiles sq.m. - - - 180.00 180.00
UNIT PRICE
DESCRIPTION UNIT CANVASS JUL PICK PRICE
DPWH 3Q '19 CED PPD DPWH 4Q '19
'20
MATERIALS
600mm x 600mm homogeneous floor tiles sq.m. - - - 380.00 380.00
300mm x 300mm tactile tiles sq.m. - - - 65.00 65.00
600mm x 600mm tactile tiles sq.m. - - - 270.00 270.00
300mm x 300mm vinyl tiles sq.m. - - - 28.00 28.00
400mm x 400mm vinyl tiles sq.m. - - - 51.00 51.00
450mm x 450mm carpet vinyl tiles sq.m. - - - 120.00 120.00
150mm x 900mm vinyl planks sq.m. - - - 83.00 83.00
Vinyl roll finish sq.m. - - - 5,400.00 5,400.00
Antibac vinyl roll 2mm thk and capping strip sq.m. - - - 42,186.00 42,186.00
Rubberized paint finish sq.m. - - - - -
Pebble Washout sq.m. - - - 350.00 350.00
Concrete stamping sq.m. - - - - -
Concrete pavers (plain) sq.m. - - - 20.00 20.00
Concrete pavers (turf grass) sq.m. - - - 50.00 50.00
Acrylic Floor Adhesive sq.m. - - - 400.00 400.00
Portland Cement bag - - - 250.00 250.00
Sand - - - - - -
S1 Sand cu.m. - - - 1,000.00 1,000.00
White Sand cu.m. - - - 1,250.00 1,250.00
Screened Sand cu.m. - - - 1,750.00 1,750.00
Gravel - - - - - -
G1 Gravel cu.m. - - - 1,350.00 1,350.00
20mm Gravel cu.m. - - - 1,750.00 1,750.00
Ordinary Gravel cu.m. - - - 2,187.50 2,187.50
Deformed Bars G40 - - - - - -
10 mm x 6 m pc - - - 134.16 134.16
12 mm x 6 m pc - - - 193.41 193.41
16 mm x 6 m pc - - - 370.00 370.00
20 mm x 6 m pc - - - 532.21 532.21
25 mm x 6 m pc - - - 831.55 831.55
28 mm x 6 m pc - - - 1,043.28 1,043.28
32 mm x 6 m pc - - - 1,371.98 1,371.98
Deformed Bars G40 - - - - - -
10 mm x 7.5 m pc - - - 182.00 182.00
12 mm x 7.5 m pc - - - 241.76 241.76
16 mm x 7.5 m pc - - - 425.70 425.70
20 mm x 7.5 m pc - - - 695.00 695.00
25 mm x 7.5 m pc - - - 1,039.45 1,039.45
28 mm x 7.5 m pc - - - 1,304.09 1,304.09
32 mm x 7.5 m pc - - - 1,718.72 1,718.72
Deformed Bars G60 - - - - - -
10 mm x 6 m pc - - - 136.00 136.00
12 mm x 6 m pc - - - 197.00 197.00
16 mm x 6 m pc - - - 347.00 347.00
20 mm x 6 m pc - - - 542.00 542.00
25 mm x 6 m pc - - - 847.00 847.00
28 mm x 6 m pc - - - 1,063.00 1,063.00
32 mm x 6 m pc - - - 1,400.00 1,400.00
Deformed Bars G60 - - - - - -
UNIT PRICE
DESCRIPTION UNIT CANVASS JUL PICK PRICE
DPWH 3Q '19 CED PPD DPWH 4Q '19
'20
MATERIALS
10 mm x 7.5 m pc - - - 170.00 170.00
12 mm x 7.5 m pc - - - 246.00 246.00
16 mm x 7.5 m pc - - - 434.00 434.00
20 mm x 7.5 m pc - - - 678.00 678.00
25 mm x 7.5 m pc - - - 1,059.00 1,059.00
28 mm x 7.5 m pc - - - 1,329.00 1,329.00
32 mm x 7.5 m pc - - - 1,751.00 1,751.00
Boards / Plywood - - - - - -
4.5mm Ordinary Plywood pc - - - 390.00 390.00
6mm Ordinary Plywood pc - - - 480.00 480.00
12mm Ordinary Plywood pc - - - 800.00 800.00
20mm Ordinary Plywood pc - - - 1,250.00 1,250.00
4.5mm Marine Plywood pc - - - 500.00 500.00
6mm Marine Plywood pc - - - 580.00 580.00
12mm Marine Plywood pc - - - 960.00 960.00
20mm Marine Plywood pc - - - 1,400.00 1,400.00
4.5mm Smart Plywood pc - - - - -
6mm Smart Board pc - - - 420.00 420.00
12mm Smart Board pc - - - 550.00 550.00
12mm Phenolic Board pc - - - 960.00 960.00
20mm Phenolic Board pc - - - 1,250.00 1,250.00
4.5mm Fibercement Board pc - - - 340.00 340.00
6mm Fibercement Board pc - - - 485.00 485.00
12mm Fibercement Board pc - - - 1,750.00 1,750.00
12mm Gypsum Board pc - - - 660.00 660.00
12mm Moisture Resistant Gypsum Board pc - - - 880.00 880.00
Coco Lumber - - - - - -
2" x 2" x 8' Coco Lumber pc - - - 88.00 88.00
2" x 2" x 10' Coco Lumber pc - - - 110.00 110.00
2" x 2" x 12' Coco Lumber pc - - - 132.00 132.00
2" x 3" x 8' Coco Lumber pc - - - 132.00 132.00
2" x 3" x 10' Coco Lumber pc - - - 165.00 165.00
2" x 3" x 12' Coco Lumber pc - - - 198.00 198.00
2" x 4" x 8' Coco Lumber pc - - - 176.00 176.00
2" x 4" x 10' Coco Lumber pc - - - 220.00 220.00
2" x 4" x 12' Coco Lumber pc - - - 264.00 264.00
Coco Lumber bd ft. - - - 33.00 33.00
Good Lumber - - - - - -
2" x 2" x 8' Kiln Dried S4S pc - - - 290.00 290.00
2" x 2" x 10' Kiln Dried S4S pc - - - 355.00 355.00
2" x 2" x 12' Kiln Dried S4S pc - - - 410.00 410.00
2" x 3" x 8' Kiln Dried S4S pc - - - 475.00 475.00
2" x 3" x 10' Kiln Dried S4S pc - - - 510.00 510.00
2" x 3" x 12' Kiln Dried S4S pc - - - 595.00 595.00
2" x 4" x 8' Kiln Dried S4S pc - - - 560.00 560.00
2" x 4" x 10' Kiln Dried S4S pc - - - 695.00 695.00
2" x 4" x 12' Kiln Dried S4S pc - - - 800.00 800.00
Good Lumber bd ft. - - - 65.00 65.00
G.I. Tie Wire #16 kg - - - 90.00 90.00
UNIT PRICE
DESCRIPTION UNIT CANVASS JUL PICK PRICE
DPWH 3Q '19 CED PPD DPWH 4Q '19
'20
MATERIALS
Angle Bar - - - - - -
2" x 2" x 6mm pc - - - 944.00 944.00
2" x 3" x 6mm pc - - - 1,660.00 1,660.00
C-Purlins - - - - - -
2" x 4" Gauge 20 pc - - - 850.00 850.00
2" x 6" Gauge 20 pc - - - 1,200.00 1,200.00
Flat Bar - - - - - -
4.5mm x 1" pc - - - 300.00 300.00
6mm x 1" pc - - - 360.00 360.00
Metal Channel - - - - - -
2" x 3" x 6mm pc - - - 1,818.00 1,818.00
2" x 4" x 6mm pc - - - 2,100.00 2,100.00
2" x 6" x 6mm pc - - - 3,510.00 3,510.00
2" x 12" x 6mm pc - - - 8,200.00 8,200.00
Tubular - - - - - -
2" x 3" x 6mm pc - - - 4,400.00 4,400.00
2" x 4" x 6mm pc - - - 5,244.00 5,244.00
2" x 4" x 1/8" pc - - - 2,642.00 2,642.00
2" x 3" x 1/8" pc - - - 2,370.00 2,370.00
1" x 1" x 1/8" pc - - - 802.00 802.00
G.I. Pipe Schedule 20 - - - - - -
1" Ø pc - - - 750.00 750.00
2" Ø pc - - - 1,450.00 1,450.00
3" Ø pc - - - 2,440.00 2,440.00
G.I. Pipe Schedule 40 - - - - - -
2" Ø pc - - - 2,370.00 2,370.00
3" Ø pc - - - 4,880.00 4,880.00
4" Ø pc - - - 7,560.00 7,560.00
6" Ø pc - - - 14,210.00 14,210.00
I-Beam - - - - - -
W8x10 x 6m pc - - - 3,616.00 3,616.00
W10x30 x 6m pc - - - 10,900.00 10,900.00
W12x45 x 6m pc - - - 16,363.00 16,363.00
W12x90 x 6m pc - - - 32,700.00 32,700.00
Structural Steel kg - - - 55.00 55.00
Deformed Bar, Grade 40 kg - - - 44.00 44.00
Deformed Bar, Grade 60 kg - - - 46.00 46.00
Ready Mix Concrete - - - - - -
Ready Mix Concrete, 3000 psi, 28 days cu.m. - - - 4,500.00 4,500.00
Ready Mix Concrete, 3500 psi, 28 days cu.m. - - - 4,750.00 4,750.00
Ready Mix Concrete, 4000 psi, 28 days cu.m. - - - 5,000.00 5,000.00
Ready Mix Concrete, 4500 psi, 28 days cu.m. - - - 5,250.00 5,250.00
Ready Mix Concrete, 5000 psi, 28 days cu.m. - - - 5,500.00 5,500.00
Ready Mix Concrete, 3000 psi, 14 days cu.m. - - - 4,650.00 4,650.00
Ready Mix Concrete, 3500 psi, 14 days cu.m. - - - 4,900.00 4,900.00
Ready Mix Concrete, 4000 psi, 14 days cu.m. - - - 5,150.00 5,150.00
Ready Mix Concrete, 4500 psi, 14 days cu.m. - - - - -
Ready Mix Concrete, 5000 psi, 14 days cu.m. - - - 5,650.00 5,650.00
Ready Mix Concrete, 3000 psi, 7 days cu.m. - - - 4,800.00 4,800.00
UNIT PRICE
DESCRIPTION UNIT CANVASS JUL PICK PRICE
DPWH 3Q '19 CED PPD DPWH 4Q '19
'20
MATERIALS
Ready Mix Concrete, 3500 psi, 7 days cu.m. - - - 5,150.00 5,150.00
Ready Mix Concrete, 4000 psi, 7 days cu.m. - - - 5,300.00 5,300.00
Ready Mix Concrete, 4500 psi, 7 days cu.m. - - - - -
Ready Mix Concrete, 5000 psi, 7 days cu.m. - - - 5,800.00 5,800.00
Aluminum Composite Panel (1.2m x 2.4m x
pcs - - - 3,200.00 3,200.00
4mm)
Backer Rod pc. - - - 15.00 15.00
Silicon Sealant tube - - - 220.00 220.00
Aluminum Angle 1/8" x 1.5" x 16' pc. - - - 650.00 650.00
Tekscrew pc. - - - 2.20 2.20
Grinding Disc pc. - - - 80.00 80.00
Cut-off Blade pc. - - - 120.00 120.00
Hacksaw Blade pc. - - - 80.00 80.00
3/8" Expansion Bolt pc. - - - 20.00 20.00
Stainless Steel Partition Hinge pc. - - - 459.00 459.00
Stainless Steel Self-closing Hinge pc. - - - 779.00 779.00
Stainless Steel Adhustable Foot pc. - - - 389.00 389.00
Toilet Partition Indicator Lock set - - - 469.00 469.00
Nylon Hinge pc. - - - 219.00 219.00
Nylon Plastic Foot pc. - - - 119.00 119.00
Stainless Steel Door Bumper with Hook pc. - - - 179.00 179.00
Stainless Steel Bracket pc. - - - 69.00 69.00
Stainless Steel Bracket (30 x 38 mm) pc. - - - 19.00 19.00
Stainless Steel Bracket (40 x 40 mm) pc. - - - 39.00 39.00
Partition Top Rail (3m) pc. - - - 429.00 429.00
Partition Side Edge (3m) pc. - - - 169.00 169.00
Aluminum Channel pc. - - - 329.00 329.00
12 mm thk Compact Laminate (6' x 6') pc. - - - - -
12 mm thk Compact Laminate (6' x 8') pc. - - - - -
12 mm thk Compact Laminate (6' x 12') pc. - - - - -
12 mm thk Compact Laminate (4' x 8') pc. - - - 1,300.00 1,300.00
12 mm thk Compact Laminate Panel (1.2 m x
sq.m. - - - 1,782.72 1,782.72
1.8 m)
Concrete Hollow Blocks - - - - - -
100mm CHB (non-load bearing) pcs - - - 10.00 10.00
100mm CHB (load bearing) pcs - - - 12.00 12.00
150mm CHB (non-load bearing) pcs - - - 13.00 13.00
150mm CHB (load bearing) pcs - - - 15.00 15.00
200mm CHB (non-load bearing) pcs - - - 18.00 18.00
200mm CHB (load bearing) pcs - - - 25.00 25.00
Floor Finishes - - - - - -
Hardwood Flooring (122mm x 910mm x
pcs - - - 525.00 525.00
18mm)
Solid wood planks and accessories pcs - - - - -
600mm x 600mm Granite floor tiles pcs - - - 990.00 990.00
Granite floor slab sq.m. - - - 6,050.00 6,050.00
Granite floor slab (flamed) sq.m. - - - 6,350.00 6,350.00
200mm x 200mm non-skid floor ceramic tiles pcs - - - 15.00 15.00
UNIT PRICE
DESCRIPTION UNIT CANVASS JUL PICK PRICE
DPWH 3Q '19 CED PPD DPWH 4Q '19
'20
MATERIALS

300mm x 300mm non-skid floor ceramic tiles pcs - - - 40.00 40.00

400mm x 400mm non-skid floor ceramic tiles pcs - - - 80.00 80.00

300mm x 600mm non-skid floor ceramic tiles pcs - - - 110.00 110.00

600mm x 600mm non-skid floor ceramic tiles pcs - - - 230.00 230.00


300mm x 300mm homogeneous floor tiles pcs - - - 60.00 60.00
400mm x 400mm homogeneous floor tiles pcs - - - 115.00 115.00
300mm x 600mm homogeneous floor tiles pcs - - - 180.00 180.00
600mm x 600mm homogeneous floor tiles pcs - - - 380.00 380.00
300mm x 300mm tactile tiles pcs - - - 65.00 65.00
600mm x 600mm tactile tiles pcs - - - 270.00 270.00
300mm x 300mm x 2mm vinyl tiles pcs - - - 28.00 28.00
300mm x 300mm x 3mm vinyl tiles pcs - - - 40.00 40.00
400mm x 400mm x 2mm vinyl tiles pcs - - - 51.00 51.00
400mm x 400mm x 3mm vinyl tiles pcs - - - 66.00 66.00
450mm x 450mm x 2mm carpet vinyl tiles pcs - - - 120.00 120.00
450mm x 450mm x 3mm carpet vinyl tiles pcs - - - 185.00 185.00
150mm x 900mm x 2mm vinyl planks pcs - - - 83.00 83.00
150mm x 900mm x 3mm vinyl planks pcs - - - 125.00 125.00
Vinyl roll (1.5m x 15m x 2mm) roll - - - 5,400.00 5,400.00
Capping Strip lm - - - 180.00 180.00
Antibac Vinyl roll (1.5m x 15m x 2mm) roll - - - 42,186.00 42,186.00
Rubberized paint finish pcs - - - - -
Washout pebbles sack - - - 350.00 350.00
Concrete stamping - - - - - -
Color Harderner (25kgs) bags - - - 2,000.00 2,000.00
Release Agent bags - - - 900.00 900.00
Concrete Sealer liters - - - 800.00 800.00
Concrete pavers (keyhole) pcs - - - 20.00 20.00
Concrete pavers (turf grass) pcs - - - 50.00 50.00
Acrylic Floor Adhesive gals - - - 400.00 400.00
Tile Adhesive (25kgs / bag) bags - - - 500.00 500.00
Tile Grout (2kgs / bag) kgs - - - 100.00 100.00
Rubber nosing (75mm width) lm - - - 450.00 450.00
Aluminum nosing (75mm width) lm - - - 700.00 700.00
Brass nosing (75mm width) lm - - - 850.00 850.00
Metal screw with tox pc - - - 5.00 5.00
76mm x 3.0m x 0.6mm Studs pc. - - - 363.00 363.00
76mm x 3.0m x 0.6mm Tracks pc. - - - 330.00 330.00
1/8Ø" x 1/4" Blind Rivets pc - - - 0.75 0.75
#7x1" Screw pc - - - 1.00 1.00
Drive Pin 1" & Charges (Red) pc - - - 10.00 10.00
Hardistop (gypsum putty 28kg/pail) pail - - - 748.00 748.00
Gypsum Tape (2"x230'/roll) roll - - - 198.00 198.00
Mesh Tape (2"x230'/roll) roll - - - 220.00 220.00
Ceiling Finishes - - - - - -
UNIT PRICE
DESCRIPTION UNIT CANVASS JUL PICK PRICE
DPWH 3Q '19 CED PPD DPWH 4Q '19
'20
MATERIALS
1mm thk. 13mm x 38mm x 5M Carrying
pc. - - - 390.00 390.00
Channel
0.40mm thk. 19mm x 50mm x 5M Furring
pc. - - - 262.00 262.00
Channel
0.60mm thk. 25mm x 25mm x 2.4M Wall
pc. - - - 117.00 117.00
Angle
6mmØ Round Bar Hanger Rod pc. - - - 13.00 13.00
Suspension Clip w/ Rod Joiner pc. - - - 26.00 26.00
Steel Angle pc. - - - 16.00 16.00
Furring Clip w/ Clip (Double) pc. - - - 9.00 9.00
Ficem Screws 1" pc. - - - 1.00 1.00
Painting - - - - - -
Skimcoat Finishing Compound (25Kgs / Pail) pail - - - 500.00 500.00
Concrete Neutralizer gals - - - 286.00 286.00
Sanding Paper lm - - - 100.00 100.00
Elastosealer l.m. - - - 385.00 385.00
Elastogel Putty gals. - - - 570.00 570.00
Elastogel gals. - - - 726.00 726.00
Steel Brush pcs. - - - 30.00 30.00
Roller Brush pcs. - - - 100.00 100.00
Paint Brush pcs. - - - 50.00 50.00
Acrylic Concrete Primer & Sealer gals. - - - 400.00 400.00
Latex Putty ( Spot Putty) gals. - - - 290.00 290.00
Latex Flat gals. - - - 400.00 400.00
Acri-color pint - - - 90.00 90.00
Roller Brush pcs. - - - 100.00 100.00
Flat Wall Enamel gals. - - - 455.00 455.00
Glasalux Glasing Putty gals. - - - 450.00 450.00
Paint Thinner gals. - - - 250.00 250.00
Tinting-color pint - - - 95.00 95.00
Epoxy primer gals - - - 800.00 800.00
Lacquer Thinner gals - - - 400.00 400.00
Lacquer Flo gals - - - 510.00 510.00
Lacquer Primer Surfacer gals - - - 570.00 570.00
Interior Primer Sealer gals. - - - 430.00 430.00
Prolux Glasing Putty gals. - - - 460.00 460.00
Quick-Dry Enamel gals. - - - 510.00 510.00
Eposeal Clear gals. - - - 1,000.00 1,000.00
Rubberized Paint gals. - - - 1,200.00 1,200.00
Paint Reducer gals. - - - 390.00 390.00
Epopatch (Spot Putty) gals. - - - 2,050.00 2,050.00
- gals. - - - - -
- gals. - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
Republika ng Pilipinas
Lungsod ng Quezon
CITY ENGINEERING DEPARTMENT
5th, 6th, 7th Floor, QC Civic Center Building “B”
Telephone Nos. 8988-4242 Local 8538

MANPOWER COST
RATE/HOUR (Php)
DESCRIPTION CANVASS JULY PICK PRICE
DPWH 3Q '19 '20 DOLE 2020
MANPOWER
Project Manager - - - -
Assistant Project Manager - - - -
Project-in-Charge - - - -
Administrative Support Staff - - - -
Safety Officer - - - -
Medical Support (Doctor) - - - -
Medical Support (Nurse) - - - -
Medical Support (First Aide) - - - -
Site Engineer (Site Dev. Works - - - -
Site Engineer (Survey Works) - - - -
Site Engineer (C.E.) - - - -
Site Engineer (S.E.) - - - -
Site Engineer (E.E.) - - - -
Site Engineer (M.E.) - - - -
Site Engineer (E.C.E.) - - - -
General Foreman 145.48 - - 145.48
Foreman (C.W.) - - - 137.50
Foreman (S&P W.) - - - 137.50
Foreman (E.W.) - - - 137.50
Foreman (M.W.) - - - 137.50
Foreman (E.C.W.) - - - 137.50
Heavy Equipment Operator 122.61 - - 122.61
Light Equipment Operator 122.61 - - 122.61
Highly Skilled Operator 122.61 - - 122.61
Light Skilled Operator 114.80 - - 114.80
Mason - - - 107.50
Carpenter - - - 107.50
Steelman - - - 107.50
Welder - - - 107.50
Plumber - - - 107.50
Electrician - - - 107.50
Laborer - - - 82.50
Pipefitter - - - 82.50
Driver 106.60 - - 106.60
Driver / Helper - - - 107.50
Utilityman - - - 82.50
Skilled Laborer 106.60 - - 106.60
Semi-skilled Laborer 98.60 - - 98.60
Unskilled Laborer 82.11 - 67.13 82.11
Republika ng Pilipinas
Lungsod ng Quezon
CITY ENGINEERING DEPARTMENT
5th, 6th, 7th Floor, QC Civic Center Building “B”
Telephone Nos. 8988-4242 Local 8538

EQUIPMENT COST

FLYWHEEL
DESCRIPTION MODEL HORSEPOWER OUTPUT RENTAL/HOUR

EQUIPMENT
Portable Jackhammer 150.00
Air Compressor All models 130.00 356-450 cfm 965.00
1.5 cu.m /
Payloader LX80-2C 110.00 1,733.00
1.95 cu.yd.
Dump Truck All models 290.00 10 cu.m. 1,420.00
SE 130 0.8 cu.m /
Backhoe 99.00 1,537.00
LC-2 1.04 cu.yd.
SE 130 0.8 cu.m /
Backhoe w/ Breaker 99.00 1,998.00
LC-2 1.04 cu.yd.
D6H
Bulldozer SERIES II 3,379.00
PSDS/DD
Motorized Road Grader G710A 140.00 2,173.00
Vibratory Roller 10 T 1,846.00
Water Truck / Pump All models 360.00 16,000 L 2,450.00
Asphalt Distributor 10 ft. wide (5 Tons) 936.00
Power Broom (2.00 m wide) 140.00
Asphalt Paver (80 HP) 80.00 1,833.00
Pneumatic Tire Roller 10 T 561.00
Tandem Steel Roller 10 T 1,952.00
Concrete Vibrator 91.25
Concrete Screeder 545.00
Concrete Cutter / Saw 5.00 32.63
Bar Cutter 219.75
Plate Compactor (5 HP) 5.00 123.00
One (1) Bagger Mixer 172.00
Welding Machine 391.00
Cutting Outfit 45.45
Generator Set (301-350 KW) 872.87
Bar Bender 351.50
Earth Scraper 720.00
Wheelbarrow 1.99
Applicator Machine 574.09
Kneading Machine 574.09
Republika ng Pilipinas
Lungsod ng Quezon
TANGGAPAN NG INHINYERYA
(Office of the City Engineer)

INDIVIDUAL PROJECTS PROGRAM OF WORK


FOR ROAD OR BRIDGES

Project : Name of

Location : Barangay : Date Estimated : Location


Limit : Rd. Right-Of-Way : Limits
Length : Pavement Width : Length
Duration of Project : Sidewalk Width : Duration
Appropriation : P Type of Pavement : AAE
Scope of Work :

Item
Item No. DESCRIPTION QTY. UNIT EXISTING COST UPDATED COST

104a Removal of Extg. Sidewalk/Driveways sq.m. P 122.24 P #REF!


104b Removal of Existing Asphalt Pavement sq.m. 37.64 37.64
104c Removal of Existing Concrete Pavement sq.m. 124.90 #REF!
104d Removal of Existing Conc. Curb & Gutter l.m. 122.24 #REF!
104e Removal of Concrete Manhole Catch Basin each 442.92 442.92
104f Removal of Reinforced Concrete Pipe l.m. 302.85 302.85
105 Roadway Excavation cu.m. 280.80 #REF!
106a Excavation for Structures, Ordinary Earth cu.m. 187.20 #REF!
106b Excavation for Structures, Unclassified Soil cu.m. 280.80 #REF!
106c Excavation for Structures, Solid Rock Adobe cu.m. 561.61 #REF!
107 Common Borrow cu.m. 646.07 #REF!
108 Aggregate Sub-Base Course cu.m. 716.07 #REF!
118 Re-Prep. of Previously Constructed Road sq.m. 29.70 29.70
200 Aggregate Base Course cu.m. 831.07 #REF!
302 Bituminous Prime Coat m.t. 46,933.09 #REF!
310 Bituminous Concrete Surface Course m.t. 5,445.69 #REF!
316a P.C.C P., 0.23 m. thk., 550 F, 28 days sq.m. 887.42 #REF!
316b P.C.C.P.,0.23 m. thk., 550 F, 14 days sq.m. 956.42 #REF!
316c P.C.C.P.,0.23 m. thk., 550 F, 7 days sq.m. 1,002.42 #REF!
316d P.C.C.P.,0.20m. thk., 550 F, 28 days sq.m. 879.64 #REF!
316e P.C.C.P.,0.20m. thk., 550 F, 14 days sq.m. 948.64 #REF!
316f P.C.C.P.,0.20m. thk., 550 F, 7 days sq.m. 1,003.14 #REF!
401 Reinforced Concrete Railing l.m. 2,031.02 2,031.02
405 Structural Concrete Class "A" cu.m. 7,303.54 7,303.54
406 Reinforcing Steel bars,Intermediate kgs. 61.95 61.95
413a 310 mm. diam./12" diam. R.C.C.P. (Utility Pipes) l.m. 755.42 #REF!
413b 460 mm. diam./18" diam. R.C.C.P. l.m. 1,023.00 #REF!
413c 610 mm. diam./24" diam. R.C.C.P. l.m. 1,500.69 #REF!
413d 760 mm. diam./30" diam. R.C.C.P. l.m. 2,252.67 #REF!
413e 910 mm. diam./36" diam. R.C.C.P. l.m. 3,272.61 #REF!
413f 1070 mm. diam./42" diam. R.C.C.P. l.m. 3,351.01 #REF!
413g 1200 mm. diam./48" diam. R.C.C.P. l.m. 4,757.89 #REF!
500 Grouted Rip-Rap cu.m. 2,964.10 #REF!
502a Concrete Curb & Gutter (Type A) l.m. 755.77 #REF!
502b Concrete Curb & Gutter (Type B) l.m. 875.55 #REF!
502c Concrete Curb & Gutter (Type C) l.m. 1,063.56 #REF!
503 Restoration/Concrete Sidewalk/Driveways sq.m. 860.76 #REF!
505a C.M.H.,w/ AB & Cast Iron,For 460 mm. (Sdwlk) each 23,285.84 #REF!
505b C.M.H.,w/ AB & Cast Iron,For 610 mm. (Sdwlk) each 24,722.54 #REF!
505c C.M.H.,w/ AB & Cast Iron For 760 mm. (Sdwlk) each 25,290.09 #REF!
505d C.M.H.,w/ AB & Cast Iron For 910 mm. (Sdwlk) each 28,100.29 #REF!
505e C.M.H.,w / AB & Cast IronFor 1070 mm (Sdwlk) each 29,995.74 #REF!
SPL 1 Asphalt Pavement/ Approaches sq.m. 687.06 #REF!
SPL 2 CHB Open Lined Canal (2-layers) l.m. 960.67 #REF!
SPL 3 CHB Open Lined Canal (3-layers) l.m. 1,381.08 #REF!
SPL 4 CHB Lined Canal with Cover (2-layers) l.m. 2,178.97 #REF!
SPL 5 CHB Lined Canal with Cover (3-layers) l.m. 2,568.50 #REF!
SPL 6 Sectional Squaring & Asphalt Patching sq.m. 722.39 #REF!
SPL7 Declogging cu.m 717.02 #REF!
SPL 8 Manhole Guard Post set 2,900.07 2,900.07
SPL 9 Bunkhouse each 64,997.10 #REF!
SPL 10 Barricade,wooden each 767.03 #REF!
SPL 11 Tapping Drainage set 637.40 #REF!
SPL 12 NAWASA Leak/ 20 meters set 1,107.00 #REF!
SPL 13a C.M.H. w/ AB & Cast Iron ,For 460mm. (Rdwy.) each 29,613.84 #REF!
SPL 13b C.M.H. w/ AB & Cast Iron,For 610mm. (Rdwy.) each 33,542.54 #REF!
SPL 13c C.M.H. w/AB & Cast Iron,For 760mm. (Rdwy.) each 34,353.09 #REF!
SPL 13d C.M.H. w/AB & Cast Iron,For 910mm. (Rdwy.) each 34,845.09 #REF!
SPL 13e C.M.H. w/AB & Cast Iron.,For 1070mm. (Rdwy.) each 36,023.74 #REF!
SPL 14 Billboard pc 3,669.30 #REF!
SPL 15a Manhole w/ Angular bar & S.G.,Ht.=2.00m. each 90,626.52 90,626.52
SPL 15b Manhole w/ Angular bar & S.G.,Ht.=3.00m. each 114,085.57 114,085.57
SPL 15c Manhole w/ Angular bar & S.G.,Ht.=4.00m. each 132,229.68 132,229.68
SPL ### l.m. 524.93 #REF!
SPL ### sq.m. 693.18 #REF!
SPL ### sq.m. 505.16 #REF!
SPL ### cu.m 5,300.10 #REF!
SPL Drainage Interceptor l.m. 7,000.00 7,000.00
SPL Steel Barrier (rental) each 1,569.98 1,569.98
SPL Concrete Approach sq.m. 956.42 956.42
SPL Box Culvert (4.5 x 3.0) l.m. 112,261.05 112,261.05
SPL Steel Railings l.m. 1,850.00 1,850.00
SPL P.C.C.P. 0.30m.thk., 550F, 3days sq.m. #REF! #REF!
SPL Cutting of Concrete l.m. 68.91 68.91
SPL Demolition of Existing Structures unit 10,000.00 10,000.00
SPL Removal of Extg. Concrete Post (Electrical) unit 3,000.00 3,000.00
SPL Removal of Extg. Trees unit 2,500.00 2,500.00
SPL Relay out of existing water line set 50,000.00 50,000.00
SPL Thermoplastic Markings (White) sq.m. 1,100.00 1,100.00
SPL Thermoplastic Markings (Yellow) sq.m. 1,320.00 1,320.00
SPL Removal of Encroachment Plantbox sq.m. 122.24 122.24
SPL Trimming of Extg. Trees units 10,000.00 10,000.00
SPL Demoltion of Existing Structures unit 10,000.00 10,000.00
SUMMARY OF REVISED UNIT COST (June

ITEM DESCRIPTION UNIT MATERIALS LABOR EQUIPMENT

104a Removal of Extg. Sidewalk/Driveways sq.m. - #REF! #REF!


104b Removal of Existing Asphalt Pavement sq.m. - 7.75 19.93
104c Removal of Existing Concrete Pavement sq.m. - #REF! #REF!
104d Removal of Existing Conc. Curb & Gutter l.m. - #REF! #REF!
104e Removal of Concrete Manhole Catch Basin each - 161.00 132.49
104f Removal of Reinforced Concrete Pipe l.m. - 80.50 116.91
105 Roadway Excavation cu.m. - #REF! #REF!
106a Excavation for Structures, Ordinary Earth cu.m. - #REF! #REF!
106b Excavation for Structures, Unclassified Soil cu.m. - #REF! #REF!
106c Excavation for Structures, Solid Rock Adobe cu.m. - #REF! #REF!
107 Common Borrow cu.m. #REF! #REF! #REF!
108 Aggregate Sub-Base Course cu.m. #REF! #REF! #REF!
118 Re-Prep. of Previously Constructed Road sq.m. 3.87 1.90 14.25
200 Aggregate Base Course cu.m. #REF! #REF! #REF!
302 Bituminous Prime Coat m.t. #REF! #REF! #REF!
310 Bituminous Concrete Surface Course m.t. #REF! #REF! #REF!
316a P.C.C P., 0.23 m. thk., 550 F, 28 days sq.m. #REF! #REF! #REF!
316b P.C.C.P.,0.23 m. thk., 550 F, 14 days sq.m. #REF! #REF! #REF!
316c P.C.C.P.,0.23 m. thk., 550 F, 7 days sq.m. #REF! #REF! #REF!
316d P.C.C.P.,0.20m. thk., 550 F, 28 days sq.m. #REF! #REF! #REF!
316e P.C.C.P.,0.20m. thk., 550 F, 14 days sq.m. #REF! #REF! #REF!
316f P.C.C.P.,0.20m. thk., 550 F, 7 days sq.m. #REF! #REF! #REF!
401 Reinforced Concrete Railing l.m. 1,937.68 71.67 14.67
405 Structural Concrete Class "A" cu.m. 5,962.54 1,140.00 159.00
406 Reinforcing Steel bars,Intermediate kgs. 51.28 10.50 0.17
413a 310 mm. diam./12" diam. R.C.C.P. (Utility Pipes) l.m. #REF! #REF! #REF!
413b 460 mm. diam./18" diam. R.C.C.P. l.m. #REF! #REF! #REF!
413c 610 mm. diam./24" diam. R.C.C.P. l.m. #REF! #REF! #REF!
413d 760 mm. diam./30" diam. R.C.C.P. l.m. #REF! #REF! #REF!
413e 910 mm. diam./36" diam. R.C.C.P. l.m. #REF! #REF! #REF!

Page 20 of 45
SUMMARY OF REVISED UNIT COST (June

ITEM DESCRIPTION UNIT MATERIALS LABOR EQUIPMENT

413f 1070 mm. diam./42" diam. R.C.C.P. l.m. #REF! #REF! #REF!
413g 1200 mm. diam./48" diam. R.C.C.P. l.m. #REF! #REF! #REF!
500 Grouted Rip-Rap cu.m. #REF! #REF! #REF!
502a Concrete Curb & Gutter (Type A) l.m. #REF! #REF! #REF!
502b Concrete Curb & Gutter (Type B) l.m. #REF! #REF! #REF!
502c Concrete Curb & Gutter (Type C) l.m. #REF! #REF! #REF!
503 Restoration/Concrete Sidewalk/Driveways sq.m. #REF! #REF! #REF!
505a C.M.H.,w/ AB & Cast Iron,For 460 mm. (Sdwlk) each #REF! #REF! #REF!
505b C.M.H.,w/ AB & Cast Iron,For 610 mm. (Sdwlk) each #REF! #REF! #REF!
505c C.M.H.,w/ AB & Cast Iron For 760 mm. (Sdwlk) each #REF! #REF! #REF!
505d C.M.H.,w/ AB & Cast Iron For 910 mm. (Sdwlk) each #REF! #REF! #REF!
505e C.M.H.,w / AB & Cast IronFor 1070 mm (Sdwlk) each #REF! #REF! #REF!
SPL 1 Asphalt Pavement/ Approaches sq.m. #REF! #REF! #REF!
SPL 2 CHB Open Lined Canal (2-layers) l.m. #REF! #REF! #REF!
SPL 3 CHB Open Lined Canal (3-layers) l.m. #REF! #REF! #REF!
SPL 4 CHB Lined Canal with Cover (2-layers) l.m. #REF! #REF! #REF!
SPL 5 CHB Lined Canal with Cover (3-layers) l.m. #REF! #REF! #REF!
SPL 6 Sectional Squaring & Asphalt Patching sq.m. #REF! #REF! #REF!
SPL7 Declogging cu.m - #REF! #REF!
SPL 8 Manhole Guard Post set 2,246.27 653.80 -
SPL 9 Bunkhouse each #REF! #REF! #REF!
SPL 10 Barricade,wooden each #REF! #REF! #REF!
SPL 11 Tapping Drainage set #REF! #REF! #REF!
SPL 12 NAWASA Leak/ 20 meters set #REF! #REF! #REF!
SPL 13a C.M.H. w/ AB & Cast Iron ,For 460mm. (Rdwy.) each #REF! #REF! #REF!
SPL 13b C.M.H. w/ AB & Cast Iron,For 610mm. (Rdwy.) each #REF! #REF! #REF!
SPL 13c C.M.H. w/AB & Cast Iron,For 760mm. (Rdwy.) each #REF! #REF! #REF!
SPL 13d C.M.H. w/AB & Cast Iron,For 910mm. (Rdwy.) each #REF! #REF! #REF!
SPL 13e C.M.H. w/AB & Cast Iron.,For 1070mm. (Rdwy.) each #REF! #REF! #REF!
SPL 14 Billboard pc #REF! #REF! #REF!

Page 21 of 45
SUMMARY OF REVISED UNIT COST (June

ITEM DESCRIPTION UNIT MATERIALS LABOR EQUIPMENT

SPL 15a Manhole w/ Angular bar & S.G.,Ht.=2.00m. each 68,138.16 22,488.36 -
SPL 15b Manhole w/ Angular bar & S.G.,Ht.=3.00m. each 85,515.24 28,570.33 -
SPL 15c Manhole w/ Angular bar & S.G.,Ht.=4.00m. each 98,955.32 33,274.36 -
SPL #REF! l.m. #REF! #REF! #REF!
SPL #REF! sq.m. #REF! #REF! #REF!
SPL #REF! sq.m. #REF! #REF! #REF!
SPL #REF! cu.m #REF! #REF! #REF!

Page 22 of 45
COST (June 11, 2012)

LABOR &
FUEL EQUIPMENT UNIT COST %DIFF. % inc.
INCL. FUEL

- #REF! #REF! #REF! #REF! #REF!


9.96 37.64 37.64 ok 37.64 #VALUE!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
149.43 442.92 442.92 ok 442.92 #VALUE!
105.44 302.85 302.85 ok 302.85 #VALUE!
#REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
9.68 25.83 29.70 ok 29.70 #VALUE!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
7.00 93.33 2,031.01 -
42.00 1,341.00 7,303.54 -
- 10.67 61.95 -
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!

Page 23 of 45
COST (June 11, 2012)

LABOR &
FUEL EQUIPMENT UNIT COST %DIFF. % inc.
INCL. FUEL

- #REF! #REF! #REF! #REF! #REF!


- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- 653.80 2,900.07 ok 2,900.07 #VALUE!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! -
- #REF! #REF! #REF! #REF! -
- #REF! #REF! #REF! #REF! -
- #REF! #REF! #REF! #REF! -
- #REF! #REF! #REF! #REF! -
#REF! #REF! #REF! #REF! #REF!

Page 24 of 45
COST (June 11, 2012)

LABOR &
FUEL EQUIPMENT UNIT COST %DIFF. % inc.
INCL. FUEL

- 22,488.36 90,626.52 ok 90,626.52 #VALUE!


28,570.33 114,085.57 ok 114,085.57 -
- 33,274.36 132,229.68 ok 132,229.68 -
- #REF! #REF! - #REF!
- #REF! #REF!
- #REF! #REF!
- #REF! #REF!
- -

Page 25 of 45
LABOR &
MATERIALS EQUIPMENT UNIT COST
INCL. FUEL

74.34 #REF! #REF! #REF! - #REF! #REF!


26.52 x 37.64 - - 37.64 37.64
194.52 #REF! #REF! #REF! - #REF! #REF!
67.22 #REF! #REF! #REF! - #REF! #REF!
320.04 x 442.92 - - 442.92 442.92
219.21 x 302.85 - - 302.85 302.85
345.34 #REF! #REF! #REF! - #REF! #REF!
344.94 #REF! #REF! #REF! - #REF! #REF!
386.28 #REF! #REF! #REF! - #REF! #REF!
432.78 #REF! #REF! #REF! - #REF! #REF!
437.08 #REF! #REF! #REF! #REF! #REF! #REF!
480.91 #REF! #REF! #REF! #REF! #REF! #REF!
19.06 x 29.70 - 3.87 25.83 29.70
578.80 #REF! #REF! #REF! #REF! #REF! #REF!
24,941.62 #REF! #REF! #REF! #REF! #REF! #REF!
2,153.67 #REF! #REF! #REF! #REF! #REF! #REF!
571.04 #REF! #REF! #REF! #REF! #REF! #REF!
660.74 #REF! #REF! #REF! #REF! #REF! #REF!
702.14 #REF! #REF! #REF! #REF! #REF! #REF!
503.12 #REF! #REF! #REF! #REF! #REF! #REF!
581.12 #REF! #REF! #REF! #REF! #REF! #REF!
617.12 #REF! #REF! #REF! #REF! #REF! #REF!
1,400.86 x 2,031.01 - 1,937.68 93.33 2,031.01
4,472.91 x 7,303.54 - 5,962.54 1,341.00 7,303.54
37.11 x 61.95 - 51.28 10.67 61.95
546.78 #REF! #REF! #REF! #REF! #REF! #REF!
735.04 #REF! #REF! #REF! #REF! #REF! #REF!
980.83 #REF! #REF! #REF! #REF! #REF! #REF!
1,421.26 #REF! #REF! #REF! #REF! #REF! #REF!
1,925.17 #REF! #REF! #REF! #REF! #REF! #REF!

Page 26 of 45
LABOR &
MATERIALS EQUIPMENT UNIT COST
INCL. FUEL

2,149.29 #REF! #REF! #REF! #REF! #REF! #REF!


2,576.11 #REF! #REF! #REF! #REF! #REF! #REF!
1,623.45 #REF! #REF! #REF! #REF! #REF! #REF!
467.67 #REF! #REF! #REF! #REF! #REF! #REF!
532.72 #REF! #REF! #REF! #REF! #REF! #REF!
532.72 #REF! #REF! #REF! #REF! #REF! #REF!
257.36 #REF! #REF! #REF! #REF! #REF! #REF!
9,515.53 #REF! #REF! #REF! #REF! #REF! #REF!
10,182.43 #REF! #REF! #REF! #REF! #REF! #REF!
11,151.73 #REF! #REF! #REF! #REF! #REF! #REF!
12,027.88 #REF! #REF! #REF! #REF! #REF! #REF!
13,063.33 #REF! #REF! #REF! #REF! #REF! #REF!
510.29 #REF! #REF! #REF! #REF! #REF! #REF!
639.15 #REF! #REF! #REF! #REF! #REF! #REF!
900.26 #REF! #REF! #REF! #REF! #REF! #REF!
1,618.70 #REF! #REF! #REF! #REF! #REF! #REF!
1,672.30 #REF! #REF! #REF! #REF! #REF! #REF!
471.30 #REF! #REF! #REF! #REF! #REF! #REF!
503.34 #REF! #REF! #REF! - #REF! #REF!
2,477.93 x 2,900.07 - 2,246.27 653.80 2,900.07
36,734.85 #REF! #REF! #REF! #REF! #REF! #REF!
657.91 #REF! #REF! #REF! #REF! #REF! #REF!
517.50 #REF! #REF! #REF! #REF! #REF! #REF!
969.00 #REF! #REF! #REF! #REF! #REF! #REF!
10,600.93 #REF! #REF! #REF! #REF! #REF! #REF!
11,333.30 #REF! #REF! #REF! #REF! #REF! #REF!
12,424.10 #REF! #REF! #REF! #REF! #REF! #REF!
13,442.00 #REF! #REF! #REF! #REF! #REF! #REF!
14,619.20 #REF! #REF! #REF! #REF! #REF! #REF!
2,300.90 #REF! #REF! #REF! #REF! #REF! #REF!

Page 27 of 45
LABOR &
MATERIALS EQUIPMENT UNIT COST
INCL. FUEL

77,556.40 x 90,626.52 - 68,138.16 22,488.36 90,626.52


103,163.20 x 114,085.57 - 85,515.24 28,570.33 114,085.57
128,810.50 x 132,229.68 - 98,955.32 33,274.36 132,229.68
9,513.65 #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
- - -

Page 28 of 45
Work Program Report Infra Form B-3
No.

OFFICE OF THE CITY ENGINEER


QUEZON CITY

Name of Project Project ID No.

Location Barangay District

Department Concerned Department Head

Description of Construction Work Additional Information Needed Before Design :

WORK PROGRAM

ITEM DESCRIPTION QTY UNIT MATERIAL COST LABOR COST TOTAL COST

104a Removal of Extg. Sidewalk/Driveways sq.m. - #REF! #REF!


104b Removal of Existing Asphalt Pavement sq.m. - - -
104c Removal of Existing Concrete Pavement sq.m. - #REF! #REF!
104d Removal of Existing Conc. Curb & Gutter l.m. - #REF! #REF!
104e Removal of Concrete Manhole Catch Basin each - - -
104f Removal of Reinforced Concrete Pipe l.m. - - -
105 Roadway Excavation cu.m. - #REF! #REF!
106a Excavation for Structures, Ordinary Earth cu.m. - #REF! #REF!
106b Excavation for Structures, Unclassified Soil cu.m. - #REF! #REF!
106c Excavation for Structures, Solid Rock Adobe cu.m. - #REF! #REF!
107 Common Borrow cu.m. #REF! #REF! #REF!
108 Aggregate Sub-Base Course cu.m. #REF! #REF! #REF!
118 Re-Prep. of Previously Constructed Road sq.m. - - -
200 Aggregate Base Course cu.m. #REF! #REF! #REF!
302 Bituminous Prime Coat m.t. #REF! #REF! #REF!
310 Bituminous Concrete Surface Course m.t. #REF! #REF! #REF!
316a P.C.C P., 0.23 m. thk., 550 F, 28 days sq.m. #REF! #REF! #REF!
316b P.C.C.P.,0.23 m. thk., 550 F, 14 days sq.m. #REF! #REF! #REF!
316c P.C.C.P.,0.23 m. thk., 550 F, 7 days sq.m. #REF! #REF! #REF!
316d P.C.C.P.,0.20m. thk., 550 F, 28 days sq.m. #REF! #REF! #REF!
316e P.C.C.P.,0.20m. thk., 550 F, 14 days sq.m. #REF! #REF! #REF!
316f P.C.C.P.,0.20m. thk., 550 F, 7 days sq.m. #REF! #REF! #REF!
401 Reinforced Concrete Railing l.m. - - -
405 Structural Concrete Class "A" cu.m. - - -
406 Reinforcing Steel bars,Intermediate kgs. - - -
413a 310 mm. diam./12" diam. R.C.C.P. (Utility Pipes) l.m. #REF! #REF! #REF!
413b 460 mm. diam./18" diam. R.C.C.P. l.m. #REF! #REF! #REF!
413c 610 mm. diam./24" diam. R.C.C.P. l.m. #REF! #REF! #REF!
413d 760 mm. diam./30" diam. R.C.C.P. l.m. #REF! #REF! #REF!
413e 910 mm. diam./36" diam. R.C.C.P. l.m. #REF! #REF! #REF!
413f 1070 mm. diam./42" diam. R.C.C.P. l.m. #REF! #REF! #REF!
413g 1200 mm. diam./48" diam. R.C.C.P. l.m. #REF! #REF! #REF!
500 Grouted Rip-Rap cu.m. #REF! #REF! #REF!
502a Concrete Curb & Gutter (Type A) l.m. #REF! #REF! #REF!
502b Concrete Curb & Gutter (Type B) l.m. #REF! #REF! #REF!
502c Concrete Curb & Gutter (Type C) l.m. #REF! #REF! #REF!
503 Restoration/Concrete Sidewalk/Driveways sq.m. #REF! #REF! #REF!
505a C.M.H.,w/ AB & Cast Iron,For 460 mm. (Sdwlk) each #REF! #REF! #REF!
505b C.M.H.,w/ AB & Cast Iron,For 610 mm. (Sdwlk) each #REF! #REF! #REF!
505c C.M.H.,w/ AB & Cast Iron For 760 mm. (Sdwlk) each #REF! #REF! #REF!
505d C.M.H.,w/ AB & Cast Iron For 910 mm. (Sdwlk) each #REF! #REF! #REF!
505e C.M.H.,w / AB & Cast IronFor 1070 mm (Sdwlk) each #REF! #REF! #REF!
SPL 1 Asphalt Pavement/ Approaches sq.m. #REF! #REF! #REF!
SPL 2 CHB Open Lined Canal (2-layers) l.m. #REF! #REF! #REF!
SPL 3 CHB Open Lined Canal (3-layers) l.m. #REF! #REF! #REF!
SPL 4 CHB Lined Canal with Cover (2-layers) l.m. #REF! #REF! #REF!
SPL 5 CHB Lined Canal with Cover (3-layers) l.m. #REF! #REF! #REF!
SPL 6 Sectional Squaring & Asphalt Patching sq.m. #REF! #REF! #REF!
SPL7 Declogging cu.m - #REF! #REF!
SPL 8 Manhole Guard Post set - - -
SPL 9 Bunkhouse each #REF! #REF! #REF!
SPL 10 Barricade,wooden each #REF! #REF! #REF!
SPL 11 Tapping Drainage set #REF! #REF! #REF!
SPL 12 NAWASA Leak/ 20 meters set #REF! #REF! #REF!
SPL 13a C.M.H. w/ AB & Cast Iron ,For 460mm. (Rdwy.) each #REF! #REF! #REF!
SPL 13b C.M.H. w/ AB & Cast Iron,For 610mm. (Rdwy.) each #REF! #REF! #REF!
SPL 13c C.M.H. w/AB & Cast Iron,For 760mm. (Rdwy.) each #REF! #REF! #REF!
SPL 13d C.M.H. w/AB & Cast Iron,For 910mm. (Rdwy.) each #REF! #REF! #REF!
SPL 13e C.M.H. w/AB & Cast Iron.,For 1070mm. (Rdwy.) each #REF! #REF! #REF!
SPL 14 Billboard pc #REF! #REF! #REF!
SPL 15a Manhole w/ Angular bar & S.G.,Ht.=2.00m. each - - -
SPL 15b Manhole w/ Angular bar & S.G.,Ht.=3.00m. each - - -
SPL 15c Manhole w/ Angular bar & S.G.,Ht.=4.00m. each - - -
SPL #REF! l.m. #REF! #REF! #REF!
SPL #REF! sq.m. #REF! #REF! #REF!
SPL #REF! sq.m. #REF! #REF! #REF!
SPL #REF! cu.m #REF! #REF! #REF!
- - -
- - -
- - -

QUANTITY INDICATORS VERTICAL HORIZONTAL


1. Excavation cu.m. 4. Gross Area 7. Length l.m.
2. Steel kilos 5. Usable Area 8. Area sq.m.
3. Cement bags 6. No. of Rooms 9. Volume cu.m.
Cost
Total VERTICAL

Materials P #REF! Per room


Labor P #REF! Per sq.m. (gross)
Overhead/Profit P #REF! Per sq.m. (net)
HORIZONTAL
Taxes P #REF!
Total P #REF! Per linear P #REF!
Designed by

Per cubic P #REF!


Costed by : Recommended by :

JAIME M. FAJARDO JOSELITO B. CABUNGCAL


Reviewed by : OIC, Engineering Dept.

Date :
SABINA D. SANTOS
Republika ng Pilipinas
Lungsod ng Quezon
TANGGAPAN NG INHINYERYA
(Office of the City Engineer)

INDIVIDUAL PROJECTS PROGRAM OF WORK


FOR ROAD OR BRIDGES

Project : 0

Location : 0 Barangay : #VALUE! Date Estimated :


Limit : Rd. Right-Of-Way :
Length : #REF! Pavement Width :
Duration of Project : Sidewalk Width :
Appropriation : P #REF! Type of Pavement :
Scope of Work : #REF!
#REF!

Item No. DESCRIPTION QTY. UNIT UNIT COST AMOUN

104a Removal of Extg. Sidewalk/Driveways sq.m. P #REF! P


104b Removal of Existing Asphalt Pavement sq.m.
104c Removal of Existing Concrete Pavement sq.m. #REF!
104d Removal of Existing Conc. Curb & Gutter l.m. #REF!
104e Removal of Concrete Manhole Catch Basin each
104f Removal of Reinforced Concrete Pipe l.m.
105 Roadway Excavation cu.m. #REF!
106a Excavation for Structures, Ordinary Earth cu.m. #REF!
106b Excavation for Structures, Unclassified Soil cu.m. #REF!
106c Excavation for Structures, Solid Rock Adobe cu.m. #REF!
107 Common Borrow cu.m. #REF!
108 Aggregate Sub-Base Course cu.m. #REF!
118 Re-Prep. of Previously Constructed Road sq.m.
200 Aggregate Base Course cu.m. #REF!
302 Bituminous Prime Coat m.t. #REF!
310 Bituminous Concrete Surface Course m.t. #REF!
316a P.C.C P., 0.23 m. thk., 550 F, 28 days sq.m. #REF!
316b P.C.C.P.,0.23 m. thk., 550 F, 14 days sq.m. #REF!
316c P.C.C.P.,0.23 m. thk., 550 F, 7 days sq.m. #REF!
316d P.C.C.P.,0.20m. thk., 550 F, 28 days sq.m. #REF!
316e P.C.C.P.,0.20m. thk., 550 F, 14 days sq.m. #REF!
316f P.C.C.P.,0.20m. thk., 550 F, 7 days sq.m. #REF!
401 Reinforced Concrete Railing l.m.
405 Structural Concrete Class "A" cu.m.
406 Reinforcing Steel bars,Intermediate kgs.
413a 310 mm. diam./12" diam. R.C.C.P. (Utility Pipes) l.m. #REF!
413b 460 mm. diam./18" diam. R.C.C.P. l.m. #REF!
413c 610 mm. diam./24" diam. R.C.C.P. l.m. #REF!
413d 760 mm. diam./30" diam. R.C.C.P. l.m. #REF!
413e 910 mm. diam./36" diam. R.C.C.P. l.m. #REF!
413f 1070 mm. diam./42" diam. R.C.C.P. l.m. #REF!
413g 1200 mm. diam./48" diam. R.C.C.P. l.m. #REF!
500 Grouted Rip-Rap cu.m. #REF!
502a Concrete Curb & Gutter (Type A) l.m. #REF!
502b Concrete Curb & Gutter (Type B) l.m. #REF!
502c Concrete Curb & Gutter (Type C) l.m. #REF!
503 Restoration/Concrete Sidewalk/Driveways sq.m. #REF!
505a C.M.H.,w/ AB & Cast Iron,For 460 mm. (Sdwlk) each #REF!
505b C.M.H.,w/ AB & Cast Iron,For 610 mm. (Sdwlk) each #REF!
505c C.M.H.,w/ AB & Cast Iron For 760 mm. (Sdwlk) each #REF!
505d C.M.H.,w/ AB & Cast Iron For 910 mm. (Sdwlk) each #REF!
505e C.M.H.,w / AB & Cast IronFor 1070 mm (Sdwlk) each #REF!
SPL 1 Asphalt Pavement/ Approaches sq.m. #REF!
SPL 2 CHB Open Lined Canal (2-layers) l.m. #REF!
SPL 3 CHB Open Lined Canal (3-layers) l.m. #REF!
SPL 4 CHB Lined Canal with Cover (2-layers) l.m. #REF!
SPL 5 CHB Lined Canal with Cover (3-layers) l.m. #REF!
SPL 6 Sectional Squaring & Asphalt Patching sq.m. #REF!
SPL7 Declogging cu.m #REF!
SPL 8 Manhole Guard Post set
SPL 9 Bunkhouse each #REF!
SPL 10 Barricade,wooden each #REF!
SPL 11 Tapping Drainage set #REF!
SPL 12 NAWASA Leak/ 20 meters set #REF!
SPL 13a C.M.H. w/ AB & Cast Iron ,For 460mm. (Rdwy.) each #REF!
SPL 13b C.M.H. w/ AB & Cast Iron,For 610mm. (Rdwy.) each #REF!
SPL 13c C.M.H. w/AB & Cast Iron,For 760mm. (Rdwy.) each #REF!
SPL 13d C.M.H. w/AB & Cast Iron,For 910mm. (Rdwy.) each #REF!
SPL 13e C.M.H. w/AB & Cast Iron.,For 1070mm. (Rdwy.) each #REF!
SPL 14 Billboard pc #REF!
SPL 15a Manhole w/ Angular bar & S.G.,Ht.=2.00m. each
SPL 15b Manhole w/ Angular bar & S.G.,Ht.=3.00m. each
SPL 15c Manhole w/ Angular bar & S.G.,Ht.=4.00m. each
SPL ### l.m. #REF!
SPL ### sq.m. #REF!
SPL ### sq.m. #REF!
SPL ### cu.m #REF!

ESTIMATED BY: Materials, Labor & Equip. Exp. P


Overhead Expenses
Contingencies
Estimator Miscellaneous Expenses
CHECKED BY: Contractor's Profit
Contractor's TAX
Sub-Total/contractor's Price P
Budget contingencies
Team Leader Total Estimated Cost
SUBMITTED BY: SAY P

Engr. GREGORIO A. FLORES


Asst. Head, PPD - Horizontal
RECOMMENDING APPROVAL:

Engr. RAMIRO J. TIAMZON


Head-Planning and Programming Div.
APPROVED:
Republika ng Pilipinas
Lungsod ng Quezon
TANGGAPAN NG INHINYERYA
(Office of the City Engineer)

DUAL PROJECTS PROGRAM OF WORK


FOR ROAD OR BRIDGES

AMOUNT

#REF!
-
#REF!
#REF!
-
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
-
-
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
-
-
-
#REF!
#REF!
#REF!
#REF!

#REF!

#REF!

#REF!
#REF!
#REF!
Republika ng Pilipinas
Lungsod ng Quezon
CITY ENGINEERING DEPARTMENT
5th, 6th, 7th Floor, QC Civic Center Building “B”
Telephone Nos. 8988-4242 Local 8538

DETAILED UNIT PRICE ANALYSIS


Item No./Description: Catch Basin (0.5m x 0.5m)
Unit of Measurement set
Derivatives
Assumed Width, m 0.50
Assumed Height, m 0.40
Sets 1.00

Designation No. of Person No. of Hours Hourly Rate Amount


Labor
A.

Labor Cost Subtotal -


Name and Capacity No. of Units No. of Hours Hourly Rate Cost
Equipment
B.

Equipment Cost Subtotal -


Name and Specification Unit Quantity Unit Cost per Area Amount
Materials

100 mm CHB (non-load bearing) pcs 4.00 10.00 40.00


Portland Cement bags 0.94 250.00 233.92
S1 Sand cu.m. 0.05 1,000.00 50.02
C.
20mm Gravel cu.m. 0.04 1,350.00 54.00
10mm Deformed Bar, grade 40 kg 3.33 44.00 146.49
G.I. Tie Wire No. 16 kg 0.10 90.00 8.99
4.5mm x 25mm Flat Bar pcs 1.00 300.00 300.00
Welding Rod kgs 0.20 100.00 20.00

Material Cost Subtotal 853.41


D. Total (A+B+C) 853.41
E. Total Sets 1.00
F. Unit Cost per Set 853.41
G. Unit Cost Php 854.00 /set.
Republika ng Pilipinas
Lungsod ng Quezon
CITY ENGINEERING DEPARTMENT
5th, 6th, 7th Floor, QC Civic Center Building “B”
Telephone Nos. 8988-4242 Local 8538

DETAILED UNIT PRICE ANALYSIS


Item No./Description: 1.80m x 2.10m Double Leaf Steel Grille Door with Leaf Design
Unit of Measurement set
Derivatives
Width, m 1.80
Height, m 2.10
Assumed Quantity, sets 1.00

Name and Specification Unit Quantity Unit Cost Amount


Materials

50mm x 50mm x 2mm Tubular Bar kg 37.68 75.00 2,826.00


50mm x 100mm x 2mm Tubular Bar kg 113.04 75.00 8,478.00
38mm Ø Barrel Bolt set 2.00 1,848.70 3,697.40
A.
Steel Jamb 150mm thck set 1.00 4,680.00 4,680.00
Treated Wooden Panel sq.m. 0.72 5,000.00 3,600.00
Welding Rod kg 0.23 300.00 67.82
Door Hinges, 3.5" x 3.5" (Butt Hinge) piece 8.00 110.00 880.00
Epoxy Enamel Paint Finish ( Steel Member - 3 Coats) sq.m. 1.62 520.00 839.91

Material Cost Subtotal 25,069.14


B Total Quantity, set 1.00
C Unit Cost per Set 25,069.14
Say, 25,070.00
D Unit Cost Php 25070/ set
Republika ng Pilipinas
Lungsod ng Quezon
CITY ENGINEERING DEPARTMENT
5th, 6th, 7th Floor, QC Civic Center Building “B”
Telephone Nos. 8988-4242 Local 8538

DETAILED UNIT PRICE ANALYSIS


Item No./Description: 0.90m x 2.15m Single Wooden Panel Door
Unit of Measurement set
Derivatives
Width, m 0.90
Height, m 2.15
Assumed Quantity, sets 1.00

Name and Specification Unit Quantity Unit Cost Amount


Materials

0.90m x 2.15m Wooden Panel Door (Simple Design) set 1.00 9,675.00 9,675.00
A. 0.90m x 2.15m Wooden Door Jamb, 100mm set 1.00 2,340.00 2,340.00
Door Knob, Lever Type, Stainless, Heavy Duty set 1.00 1,400.00 1,400.00
Door Hinges, 3.5" x 3.5" (Butt Hinge) piece 4.00 110.00 440.00
Door Stopper set 1.00 179.00 179.00

Material Cost Subtotal 14,034.00


B Total Quantity, set 1.00
C Unit Cost per Set 14,034.00
Say, 14,040.00
D Unit Cost Php 14040/ set
Republika ng Pilipinas
Lungsod ng Quezon
CITY ENGINEERING DEPARTMENT
5th, 6th, 7th Floor, QC Civic Center Building “B”
Telephone Nos. 8988-4242 Local 8538

DETAILED UNIT PRICE ANALYSIS


Item No./Description: 1.00m x 2.15m Single Wooden Panel Door
Unit of Measurement set
Derivatives
Width, m 1.00
Height, m 2.15
Assumed Quantity, sets 1.00

Name and Specification Unit Quantity Unit Cost Amount


Materials

1.00m x 2.15m Wooden Panel Door (Simple Design) set 1.00 10,750.00 10,750.00
A. 1.00m x 2.15m Wooden Door Jamb, 100mm set 1.00 2,385.00 2,385.00
Door Knob, Lever Type, Stainless, Heavy Duty set 1.00 1,400.00 1,400.00
Door Hinges, 3.5" x 3.5" (Butt Hinge) piece 4.00 110.00 440.00
Door Stopper set 1.00 179.00 179.00

Material Cost Subtotal 15,154.00


B Total Quantity, set 1.00
C Unit Cost per Set 15,154.00
Say, 15,160.00
D Unit Cost Php 15160/ set
Republika ng Pilipinas
Lungsod ng Quezon
CITY ENGINEERING DEPARTMENT
5th, 6th, 7th Floor, QC Civic Center Building “B”
Telephone Nos. 8988-4242 Local 8538

DETAILED UNIT PRICE ANALYSIS


Item No./Description: 0.90m x 2.10m Single Wooden Panel Door with Louver
Unit of Measurement set
Derivatives
Width, m 0.90
Height, m 2.10
Assumed Quantity, sets 1.00

Name and Specification Unit Quantity Unit Cost Amount


Materials

0.90m x 2.10m Wooden Panel Door (Simple Design) set 1.00 9,450.00 9,450.00
0.90m x 2.10m Wooden Door Jamb, 100mm set 1.00 2,295.00 2,295.00
A.
Louver set 1.00 500.00 500.00
Door Knob, Lever Type, Stainless, Heavy Duty set 1.00 1,400.00 1,400.00
Door Hinges, 3.5" x 3.5" (Butt Hinge) piece 4.00 110.00 440.00
Door Stopper set 1.00 179.00 179.00

Material Cost Subtotal 14,264.00


B Total Quantity, set 1.00
C Unit Cost per Set 14,264.00
Say, 14,270.00
D Unit Cost Php 14270/ set
Republika ng Pilipinas
Lungsod ng Quezon
CITY ENGINEERING DEPARTMENT
5th, 6th, 7th Floor, QC Civic Center Building “B”
Telephone Nos. 8988-4242 Local 8538

DETAILED UNIT PRICE ANALYSIS


Item No./Description: 1.10m x 2.15m Single Wooden Panel Door
Unit of Measurement set
Derivatives
Width, m 1.10
Height, m 2.15
Assumed Quantity, sets 1.00

Name and Specification Unit Quantity Unit Cost Amount


Materials

1.10m x 2.15m Wooden Panel Door (Simple Design) set 1.00 11,825.00 11,825.00
A. 1.10m x 2.15m Wooden Door Jamb, 100mm set 1.00 2,430.00 2,430.00
Door Knob, Lever Type, Stainless, Heavy Duty set 1.00 1,400.00 1,400.00
Door Hinges, 3.5" x 3.5" (Butt Hinge) piece 4.00 110.00 440.00
Door Stopper set 1.00 179.00 179.00

Material Cost Subtotal 16,274.00


B Total Quantity, set 1.00
C Unit Cost per Set 16,274.00
Say, 16,280.00
D Unit Cost Php 16280/ set
Republika ng Pilipinas
Lungsod ng Quezon
CITY ENGINEERING DEPARTMENT
5th, 6th, 7th Floor, QC Civic Center Building “B”
Telephone Nos. 8988-4242 Local 8538

DETAILED UNIT PRICE ANALYSIS


Item No./Description: AWD010204 0.85m x 2.10m Wooden Panel Door (Simple Design), Indoor
Unit of Measurement set
Derivatives
Assumed Quantity, sets 1.00

Name and Specification Unit Quantity Unit Cost Amount


Materials

0.85m x 2.10m Wooden Panel Door (Simple Design) set 1.00 8,925.00 8,925.00
A. 0.85m x 2.10m Wooden Door Jamb, 4" set 1.00 1,770.00 1,770.00
Door Knob, Lever Type, Stainless, Heavy Duty set 1.00 1,400.00 1,400.00
Door Hinges, 3.5" x 3.5" (Butt Hinge) piece 4.00 110.00 440.00
Door Stopper set 1.00 179.00 179.00

Material Cost Subtotal 12,714.00


B Total Quantity, set 1.00
C Unit Cost per Set 12,714.00
Say, 12,720.00
D Unit Cost Php 12720/ set
Republika ng Pilipinas
Lungsod ng Quezon
CITY ENGINEERING DEPARTMENT
5th, 6th, 7th Floor, QC Civic Center Building “B”
Telephone Nos. 8988-4242 Local 8538

DETAILED UNIT PRICE ANALYSIS

Item No./Description: AWD010203 0.70m x 2.30 Metal Sheet Door (50mm & 25mm G.I. Pipe with 50mm x 50mm Wire Mesh )
Unit of Measurement set
Derivatives
Width, m 0.70
Height, m 2.30
Assumed Quantity, sets 1.00

Name and Specification Unit Quantity Unit Cost Amount


Materials

50mm G.I. Pipe kg 14.80 75.00 1,109.77


25mm x 2mm Flat Bar kg 4.71 75.00 353.25
Welded Wire Mesh, 2" x 2" x 2mm thk. sq.m. 1.61 213.00 342.93
A.
Plain Sheet sq.m. 1.61 382.50 615.82
38mm Ø Barrel Bolt set 1.00 1,848.70 1,848.70
Welding Rod kg 0.03 300.00 8.78
Door Hinges, 3.5" x 3.5" (Butt Hinge) piece 4.00 110.00 440.00
Epoxy Enamel Paint Finish ( Steel Member - 3 Coats) sq.m. 1.24 520.00 646.09

Material Cost Subtotal 5,365.34


B Total Quantity, set 1.00
C Unit Cost per Set 5,365.34
Say, 5,370.00
D Unit Cost Php 5370/ set
Republika ng Pilipinas
Lungsod ng Quezon
CITY ENGINEERING DEPARTMENT
5th, 6th, 7th Floor, QC Civic Center Building “B”
Telephone Nos. 8988-4242 Local 8538

DETAILED UNIT PRICE ANALYSIS


Item No./Description: AWD010202 1.40m x 2.10 Steel Gate (50mm & 25mm G.I. Pipe with 50mm x 50mm Wire Mesh )
Unit of Measurement set
Derivatives
Width, m 0.70
Height, m 2.10
Assumed Quantity, sets 2.00

Name and Specification Unit Quantity Unit Cost Amount


Materials

50mm G.I. Pipe kg 27.62 75.00 2,071.57


25mm x 2mm Flat Bar kg 8.79 75.00 659.40
A. Welded Wire Mesh, 2" x 2" x 2mm thk. sq.m. 2.94 213.00 626.22
38mm Ø Barrel Bolt set 2.00 1,848.70 3,697.40
Welding Rod kg 0.05 300.00 16.39
Door Hinges, 3.5" x 3.5" (Butt Hinge) piece 8.00 110.00 880.00
Epoxy Enamel Paint Finish ( Steel Member - 3 Coats) sq.m. 1.44 520.00 748.62

Material Cost Subtotal 8,699.59


B Total Quantity, set 1.00
C Unit Cost per Set 8,699.59
Say, 8,700.00
D Unit Cost Php 8700/ set
Republika ng Pilipinas
Lungsod ng Quezon
CITY ENGINEERING DEPARTMENT
5th, 6th, 7th Floor, QC Civic Center Building “B”
Telephone Nos. 8988-4242 Local 8538

DETAILED UNIT PRICE ANALYSIS

Item No./Description: AWD010201 1.020m x 2.10m Wooden Panel Door (Simple Design), Indoor
Unit of Measurement set
Derivatives
Width, m 1.02
Height, m 2.10
Assumed Quantity, sets 1.00

Name and Specification Unit Quantity Unit Cost Amount


Materials

1.020m x 2.10m Wooden Panel Door (Simple Design) set 1.00 10,710.00 10,710.00
A. 1.020m x 2.10m Wooden Door Jamb, 4" set 1.00 1,820.00 1,820.00
Door Knob, Lever Type, Stainless, Heavy Duty set 1.00 1,400.00 1,400.00
Door Hinges, 3.5" x 3.5" (Butt Hinge) piece 4.00 110.00 440.00
Door Stopper set 1.00 179.00 179.00

Material Cost Subtotal 14,549.00


B Total Quantity, set 1.00
C Unit Cost per Set 14,549.00
Say, 14,550.00
D Unit Cost Php 14550/ set
Republika ng Pilipinas
Lungsod ng Quezon
CITY ENGINEERING DEPARTMENT
5th, 6th, 7th Floor, QC Civic Center Building “B”
Telephone Nos. 8988-4242 Local 8538

DETAILED UNIT PRICE ANALYSIS


Item No./Description: 0.65m x 1.20m Wooden Panel Door (Simple Design), Indoor
Unit of Measurement AWD010205
Derivatives
Width, m 0.70
Height, m 2.10
Assumed Quantity, sets 1.00

Name and Specification Unit Quantity Unit Cost Amount


Materials

A. 0.65m x 1.20m Wooden Panel Door (Simple Design) set 1.00 3,900.00 3,900.00
0.65m x 1.20m Wooden Door Jamb, 4" set 1.00 816.00 816.00
Door Hinges, 3.5" x 3.5" (Butt Hinge) piece 4.00 110.00 440.00

Material Cost Subtotal 5,156.00


B Total Quantity, set 1.00
C Unit Cost per Set 5,156.00
Say, 5,160.00
D Unit Cost Php 5160/ set