Kotter’s Eight Stage Process for Creating a Major Change is one of the most widely
recognised models for Change Management, and yet there are few case studies in
the academic literature that enquire into how this Process has been used in practice.
This paper describes a Change Manager’s Action Research enquiring into the use of
this Process to manage a major organisational change. The change was initiated in
response to the organisation’s ageing workforce, introducing a knowledge
management program focusing the interpersonal aspects of knowledge retention.
Although Kotter’s Process emphasises a top-led model for change, the change team
found it was necessary to engage at many levels of the organisation to implement the
organisational change. The Process is typically depicted as a linear sequence of
steps. However, this image of the change process was found to not represent the
complexity of the required action. Managing the change required the change team to
facilitate multiple concurrent instances of Kotter’s Process throughout the
organisation, to re-create change that was locally relevant to participants in the
change process.
Keywords
1
Cite as: Pollack, J., Pollack, R. (2015) Using Kotter’s Eight Stage Process to manage an organisational change
program: presentation and practice. Systemic Practice and Action Research, DOI 10.1007/s11213-014-9317-0
Introduction
The relevance of this research becomes clear on recognising the significant divide
that has been identified between the academic and practitioner Change Management
communities. In 1993, it was identified that a boundary existed between theoreticians
and practitioners (Buchanan 1993, p.684), with both being dismissive of each others’
work, and that there was little connection between their contributions (1993, p.685).
More recently, Saka (2003, p. 481) identified a similar division between how Change
Management is described and how it is practiced. This situation has apparently not
changed, with Applebaum et al (2012, p.764) calling for a greater emphasis on
producing research in a form that is usable by those who practice Change
Management.
There appears to be little research that enquires into the practicalities of using
Change Management techniques to effect organizational change, either with regard
to their suitability or appropriateness. Although there is a significant body of literature
which provides advice for practitioners, there remains little research on how to
actually apply Change Management techniques, or critically questions their
effectiveness (Raineri 2011, p. 267); a lack to that this research helps to address.
Kotter’s (1996) Eight Stage Process of Creating a Major Change has been
recognised as one of the most well known approaches to organisational
transformation (Mento et al. 2002, p.45), as the mainstream wisdom for leading
change (Nitta et al. 2009, p.467), and the most compelling formula for success in
change management (Phelan 2005, p.47). Kotter’s work became highly sought after
by leaders of organizations who were planning on implementing organizational
change initiatives (Brisson-Banks 2010, p.248). The Process “…became an
instantaneous success at the time it was advocated and it remains a key reference in
the field of change management” (Applebaum et al. 2012, p.765).
Given the popularity of Kotter’s Eight Stage Process it may be reasonable to assume
that claims of a divide between research and practice are not relevant in this case.
However, a thorough study of the literature by Applebaum et al. (2012) has revealed
that this is not necessarily true. Their review of the Change Management literature
revealed that “…most of the evidence found during the search points to data that has
been compiled by Kotter himself … In essence Kotter validated Kotter” (Applebaum
et al. 2012, p.776). Academics appear to have used Kotter’s findings about Change
Management as if verified and tested. “Kotter’s change management model appears
to derive its popularity more from its direct and usable format than from any scientific
consensus on the results” (Applebaum et al. 2012, p.764).
A variety of reviews of the field of organisational change can be found in the literature
(e.g. Cao and McHugh, 2005). Although some authors (e.g. Tsoukas and Papoulias
2005) refer to an abundance of case studies examining organizational change, there
are few case studies of changes managed using Kotter’s Process (Applebaum et al.
2012, p.776). The weight of research that references Kotter’s work does not
investigate how the Process can be used, but instead either discusses Kotter’s
writing in the context of the broader literature on Change Management, or uses the
Process as a framework for conducting a post-hoc analysis of a change (e.g. Yauch
2
Cite as: Pollack, J., Pollack, R. (2015) Using Kotter’s Eight Stage Process to manage an organisational change
program: presentation and practice. Systemic Practice and Action Research, DOI 10.1007/s11213-014-9317-0
and Steudel 2002; Sidorko, 2008; Smith 2011; Casey et al. 2012; Nitta et al. 2009;
Goede 2011; Gupta 2011).
Studies by Cole et al (2006, p.363) and Paper et al. (2001, p.85) have found the
actual execution of a change to be one of the key factors in determining success or
failure. Of the various ways in which Kotter’s work has been used in the Change
Management literature, it is arguably Action Research, rather than literature reviews
or post-hoc analyses, that have the greater potential to contribute to improved
execution. Some case studies of changes managed using Kotter’s Process do stand
out (e.g. Springer et al. 2012; Lintukangas et al. 2009; Day and Atkinson 2004;
Ansari and Bell 2009; Joffe and Glynn 2002), and it is to this small but important
literature to which this research contributes. This research critically examines how
Kotter’s (1996) Eight Stage Process of Creating a Major Change has been used to
manage an organisational change; a process that despite its popularity, has rarely
been studied in the academic literature.
The Eight Stage Process is “...as a vision for the change process” (Mento et al. 2002,
p.45) describing a series of steps to be taken to achieve mandated organisational
changes. A wide variety of models for managing organisational change exist in the
literature (Sidorko 2008, p.307; Stewart and Kringas 2003, p.676; Buchanan 1993,
p.684; Smith 2011, p.115; Pillay et al. 2012, p.59), and is not the place of this
research to analyse Kotter’s Process in relation to other models. Readers are instead
referred to authors who have already done this (e.g. Brisson-Banks 2010; Stewart
and Kringas 2003). However, it is worthwhile to note some ways in which the
Process has been characterized: as placing a strong emphasis on leadership (Pillay
et al. 2012, p.61; Raineri 2011; Choi et al. 2011, p.12) and viewing change as top-led
(Abraham et al. 2002, p.36; Choi et al. 2011, p.12; Day and Atkinson 2004, p.258).
Kotter’s approach has also been described as focusing on organisational culture
(Casey et al. 2012, p.112), and of being typical of private sector change models
(Stewart and Kringas, 2003). Disagreement also exists, with some (Pillay et al. 2012,
p.60) describing the Process as centrally planned change, while By (2005) has
described it as emphasising an emergent, rather than a planned, approach to
Change Management.
The efficacy of Kotter’s Process has been broadly supported in the literature (e.g.
Ansari and Bell 2009, p.160; Cegielski et al. 2006, p.311). Despite its popularity, the
Process has also been criticised. It has been claimed that this, and other, Change
Management processes describe what has to be done but provide little detail in how
it should be achieved (Pfeifer et al. 2005, p.297), and that it is not sufficiently detailed
to guide Change Management in all situations (Applebaum et al. 2012, p.775).
Conversely, the Process has also been criticised as not general enough for some
kinds of change (Ansari and Bell 2009, p.157), and of being overly planned, and
3
Cite as: Pollack, J., Pollack, R. (2015) Using Kotter’s Eight Stage Process to manage an organisational change
program: presentation and practice. Systemic Practice and Action Research, DOI 10.1007/s11213-014-9317-0
therefore not representation of the realities of organisational life (Hay et al. 2001,
p.243). However, these criticisms need to be tempered by Sidorko’s (2008, p.316)
observation that “…no single model can provide a one-size-fits-all solution to
organisational change.”
Springer (2012) provides a detailed case study which reviews the use of the Process
to implement a cultural change at the Boise State University School of Nursing. The
case provides detail about the changes that were implemented within the
organisation, but does not focus on how the process was used to facilitate this
change. This case study leaves the reader with the impression use of Kotter’s
Process was uncontentious. Perhaps this was the case, although without specific
comment to this effect it is not possible to say.
The Process was also used to facilitate change in an aerospace industry study
presented by Day and Atkinson (2004). In this case, the Process was used as a
planning tool and to communicate the nature of the change to procurement functions
in the early stages of the change program. However, the practitioners in this case
study had limited success using the Process as a guide for future action, finding the
Process to be of “…limited use over and above the raising of personal awareness
about the range of factors that are to be considered throughout a change
programme…” (Day and Atkinson 2004, p.266).
Kotter’s Process was also used in the implementation of a Shell Gabon strategic cost
initiative in the initial planning phases of the change program (Ansari and Bell, 2009).
However, the change team found that not all stages of Kotter’s Process suited their
environment, needing to add other conceptual frameworks. Joffe and Glynn (2002)
also present a study of the use of Kotter’s Process in the pharmaceutical industry,
while Lintukangas et al. (2009) present a case study of a forestry company which
aimed to follow Kotter’s Process in implementing an organisational change. However,
neither of these latter two cases provide significant critical reflection on the use of the
Process, and so are of limited use in understanding how the Process can be applied
in practice.
This research was managed using Action Research (AR). There are a wide variety of
forms of AR, although it would be fair to say that most could be described as cyclic
and reflective methodologies (Swepson 2003, p. 102), which are primarily focused on
intervention, rather than observation (Midgley 2003, p. 81). AR is an approach to
research which allows a researcher to engage in an organisation, and simultaneously
create knowledge about that process (Olesen and Myers, 1999, p. 323).
4
Cite as: Pollack, J., Pollack, R. (2015) Using Kotter’s Eight Stage Process to manage an organisational change
program: presentation and practice. Systemic Practice and Action Research, DOI 10.1007/s11213-014-9317-0
systems change (Lau 1999, p. 149), and has been used to study a wide variety of
business problems, including: organisational change and transformation; marketing;
product development; manufacturing; engineering; information systems and e-
commerce; accounting; small business; and management development (Sankaran
and Tay 2003, pp. 1 - 2).
Flood (1999, p. 53) has noted the development of a unique form of AR as one of the
key strands in Checkland’s work. Checkland’s FMA model has been identified as one
of the most widely used forms of AR (Champion 2007, p. 455), and it is this model
which has been followed in this research. The main components of this model are a
research framework (F); a methodology (M); and an area of application (A). Simply,
particular "... linked ideas F are used in a methodology M to investigate an area of
interest A" (Checkland and Holwell 1998b, p. 13). Being explicit about these three
elements may lead to learning not only about the area of application, but also about
the adequacy of the methodology and the research framework (Checkland and
Holwell 1998b, p. 13). Indeed, the majority of learning resulting from the research
presented in this paper is at the level of methodology.
Clear distinction between a framework of ideas and a methodology for the organised
application of those ideas differentiates this approach to AR from others (Checkland
2003, p. 291). Most other AR "... omits the need for a declared-in-advance
intellectual framework of ideas, a framework in terms of which what constitutes
'knowledge' about the situation researched will be defined and expressed"
(Checkland and Holwell 1998a, pp. 22 - 3). What constitutes knowledge in a problem
situation should not be taken as given. In defining F, the researcher is in effect
defining the epistemology of the research and defining what will count as knowledge
(p. 24). Declaring the intellectual framework for an AR project can be thought of as a
way of contextualising the research in relation to the range of possible forms of
knowledge extant, allowing any research findings to be appropriately judged and
understood.
Data for this paper was gathered through semi-structured interviews between the
authors as a way of facilitating reflection, one of whom was the change manager for
the Knowledge Management Program at UGF. At the time of initial submission of this
research for publication, the organisational change had been running for over two
years.
The remainder of this paper will be structured according to Kotter’s Process. Each
Stage will be discussed in terms of principles for action as described in the literature,
before actions taken at UGF are examined. Observations and conclusions about the
overall use of the Process will then follow.
5
Cite as: Pollack, J., Pollack, R. (2015) Using Kotter’s Eight Stage Process to manage an organisational change
program: presentation and practice. Systemic Practice and Action Research, DOI 10.1007/s11213-014-9317-0
The first stage in Kotter’s Eight Stage Process is to create a sense of urgency; an
awareness of the need for the organisation to change. Kotter notes the failure to
create a sense of urgency to be the single biggest error made when trying to change
organisations (Kotter 2008, p.viii), and has written a whole book, A Sense of
Urgency, exclusively focusing on this stage.
Complacency, rather than a desire for change, has been identified as more likely to
be the norm in established organisations (Kotter 2008, p.15). Considerable effort may
be required to motivate organisational personnel to invest their time and effort and to
put up with the inconveniences of change (Ansari and Bell 2009, p.157).
Although in Australia the Financial and Insurance Services sector has a relatively
younger workforce than many other sectors (Department of Education, Employment
and Workplace Relations 2010, p.12), the issues that could result from a failure to
respond to their aging workforce were apparent to the senior management team at
UGF. It was identified that aging workforce issues could negatively impact upon core
business areas if left unaddressed. In particular, senior product roles were identified
as under threat, due to a lack of younger personnel able to fill these roles.
The second stage in Kotter’s Process involves forming a group who have enough
power to lead the change (Kotter 1996, p.21). Guiding coalitions for the Knowledge
Management Program were created at multiple levels. Most prominently, the
executive management coalition was championed by the CEO and direct reports,
and provided ongoing strategic direction for the program.
The General Management Advisory Group, the second coalition, was also formed to
provide project governance. It has been identified that it is often problematic to
6
Cite as: Pollack, J., Pollack, R. (2015) Using Kotter’s Eight Stage Process to manage an organisational change
program: presentation and practice. Systemic Practice and Action Research, DOI 10.1007/s11213-014-9317-0
identify isolated factors that are responsible for the successful implementation of
changes in organisations (Van der Meer 1999). However, Helm and Remington
(2005) have identified that the role of program sponsor is vital. This is particularly true
in complex organisational change programs (Remington and Pollack, 2007). The
involvement of these groups of senior personnel met the need for a strong guiding
coalition for the Program, something that Kotter (1996) identifies as essential.
A third prominent coalition was formed at a technical level of the organisation. One of
the projects within the program involved the development of a mentoring network,
using a risk based approach to knowledge management consistent with the approach
reported on by Sherman (2008). The Change Manager put considerable effort into
bonding the senior personnel invited to be coaches into a group. It was made clear
that the success of the Program depended upon their involvement and drive for
change. The group received personalised communication from the sponsor EGM and
CEO, and would go on to have guiding influence beyond the limits of their project.
The strategy to address this issue involved launching a wide variety of projects,
including: a mentoring project; developing communities of practice; role redefinition to
allow for accelerated specialist development; the introduction of a graduate program;
introduction of software supported discussion forums and analysis tools;
development of seminars focused on knowledge sharing; and a retirement
preparation project focusing on retention and workload issues. It was found that
developing a vision and gaining acceptance for projects was relatively uncontentious.
This can be attributed to broad and common acceptance of the need to change. Of
the four types of organisational change identified by Cao et al. (2004, p. 105), this
program would come to emphasise change of cultures and values.
The fourth Stage in Kotter’s Process is to communicate the vision for change.
However, Kotter notes that managers underestimate the amount of communication
required to develop a consistent understanding, an effort which may be hampered by
inconsistent messages, and lead to a stalled change implementation (1996, p.85).
Other research has observed that “…in any company there is twice as much
discussion about the weather than about new strategies” (Pfeifer et al. 2005, p.302).
7
Cite as: Pollack, J., Pollack, R. (2015) Using Kotter’s Eight Stage Process to manage an organisational change
program: presentation and practice. Systemic Practice and Action Research, DOI 10.1007/s11213-014-9317-0
Ansari and Bell (2009, p.159) have identified the need to communicate the change as
one of the two most important stages in Kotter’s Process.
The change team focused on two broad groups of activities in communicating the
vision: visible senior support; and harnessing existing activities. Senior leaders were
regularly enlisted to talk about the need for change, and this was found to be an
effective strategy in developing senior support. For instance, on one occasion it was
noted that an executive appeared bored with the progress reports he had received.
However, when he was given slides and asked to present on the topic he became
interested. In front of an audience, he was animated and engaged, and afterwards
requested more material to present. This approach of engaging senior leaders
through presentation to their teams and to other product areas was reported as
effective. It was also reported that the change team needed to take the initiative to
find new forums at which senior leaders could present, rather than assuming this
would happen without prompting. Despite CEO endorsement of the Program,
initiative could not be assumed.
The change team built on already planed activities within the organisation, often
taking senior managers’ presentation slides on other topics to draw out links to the
Program, rewriting parts of the presentations to provide examples of the importance
of the change, including for the CEO. One example included the annual CEO and
Executive road-show, which was adapted to feature a strong emphasis on the
Program. The change team also approached the EGM of HR and suggested that he
may also want to discuss the Program at the road-show. This gave the EGM of HR
an opportunity to join a politically expedient movement, and helped to promote the
Program in multiple forums; at the road-show itself, and later again when the EGM of
HR reported to his leadership team.
The fifth stage in Kotter’s Process involves removing obstacles to change, changing
structures or systems that undermine the vision, and encouraging innovative ideas
(Kotter 1996, p.21). As relationships with the communications team helped in the
previous stage, relationships with HR and other business units helped to remove
structural barriers to empowerment. For instance, unit business plans were centrally
controlled for some units, and locally controlled for others. The change team talked to
each unit individually and to the group overseeing central control of business plans to
have aspects of the Program included in all business plans. Relationships with key
personnel in HR helped to ensure approval, and when it was approved the
relationships with the communications team helped to ensure that the Program
priorities featured prominently in unit plan documentation.
8
Cite as: Pollack, J., Pollack, R. (2015) Using Kotter’s Eight Stage Process to manage an organisational change
program: presentation and practice. Systemic Practice and Action Research, DOI 10.1007/s11213-014-9317-0
Many of the blocks removed were at the project, rather than the program, level and
can be most clearly illustrated through reference to the mentoring project. To ensure
coach performance, all coaches attended training. The need for coaching training is
consistent with observations in the literature (Lubit 2001, p.176). It has been
identified that many organisations have lost the ability to coach upcoming
generations (Crawford et al. 2006, p.727). Coaches were also provided with a
resource to assist with ongoing coaching on coaching.
The sponsor encouraged coaches, protégés, and participants to experiment, with the
intention of empowering them to take independent action. Coaches were allowed to
define their coaching roles to suit their interests and skills. For instance, at one
Community of Practice it was revealed that a coach had taken his protégés on a field
trip. Another coach felt that their protégés’ negotiation skills needed to be further
developed, and engaged an external training provider. These actions were neither
suggested nor pre-sanctioned, but when revealed were actively supported.
Emphasis was also placed on ensuring that the coaches knew they had senior
management support. At one point, a coach approached the change team identifying
that a protégé’s manager was making participation in the Program difficult. The
Change Manager didn’t have the line authority to remove the block, but had access
to those who could, and did, resolve such issues.
The existing role design for many protégés also did not align with the Program goals,
with many protégé’s in generalist product roles that did not allow for rapid specialist
development. The GM who oversaw many protégés was opposed to changing their
role description, so the change team started talking to everyone they could to garner
support. Coaches were surveyed and approximately 80% identified specialisation as
the better option. It became clear that public opinion was for role specialisation and
so the GM redefined roles for the protégés.
Short-term wins help to demonstrate the viability of change and to build momentum.
Kotter (1996, p.123) identifies that short-term wins need to be visible; unambiguously
successful; and clearly related to the direction of change. Although not all
researchers consider short-term significant in all change programs (Ansari and Bell
2009, p.159), they did play a significant part in the management of the Knowledge
Management Program. The change team’s role involved less of the direct creation of
short-term wins than in advertising the successes of those wins.
Survey results were one way that the progress was advertised within UGF. For
instance, although at the time of writing it was too early to prove the impact of the
mentoring project on the speed of development of specialist product knowledge, the
project has been lauded as successes. Survey responses indicated a positive
perception of the impact on development speed. For instance, 94% of coaches had
noticed a positive change in protégés’ confidence and knowledge. Survey results
were also used in the case study documented by Springer et al (2012, p.84),
although in that case they were used to develop a sense of urgency rather than to
communicate short-term wins.
Another tactic used to raise awareness of Program progress was through storytelling.
Kotter (2008, p.54) has noted that "Neurologists say that our brains are programmed
much more for stories than for PowerPoint slides and abstract ideas”, and has
referred to “…the incredible power of good stories to influence behaviors over time…”
9
Cite as: Pollack, J., Pollack, R. (2015) Using Kotter’s Eight Stage Process to manage an organisational change
program: presentation and practice. Systemic Practice and Action Research, DOI 10.1007/s11213-014-9317-0
(Kotter 2005, p.142). Indeed, Kotter’s Our Iceberg is Melting (2005) is almost entirely
delivered through story. The significance of using metaphors and compelling stories
to develop awareness of the need for change or to explain a specific initiative has
also been identified by Roberto and Levesque (2005, p.56).
The change team sought out examples of positive change throughout UGF that
illustrated the successes of the Program, including structuring stories based on
Denning’s framework for the springboard story (2001), a story structure designed to
facilitate and encourage organisational change. Senior leaders were then supplied
with a drip-feed of new scripted stories for upcoming organisational events.
The change team found that some coaches started to comment that change was too
hard to continue; that they didn’t feel they had made progress. Many of the changes
that had already occurred were intangible and easy to forget. Communicating short-
term wins were useful in soothing flagging spirits, but finding ways of communicating
intangible and diffuse wise often required considerable effort.
At the time of interview, the Knowledge Management Program was in the seventh
stage of Kotter’s Process. The Program had gained considerable momentum through
the short-term wins, the involvement of the Program’s guiding coalitions of senior
personnel, and the persistent use all possible communication channels to increase
the visibility of the Program.
The change team now had to deal with the consequences of their success. Due to
increased access to senior management and a perception that they were on a fast-
tracked development path, participants in some projects were perceived as members
of an ‘exclusive club’. In the early stages of the Program this had contributed to an
aura of success. However, the ‘exclusive club’ approach would not suit the larger and
more inclusive group involved in the next stage of growth. The change team were
coming to terms with the need to change their personal conceptualisation of the
Program.
During Stage Seven other projects that were contributing to aligned goals and
relatable projects that were in the early stages of initiation were brought under the
Program banner. It was reported that effort was required to keep the Program true to
the vision during this stage of growth and to resist the manoeuvres of other parties
from subverting, or changing, the Program approach. For instance, some parties
were interested in changing the focus from developing interpersonal networks of
knowledge sharing to an IT-focus on developing knowledge repositories. However, it
has been identified in the literature that tacit knowledge is not easily codified and that
“While it's true that merely describing experiences to people (or telling them what to
do or giving them rules) may create some mental receptors upon which to hang
experience, the tacit dimensions of an expert's deep smarts have to be re-created to
take hold” (Leonard and Swap 2004, p.94). At UGF, knowledge was being re-created
through protégés’ vicarious experience of mentors’ stories, and access to world-
views developed over decades in the industry. A move towards a greater emphasis
on IT investment over interpersonal network development was resisted.
Stages Seven and Eight of this change process were reported as likely to take a long
time to complete. It has been noted that large scale change can take a long time to
complete, and that this is particularly true in larger organisations (Kotter 1996, p.132).
New messages were being sought to maintain organisational interest in the change.
10
Cite as: Pollack, J., Pollack, R. (2015) Using Kotter’s Eight Stage Process to manage an organisational change
program: presentation and practice. Systemic Practice and Action Research, DOI 10.1007/s11213-014-9317-0
“Whenever you let up before the job is done, critical momentum can be lost and
regression may follow. Until changed practices attain a new equilibrium and have
been driven into the culture, they can be very fragile” (Kotter 1996, p.133). As noted
by Applebaum et al. (2012, p.776) Stages 7 and 8 are complicated to evaluate. It will
likely be many years before definitive statements can be made about how well the
Knowledge Management Program was embedded in the culture of UGF.
Kotter’s Process has been described as “…structured linear steps” (Day and
Atkinson 2004, p.257), an “…’n’ step change…” process (p.265), “…a linear
progression…” (Nitta et al. 2009, p.483) or “…a sequential procedure…” (Pfeifer et
al. 2005, p.297). Indeed, Kotter (1996) identifies the “…importance of sequence…”
(p.23) and that “…skipping even a single step or getting too far ahead without a solid
base almost always creates problems” (p.23). Other writers have criticised linear
approaches as they “…they lack flexibility to deal with the vast assortment of
problems and issues that may be experienced during change” (Sidorko 2008, p.308),
and that a traditional reading of Kotter’s work does not account for how democratic
organisational change can be (Reissner et al. 2011, p.426).
It is clear from the number of authors that have interpreted Kotter’s work in this way,
that his writing gives the impression that organisational change involves one
sequence of movement through the eight Stages. However, Kotter does
acknowledge that earlier stages may have to be revisited, suggesting the possibility
of some break to the sequence. Although this research paper has related the change
at UGF in linear fashion, use of the Process in practice was found to be significantly
more complex than a single linear series of steps. The distinguishing characteristic is
not whether the change was linear or cyclic, or whether it was top-down or bottom-up
change. The distinction being made is between viewing change as one cohesive
Process or the sum or many coordinated Processes.
At UGF, there were many different stakeholder groups involved in delivering the
change; from the many guiding coalitions to project teams delivering individual pieces
of work. These different groups started the change process at different times, and
multiple concurrent instances of the Process were needed. To engage with
stakeholders it was necessary to treat them individually, not as part of a one-size-fits-
all package. Kotter’s description of the Process does not make explicit allowance for
this. Nonetheless, the Eight Stage Process was found to be an accurate description
of the change process at the individual group level. This is depicted in Figure 1.
11
Cite as: Pollack, J., Pollack, R. (2015) Using Kotter’s Eight Stage Process to manage an organisational change
program: presentation and practice. Systemic Practice and Action Research, DOI 10.1007/s11213-014-9317-0
Different stakeholder groups also moved through the stages at different speeds. For
instance, little effort was needed to develop a sense of urgency in the coalition of
EGMs. By contrast, ten months after the Program had started, the change team met
with a group of managers five levels below the CEO who had not yet had much
involvement in the Program. It was clear that the managers were not engaged.
Although the organisation was celebrating the short term wins from other parts of the
Program, this group did not understand the urgency. In order to engage this group, it
was necessary to start the change process again separately. This involved bringing
in senior managers to discuss the need for change, forming this group into their own
coalition to lead their manifestation of the change, and defining a vision for what the
change meant for them. Senior management’s vision for the change needed to be re-
created at a local level for this group to own their part of the change process.
This can also be seen in discussion of Stage 2. One interpretation of this stage
suggests the need to create a single guiding coalition. Kotter’s work tends to only
refer to a guiding coalition in the singular, and is silent on the possibility of using
multiple distributed guiding coalitions. However, Day and Atkinson criticise the idea of
a guiding coalition as unable to address a “…multiplicity of agendas…” (2004, p.265),
and it is possible that a single coalition would not have been able to address all
agendas in the Program at UGF. However, in this Program multiple guiding coalitions
were created at different organisational levels and in different areas of the
organisation. One executive coalition set the original strategy, and a second
significant coalition addressed governance issues, while a third took ownership of
two prominent projects. In addition, as the Program developed, still more groups
provided leadership for the parts of the Program that were relevant to them, with the
change management team providing a guiding force to maintain alignment between
these different groups. Each coalition was given responsibility for pushing change at
a level that was appropriate to their scope of work. This finding echoes an
observation made by Sidorko (2008, p.310).
12
Cite as: Pollack, J., Pollack, R. (2015) Using Kotter’s Eight Stage Process to manage an organisational change
program: presentation and practice. Systemic Practice and Action Research, DOI 10.1007/s11213-014-9317-0
Kotter’s work remains ambiguous and relatively silent with respect to the issue of
whether change should be managed as a single instance of his Process or as
multiple instances distributed throughout an organisation. His silence on this issue
may be deliberate, with the intention of preserving a simple account of the process of
organisational change. While this simplicity may have aided in communicating the
change process, it may also have given the impression that change in a large
organisation can, or should, be managed as a single iteration through the Process,
with all parts of the organisation moving in unison. Such an approach that would
have been problematic at UGF where different stakeholder groups started the
Process at different times, and progressed through it at different speeds.
Conclusion
This paper has discussed the case of an organisational change using Kotter’s Eight
Stage Process for Creating a Major Change at UGF, a company in the Australian
Finance and Insurance Sector. Kotter’s Process was found to be an effective way of
managing the change, although some adaptation was required to suit the Process to
the needs of the organisation. Kotter’s work has been interpreted by other authors as
suggesting that the Process should be used as a simple set of linear steps. However,
it was found that in practice the use of the Process was significantly more complex.
Although the change started with the UGF leadership team, developing momentum
within the leadership team was not sufficient to create the change. Many other
13
Cite as: Pollack, J., Pollack, R. (2015) Using Kotter’s Eight Stage Process to manage an organisational change
program: presentation and practice. Systemic Practice and Action Research, DOI 10.1007/s11213-014-9317-0
This research has contributed to a much needed link between Change Management
theory and practice. It has also contributed to the small literature which enquires how
Kotter’s Process can be applied in practice, providing some validation of one of the
more popular change models; one which has hereto been the subject of little external
practice based research. This research has provided one example, but more are
needed to enquire into how others have applied Kotter’s Process in practice so that
practitioners have greater opportunity to learn from others’ experience in changing
their organisations.
Reference list
14
Cite as: Pollack, J., Pollack, R. (2015) Using Kotter’s Eight Stage Process to manage an organisational change
program: presentation and practice. Systemic Practice and Action Research, DOI 10.1007/s11213-014-9317-0
Crampton S, Hodge J, Mishra J (1996). Transition - Ready or Not: The Ageing of America's
Work Force. Public Personnel Management 25:243-256.
Crawford L, Morris P, Thomas J, Winter M (2006) Practitioner development: From trained
technicians to reflective practitioners. International Journal of Project Management
24:722-733.
Day M, Atkinson D (2004) Large-scale Transitional procurement change in the aerospace
industry. Journal of Purchasing & Supply Management 10:257-268.
DeLong D (2004) Lost Knowledge: Confronting the Threat of an Aging Workforce. Oxford
University Press, Cary.
Denning S (2001) The Springboard. Butterworth-Heinmann, Oxford.
Department of Education, Employment and Workplace Relations (2010) Employment Outlook
for Financial and Insurance Services. Australian Government, Canberra.
Flood R (1999) Rethinking the Fifth Discipline: Learning within the unknowable. Routledge,
London.
Goede M (2011) Globalization of small islands: the role models of Curacao. International
Journal of Commerce and Management 21:192-212.
Gupta P (2011) Leading Innovation Change - The Kotter Way. International Journal of
Innovation Science 3:141-149.
Hay G, Beattie R, Livingstone R, Munro P (2001) Change, HRM and the voluntary sector.
Employee Relations 23:240-255.
Helm J, Remington K (2005) Effective Project Sponsorship: An evaluation of the Role of the
Executive Sponsor in Complex Infrastructure Projects by Senior Project Managers.
Project Management Journal 36:51-61.
Hillson D (2003) Extending the risk process to manage opportunities. International Journal of
Project Management 20:235-240.
International Atomic Energy Agency (IAEA) (2004) The nuclear power industry's ageing
workforce: Transfer of knowledge to the next generation (IAEA-TECDOC-1399).
International Atomic Energy Agency, Viena.
Joffe M, Glynn S (2002) Facilitating change and empowering employees. Journal of Change
Management 2:369-379.
Kotter J (1996) Leading Change. Harvard Business School Press, Boston.
Kotter J (2005) Our iceberg is melting. St. Martlings Press, New York.
Kotter J (2008) A sense of urgency. Harvard Business School Press, Boston.
Krail K (2005) Retaining the Retiring Nurse. Nurse leader 33-36.
Lau F (1999) Toward a framework for action research in information systems studies.
Information Technology & People 12:148-175.
Leonard D, Swap W (2004) Deep smarts. Harvard Business Review:88-97.
Lintukangas K, Peltola S, Virolainen V (2009) Some issues of supply management
integration. Journal of Purchasing & Supply Management 15:240-248.
Lubit R (2001) Tacit Knowledge and Knowledge Management: The Keys to Sustainable
Competitive Advantage. Organizational Dynamics 29:164-178.
Malone D (2002) Knowledge Management: A model for organizational learning. International
Journal of Accounting Information Systems 3:111-123.
Mento A, Jones R, Dirndorfer W (2002). A change management process: Grounded in both
theory and practice. Journal of Change Management 3:45-59.
Midgley G (2003) Science as Systemic Intervention: Some Implications of Systems Thinking
and Complexity for the Philosophy of Science. Systemic Practice and Action
Research 16:77-97.
Molineux J, Haslett T (2002) Working Within Organizational Cycles - A More Suitable Way to
Manage Action Research Projects in Large Organizations? Systemic Practice and
Action Research 15:465-484.
Nitta K, Wrobel S, Howard J, Jimmerson-Eddings E (2009) Leading Change of a School
District Organization. Public Performance & Management Review 32:463-488.
Olsen K, Myers M (1999) Trying to improve communication and collaboration with information
technology: An action research project which failed. Information Technology & People
12:317-332.
Paper D, Rodger J, Pendharkar P (2001) A BPR case study at Honeywell. Business Process
Management Journal 7:85-99.
Pfeifer T, Schnitt R, Voigt T (2005) Managing change: quality-oriented design of strategic
change processes. The TQM Magazine 17:297-308.
15
Cite as: Pollack, J., Pollack, R. (2015) Using Kotter’s Eight Stage Process to manage an organisational change
program: presentation and practice. Systemic Practice and Action Research, DOI 10.1007/s11213-014-9317-0
16