Treatment Process: Physico-Chemical Followed by Biological Oxidation Process With Return Activated Sludge Process

You are on page 1of 1

SN Tank Name Tank Size F- Board Volume HRT

Plant Details: 01 Septic/Collection Tank 3.5x2x3m (Bonded) 300mm 20m3 10hr


Sewage Flow Capacity: 2.0m3/hr. 02 Oil &Grid Tank 1x.75x2.1m 225mm 1.5m3 0.75hr
03 Equalization Tank Area: 5.75m2, H-2.1m 300mm 12m3 6hr
Treatment Process: Physico-Chemical followed by 04 Flash Mixing Tank 0.8x0.8x1.25m 150mm 0.50m3 15Min
150mm
Biological Oxidation Process 05
06
Flocculation Tank
Primary Clarifier
0.8x0.8x1.5m
Ø-2.5m, H-2.1m 150mm
0.65m3 18Min
8m3 4hr
with Return Activated Sludge Process 07 pH Correction 0.8x0.8x1.55m 150mm 0.65m3 18Min
08 Biological Tank Area: 18.87m2, H-2.1m 225mm 38m3 19hr
09 Secondary Clarifier Ø-2.5m, H-2.1m 150mm 8m3 4hr
10 Filter Feed Tank Area: 1.65m2, H-2m 300mm 3m3 1.5hr
11 Post Aeration Tank Area: 2.5m2, H-2m 300mm 5m3 2.5hr
12 Sludge Dryer Bed 3x1.5x1.5m 225mm

Temp. DO, pH & TDS Meter Inlet & Outlet


Water Flow Meter Total HRT = 38.25hr

Sludge Holding Tank


(Optional)

Chemical Dosing Unit Water Line

Air Li ne
Sludge Store
Treated Water
Storage Tank
FeSO4 BIO-101 Poly Acid
Lime

Sludge Dryer Bed

Flash Mixing Tank

Flocculation Tank

Primary Clarifier Aeration Line


Agitator Agitator
20RPM
100RPM
Rake Arm pH Controller
Secondary Clarifier Tank
Speed: 10RPM V-Notch
Recycle Activated Sludge (RAS)

Rake Arm Over Flow Drain


Plain Clarifier
Water Inlet Pipe
Plain Clarifier
Floor & Parking Wash
66.0831

Control Panel Board Roots Air Blower


MULTIGRADE SAND FILTER ACTIVATED CARBON FILTER

To Sludge Top Manhole Top Manhole

Holding Tank

Sludge Drying Bed

Bar Screen Sludge


Transfer Pump Flow Meter

G.L

Raw Drain Line Drain Line G.L

66.0831
Sewage Inlet
Toilet/Wash
Effluent
To Re-Used & Drain
Oil & Grid Separator Tank

Influent Lifting Pump

1380.66

Equalization Tank Biological Tank Filter Feed Tank Post Aeration Tank
DO Meter Garden
RAS Pump
Biological Tank
Aeration System

Equalizing of Water & Increase of Aeration/Oxidizing System Secondary Sedimentation System Advanced & RO System Reduce
Chemical &Sedimentation System
Dissolved Oxygen in Water Reduce with Control of BOD, COD & Nitrogen Reduce High TSS & Recycling of TDS, Chloride, Nitrate , Sodium &
is All ways Reduce High TSS
Sludge in Oxidizing Tank Coliforms Bacteria.
Irrigation /Land

CLIENT NAME & ADDRESS CONSULTANT NAME:


Sewage Treatment Plant for Expo Accessories Ltd.
Engr. M.M Sanjidul Islam Engr. Mohammad Ariful Molla 00 -
Expo Accessories Ltd. B.Sc in Civil, MIEB-M/31346
Biprobortha, Sadar Thana, GMP,
Gazipur, Bangladesh. 5th Floor, Sena Shopping Complex, Nabinagar, Savar Engr. Md. Suruz Zaman 30/03/2023
Hydraulic Process Flow Drawing of ETP B.Sc in Civil 02
Email: ietbd,office@gmail.com