SLP Sishen 2019
SLP Sishen 2019
SLP Sishen 2019
31 May 2016
DATE:
_______________________________
SISHEN MINE
SOCIAL AND LABOUR PLAN - LED EXTRACT
2016 - 2020
PLEASE NOTE THAT THIS DOCUMENT IS ONLY AN EXTRACT FROM SISHEN IRON ORE
COMPANY (PTY) LTD’S (SIOC) SISHEN MINE SOCIAL AND LABOUR PLAN AND THIS
EXTRACT IS PUBLISHED IN GOOD FAITH TO COMMUNICATE ENVISAGED LOCAL
ECONOMIC DEVELOPMENT (LED) PROGRAMME TO THE COMMUNITIES. SIOC IS IN NO
WAY LEGALLY BOUND TO COMPLY WITH THE LED PROGRAMME AND RESERVES THE
RIGHT TO, AT ANY TIME AMEND THE LED AS AND WHEN DEEMED NECESSARY, OR
WHERE CIRCUMSTANCES ARISE WHICH WERE NOT CONTEMPLATED OR VISUALISED BY
SIOC, OR FOR ANY OTHER REASON.
3.4 Regulation 46 (c) (iii): Sishen Mine Led Programme (2015-2019)
Sishen Mine, by conforming with the guidelines of the Social and Labour Plans and measured in
accordance with the Mining Charter Scorecard, presents its LED programme. The programme was
developed in consultation with Sishen Mine’s key stakeholders. The programme aligns itself to the
requirements below:
The LED programme has been compiled after following an intense consultation process with all local,
district and provincial authorities and other interested stakeholders in a combined forum. In
recognising broader community needs, Sishen Mine also implements projects at a provincial level in
the Northern Cape.
Sishen Mine is actively involved in the integrated development planning process of the JTG
Development node, and to this effect has funded a comprehensive rural research study that has
been adopted by the JTG District Municipality as the baseline input document used for the revision
of the JTG Integrated Development Plan.
Sishen Mine played an instrumental role in the establishment of JTG District Growth and
Development Forum (DGDF).
The following are SLP projects commitments for the three municipalities in the JTG district
Table 3.4 SLP Projects for the Gamagara Local Municipality 2016 – 2021
Mapoteng Road
Mapoteng 4 000 000
Infrastructure
Upgrade of Traffic
Department
Kathu 1,500,000
(systems and
capacity handling)
Road Maintenance
Bathlaros & Maruping 1,920,000
Table 3.6. SLP Projects for the Joe Morolong Local Municipality 2016 – 2021
Batho Pele Mobile Units 2,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000
Heuningvlei Sanitation at Ba Ga
40 000
Lotlhare H.S
Gamorona Sanitation at Ba
40 000
GaPhadima H.S
Segwaneng Sanitation at
250 000
Segwaneng P.S
Kganwane Sanitation at
40 000
Kegomoditswe H.S
Kganwane Sanitation at
40 000
Thaganyane P.S
Cassel Sanitation at
40 000
Nametsegang H.S
Sub-total: 3,000,000
3,580,000 3,000,000 3,000,000 3,000,000 3,000,000
Total 9,000,000