SAP ECC PP Vs S4 HANA PP

Detailed scheduling is added to the PP module in S4HANA. In ECC


scheduling will be available not Detailed scheduling. Detailed scheduling
means that the plan will be created week wise, Day wise and even minute
wise. Monthly plan will be distributed to weekly plan, then daily plan. If
required minute plan.
In ECC MRP will create production plan but in PPDS S4HANA Production
Planning Run will create feasible plan. In ECC you have MRP Run and but
in S4HANA you will have Production Planning run that will create feasible
plan. This will consider detailed scheduling parameters which is setup in
profiles.

Feasible plan means that when production activity needs to start and finish.
How effectively work center and resource will be used and how efficiently
production resource will be used. Maximum utilization of resources and
minimization of idleness and breakdown of resources are part of S4HANA.
The cost of the production will be optimized using the optimizer in
S4HANA. This will use Optimizer Profile setup.