CURRICULUM VITAE
Nationality : Malaysian
LANGUAGES
English – Excellent
Job Description:-
- Overall supervise site works and adjust works plan according to actual site condition
changing.
- Daily check and inspect major equipement on site to keep it under good condition.
- Measure and report daily works done.
- Provide coordination between surveyor and works team to avoid any reworks.
- Ensure site works is carried out according to PTS.
- To apply and close PTW and submit daily report on time.
- Any discrepancy between construction drawing and site condition to rise up to project
team immediately.
- Ensure project planning scheduling and purchase requisition schedule is established
and maintained.
- Drive innovation and continuous improvement by resolving problems and instituting
corrective and preventive actions and follow up audits.
- Coordinating and supervising all lifting activities in accordance with Lifting Plan and PTS.
- Ensure all lifting activites compliy with safty regulations.
- Works closely with all lifting team members.
- Briefing all lifting team members. (i.e, crane operators , riggers and signalmen) on the
Lifting Plan , risk control measure and safe lifting procedure before the commencement
of any lifting operation.
- Attend all tool box meetings.
- Correct any unsafe activities on site.
Job Description:-
- Overall supervise site works and adjust works plan according to actual site condition
changing.
- Daily check and inspect major equipement on site to keep it under good condition.
- Measure and report daily works done.
- Provide coordination between surveyor and works team to avoid any reworks.
- Ensure site works is carried out according to PTS.
- To apply and close PTW and submit daily report on time.
- Any discrepancy between construction drawing and site condition to rise up to project
team immediately.
- Ensure project planning scheduling and purchase requisition schedule is established
and maintained.
- Drive innovation and continuous improvement by resolving problems and instituting
corrective and preventive actions and follow up audits.
- Coordinating and supervising all lifting activities in accordance with Lifting Plan and PTS.
- Ensure all lifting activites compliy with safty regulations.
- Works closely with all lifting team members.
- Briefing all lifting team members. (i.e, crane operators , riggers and signalmen) on the
Lifting Plan , risk control measure and safe lifting procedure before the commencement
of any lifting operation.
- Attend all tool box meetings.
- Correct any unsafe activities on site.
Job Description:-
- Overall supervise site works and adjust works plan according to actual site condition
changing.
- Daily check and inspect major equipement on site to keep it under good condition.
- Measure and report daily works done.
- Provide coordination between surveyor and works team to avoid any reworks.
- Ensure site works is carried out according to PTS.
- To apply and close PTW and submit daily report on time.
- Any discrepancy between construction drawing and site condition to rise up to project
team immediately.
- Ensure project planning scheduling and purchase requisition schedule is established
and maintained.
- Drive innovation and continuous improvement by resolving problems and instituting
corrective and preventive actions and follow up audits.
- Coordinating and supervising all lifting activities in accordance with Lifting Plan and PTS.
- Ensure all lifting activites compliy with safty regulations.
- Works closely with all lifting team members.
- Briefing all lifting team members. (i.e, crane operators , riggers and signalmen) on the
Lifting Plan , risk control measure and safe lifting procedure before the commencement
of any lifting operation.
- Attend all tool box meetings.
- Correct any unsafe activities on site.
Job Description:-
- Overall supervise site works and adjust works plan according to actual site condition
changing.
- Daily check and inspect major equipement on site to keep it under good condition.
- Measure and report daily works done.
- Provide coordination between surveyor and works team to avoid any reworks.
- Ensure site works is carried out according to PTS.
- To apply and close PTW and submit daily report on time.
- Any discrepancy between construction drawing and site condition to rise up to project
team immediately.
- Ensure project planning scheduling and purchase requisition schedule is established
and maintained.
- Drive innovation and continuous improvement by resolving problems and instituting
corrective and preventive actions and follow up audits.
- Coordinating and supervising all lifting activities in accordance with Lifting Plan and PTS.
- Ensure all lifting activites compliy with safty regulations.
- Works closely with all lifting team members.
- Briefing all lifting team members. (i.e, crane operators , riggers and signalmen) on the
Lifting Plan , risk control measure and safe lifting procedure before the commencement
of any lifting operation.
- Attend all tool box meetings.
- Correct any unsafe activities on site.
Job Description:-
- Overall supervise site works and adjust works plan according to actual site condition
changing.
- Daily check and inspect major equipement on site to keep it under good condition.
- Measure and report daily works done.
- Provide coordination between surveyor and works team to avoid any reworks.
- Ensure site works is carried out according to SWP .
- To apply and close PTW and submit daily report on time.
- Any discrepancy between construction drawing and site condition to rise up to project
team immediately.
- Ensure project planning scheduling and purchase requisition schedule is established
and maintained.
- Drive innovation and continuous improvement by resolving problems and instituting
corrective and preventive actions and follow up audits.
- Attend all tool box meetings.
- Correct any unsafe activities on site.
Job Description:-
- Overall supervise site works and adjust works plan according to actual site condition
changing.
- Daily check and inspect major equipement on site to keep it under good condition.
- Measure and report daily works done.
- Provide coordination between surveyor and works team to avoid any reworks.
- Ensure site works is carried out according to SWP .
- To apply and close PTW and submit daily report on time.
- Any discrepancy between construction drawing and site condition to rise up to project
team immediately.
- Ensure project planning scheduling and purchase requisition schedule is established
and maintained.
- Drive innovation and continuous improvement by resolving problems and instituting
corrective and preventive actions and follow up audits.
- Attend all tool box meetings.
- Correct any unsafe activities on site.
Job Description:-
- Overall supervise site works and adjust works plan according to actual site condition
changing.
- Daily check and inspect major equipement on site to keep it under good condition.
- Measure and report daily works done.
- Provide coordination between surveyor and works team to avoid any reworks.
- Ensure site works is carried out according to PTS.
- To apply and close PTW and submit daily report on time.
- Any discrepancy between construction drawing and site condition to rise up to project
team immediately.
- Ensure project planning scheduling and purchase requisition schedule is established
and maintained.
- Drive innovation and continuous improvement by resolving problems and instituting
corrective and preventive actions and follow up audits.
- Coordinating and supervising all lifting activities in accordance with Lifting Plan and PTS.
- Ensure all lifting activites compliy with safty regulations.
- Works closely with all lifting team members.
- Briefing all lifting team members. (i.e, crane operators, riggers and signalmen) on
the Lifting Plan , risk control measure and safe lifting procedure before the
commencement of any lifting operation.
- Attend all tool box meetings.
- Correct any unsafe activities on site.
Job Description:-
- Overall supervise site works and adjust works plan according to actual site condition
changing.
- Daily check and inspect major equipement on site to keep it under good condition.
- Measure and report daily works done.
- Provide coordination between surveyor and works team to avoid any reworks.
- Ensure site works is carried out according to PTS.
- To apply and close PTW and submit daily report on time.
- Any discrepancy between construction drawing and site condition to rise up to project
team immediately.
- Ensure project planning scheduling and purchase requisition schedule is established
and maintained.
- Drive innovation and continuous improvement by resolving problems and instituting
corrective and preventive actions and follow up audits.
- Coordinating and supervising all lifting activities in accordance with Lifting Plan and PTS.
- Ensure all lifting activites compliy with safty regulations.
- Works closely with all lifting team members.
- Briefing all lifting team members. (i.e, crane operators , riggers and signalmen) on the
Lifting Plan , risk control measure and safe lifting procedure before the commencement
of any lifting operation.
- Attend all tool box meetings.
- Correct any unsafe activities on site.
Job Description :-
- Overall supervise site works and adjust works plan according to actual site condition
changing.
- Daily check and inspect major equipement on site to keep it under good condition.
- Measure and report daily works done.
- Provide coordination between surveyor and works team to avoid any reworks.
- Ensure site works is carried out according to PTS.
- To apply and close PTW and submit daily report on time.
- Any discrepancy between construction drawing and site condition to rise up to project
team immediately.
- Ensure project planning scheduling and purchase requisition schedule is established
and maintained.
- Drive innovation and continuous improvement by resolving problems and instituting
corrective and preventive actions and follow up audits.
- Coordinating and supervising all lifting activities in accordance with Lifting Plan and PTS.
- Ensure all lifting activites compliy with safty regulations.
Job Description :-
- Overall supervise site works and adjust works plan according to actual site condition
changing.
- Daily check and inspect major equipement on site to keep it under good condition.
- Measure and report daily works done.
- Provide coordination between surveyor and works team to avoid any reworks.
- Ensure site works is carried out according to SWP.
- To apply and close PTW and submit daily report on time.
- Any discrepancy between construction drawing and site condition to rise up to project
team immediately.
- Ensure project planning scheduling and purchase requisition schedule is established
and maintained.
- Drive innovation and continuous improvement by resolving problems and instituting
corrective and preventive actions and follow up audits.
- Attend all tool box meetings.
- Correct any unsafe activities on site.
Project : Seconded to Petronas Gas Bhd for Perlis LateraL Gas Pipeline, Perlis
Job Description :-
- Overall supervise site works and adjust works plan according to actual site condition
changing.
- Daily check and inspect major equipement on site to keep it under good condition.
- Measure and report daily works done.
- Provide coordination between surveyor and works team to avoid any reworks.
- Ensure site works is carried out according to SWP.
- To apply and close PTW and submit daily report on time.
- Any discrepancy between construction drawing and site condition to rise up to project
team immediately.
- Ensure project planning scheduling and purchase requisition schedule is established
and maintained.
- Drive innovation and continuous improvement by resolving problems and instituting
corrective and preventive actions and follow up audits.
- Attend all tool box meetings.
- Correct any unsafe activities on site.
Job Description :-
- Overall supervise site works and adjust works plan according to actual site condition
changing.
- Daily check and inspect major equipement on site to keep it under good condition.
- Measure and report daily works done.
- Provide coordination between surveyor and works team to avoid any reworks.
- Ensure site works is carried out according to SWP.
- To apply and close PTW and submit daily report on time.
- Any discrepancy between construction drawing and site condition to rise up to project
team immediately.
- Ensure project planning scheduling and purchase requisition schedule is established
and maintained.
- Drive innovation and continuous improvement by resolving problems and instituting
corrective and preventive actions and follow up audits.
- Attend all tool box meetings.
- Correct any unsafe activities on site.
Job Description :-
- Overall supervise site works and adjust works plan according to actual site condition
changing.
- Daily check and inspect major equipement on site to keep it under good condition.
- Measure and report daily works done.
- Provide coordination between surveyor and works team to avoid any reworks.
- Ensure site works is carried out according to SWP.
- To apply and close PTW and submit daily report on time.
- Any discrepancy between construction drawing and site condition to rise up to project
team immediately.
- Ensure project planning scheduling and purchase requisition schedule is established
and maintained.
- Drive innovation and continuous improvement by resolving problems and instituting
corrective and preventive actions and follow up audits.
- Attend all tool box meetings.
- Correct any unsafe activities on site.
1996 ~ 1997
PEREMBA CONSTRUCTION SDN. BHD.
Position : Inspector - Civil
Based at Manjung Power Plant, Teluk Rubiah, Setiawan Perak
Job Description :-
- Overall supervise site works and adjust works plan according to actual site condition
changing.
- Daily check and inspect major equipement on site to keep it under good condition.
- Measure and report daily works done.
- Provide coordination between surveyor and works team to avoid any reworks.
- Ensure site works is carried out according to SWP.
- To apply and close PTW and submit daily report on time.
- Any discrepancy between construction drawing and site condition to rise up to project
team immediately.
- Ensure project planning scheduling and purchase requisition schedule is established
and maintained.
- Drive innovation and continuous improvement by resolving problems and instituting
corrective and preventive actions and follow up audits.
- Attend all tool box meetings.
Project : Peninsula Gas Utilization Sector 2 and 3 Petronas Manjung Power Plant
1995 ~ 1996
PENS TRANSTEEL Sdn. Bhd
Position : Site Supervisor
Based at Taman Kangar, Perlis
Job Description :-
- Overall supervise site works and adjust works plan according to actual site condition
changing.
- Daily check and inspect major equipement on site to keep it under good condition.
- Measure and report daily works done.
- Provide coordination between surveyor and works team to avoid any reworks.
- Ensure site works is carried out according to SWP.
Project : Pre cast system building project in Perlis. Construct 10 storey Hotel building,
12 storey state government building, shop house
Owner :JKR State Government Perlis
Main Contractor : Pens transteel Sdn. Bhd.