Powerlayout
Powerlayout
Powerlayout
S2 S2 S
3
S
5
S
ARCHITECT ENGINEER PROJECT TITLE REPUBLIC ACT No.9266 SHEET CONTENTS REVISION / S OWNER SHEET NO.
SECTION 33: OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF JONATHAN GAN AND ASSOCIATES,
WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE
--- --- UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS AS SHOWN ON PLAN MR/MRS. -------
FOR USE IN THE REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER
EXECUTED PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF AN
ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
E-2
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
-ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND
T I N: REG. NO.: 0044079 T I N: REG. NO.: ADDRESS: PROJECT MANAGERS. CAD BY: DATE: RES. CERT. NO. DATE:
--- -CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS
PTR NO.: REG. DATE: PTR NO.: DATE: PRIOR TO COMMENCEMENT OF WORK. CHECKED BY: TIN: TCT NO.: