5th RA BILL Final
5th RA BILL Final
5th RA BILL Final
The GM
Ambuja Neotia, Urvisha Project
Newtown,
Kolkata-156
Sir,
We are hereby submitting our 4th R/A bill for the above referred work along with
measurement sheet,Abstruct of bill & Invoice.
________________________
(Signature of Contarctor with date & seal)
__________________________ _____________________________
`
TOTAL excluding Taxes 27,310,296.00 16,639,827.20 2,655,240.00 19,295,067.20
BOQ
SAC BREAD HEIGH QUANTIT
SL Description of Item UOM NO. LENGTH REMARKS
Code TH T Y
NO.
1 45008615 SURPLUS EARTH DISPOSAL:
- OUTSDE OF SITE(Mterials to be CUM
11090000 arranged by contractor)
AVG
Block-D & E & C
EGL=(+)0.194
Earth excavation out side of bolla piling CUM 1 244.800 1.356 1.500 497.923
DRAIN CUM 1 162.500 1.400 0.475 108.063
AVG
Block-A & B
EGL=(+)0.297
From grid B26 to A24 and grid 37 to 47
CUM 1 4169.357 3.665 15280.692
inside Bollah Pile (-3.325m)
Earth excavation out side of bollah piling CUM 1 201.590 1.200 1.700 411.244
DRAIN(GRID B24-A10) CUM 1 149.835 1.400 0.475 99.640
(BLOCK-B )Earth excavation in Pile Cap Pocket Cutting
Earth Excavation in 1BP CUM 7 3.240 0.400 9.072
NOT APPLICABLE
Authorised
Issued Qty Checked By Consumption Qty Checked By E Approved By Project in
Verified By Billing Engineer Representative Of
Store In Charge IC charge
Contractor