The undersigned:
1. The State of the Netherlands, which has its seat in The Hague,
represented by the [Minister of /State Secretary for …],
legally represented in this matter by
… [signatory’s name and position],
and
WHEREAS:
4. The Contracting Authority has awarded the contract as defined in the Request for
Quotations to the Contractor on the basis of the award criterion of [the best price-
quality ratio or the lowest price or the lowest costs] ;
5. This Call-off Contract lays down the specific conditions applicable to the
performance by the Contractor of the Services specified in the Request for
Quotations.
AGREE AS FOLLOWS:
1. Applicable conditions
1.2 The conditions included in the Quotation (including price indexation, discounts
and guarantees) do not apply in so far as they are less favourable for the
Contracting Authority than those included the Framework Agreement.
2.1 The Contracting Authority hereby commissions the Contractor to perform the
Services specified in the Quotation submitted on the basis of the Request for
Quotations, which commission the Contracting Authority hereby accepts, in so
2.2 The following documents together form the Call-off Contract. In the event of
inconsistencies, a higher ranked document takes precedence over a lower
ranked document:
1. this document;
2. the Framework Agreement dated [date];
3. the ARVODI 2018;
4. the Request for Quotations;
5. the other Schedules;
6. the Quotation issued by the Contractor to the Contracting Authority on [date],
ref. …...
3. Duration
3.1 This Call-off Contract enters into force on [date] and ends on [date].
OR
3.1 This Call-off Contract enters into force on [date] and lasts until the result of the
Services has been accepted by the Contracting Authority.
3.2 <OPTIONAL> If the result of the Services is provided in the form of a final report,
in accordance with articles 1.6 and 1.7 of the Framework Agreement, the
following conditions apply:
1. The Contractor will provide [number] copies of the draft report in electronic
form no later than [date]. The Contractor will make the changes requested by the
Contracting Authority to the report within [period], and submit the amended draft
report to the Contracting Authority no later than the deadline referred to in the
next sentence.
2. The Contractor will provide [number] copies of the final report in electronic and
hard copy form no later than [date], in accordance with the requirements set out
in [Schedule 1] to this Call-off Contract.
3.3 <OPTIONAL> If the Services have not been performed in full in accordance
with the Contract within the agreed or extended term, the Contractor will
The penalty will be payable to the Contracting Authority, without prejudice to all
other rights and claims, including:
a. its right to demand that the Services be performed as agreed;
b. the right to damages.
The penalty will be set off against amounts payable by the Contracting Authority
regardless of whether the right to such amounts has been assigned to a third
party.
4. Financial provisions
4.1 The following provisions apply in addition to the financial provisions of the
Framework Agreement:
In accordance with article 4.1 of the Framework Agreement, the Contractor will
perform the Services to be provided on the basis of this Call-off Contract for a
fixed total price of €… (excluding VAT).
OR
4.1 The Contractor will perform the Services to be provided under this Call-off
Contract for a price based on actual time worked, using the rates referred to in
the Quotation. <OPTIONAL> The Contractor will charge a maximum price of €…
(excluding VAT). The Contractor guarantees that this amount will not be
exceeded and that the agreed Services will be provided for this maximum
amount.
4.2 Payment will be made once the result of the Services has been received and
accepted.
OR
OR
4.2 A sum of €… (including VAT) will be paid after … (instalment(s)) have been
accepted, and the remainder after the results of the Services have been received
and accepted.
5.1 For the purpose of this Call-off Contract, the Contracting Authority’s contact is ...
and the Contractor’s contact is ... . The contacts will hold consultations on the
Contractor’s implementation of the work as frequently as the Contracting
Authority demands, and at least once per … [period]. <OPTIONAL> The
Contractor will report in writing on the progress of its work as frequently as the
Contracting Authority demands, and at least [number] per [period].
6. Place
6.1 The work will in principle be performed at the offices of [name] at [street],
[town/city].
Done on the later of the two dates stated below and signed in duplicate.
[Schedule(s):]