391.BE.01 BESTWAY CEMENT LIMITED FAROOQIA Date: 22.12.

2021

Specific Inspection Mass Flow 400 t/h

Job Plan Location Cement Transport # Stopped

Equipment: Cement transport Bucket Elevator (581.BE.01) IJP Duration : 02 Hours

Preventive Maintenance Specific Inspection


Bucket Elevator Belt Shore Hardness, Buckets Condition, Discharge Plate Gap, Bearings Condition

Additional information & reference documents


Bucket Elevator data
Bucket Elevator Make BEUMER GROUP
Bucket Elevator Type HGBW-HC 630 x 59500
Conveying Speed 1.65 m/s
Serial No 617080048.60
Motor Make MARATHON
Motor KW 110 Kw
Fluid Coupling Make VOITH
Fluid Coupling type 487TVN*
Flexible Coupling Make SIEMENS
Flexible Coupling Type FLENDER N-EUPEX B 225
Gearbox Make FLANDAR
Gearbox Type B3SH10
Line Sketch/ Photo
Procedure - Check list

Operation Description Done

10 Safety - Observe safety , apply LOTOO. v


20 Remove Inspection doors for bucket elevator. v
30 Inspect bucket elevator belt, buckets. v
40 Measure the belt shore hardness according to sketch from Point # 1 to 3 v
50 Inspect the Steel Cord joint. v Comments
60 Inspect the casing regarding cleaning v
70 Measure the radial internal clearance for tail end bearing v
80 Inspect the discharge plate gap under 10mm. v
90 Inspect the bucket elevator pit condition. v
100 Inspect and restore. v
110 Take action accordingly, if measured values reaches to alarm or action value. v
INPUT Form for Shore Hardness measurement
Front Surface of Belt Rear Surface of Belt
S. No Description
At left side of At Center At Right side of At left side At Center side of At Right side of
belt side of belt belt of belt belt belt

1 Point No.1 82 82 82 82 84 83
Point No.2 84 84 84 82 82 83
Comments
2
Point No.3 84 84 84 83 83 84
3 Condition of Buckets Good Good Good Good Good Good
Condition of belt w.r.f. cracks & Blisters
4 Good
(Bubbles)

Comments: 02 No buckets bended and 02 buckets bolts loose.

Prepared by Naeem Khan 02/02/2024 Page 1


391.BE.01 BESTWAY CEMENT LIMITED FAROOQIA Date: 25.07.2023

Specific Inspection Mass Flow 400 t/h

Job Plan Location Cement Transport # Stopped

Equipment: Cement transport Bucket Elevator (581.BE.01) IJP Duration : 02 Hours

Preventive Maintenance Specific Inspection


Bucket Elevator Belt Shore Hardness, Buckets Condition, Discharge Plate Gap, Bearings Condition

Additional information & reference documents


Bucket Elevator data
Bucket Elevator Make BEUMER GROUP
Bucket Elevator Type HGBW-HC 630 x 59500
Conveying Speed 1.65 m/s
Serial No 617080048.60
Motor Make MARATHON
Motor KW 110 Kw
Fluid Coupling Make VOITH
Fluid Coupling type 487TVN*
Flexible Coupling Make SIEMENS
Flexible Coupling Type FLENDER N-EUPEX B 225
Gearbox Make FLANDAR
Gearbox Type B3SH10
Line Sketch/ Photo
Procedure - Check list

Operation Description Done

10 Safety - Observe safety , apply LOTOO. v


20 Remove Inspection doors for bucket elevator. v
30 Inspect bucket elevator belt, buckets. v
40 Measure the belt shore hardness according to sketch from Point # 1 to 3 v
50 Inspect the Steel Cord joint. v Comments
60 Inspect the casing regarding cleaning v
70 Measure the radial internal clearance for tail end bearing v
80 Inspect the discharge plate gap under 10mm. v
90 Inspect the bucket elevator pit condition. v
100 Inspect and restore. v
110 Take action accordingly, if measured values reaches to alarm or action value. v
INPUT Form for Shore Hardness measurement
Front Surface of Belt Rear Surface of Belt
S. No Description
At left side of At Center At Right side of At left side At Center side of At Right side of
belt side of belt belt of belt belt belt

1 Point No.1 87 93 88 88 92 86
Point No.2 88 91 84 87 90 87
2
Point No.3 86 93 87 84 89 86
3 Condition of Buckets Good Good Good Good Good Good
Condition of belt w.r.f. cracks & Blisters Cracks observed on Belt. Buckets washer penetration insode belt is observed. At some points
4
(Bubbles) Steel wire exposed. Belt Condition is unsatisfactory

Comments: Spares May be arranged on Urgent basis to avoid any breakdown