GENERAL NOTE :

1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.

2. DRILLING PROCESS FOR ALL HOLE ON THIS DRAWING MUST BE HOLD

2 SEE NOTE 2

MARK PROFIL QTY REMARK


PS035B-1 P1-H100-125-1940_A5 1 SHEET 37 ISOMETRIC

A A

P1-H100-125-1940_A5
UA2-B-3/4-CS

A-A

02 17.MEI.23 F - FABRICATION MUGHNI FIKY ANDHIKA

01 01.MAR.23 F - FABRICATION IHSAN FIKY ANDHIKA

REV DATE DESCRIPTION DRAWN CHKD APPD


REVISIONS

REFERENCE
DRAWINGS TEP-1198019-E99-0015 PIPING LAYOUT

TEP-1198019-B01-0002 GENERAL ARRANGEMENT DRAWING for NHWI


DETAIL BASE DETAIL BASE
DWG NO. TITLE
ALL RIGHT RESERVED
THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND PROPERTY BP BERAU LTD. AND COPYRIGHT THEREIN IS VESTED BP BERAU LTD. NO PART OF THIS DOCUMENT, DATA,
INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF BP BERAU LTD.

TANGGUH EXPANSION PROJECT


FRONT VIEW SIDE VIEW

1 REQUIRED AS DRAWING MARKED PS035(A)


ALL SHARP EDGES MUST BE GRINDED PT. HASAKONA BINACIPTA
WITH MINIMUM 2MM OF RADIUS

DETAILED DRAWING
FOR PIPE SUPPORT NHWI B
(PS035B-1)

PURCHASE ORDER NO : @BP p.l.c. SCALE


SECURITY CLASSIFICATION:
BP INTERNAL
AS-SHOWN
COMPANY DRAWING NO. CORE SIZE REV.

TEP-1198019-C31-0002 NON CORE A1 02


SUPPLIER NUMBER CSTS NUMBER

870310-S-1198019-MEC-C31-0002