DPWH (Phase 4)
DPWH (Phase 4)
DPWH (Phase 4)
L/4 L/4
D
B L/6
L/4 L/4
PROJECT/LOCATION: SHEET CONTENTS : DRAWN BY: CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.
7
C1 C1 C1 C1 C1 C1 C1 C1 C1 C1
6750
6
C2 C2
C2 C2 C2 C2 SW1 C2 C2 C2 C2
6500
5 C2
C2 C2 C2 C2 C2 C2 C2 C2 C2
6500
39500
4 C2
C2 C2 C2 C2 C2 C2 C2 C2 C2
6500
3 C2
C2 C2 C2 C2 C2 C2 C2 C2 C2
6500
C2 C2 C2 C2 C2 C2 C2 C2
2
PROJECT/LOCATION: SHEET CONTENTS : DRAWN BY: CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.
6750
6
C2 C2
C2 C2 C2 C2 SW1 C2 C2 C2 C2
6500
5 C2
C2 C2 C2 C2 C2 C2 C2 C2 C2
6500
39500
4 C2
C2 C2 C2 C2 C2 C2 C2 C2 C2
6500
C2
3
C2 C2 C2 C2 C2 C2 C2 C2 C2
6500
C2 C2 C2 C2 C2 C2
2
PROJECT/LOCATION: SHEET CONTENTS : DRAWN BY: CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.
A DETAILED PLAN
A DETAILED PLAN
6
B DETAILED SECTION
B DETAILED SECTION
2 TYPICAL MOMENT CONNECTION DETAIL
W14X370
DETAILS OF NUTS & WASHER 3 TYPICAL MOMENT CONNECTION DETAIL
1 FOR COLUMN SPLICE CONNECTION
PROJECT/LOCATION: SHEET CONTENTS : DRAWN BY: CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.