LONG DIRECTION SHORT DIRECTION

DESCRIPTION Thickness BAR SUPPORT MIDSPAN SUPPORT MIDSPAN


(mm) DIAMETER
BOT. BARS TOP BARS BOT. BARS TOP BARS BOT. BARS TOP BARS BOT. BARS BOT. BARS
S-3 125 12mmØ 300 o.c. 300 o.c. 300 o.c. 300 o.c. 300 o.c. 150 o.c. 150 o.c. 300 o.c. ONE-WAY SLAB
S-4 125 12mmØ 300 o.c. 150 o.c. 150 o.c. 300 o.c. 300 o.c. 150 o.c. 150 o.c. 300 o.c. TWO-WAY SLAB
S-5 125 12mmØ 300 o.c. 150 o.c. 150 o.c. 300 o.c. 300 o.c. 150 o.c. 150 o.c. 300 o.c. TWO-WAY SLAB

NOTE : A.) USE FC=21 MPa (3,000 PSI)


B.) USE FY=227 MPa (GRADE 33)
C.) FOR ADJACENT SIDES OF SLAB USE THE CLOSER SPACING
D.) CONCRETE COVER = 20MM

L/4 L/4

D
B L/6

L/4 L/4

TYPICAL STEEL DECK SLAB SECTION DETAIL

PROJECT/LOCATION: SHEET CONTENTS : DRAWN BY: CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


JEANY B. TORNO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF SECURITY AND ENGINEER II
NATIONAL CAPITAL REGION
METRO MANILA FIRST ENGINEERING DISTRICT ESCORT BATTALION ADMINISTRATION AS INDICATED S-5
WEST BANK ROAD, MANGGAHAN FLOODWAY BUILDING, FORT ANDRES BONIFACIO,
PREPARED BY: TAG
ROSARIO, PASIG CITY TAGUIG CITY, PHASE IV ELINO V. CASTRO 10 13
FAUSTO F. FAUSTO MARY JESSICA P. HONRADE CHIEF, PLANNING & DESIGN SECTION LAMBERTO C. DE LEON MEDEL F. CHUA
ENGINEER II ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
A B C D E F G H I J
59000
6750 6500 6500 6500 6500 6500 6500 6500 6750

7
C1 C1 C1 C1 C1 C1 C1 C1 C1 C1

6750

6
C2 C2
C2 C2 C2 C2 SW1 C2 C2 C2 C2
6500

5 C2
C2 C2 C2 C2 C2 C2 C2 C2 C2
6500
39500

4 C2
C2 C2 C2 C2 C2 C2 C2 C2 C2
6500

3 C2
C2 C2 C2 C2 C2 C2 C2 C2 C2
6500

NOT INCLUDED IN THIS PROGRAM

C2 C2 C2 C2 C2 C2 C2 C2
2

1 GROUND FLOOR LEVEL FRAMING PLAN


6750

PROJECT/LOCATION: SHEET CONTENTS : DRAWN BY: CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


JEANY B. TORNO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF SECURITY AND ENGINEER II
NATIONAL CAPITAL REGION
METRO MANILA FIRST ENGINEERING DISTRICT ESCORT BATTALION ADMINISTRATION AS INDICATED S-6
WEST BANK ROAD, MANGGAHAN FLOODWAY BUILDING, FORT ANDRES BONIFACIO,
PREPARED BY: TAG
ROSARIO, PASIG CITY TAGUIG CITY, PHASE IV ELINO V. CASTRO 11 13
FAUSTO F. FAUSTO MARY JESSICA P. HONRADE CHIEF, PLANNING & DESIGN SECTION LAMBERTO C. DE LEON MEDEL F. CHUA
ENGINEER II ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
A B C D E F G H I J
59000
6750 6500 6500 6500 6500 6500 6500 6500 6750

6750

6
C2 C2
C2 C2 C2 C2 SW1 C2 C2 C2 C2
6500

5 C2
C2 C2 C2 C2 C2 C2 C2 C2 C2
6500
39500

4 C2
C2 C2 C2 C2 C2 C2 C2 C2 C2
6500

C2
3
C2 C2 C2 C2 C2 C2 C2 C2 C2
6500

NOT INCLUDED IN THIS PROGRAM

C2 C2 C2 C2 C2 C2
2

1 TYPICAL 2ND FLOOR TO 9TH FLOOR LEVEL FRAMING


6750

PROJECT/LOCATION: SHEET CONTENTS : DRAWN BY: CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


JEANY B. TORNO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF SECURITY AND ENGINEER II
NATIONAL CAPITAL REGION
METRO MANILA FIRST ENGINEERING DISTRICT ESCORT BATTALION ADMINISTRATION AS INDICATED S-7
WEST BANK ROAD, MANGGAHAN FLOODWAY BUILDING, FORT ANDRES BONIFACIO,
PREPARED BY: TAG
ROSARIO, PASIG CITY TAGUIG CITY, PHASE IV ELINO V. CASTRO 12 13
FAUSTO F. FAUSTO MARY JESSICA P. HONRADE CHIEF, PLANNING & DESIGN SECTION LAMBERTO C. DE LEON MEDEL F. CHUA
ENGINEER II ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
6

A DETAILED PLAN

A DETAILED PLAN

6
B DETAILED SECTION

B DETAILED SECTION
2 TYPICAL MOMENT CONNECTION DETAIL
W14X370
DETAILS OF NUTS & WASHER 3 TYPICAL MOMENT CONNECTION DETAIL
1 FOR COLUMN SPLICE CONNECTION

PROJECT/LOCATION: SHEET CONTENTS : DRAWN BY: CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


JEANY B. TORNO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF SECURITY AND ENGINEER II
NATIONAL CAPITAL REGION
METRO MANILA FIRST ENGINEERING DISTRICT ESCORT BATTALION ADMINISTRATION AS INDICATED S-8
WEST BANK ROAD, MANGGAHAN FLOODWAY BUILDING, FORT ANDRES BONIFACIO,
PREPARED BY: TAG
ROSARIO, PASIG CITY TAGUIG CITY, PHASE IV ELINO V. CASTRO 13 13
FAUSTO F. FAUSTO MARY JESSICA P. HONRADE CHIEF, PLANNING & DESIGN SECTION LAMBERTO C. DE LEON MEDEL F. CHUA
ENGINEER II ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER

You might also like