MAIN CONTRACTOR
No. Activity / description Specification / criteria Frequency Record Inspection and Acceptance Remarks / report
CON ITL COM no.
1. Pre-PCPT BS 1377 1 PCPT in every control box (25 PDF-
x 25 m) over the entire fill progress Report conform
H H W
thickness and at least 2 meters report Attachment 1
below seabed.
2. Post - PCPT BS 1377 2 PCPT (VC: centroid and third PDF-
point / RIC: off the point and on progress
Report conform
the point) in every control box report H H W
Attachment 1**
(25 x 25 m) over the entire fill
thickness*.
3. Re-post PCPT BS 1377 1 PCPT for every failed PCPT PDF-
Report conform
(misreading, inclination, refusal) progress H H W
Attachment 1**
over the entire fill thickness*. report
4. Additional post PCPT BS 1377 2 PCPT (VC: centroid and third PDF-
point / RIC: off the point and on progress
Report conform
the point) in every control box report H H W
Attachment 1**
(25 x 25 m) over the entire fill
thickness*.
* For PCPT’s done after re-compaction of VC boxes by means of RIC for the layer above +1.6mDID, PCPT’s will only be executed to a level of +1.6mDID
** For PCPT’s done after re-compaction of VC boxes by means of RIC for the layer above +1.6mDID, additional reports shall be submitted of all full depth PCPT’s
including those showing conformance below +1.6mDID
MAIN CONTRACTOR
No. Activity / description Specification / criteria Frequency Record Inspection and Acceptance Remarks / report
CON ITL COM no.
5. Re-extra post PCPT BS 1377 1 PCPT for every failed PCPT PDF-
(misreading, inclination, progress Report conform
H H W
refusal) over the entire fill report Attachment 1**
thickness*.
6. Second chance PCPT BS 1377 4 PCPT (VC: 2 centroids and 2 PDF-
third points / RIC: 2 off the progress
Report conform
point and 2 on the point) in report W H S/R
Attachment 1**
every control box (25 x 25 m)
over the entire fill thickness*.
7. Re second chance PCPT BS 1377 1 PCPT for every failed PCPT PDF-
(misreading, inclination, progress Report conform
H H S/R
refusal) over the entire fill report Attachment 1**
thickness*.
8. 4 day soaked CBR at 100% BS1377-4, sample 1 test for every 4 control boxes
PDF-third
MDD or 95% MDD or at 90% preparation according (50 x 50 m) for the runwayparty
W H S/R Form # 17
MDD to method 4 area. inspection
report
* For PCPT’s done after re-compaction of VC boxes by means of RIC for the layer above +1.6mDID, PCPT’s will only be executed to a level of +1.6mDID
** For PCPT’s done after re-compaction of VC boxes by means of RIC for the layer above +1.6mDID, additional reports shall be submitted of all full depth PCPT’s
including those showing conformance below +1.6mDID
MAIN CONTRACTOR
No. Activity / description Specification / criteria Frequency Record Inspection and Acceptance Remarks / report
CON ITL COM no.
9. 4 day soaked CBR at 100% BS1377-4, sample 1 test for every 16 control PDF-third
MDD or 95% MDD or at 90% preparation according boxes (100 x 100 m) for all of party
W H S/R Form # 17
MDD to method 4 the reclamation area except inspection
the runway. report
10. In situ field density tests BS 1377-9:1990 1 test for every control box (25 PDF-third
x 25 m) for the runway. party
H H W Form # 15
inspection
report
11. In situ field density tests BS 1377-9:1990 1 test for every control box (25 PDF-third
x 25 m) for all of the party
H H W Form # 15
reclamation area except the inspection
runway. report
12. Maximum & minimum dry ASTM D-4253 and 10 reclamation samples (5 out PDF-third
density tests ASTM D-4254 every borrow area) before start party
W W S/R Form # 119
of compaction works. inspection
report
13. Maximum dry density tests and As per TNO-5975-025: 1 test for every control box (25 PDF-third
optimum moisture content tests BS1377-4, clause 3.7 x 25 m) for the runway area. party
W H S/R Form # 119
inspection
report
MAIN CONTRACTOR
No. Activity / description Specification / criteria Frequency Record Inspection and Acceptance Remarks / report
CON ITL COM no.
14. Maximum dry density tests and As per TNO-5975-025: 1 test for every 16 control box PDF-third
optimum moisture content tests BS1377-4, clause 3.7 (100 x 100 m) for all of the party
reclamation area except the inspection W H S/R Form # 119
runway. report
15. Particle Size Distribution BS1377-2 1 test every 4 control boxes PDF-third
(50 x 50 m) for the runway party
area. inspection W H S/R Form # 22
report
16. Particle Size Distribution BS1377-2 1 test for every 16 control PDF-third
boxes (100 x 100 m) for all of party
the reclamation area except inspection W H S/R Form # 22
the runway. report
17. Liquid Limit, Plastic Limit and BS1377-2 On samples with PSD PDF-third
Plasticity Index (Atterberg indicating more than 15% fine party
Limits) material (<63μm). inspection W H S/R Form # 18
report
MAIN CONTRACTOR
No. Activity / description Specification / criteria Frequency Record Inspection and Acceptance Remarks / report
CON ITL COM no.
18. Settlement monitoring including -Settlement plates, as Settlement plates: 1 for PDF –
Settlement plates per TNO-5975-017 every 100 x 100 m fill. settlement
PDF – settlement
Magnetic probe - Magnetic Magnetic probe report W H S/R
report
extensometers extensometer, as per extensometer: derived from
TNO-5975-027 drawing 306-REC-C-381
19. Plate Loading Test for CBR HD 25/94 and BS As requested by the PDF –
PDF – settlement
1377-9 COMPANY. settlement W H S/R
report
report
LEGEND: (Inspection and Acceptance)
CON = CONTRACTOR ITL = INDEPENDENT TESTING LABORATORY COM = COMPANY
H = HOLD FOR INSPECTION W = WITNESS INSPECTION S = SURVEILLANCE INSPECTION R = REVIEW
MAIN CONTRACTOR
Inspection and/or Test Requests (ITR’s) are coded in such a way that ITR’s can be conveniently compiled and it is clear which tests are involved. Requests are
made therefore and coded separately for each type of test. Some tests with same frequency and which are executed or for which samples are taken at the same
time are requested under the same ITR code. This is the case for the CBR, PSD and MDD testing where the required in situ samples are taken at the same time
and at the same location. Above results in the following ITR coding:
For CBR, PSD, MDD the coding will be ITR-5975-CB-001 and further
For FDT the coding will be ITR-5975-FD-001 and further
For PCPT the coding will be ITR-5975-SI-001 and further
A special case is the runway area where the frequency of MDD sampling is somewhat higher than PSD and CBR samples, therefore the additional MDD sampling
ITR’s will be requested under: ITR-5975-MD-001 and further.
Form numbering
All the laboratory test reports have Form numbers (refer last column of the table above) as an ID. The form numbers can be found in the bottom left lines for each
test template provided in the attachments.
In addition all test reports will contain the Control Box ID of the sampling location and the code of the relevant ITR.
MAIN CONTRACTOR
Attachments
MAIN CONTRACTOR
0 5 10 15 20 25 30 0 0.1 0.2 0.3 0.4 0.5 0.6 -0.04 0 0.04 0.08 0.12 0.16 0.2 0 0.7 1.4 2.1 2.8 3.5 4.2
+6
+5
+4
+3
<- Depth in m to reference level
+2
+1
-1
-2
-3
-4
-5
-6
-7
-8
u2
Test according to BS 1377: Part 9: 1990 Predrill : 0
225 cm²
15 cm² G.L. 5.68 DID W.L.: 0 Date: 07-Sep-2011
CPTask V1.31
Factor of safety
Cone resistance (MPa) Friction ratio (%) against liquefaction (−)
6.5
6.0
5.5
4.5
4.0
3.5
3.0
2.5
Elevetion DID (m)
2.0
Water table (DID +1.60m)
1.5
1.0
0.5
0.0
−0.5
−1.0
−1.5
−2.0
−2.5
Seabed level (DID −2.87m)
−3.0
0 5 10 15 20 0 1 2 3 4 0 2 4
Performance line
Threshold for cohesive soil
Averaged cone resistance of Minimum FoS
TKQW10PO
TKQW10PO, TKQW30PO Calculated FoS
TKQW30PO
TKQW01PR
Factor of safety
Cone resistance (MPa) Friction ratio (%) against liquefaction (−)
6.5
6.0
5.5
4.5
4.0
3.5
3.0
2.5
Elevetion DID (m)
2.0
Water table (DID +1.60m)
1.5
1.0
0.5
0.0
−0.5
−1.0
−1.5
−2.0
−2.5
Seabed level (DID −2.87m)
−3.0
0 5 10 15 20 0 1 2 3 4 0 2 4
Performance line
Cone resistance of Threshold for cohesive soil Minimum FoS
TKQW10PO TKQW10PO Calculated FoS
TKQW01PR
Factor of safety
Cone resistance (MPa) Friction ratio (%) against liquefaction (−)
6.5
6.0
5.5
4.5
4.0
3.5
3.0
2.5
Elevetion DID (m)
2.0
Water table (DID +1.60m)
1.5
1.0
0.5
0.0
−0.5
−1.0
−1.5
−2.0
−2.5
Seabed level (DID −2.87m)
−3.0
0 5 10 15 20 0 1 2 3 4 0 2 4
Performance line
Cone resistance of Threshold for cohesive soil Minimum FoS
TKQW30PO TKQW30PO Calculated FoS
TKQW01PR
Factor of safety
Cone resistance (MPa) Friction ratio (%) against liquefaction (−)
7.5
7.0
6.5
5.5
5.0
4.5
4.0
3.5
3.0
2.5
2.0
Elevetion DID (m)
1.0
0.5
0.0
−0.5
−1.0
−1.5
−2.0
−2.5
−3.0
−4.0
−4.5
−5.0
−5.5
0 5 10 15 20 0 1 2 3 4 0 2 4
MAIN CONTRACTOR
6
Force (kN)
Top of Sample
5
4
Bottom of sample
3
0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0
Penetration (mm)
Authorized Signatory
MAIN CONTRACTOR
Contractor
Address
Client
Consultant
Project name
Project No.
Location
Test Method : BS 1377: Part 9: 1990: Clause 2.2: Amd. 8264: 1995.
Test Method Variation : The pouring cylinder was kept on the template for pouring the sand in the hole.
Remarks : Moisture content of material determined as per BS 1377: Part 2: 1990: Clause 3.2: Amd. 9027: 1996
MDD and OMC#Provided by the Contractor
Degree of compaction calculated based on the max. dry density of material and is reported to
the nearest whole no.
Note : This test is Accredited by Dubai Accreditation Center
Authorized Signatory
Form # 15 Rev 03 Rev on April 2009
MAIN CONTRACTOR
Contractor : Report No :
TEST RESULTS
Test Method : BS 1377 : Part 2 : 1990: Amd. 9027: 1996 ( Cone penetrometer )
Sample Prep Method : BS 1377 : Part 2 : 1990: Clause 4.2: Amd. 9027: 1996
Remarks : None
Authorized Signatory
This report may not be reproduced other than in full except with the prior written approval of the laboratory.
Any amendments made to this document in any way will invalidate the report.
DAS ISLAND DEVELOPMENT – PHASE III
LAND RECLAMATION AND SHORE PROTECTION AGREEMENT No.
PROJECT NO. 5975 115975C1
TITLE Ref. No.: ITP-5975-350
INSPECTION AND TEST PLAN REV. No. 7
Soil Improvement Date: 27 Nov 2011
Page: 13 of 14
MAIN CONTRACTOR
Contractor :
Address : Report No. :
Consultant : Lab. Sample No :
Client name : Lab. Project No :
Project name : Sample Size ( Kg ) :
Project No. : Coordinate :
Project Location : Date received :
Sample Description : Date test Started :
Source : Date test Completed :
Sampling Method : Report Date :
Sampled by : Tested By :
Sample brought by :
Sample No : 05
Test Data
Item
Authorized Signatory
MAIN CONTRACTOR
Test Data
Authorized Signatory