1 2 3 4 5 6 7 8 9 10 11 12 13 14

LT PANEL-1 LT PANEL-2 LEGENDS


AUXILIARY O/G AUXILIARY O/G
01 MCB

02 MCCB

A 1.9/3.3kV 1Rx4Cx16MM² AL. 1.9/3.3kV 1Rx4Cx16MM² AL. 03 RCBO A


XLPE CABLE XLPE CABLE
04 AUX. TRAFO
32A, 800V, 32A, 800V,
50kA, 1SEC, 50kA, 1SEC, 05 INVERTER
3P MCCB 3P MCCB
WITH OL/SCEF WITH OL/SCEF 06 CURRENT TRANSFORMER (CT)
PROTECTION PROTECTION

07 DELTA WINDING

08 STAR WINDING

B TRAFO 15kVA, SPD B


09
0.8/0.415kV AN,
Dyn11, Z=4.5%
(DRY TYPE) 10 DIRECT CURRENT (DC)

11 ALTERNATING CURRENT (AC)


1.1kV 1Rx4Cx120MM² AL. 12 EQUIPMENT EARTHED
PVC CABLE (10M APPROX. LENGTH)
13 L R
LOCAL & REMOTE SELECTOR SWITCH
ACDB (INDOOR)
SPD TYPE 2
LOC: MCR ROOM
10kA 14 INDICATION LAMP

C VSS V C

CT ABBREVIATIONS
30/1A A 3PH AMMETER (DIGITAL)
CL-0.5 MFM RS485
5VA ASS AMMETER SELECTOR SWITCH
ASS A CT CURRENT TRANSFORMER
63A 4P MCCB WITH MCB MINIATURE CIRCUIT BREAKER
SHUNT TRIP
THERMOMAGNETIC MFM MULTI FUNCTION METER (DIGITAL)
10kA
ON OFF TRIP AN AIR NATURAL COOLING
3Ph, 415V 100A 10KA 1 SEC AL BUSBAR WITH PVC HEAT
D SHRINKABLE SLEEVE R Y B PT POTENTIAL TRANSFORMER D
SPD SURGE PROTECTION DEVICE
RN ON RYBN ON YN ON BN ON RN ON BN ON BN ON RYBN ON RN ON BN ON RN ON RN ON YN ON BN ON 3 PH VOLTMETER (DIGITAL)
V
6A 16A 6A 6A 10A 10A 10A 16A 6A 6A 6A
6A 6A VOLTMETER SELECTOR SWITCH
16A SPN SPN TPN SPN SPN TPN SPN SPN SPN VSS
SPN DP TPN TPN
TPN MCB MCB RCBO MCB MCB MCB MCB MCB MCB
MCB MCB ELCB ELCB
ELCB 10kA 10kA 100MA 10kA 10kA 10kA 10kA 10kA 10kA 10kA
10kA 10kA C-CURVE C-CURVE
C-CURVE C-CURVE C-CURVE C-CURVE C-CURVE C-CURVE C-CURVE C-CURVE C-CURVE C-CURVE NOTES:
C-CURVE C-CURVE TIMER TIMER

1. AUX TRF IS PART OF ACDB. IT WILL BE INSTALLED INSIDE THE ACDB


PANEL.
1.1kV,1RX2C 1.1kV,1RX4C 1.1kV,1RX4C 1.1kV,1RX2C 1.1kV,1RX4C 1.1kV,1RX4C 1.1kV,1RX2C 1RX4C 1.1kV,1RX2C 1.1kV,1RX2C 2. ACDB WILL BE FLOOR MOUNTED TYPE & CABLE ENTRY SHALL BE
2.5SQMM CU 4SQMM CU 4SQMM CU 2.5SQMM CU 4SQMM CU 4SQMM CU 2.5SQMM CU 6SQMM CU 2.5SQMM CU 2.5SQMM CU
E FRLS WIRE FRLS WIRE FRLS WIRE FRLS WIRE FRLS WIRE FRLS WIRE FRLS WIRE FRLS WIRE FRLS WIRE FROM BOTTOM. E

3. ALL OUTGOING MCB'S OF ACDB WILL BE OF 'C' CURVE.


NO OF FEEDERS 1 2 3 4 5 6 7 8 9 10 11 12 13 14
3. ALL OUTGOING MCB'S OF UPS DB WILL BE OF 'D' CURVE.

WELDING SOCKET
INDOOR LIGHTING
4. ALL DETAILS OF THE PANEL ARE POSSIBLE TO SHOW IN SLD.

AUXILIARY LOAD

6/16 A, SOCKET

6/16 A, SOCKET
TRANSFORMER

LIGHTING FOR

LIGHTING FOR
SWITCHYARD

SWITCHYARD
FEEDERS

AREA-CKT-1

AREA-CKT-2
HOWEVER PANEL MANUFACTURE HAS TO FOLLOWTECHNICAL
NAME

OUTDOOR

OUTDOOR
2kVA UPS

INVERTER
BREAKER

SPARE-1

SPARE-2

SPARE-3

SPARE-4
33kV MV

SPECIFICATION FOR FURTHER DETAILS. CT, PT,BUSBAR SIZING TO BE


PANEL

NIFPS
DONE AS ER CALCULATIONS.
CONNECTED LOAD 500W 480W 2000W 200W 400W 400W 350W 3000W 500W 500W 3 x 75 MVA,
225MW PROJECT
220/33kV
AT JAGALURU,
SUBSTATION

KARNATAKA

F F

1RX4C
4SQMM CU

G 2kVA G
UPS

BATTERY
(2 Hours
back-up )

1.1kV, 4Cx6MM²
Cu., CABLE

H H

UPS DB
R1 08/02/2024 REVISED AS PER COMMENTS TP
32A R0 30/01/2024 FOR APPROVAL SP
RCBO
NO. DATE DESCRIPTION BY
1Ph, 230V 32A, 10KA 1 SEC AL BUSBAR WITH PVC HEAT 100MA
ON OFF SPV NAME: M/s Vasuprada Energy Pvt. Ltd.
SHRINKABLE SLEEVE
201, Gat nos. 109 & 111,
village – Savargaon,
ON ON ON ON ON ON ON ON ON Tal. – Tuljapur, Dist. – Osmanabad
6A 6A 6A 6A 6A 6A 10A 6A 6A DEVELOPER:
SPN SPN SPN SPN SPN SPN SPN SPN SPN
M/s SunSource Energy Pvt Ltd
I MCB MCB MCB MCB MCB MCB MCB MCB MCB SunSource Square, 5th Floor, Tower I
10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA A, Club 125, A 3,4,5, Sector 125,
D-CURVE D-CURVE D-CURVE D-CURVE D-CURVE D-CURVE D-CURVE D-CURVE D-CURVE Noida - 201301, India

EPC CONTRACTOR:
M/s TS Wind Power Developers
1RX2C 1RX2C 1RX2C 1RX2C 1RX2C 1RX2C 201, Orchid Society,
2.5SQMM CU 2.5SQMM CU 2.5SQMM CU 2.5SQMM CU 2.5SQMM CU 2.5SQMM CU Near Dr. Pai Marg, Nachiket Park,
Baner Road, Pune-411045.

NO OF FEEDERS PROJECT TITLE:


1 2 3 4 5 6 7 8 9
4.5MW AC (6.75MWp DC cap) Ground
Mounted Solar PV Project at Tuljapur
MFM METER AUX.

TRANSFORMER

DRAWING TITLE: AUXILIARY SINGLE LINE DIAGRAM


AUX. SUPPLY

AUX. SUPPLY
UPS SOCKET
EMERGENCY

J FEEDER NAME J
(ALONG WITH UPS)
SPARE-1

SPARE-2

SPARE-3
SUPPLY

OTI/WTI
LIGHTS

CCTV

PLCC

PREPARED BY : DS
CHECKED BY : SP
CONNECTED LOAD 40W 100W 1000W 20W 20W 100W APPROVED BY : AM
SCALE : NTS
DATE: 30/01/2024
DRAWING NO : SS-0150-TJR-DWG-ELE-004
SHEET NO 01 OF 02 REV: R1
1 2 3 4 5 6 7 8 9 10 11 12 13 14